Surfside Building Department | Permits, Inspections & Official Contact

Surfside Florida permit action guide

Clear Flood, Zoning, Product Approval and Miami-Dade Reviews Before a Surfside Building Permit

Surfside accepts online permit applications, but coastal construction requires more than uploading a drawing. The project may also need flood-elevation information, High-Velocity Hurricane Zone product approvals, Planning, Fire, Public Works, DERM or Miami-Dade County review.

This guide explains Tyler Customer Self Service, the physical plan-set requirement, contractor registration, owner-builder limits, Surfside’s March 10, 2026 fee guide, inspection requests, permit expiration, demolition, roofing, condo recertification and final occupancy closeout.

Tyler CSS application, plans, payment and status workflow
HVHZ NOA, Florida Product Approval and flood documentation
2026 fees, inspections, extensions and final certificates
Surfside coastal permit process A coastal building is checked against flood elevation and hurricane product approvals before plans are uploaded, inspected and finally approved. COASTAL CODE CHECK DESIGN FLOOD ELEVATION TYLER CSS PLANS + NOA REVIEW + PAYMENT PRODUCT APPROVAL INSPECT FINAL APPROVED
⚠️
Use the current portal and 2026 fee guide—not an older instruction sheet by itself. Surfside’s live Building page directs applicants to Tyler Customer Self Service. A separately linked older PDF still says “email only” and shows a 20% upfront fee, while the fee guide effective March 10, 2026 requires 30% of the estimated permit fee or the applicable base fee, whichever is greater. Start in CSS and follow the current invoice unless Building staff specifically directs an email submission.
Start here

Choose the Surfside Building Department Task You Need

Official contact panel

Surfside Building Department Phone, Address, Email and Hours

Main Town Line 305-861-4863 Ask for Building or select the applicable option
Building Official Manuel “Manny” Salazar Extension 231
Permit Email buildingapp@townofsurfsidefl.gov Use when directed or when submitting an official form
Fax 305-861-1302 Confirm acceptance before faxing
Address 9293 Harding Avenue Surfside, FL 33154
Counter Hours Monday–Friday 9:00 AM–5:00 PM
Inspection Form Building, Roofing & Trades Includes Electrical, Plumbing/Gas and Mechanical
Public Records Custodian Sandra N. McCready, MMC Town Clerk public-record requests
Inspectors work on limited schedules. Submit the inspection request early, provide a monitored email and phone number, and confirm the scheduled date. The current inspection form does not publish a universal daily cutoff or guaranteed arrival time.
Five-minute property check

Check These Conditions Before Paying for Final Plans

📍

Parcel and ownership

Confirm the correct address, legal owner, condominium unit, master parcel and location of the proposed work.

Open Miami-Dade property search

📐

Zoning district

Surfside fee and development rules differ among H30A, H30B, H30C, H40, H120 and SD-B40 districts.

Open Surfside Code

🌊

Flood elevation

Determine the FEMA zone, base-flood elevation and whether an elevation certificate or floodplain review is needed.

Open FEMA Map Service Center

🌀

HVHZ product approval

Surfside is in Miami-Dade County’s High-Velocity Hurricane Zone. Doors, windows, shutters and roofing commonly require approved assemblies.

Open Miami-Dade Product Control

🔥

Fire review

Commercial, multifamily, fire-alarm, sprinkler, occupancy and some mechanical projects require Miami-Dade Fire review.

Open Fire permit information

🚧

Public Works impact

Driveways, approaches, right-of-way work, pools, dewatering, moving and sediment control can require separate Town review.

Open Public Works forms

Condo approval does not replace a Town permit. A condominium association or architectural-review letter may be required by the property, but Building, Planning, Fire and Public Works approvals remain separate.
Permit decision table

