Shrewsbury Building Department | Permits, Inspections & Official Contact

Shrewsbury permit action guide

Apply, Track, Inspect and Close a Shrewsbury Building Permit

The Town of Shrewsbury uses OpenGov for building, electrical, plumbing, gas, sheet-metal and related permit applications. Applicants can upload plans, read departmental comments, pay online, receive electronic issuance and track the permit record from one account.

This guide explains the current $12-per-$1,000 building fee, Massachusetts contractor requirements, project exemptions, SELCO electrical dependencies, zoning review, inspections and commercial occupancy steps.

OpenGov application, payment and tracking micro-steps
Current building and trade permit fee tables
Homeowner, contractor, zoning and inspection guidance
Shrewsbury building permit blueprint moving through zoning, plans and inspection review An animated blueprint application moves through zoning, building-code and permit checks before receiving final approval. PLOT + FLOOR PLAN SURVEY • ELEVATION • VALUE ZONING 780 CMR PERMIT OPENGOV REVIEW APPLICATION FINAL INSPECTION APPROVED
📌
Use the current OpenGov process Shrewsbury has used online permitting since 2011 and now directs applicants to its OpenGov storefront. Work may begin only after electronic permit issuance, and the permit card must be printed and posted at the project site.
Start here

Choose the Exact Shrewsbury Permit Task

Open the Route That Matches Your Project

Each panel identifies the first action and the document most likely to delay review.

Home addition or major renovation

Prepare floor plans, structural plans, elevations, energy-code information, smoke and carbon-monoxide details and a certified plot plan prepared by a registered land surveyor. Separate electrical, plumbing, gas and sheet-metal permits may apply.

Basement finish

Use the Town’s 10th Edition Basement Finishing Guide. Show each room’s use, emergency escape and rescue openings, ceiling height, fire blocking, insulation, alarms and all trade work. Open Shrewsbury guides.

Deck

Use the Shrewsbury Deck Construction Guide. A very limited ground-level detached deck may be permit-exempt under the Town’s FAQ, but attached, elevated, exit-serving or larger decks generally require review. Confirm setbacks before designing.

Shed or accessory building

The Town FAQ lists a shed not greater than 200 square feet as exempt from a building permit. Zoning setbacks, easements, lot coverage, height and utility restrictions still apply.

Swimming pool

A prefabricated pool less than 24 inches deep is listed as permit-exempt. Other pools require the applicable building and electrical permits, barrier documentation and safety review. Open pool guidance.

Electrical service, solar or new home

Obtain a SELCO Work Request number when required. The current fee table marks new homes, temporary services, solar installations and service upgrades as requiring a SELCO number. Open SELCO work requests.

Accessory Dwelling Unit

Start with the Town’s ADU guide and verify zoning, owner authorization, parking, utilities, building-code separation, egress, energy and trade-permit requirements before submitting construction plans.

New business or change of use

Confirm the proposed use with Planning before signing a lease. A building permit, Certificate of Occupancy, sign permit, trade permits, Fire Department approvals and business licenses may all be required.

Official contact panel

Shrewsbury Building Inspector Contact Information

Building office 508-841-8512 Permits, building inspections and zoning enforcement
Inspector of Buildings Patricia Sheehan psheehan@shrewsburyma.gov
Assistant Building Inspector Alex Moriarty amoriarty@shrewsburyma.gov
Electrical Inspector 508-841-1519 dblue@shrewsburyma.gov
Plumbing and Gas Inspector 508-841-8343 jreilly@shrewsburyma.gov
Administrative assistant Kristen Rupolo krupolo@shrewsburyma.gov
Office address 100 Maple Avenue Shrewsbury, MA 01545
Appointments Required Call before arriving to speak with an inspector
Building inspector office hours:
Monday–Thursday: 8:00–9:00 AM and 3:00–4:30 PM.
Friday: 8:00–9:00 AM. Appointments are required.
Town Hall public hours are different: Monday, Wednesday and Thursday 8:00 AM–4:30 PM; Tuesday 8:00 AM–6:30 PM; Friday 8:00 AM–12:00 PM.
Town-versus-other-agency check

Shrewsbury Issues the Building Permit—Related Work May Need Another Approval

Building Inspector commonly handles

  • Building permits
  • Electrical permits
  • Plumbing permits
  • Gas-fitting permits
  • Sheet-metal permits
  • Building inspections
  • Certificates of Occupancy
  • Certificates of Inspection

Another department may also be required

  • Planning Board or ZBA
  • Water and sewer permits
  • Driveway or trench permits
  • Board of Health approvals
  • Fire-protection permits
  • SELCO work request
  • Conservation approval
  • State professional licenses
Planning 508-841-8549 planning@shrewsburyma.gov
DPW permits 508-841-8497 Water, sewer, driveway and road work
Fire Department 508-841-8522 Fire alarms, sprinklers and combustible materials
SELCO 508-841-8500 Electric, cable and utility work requests
Permit decision table

Which Shrewsbury Permit Fits the Work?