Match the Project to the Correct Surfside Application Route

Project
Start with
Important supporting review
New single-family residence
New Single Family Residential
Survey, zoning, flood, drainage, landscaping, Public Works, Fire as applicable, energy and all trade permits
Residential addition or remodel
Residential Addition or Remodel
Site plan, existing/proposed plans, zoning, flood, structure, energy and subsidiary permits
Door or window replacement
Residential Doors or Windows
Miami-Dade NOA or Florida Product Approval, design pressures, opening sizes and installation details
Roof replacement
Residential or Commercial Roof
HVHZ roofing application, product approvals, mitigation forms, gas-vent mechanical permit and DERM for commercial/multifamily
Garage-door replacement
Residential Garage Door Changeout
Product approval, design pressure, opening dimensions and anchorage
Air-conditioning replacement
HVAC straight changeout
Equipment rating sheet, mechanical application, electrical work, flood-elevation placement and condominium approval
Electrical alteration or repair
Electrical permit
Licensed electrical contractor, electrical worksheet, service details and master-permit connection
Potable water or drainage work
Plumbing permit
Licensed plumbing contractor, 2023 Plumbing worksheet, fixtures, riser or sanitary information
Driveway or approach
Building + Public Works
Survey, impervious area, drainage, curb and gutter detail, right-of-way and construction-parking plan
Fence
Fence permit
Survey, height, material, visibility, zoning, flood, right-of-way and pool-barrier conditions
Swimming pool
Pool + subsidiary permits
Survey, barrier, electrical bonding, plumbing, dewatering, sediment control and Public Works checklist
Commercial or multifamily flooring
Flooring and Soundproofing
Association approval, floor assembly, sound transmission information and unit identification
Commercial remodel or addition
Commercial Building
Planning, accessibility, Fire, DERM, occupancy, parking, structural, electrical, mechanical and plumbing review
Whole or partial demolition
Full or Partial Demolition
Survey, owner consent, utility disconnects, asbestos/DERM, sewer cap, vermin letter, NPDES and staging
Certificate of Occupancy or Completion
CO, CC or TCO application
All final inspections, completion holds, Fire release and approved as-built documents
Tyler CSS workflow

Apply Online Without Losing the Project in Outside Review

Confirm the zoning and coastal route

Identify the zoning district, flood zone, product-approval needs, condominium conditions and outside-agency reviews before finalizing the plans.

Best first call: Ask whether the project needs Planning, Fire, DERM, Miami-Dade County or Public Works review.

Create a Tyler Portico account

Register with an email address that will be monitored during plan review, corrections, invoicing and inspections.

Select the exact permit

Open the Permits tab and choose the project-specific application. Use the master building permit for the overall project and connect subsidiary trade permits where required.

Enter a complete scope and valuation

Describe the exact work, property area, building or unit, products and systems. Include the full value of labor and materials.

Valuation warning: The Building Official may apply minimum square-foot construction values when the declared value is below the current schedule.

Upload digital plans and attachments

Attach site plans, construction details, equipment rating sheets, surveys, calculations and Miami-Dade NOAs or Florida Product Approvals.

Organize by discipline: Architectural, structural, electrical, mechanical, plumbing, civil and supporting approvals should be easy to identify.

Complete contractor registration

The contractor’s Florida or Miami-Dade credentials, insurance, workers’ compensation information, driver identification and business-tax documentation must be current.

Annual cycle: Surfside contractor registration runs October through September and is due for renewal by September 30.

Pay the current upfront amount

The fee guide effective March 10, 2026 lists an upfront processing amount equal to 30% of the estimated permit fee or the applicable base fee, whichever is greater.

Do not use the older 20% figure: Follow the amount generated by the current Town invoice.

Obtain the Surfside application number

Use the Town application number when submitting plans to Miami-Dade County, DERM or Fire for any required outside review.

Monitor comments and resubmit correctly

Correct every rejection, label the revised plans and use the Town’s revision or resubmittal process rather than creating an unrelated new application.

Repeated rejection fee: The first and second plan re-reviews are listed at no charge; repeated unresolved code comments can trigger a per-discipline fee after later reviews.

Deliver the final physical drawing set

Surfside’s current CSS instructions state that a final physical copy of the drawings is required before permit issuance.

Do not deliver an early draft: Confirm the format and number of final approved sets with the permit clerk.

Pay the final invoice and obtain the permit

After all required reviews are approved, the Town emails the payment notice. Pay the invoice and obtain the official permit card before work begins.

Upload and plan checklist

Prepare the Files the Reviewer Actually Needs

Property documents

  • Current survey
  • Site plan and lot dimensions
  • Existing and proposed structures
  • Flood-zone information
  • Base-flood elevation
  • Condo authorization when applicable

Construction documents

  • Floor plans
  • Elevations and sections
  • Foundation and framing
  • Structural calculations
  • Electrical and mechanical plans
  • Plumbing and gas plans

Coastal product documents

  • Miami-Dade NOA
  • Florida Product Approval
  • Design-pressure schedule
  • Opening dimensions
  • Anchorage and installation details
  • Roof system and uplift calculations
Document problem
Why it delays Surfside review
Better submission
NOA without selected option
The reviewer cannot identify the exact glass, frame, anchorage or substrate
Mark the approved product option and installation details used on the project
Florida approval for the wrong code edition
The product may not be approved under the current Florida Building Code
Use the current 2023-code approval record and verify HVHZ applicability
Survey lacks proposed work
Planning and flood reviewers cannot confirm location, setbacks or coverage
Show all existing and proposed improvements with dimensions
Plans omit design pressures
Doors, windows, roofing and cladding cannot be matched to approved products
Provide a signed design-pressure schedule and product-specific information
Condo unit not identified
The reviewer cannot connect the work to the correct unit and master building
Use the full address, unit, building name and master permit where applicable
Revisions mixed with old pages
Reviewers cannot determine which sheets control
Upload a complete revised discipline set with revision clouds and dates
Flood and hurricane-zone command board

Design for Surfside’s Coastal and High-Wind Conditions

Floodplain questions

  • What FEMA flood zone applies?
  • What is the base-flood elevation?
  • Does the Town require a design-flood elevation above BFE?
  • Is the work a substantial improvement or repair of substantial damage?
  • Will mechanical or electrical equipment remain below the required elevation?
  • Does enclosed lower-level space meet flood-opening and use restrictions?
  • Is an elevation certificate required before, during or after construction?

HVHZ product questions

  • Is the product approved for the Miami-Dade High-Velocity Hurricane Zone?
  • Does the approval cover the exact size and configuration?
  • Does the design pressure meet the project-specific pressure?
  • Is the substrate listed in the approval?
  • Are fastener type, spacing and edge distances shown?
  • Is the glass impact-rated or protected by an approved shutter?
  • Does the roof assembly match the tested and approved system?

Door and window replacement

Upload the product approval, selected approval pages, opening schedule, design pressures, glass information and anchorage details.

Roof replacement

Provide the HVHZ roofing application, approved assembly, uplift or pressure calculations, mitigation forms and required DERM review for commercial or multifamily work.

Exterior equipment

Show elevation, anchorage, wind resistance, flood protection, service access and screening for condensers, generators and rooftop equipment.

A product approval is not a design. The architect or engineer must still select the correct approved configuration, confirm project pressures and show how the product connects to the actual building.
Outside-review matrix

Know Which Agency Reviews Each Part of the Project

Review
Common trigger
Do this before final permit issuance
Surfside Planning/Zoning
New structure, addition, fence, driveway, lot coverage, use, height, setbacks, signage or parking
Provide site and zoning information and resolve any required Board or Commission approval
Miami-Dade Fire
Commercial, multifamily, occupancy, alarm, sprinkler, suppression and selected mechanical projects
Use the Surfside application number and submit the applicable Fire plans
DERM
Commercial/multifamily roofing, asbestos, demolition, environmental or sanitary conditions
Obtain the DERM review or stamp identified by the permit checklist
Public Works
Driveway, approach, right-of-way, pool dewatering, sediment control, moving or curb work
Submit the applicable Public Works checklist, detail and permit application
Miami-Dade Product Control
Windows, doors, shutters, roofing and other exterior-envelope systems
Submit a current HVHZ NOA or qualifying Florida Product Approval
Condominium Association
Work inside or affecting a condominium unit, common element or building envelope
Obtain the association authorization required by the property
FPL or utility
Electrical service, temporary power, demolition or utility release
Coordinate disconnect, service and power-release documents
Contractor and owner-builder rules

Register the Contractor Annually or Accept Full Owner-Builder Responsibility

Contractor registration package

  • Current Florida state license or Miami-Dade Certificate of Competency.
  • State registration when required.
  • Liability and workers’ compensation insurance naming the Town of Surfside as certificate holder.
  • Qualifier’s driver license.
  • Applicable local business-tax receipt or business license.
  • All documents in the same company or individual name.
  • Annual renewal by September 30.