Project
Start with
Also check
New home, addition or structural renovation
Building permit
Certified plot plan, energy, structure, zoning and separate trade permits
Change of use or occupancy classification
Planning and building review
Zoning use, accessibility, egress, fire protection and Certificate of Occupancy
Basement finish
Building permit
Room use, egress, alarms, insulation and trade permits
Electrical installation or service work
Electrical permit
Licensed electrician and SELCO work-request number when listed
Plumbing or gas work
Plumbing or gas permit
Application must be filed by the licensed plumber or gas fitter
Ductwork or sheet-metal installation
Sheet-metal permit
Mechanical equipment and electrical work may need separate permits
Shed not greater than 200 square feet
Zoning check
The FAQ lists a building-permit exemption, but setbacks and easements still apply
Fence up to seven feet
Zoning and property-line check
The FAQ lists a building-permit exemption, subject to exact code conditions
Pool deeper than 24 inches
Building and electrical permits
Barrier, alarm, access, equipment and deck requirements
Commercial sign or banner
Sign and zoning review
Electrical permit, landlord approval and structural attachment
Permit exemptions

Work the Town FAQ Lists as Building-Permit Exempt

Small structures

  • Accessory building not greater than 200 square feet
  • Fence up to seven feet high
  • Retaining wall not greater than four feet unless supporting a surcharge
  • Ground-level detached deck not larger than 200 square feet

Limited outdoor work

  • Prefabricated pool less than 24 inches deep
  • One- and two-family play structures
  • Plastic-film greenhouse
  • Self-supported window awning extending less than 54 inches

Finish and ordinary work

  • Painting and wallpaper
  • Tile, carpet, cabinets and countertops
  • Sidewalk and driveway work handled through DPW
  • Ordinary repairs, including limited roof or siding repair
An exemption is not a blanket approval. Zoning, Conservation, DPW, electrical, plumbing, gas, fire, accessibility, historic, utility and property-line requirements can still apply. Full roof or siding replacement, structural repair or work affecting public safety should be confirmed with the inspector.
OpenGov workflow

Apply for a Shrewsbury Permit in Seven Steps

Confirm zoning and every permit type

Identify the building, electrical, plumbing, gas, sheet-metal, Fire, DPW and land-use approvals required for the full project.

Commercial project: Confirm the intended use with Planning before signing a lease or ordering construction drawings.

Create or access the OpenGov account

Open the Shrewsbury storefront, register with an active email address and retain the case-sensitive login information.

Select the correct permit application

Choose the application that matches the work rather than placing electrical, plumbing or gas work only inside the building description.

Enter a complete scope and construction value

Describe dimensions, rooms, structural changes, equipment, occupancy and all affected systems. Include labor and materials in the construction value.

Avoid: Descriptions such as “remodel,” “repair” or “replace” without explaining exactly what changes.

Upload every required document

Submit code-compliant plans, a certified plot plan when required, energy documents, product details, contractor credentials and outside approvals.

Track comments and upload coordinated revisions

OpenGov shows missing documents, departmental comments and approvals. Revise every affected sheet and identify the new revision date.

Review timing: The Town does not publish one universal turnaround for every project. Completeness, complexity and outside reviews affect processing.

Pay and confirm electronic issuance

Pay online, by cash in the Building Inspector’s Office or by check payable to the Town of Shrewsbury.

Before starting: Confirm the official permit number, issued status and approved scope. Print and post the permit card at the site.
Application readiness

Minimum Documents for a Complete Building Application

Property and scope

  • Legal property address
  • Owner information
  • Applicant contact details
  • Existing conditions
  • Detailed proposed work
  • Total construction value

Construction plans

  • Floor plans with room uses
  • Structural framing plans
  • Engineered-lumber details
  • Exterior elevations
  • Sections and connection details
  • Equipment specifications

Site, energy and safety

  • Certified plot plan
  • Setbacks and easements
  • Energy-code compliance
  • Smoke and CO alarms
  • Egress doors and windows
  • Outside agency approvals
Certified plot plan: Shrewsbury’s current FAQ identifies a certified plot plan prepared by a registered land surveyor as part of the minimum building-permit information. Confirm whether the specific project requires a full certified plan or another accepted site document.
Project-specific checkpoints