Owner-builder restrictions

  • The owner must personally appear at the Building Department to sign the affidavit.
  • The owner becomes the legally and financially responsible contractor of record.
  • The property generally must be for the owner’s use or occupancy.
  • A one- or two-family residence may qualify under the statutory exemption.
  • A qualifying commercial owner-builder project is limited by the current Florida statutory cost threshold.
  • The owner may not use the exemption to hire an unlicensed person as the real contractor.
  • Sale or lease within one year can create a legal presumption that the work was done for sale or lease.
Owner-builder does not mean hands-off owner. The owner must directly supervise unlicensed employees, comply with employment and workers’ compensation laws and verify every licensed trade contractor.
Effective March 10, 2026

Build the Fee Budget in Layers Rather Than Using One Percentage

Charges applied broadly

  • Upfront processing: 30% of estimated permit fee or applicable base fee, whichever is greater.
  • Town training, safety and technology: 6% of the building permit fee.
  • Florida Building Code surcharge: 1% of permit fee, $2 minimum.
  • Building administrator and inspector fund: 1.5%, $2 minimum.
  • Miami-Dade code-compliance surcharge: $0.60 per $1,000 of work valuation.
  • Sanitation: 0.30% of job value, $15 minimum and $1,530 maximum.
  • Construction Parking Plan: $144 where required.

Possible department add-ons

  • Planning review
  • Fire review
  • Public Works review
  • Electrical, Mechanical and Plumbing permits
  • Revision and resubmittal fees
  • Private-provider administration
  • Certificate of Occupancy or Completion
  • Records, extension, renewal and reinspection charges
Current fee item
Published 2026 amount
How to use it
H30C, H40, H120 or SD-B40 new construction minimum
$350
Minimum before valuation formula and surcharges
H30C, H40, H120 or SD-B40 alteration minimum
$250
Minimum before valuation formula and surcharges
H30A or H30B new construction minimum
$350
Minimum before valuation formula and surcharges
H30A or H30B alteration minimum
$150
Minimum before valuation formula and surcharges
Residential swap-out minimum
$150
Examples include selected water-heater or AC replacement permits as determined by Building Official
Residential valuation rate
Base fee + 1.5% of construction cost
Subject to district minimums and Building Official valuation review
Commercial valuation rate up to $50 million
Base fee + 2.5% of construction cost
Higher-value projects use the additional tiers in the guide
Minimum construction valuation
$400 per sq. ft.
Unless Building Official approves another value
Detached single-family minimum valuation
$250 per sq. ft.
Unless Building Official approves another value
Planning review
0.75% of construction cost; $75 minimum
Applied where the Building permit requires Planning review
Fire review
$75 minimum
Uses applicable Miami-Dade Fire Prevention fee schedule
Public Works review
0.50% or 0.75%; $75 minimum
Rate depends on zoning district and project subtype
Residential CO in H30A or H30B
$400 per unit
Due for the applicable occupancy certificate
Other occupancy CO
$0.07 per sq. ft.; $400 minimum
Applies to occupancies outside the H30A/H30B residential-unit category
Change of contractor
$124
Requires the Town’s change form and supporting documents
Change of architect or engineer
$124
Requires a formal professional-of-record change
Reinspection
$104
Can apply after failed, incomplete or inaccessible work
One-time permit extension
$124
Permit must not already be expired
Late repeated plan re-review
$350 per discipline
Can apply after repeated failure to correct the same noted code rejection
Building recertification
$500 per building
Eligible condo associations may separately qualify for the 2026 Town grant

Illustrative residential alteration

For a $25,000 residential alteration in an H30A or H30B district:

$150 base + 1.5% × $25,000 = $525 core permit calculation

The Town then adds applicable state, county, technology, sanitation, Planning, Public Works, trade and certificate charges. Use the issued invoice as the final amount.

Upfront amount concept

If the estimated permit fee were $525:

30% × $525 = $157.50

The current guide requires the greater of that 30% amount or the applicable base fee. The portal invoice controls the amount due.

Do not estimate from the old page or old PDF. Surfside’s current fee guide is effective March 10, 2026 and contains marked changes to several former amounts.

Open the March 10, 2026 Fee Guide

Inspection command board

Request the Correct Trade Inspection and Keep the Work Exposed

Inspection request form

Select Building, Roofing, Electrical, Plumbing/Gas or Mechanical and enter the exact inspection type.

Permit information

Provide the property address, master permit number, subsidiary permit number, requester name, email and phone.

Scheduling

Submit through the portal or current Town process and confirm the date because inspectors are not always onsite full time.

Common stage
What should be ready
Do not do this first
Footing or foundation
Excavation, forms, reinforcement, dimensions and approved site plans visible
Pour or backfill before approval
Underground plumbing, gas or electrical
Piping, conduit, bonding, testing and protection visible
Cover trenches or pour slabs
Roofing
Approved roof system, deck condition, fastening, dry-in and required photographs or affidavits
Cover required stages before the roofing inspection
Rough structural
Framing, connections, fireblocking, openings and approved revisions complete
Install insulation or finishes
Rough trades
Complete wiring, piping, gas, ductwork and equipment connections visible
Conceal regulated work
Window or door installation
Product labels, anchorage, fastener spacing, substrate and opening protection available
Cover anchors or remove approval labels too early
Flood elevation
Required surveyor or elevation documentation for the construction stage
Proceed past an elevation hold without approval
Trade finals
Systems operational, tested, labeled and safely accessible
Request final Building while subsidiary permits remain open
Final Building / CO / CC
All work complete, corrections resolved, outside releases approved and final documents submitted
Occupy the space before the required certificate

Keep onsite

  • Issued permit card
  • Approved physical plans
  • Approved revisions
  • Product approvals
  • Engineer letters or affidavits
  • Safe inspector access

Prevent a reinspection fee

  • Correct trade selected
  • Work complete for the stage
  • Prior corrections resolved
  • Address and unit visible
  • Doors and gates unlocked
  • Required contractor available
Do not schedule a “check progress” visit as a final inspection. The current fee schedule lists a $104 reinspection charge, and repeated inspections may be assessed under Florida law.

Open the Inspection Request Form

Roofing and openings

Use the Complete HVHZ Package for Roofs, Windows and Doors

Roof permit package

  • Building permit application.
  • High-Velocity Hurricane Zone roofing application.
  • Selected roofing system and product approval.
  • Roof pressure or uplift calculations where required.
  • Hurricane Mitigation Retrofit Form.
  • Roof-to-wall connection affidavit based on the applicable single-family valuation category.
  • DERM approval for commercial and multifamily roofs.
  • Mechanical permit when a gas vent is affected.

Window, door and garage-door package

  • Opening schedule with exact dimensions.
  • Project-specific design pressures.
  • Current Miami-Dade NOA or Florida Product Approval.
  • Selected glass, frame and installation option.
  • Fastener, spacing, edge-distance and substrate details.
  • Impact protection information.
  • Condominium or owner authorization.
  • Electrical permit for powered shutters or doors where applicable.
Commercial or multifamily roof: Do not wait until the end of Town review to discover the DERM approval is missing. Include the Town application number when submitting to the outside agency.

Open Surfside Roofing Requirements

Pools, driveways and right-of-way

Coordinate Private-Lot Work With Public Works Before Construction

Pool workflow

  1. Show the pool, deck and equipment on the survey.
  2. Confirm zoning and flood requirements.
  3. Submit Building, Electrical and Plumbing permits.
  4. Show the code-compliant pool barrier.
  5. Submit sediment-control and dewatering information.
  6. Protect the street, drains and neighboring property.
  7. Pass bonding, piping, barrier and final inspections.

Driveway workflow

  1. Show existing and proposed driveway areas on a survey.
  2. Identify impervious and pervious area.
  3. Show whether curb and gutter are disturbed.
  4. Use the Town’s driveway and curb-transition details.
  5. Apply for Building and Public Works review.
  6. Maintain drainage and right-of-way access.
  7. Obtain final Public Works and Building approval.
No pool water into the street or storm drain without approval. Follow the Town’s dewatering and sediment-control procedures before pumping or draining a pool.
Whole-structure demolition

Complete Utility, DERM and Site-Control Steps Before Demolition Issuance

Single-family demolition checklist

  • Plumbing permit to cap sewer and turn off water.
  • Approved cap inspection before demolition-permit issuance.
  • Executed demolition application.
  • Sealed survey not more than two years old.
  • Notarized owner demolition consent.
  • Proof of ownership and legal authorization where needed.
  • Asbestos report and DERM review, or qualifying architect/engineer certification.
  • Utility disconnect letters.
  • Vermin-clear letter.
  • NPDES sediment-control form.

Commercial and multifamily additions

  • Applicable demolition checklist items.
  • Underground utility demolition plan by a civil engineer.
  • Engineer’s acceptance of the underground demolition work.
  • Construction circulation and staging plan.
  • Construction trailer permit.
  • Construction-fence permit.
  • Public Works and Fire coordination.
  • Temporary-shoring design where required.
Partial demolition is a separate portal category. Select the scope that accurately reflects the project rather than using a whole-structure application for exploratory or limited demolition.

Open the Demolition Checklist

Condo and older-building safety

Use the Current Miami-Dade Recertification Thresholds

The Town webpage is still titled “40-Year Recertification,” but current Miami-Dade rules are broader. Do not wait for a building’s 40th year without checking whether the 25-year coastal or 30-year requirement already applies.
Building category
Current initial cycle
Later cycle
Coastal condominium or cooperative, three stories or taller, built on or after 1998 and within three miles of coastline
25 years
Every 10 years
Other covered building built on or after 1993
30 years
Every 10 years
Buildings already on an older established cycle
Follow the notice and applicable transition rule
Usually every 10 years
Single-family, duplex or qualifying minor structure
Generally excluded
Confirm building-specific status

After receiving the notice

  1. Hire qualified Florida-licensed design professionals.
  2. Use the current Miami-Dade report templates.
  3. Complete structural and electrical inspections.
  4. Include required photographs and certifications.
  5. Submit reports within the stated 90-day notice period.
  6. Obtain permits for required repairs.
  7. Complete repairs and final recertification review.

Important report components

  • Foundation and settlement conditions.
  • Structural frame, balconies and railings.
  • Façade, cladding and attached elements.
  • Roof, parapets and unusual structural features.
  • Electrical systems and required infrared thermography.
  • Parking-lot illumination certification.
  • Waterway guardrail certification where applicable.
  • Unpermitted alterations and unsafe-structure records.
Possible 60-day extension: The Building Official may consider a signed and sealed professional request stating that the building may remain occupied during the extension. File before the deadline and expect an extension fee.

Surfside 2026 Recertification Permit Fee Grant

  • Available to eligible condominium associations—not individual unit owners.
  • Covers reimbursement of municipal recertification permit fees, including structural and electrical review fees.
  • Does not cover engineering, repairs, construction, legal services or fines.
  • Maximum award: up to $200,000 per eligible building per recertification cycle.
  • Subject to available funds and first-qualified review.
  • Requires proof of payment, recertification documentation, board authorization, W-9 and payment information.
Permit life, changes and closeout

Request Extensions Before Expiration and Keep the Professionals of Record Current

Permit inactivity

Issued permits with no qualifying activity for 180 days can enter the Town’s renewal process.

  • Schedule inspections as work progresses.
  • Do not wait until the permit is expired.
  • Check every subsidiary permit separately.

Extension

The current schedule lists a one-time extension request at $124 when the permit is not expired.

  • File before expiration.
  • Explain the delay.
  • Provide professional confirmation where needed.

Expired permit renewal

The fee schedule lists 25% of the original permit fee plus a processing amount equal to the applicable minimum permit fee.

  • Outside-agency fees are handled under the current renewal rule.
  • Final-only reopenings use a separate minimum-fee provision.
Project change
Required Town action
Do not do this
Design or scope changes
Submit revised plans and the revision/resubmittal form
Construct the revision before approval
Change of contractor
Submit the hold-harmless change form and current contractor registration
Allow the replacement contractor to work under the former contractor’s permit access
Change of architect or engineer
Submit the professional-of-record change documentation
Upload conflicting sealed plans from two professionals without formal transfer
Private provider
Submit the Notice to Building Official and complete program forms
Use private-provider inspections before Town acceptance
Temporary occupancy
Apply for TCO or TCC after required temporary inspection and completion holds are resolved
Occupy without the issued temporary certificate
Final approval is permit-specific. A final Building inspection does not automatically close Electrical, Plumbing, Gas, Mechanical, Fire, Public Works or recertification repair permits.
Construction-site rules

Keep Work Inside Surfside’s Permitted Construction Schedule

Standard construction hours

  • Monday–Friday: 8:00 AM–6:00 PM.
  • No standard permitted construction on Saturday.
  • No standard permitted construction on Sunday.
  • No standard permitted construction on legal holidays.
  • Special authorization may be required for emergency or exceptional work.

Construction Parking Plan

  • Provide onsite parking for workers assisting with the improvement when required.
  • Submit the Construction Parking Plan before mobilization.
  • Current published fee: $144.
  • Do not block sidewalks, drives or emergency access.
  • Coordinate trailers, fencing, dumpsters and deliveries.
Beachfront work: Sea-turtle lighting, dune protection, sand disturbance and beach access can require environmental approvals outside the Building permit.
Permit search and property due diligence

Search CSS, Then Request the Missing Historical File

Open Tyler Customer Self Service

Use the portal to search permit records, invoices, applications and saved work.

Search the exact property and unit

Use the full address, condominium unit, owner and permit number when available.

Open the master permit

Review the scope, applicant, contractor, fees, review comments, inspections and issuance status.

Do not stop at “Issued.” Issuance proves permission to begin, not successful closeout.

Find every subsidiary permit

Search Electrical, Plumbing, Gas, Mechanical, Roofing, Fire and Public Works approvals connected to the project.

Confirm final inspection results

Check that failed or cancelled inspections have later approved results and that every trade reached final status.

Confirm CO or CC issuance

New buildings, changed occupancies and applicable commercial or multifamily projects require the correct occupancy or completion certificate.

Request older records

Use Surfside’s public-record process for historical permits, inspection logs, reports or plans not available through CSS.

Save the closeout file

Keep the permit card, final inspections, approved plans, elevation documents, product approvals and CO or CC with the property records.

Condominium buyer or seller: Confirm both the individual unit permits and any master-building permits that affected windows, balconies, structure, roofing, fire systems or recertification repairs.
Status decoder

What Common Portal and Permit Stages Mean

Saved work The application is still a draft and has not entered formal review.
Submitted Surfside received the application, but completeness and routing remain.
Outside review Planning, Fire, DERM, Miami-Dade or Public Works approval remains open.
Corrections required Plans, product approvals, valuation, license or another document must be revised.
Invoice issued A Town-calculated upfront or final payment is due.
Permit issued The official permit is active; obtain and post the permit card.
Finals pending One or more Building, trade or outside-agency approvals remain incomplete.
CO, CC or final approved Save the certificate and verify every connected permit is also closed.
Current code framework

Surfside Currently Uses the Eighth Edition Florida Building Code

Florida Building Code

The Eighth Edition (2023) became effective December 31, 2023 and remains the current adopted edition as of this review.

Open Florida Building Code

High-Velocity Hurricane Zone

Miami-Dade HVHZ requirements affect wind design, exterior-envelope products, glazing, roofing and installation details.

Open Product Control

Surfside local code

Town ordinances add zoning, parking, construction-site, planning, recertification and local permit requirements.

Open Town Code

Code-transition warning: Florida is developing its next code edition, but use the code legally in effect when the Surfside application is filed—not a draft future edition.
Troubleshooting

Fix Common Surfside Permit Problems

Problem
Likely reason
Best next action
Portal account will not register
Cookies are disabled, browser session expired or duplicate email exists
Enable cookies, refresh Tyler Portico and use password recovery before creating another account
Application remains incomplete
Required field, contractor registration, survey, plan or product approval is missing
Review every portal section and upload the complete checklist
Upfront charge does not match older PDF
The older submittal sheet says 20%, but the March 2026 fee guide says 30%
Use the current Town invoice and 2026 fee guide
Door or window plans rejected
NOA, selected approval pages, pressure schedule or anchorage details are incomplete
Match the exact product to the project pressures and substrate
Roof permit waiting on another agency
Commercial or multifamily DERM approval, mitigation document or mechanical permit is missing
Complete the roofing checklist and outside review
Permit waiting on Fire
Fire alarm, sprinkler, occupancy or commercial review remains open
Use the Surfside application number to track the Miami-Dade Fire submission
Inspection cannot be completed
Wrong trade, no access, work incomplete, plans missing or installation concealed
Correct the readiness issue before requesting reinspection
Permit expired with only finals missing
No qualifying activity occurred for the permitted period
Ask about the current minimum-fee reopening process for final inspections
Recertification notice seems early
A coastal three-story condo may be on the 25-year cycle rather than the old 40-year rule
Confirm the cycle using current Miami-Dade requirements and the Town notice
Final occupancy is blocked
Building, Fire, Planning, trades, elevation, as-built or completion holds remain open
Request a permit-by-permit final-status list before applying for CO or CC
Ready-to-use scripts

What to Say When You Contact Surfside

Permit-route question
“I am planning [exact work] at [full address and unit]. Can you confirm the required Building, Planning, Fire, DERM, Public Works, flood and trade reviews before I submit?”
Product-approval question
“The project uses [manufacturer/model] at [opening or roof area]. Which Miami-Dade NOA or Florida Product Approval pages, pressures and installation details must be marked?”
Inspection request
“I need the [trade and inspection type] for master permit [number] and subsidiary permit [number] at [address]. The work is complete, exposed and safely accessible.”
Open-permit question
“The permit record for [address] does not show final approval. Which Building, trade, Fire, Planning, elevation, as-built or certificate requirement remains?”
Final project checklist

Do Not Consider the Surfside Project Finished Until These Are Complete

  • Property and owner verified
  • Zoning district confirmed
  • Flood zone and elevation checked
  • Condo approval obtained when required
  • Correct CSS permit selected
  • Complete scope and valuation entered
  • Contractor registration current
  • Survey and site plan uploaded
  • Plans organized by discipline
  • NOAs or Florida approvals selected
  • Fire, DERM and Public Works routed
  • Current upfront invoice paid
  • Corrections fully resolved
  • Final physical plan set delivered
  • Permit formally issued and posted
  • Construction hours followed
  • Work kept exposed for inspection
  • Building and trade finals passed
  • CO, CC or final approval issued
  • Closed records saved
Office map

Town of Surfside Building Department Location

Address: Surfside Town Hall, 9293 Harding Avenue, Surfside, FL 33154.
Phone: 305-861-4863.
Building Official: Manuel “Manny” Salazar, extension 231.
Hours: Monday–Friday, 9:00 AM–5:00 PM.
Official resources

Open the Correct Surfside Portal, Form or Outside Review

Frequently asked questions

Surfside Florida Building Permit FAQs

Where do I apply for a Surfside building permit?

Start through the Town of Surfside Tyler Customer Self Service portal. Register an account, select the correct permit, enter the project information and upload the plans, survey, contractor documents, equipment information and product approvals requested for that permit type.

What is the Surfside Building Department phone number?

Call 305-861-4863. Building Official Manuel “Manny” Salazar is listed at extension 231. The Building Department is at Surfside Town Hall, 9293 Harding Avenue, Surfside, Florida 33154.

Does Surfside still require a physical plan set?

Yes. The current Tyler CSS instructions say applicants upload digital documents for review, but a final physical copy of the drawings is required before permit issuance. Confirm the final format and number of sets with the permit clerk.

Is the Surfside upfront permit fee 20% or 30%?

The Building Department Fee Guide effective March 10, 2026 lists the upfront processing amount as 30% of the estimated permit fee or the applicable base fee, whichever is greater. An older linked submittal instruction sheet still displays 20%, so follow the current Town invoice and 2026 fee guide.

How do I schedule a Surfside building inspection?

Use the Tyler CSS process or submit the current inspection request form as directed by the Building Department. Provide the trade, inspection type, address, master permit number, subsidiary permit number, email and phone. Confirm the scheduled date because inspector availability varies.

What product approval is needed for Surfside windows and doors?

Surfside is in the Miami-Dade High-Velocity Hurricane Zone. Submit a current Miami-Dade Notice of Acceptance or qualifying Florida Product Approval that covers the exact product, size, configuration, design pressure, glass, substrate, anchorage and installation method.

Can a homeowner obtain an owner-builder permit in Surfside?

A qualifying property owner may apply under Florida’s owner-builder exemption, but must personally appear at the Building Department to sign the affidavit and assume legal, financial, supervisory, employment and safety responsibility for the work.

When does a Surfside permit expire?

Issued permits can enter the renewal process after 180 days without qualifying activity. File an extension before the permit expires. The current fee guide lists a one-time pre-expiration extension request at $124 and separate fees for renewal of an expired permit.

When is a Surfside condominium building recertification required?

Current Miami-Dade rules can require a coastal condominium or cooperative building that is three stories or taller and within three miles of the coastline to begin recertification at 25 years, with later reviews every 10 years. Other covered buildings generally begin at 30 years. Follow the building-specific Town notice.

How do I prove a Surfside permit is closed?

Confirm that the master Building permit and all Roofing, Electrical, Plumbing, Gas, Mechanical, Fire, Public Works and outside-agency approvals passed final inspection. Also obtain the required Certificate of Occupancy, Certificate of Completion or final-approved status and save the complete record.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the Town of Surfside, Florida.

This page was rebuilt using the Surfside Building Department, Tyler Customer Self Service portal, Documents and Forms library, March 10, 2026 Building Department Fee Guide, permit-submittal instructions, inspection request, contractor registration, owner-builder affidavit, roofing and demolition checklists, Public Works forms, Town ordinances, Miami-Dade Product Control, Miami-Dade recertification rules, FEMA resources and Florida Building Commission materials.

Last reviewed: July 22, 2026.

Fees, staff, forms, portal procedures, product approvals, flood elevations and code requirements can change. Confirm time-sensitive requirements with Surfside Building staff and the responsible outside agency before filing, paying, purchasing products or beginning construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.