Local Issues to Solve Before Submitting Plans

Project
Prepare
Common missed dependency
Accessory Dwelling Unit
ADU guide, floor plan, legal bedroom and egress details, parking, utilities and energy documents
Zoning and occupancy requirements
Basement finish
Existing/proposed plans, room uses, ceiling heights, egress, insulation, alarms and fire blocking
Bedroom egress and concealed trade work
Deck
Plot plan, footing layout, ledger or freestanding design, framing, guards and stairs
Setbacks and lateral-load connection
Pool
Plot plan, pool dimensions, barrier form, gate, alarm, electrical bonding and equipment location
Pool barrier and electrical inspection
Ductless HVAC
Equipment sheets, condenser and head locations, electrical and refrigerant details
Required building, electrical, mechanical or sheet-metal applications
New single-family home
Certified plot plan, complete construction documents, energy compliance, radon checklist and utility approvals
Stretch-code, SELCO, DPW and final occupancy approvals
Solar installation
Structural attachment, electrical one-line, equipment specifications and site layout
SELCO Work Request number
Work near a property line
Registered survey, exact setbacks and easement locations
Zoning relief or redesign before building review

Open Shrewsbury Project Guides

Homeowner and contractor rules

Know Who Should Pull the Building Permit

Contractor application package

  • Construction Supervisor License
  • Home Improvement Contractor registration
  • Workers’ compensation certificate
  • Business and contact information
  • Complete project contract
  • Required licensed trade contractors

Homeowner permit limitations

  • The property must be the owner’s occupied home.
  • The owner assumes responsibility for code compliance.
  • The owner may lose access to the Home Improvement Guaranty Fund for the project.
  • People hired for covered construction work still require applicable registration and licensing.
  • Electrical, plumbing and gas applications must be submitted by the licensed tradesperson.
Do not pull the permit merely because a contractor asks you to. Shrewsbury publishes a homeowner-risk notice warning that permit holders can become responsible for code compliance, corrections and significant reconstruction costs.
Massachusetts home-improvement work: Roofing, siding, windows, decks, demolition, structural carpentry, insulation and similar work can require HIC registration, a CSL or both. Verify credentials before signing the contract.

Open Licensing and Homeowner Resources

Electrical utility dependency

When a SELCO Work Request Number Is Needed

Electrical project
Posted residential fee
SELCO Work Request?
New house
$100 plus $0.60 per amp
Yes
Temporary overhead service
$50
Yes
Temporary underground service
$80
Yes
Solar installation
$80
Yes
Service upgrade
$50
Yes
Swimming pool
$80
No
Addition or remodeling
$80
No
HVAC, burner or water heater
$50
No
Do this first: Obtain the SELCO Work Request number before filing an electrical permit that requires it. Missing utility information can stop permit processing.

Start a SELCO Work Request

Current code framework

Codes Used for Shrewsbury Construction Review

Building code 10th Edition 780 CMR Current statewide building code
Model-code basis 2021 I-Codes With Massachusetts amendments
Residential volume 780 CMR 51.00 One- and two-family residential work
Energy 225 CMR 22 and 23 Stretch or specialized provisions as applicable
Plumbing and gas 248 CMR Massachusetts plumbing and fuel-gas rules
Electrical 527 CMR 12.00 Massachusetts Electrical Code
Local layer Shrewsbury Zoning Bylaw Use, setbacks, height and dimensional rules
Effective code transition 10th Edition only Ninth/10th concurrency ended June 30, 2025
Energy-code selection matters. Shrewsbury’s code page directs users to Massachusetts Stretch and Specialized Code materials. Confirm the code applicable to the project type and filing date before completing the energy analysis.

Open Shrewsbury Code Links Open 10th Edition Code

Current fee estimator

Estimate the Shrewsbury Building Permit Fee

The Town calculates both building and sheet-metal permits at $12 per $1,000 of construction value, rounded up to the next whole $1,000, with a $50 minimum. This does not include trade permits, outside reviews or other approvals.

Building and Inspection Fees

Permit or service
Current fee
How it works
Residential building
$12 per $1,000
Round construction value up to the next $1,000; $50 minimum
Commercial building
$12 per $1,000
Same current valuation formula; $50 minimum
Sheet metal
$12 per $1,000
Round up to the next $1,000; $50 minimum
Building reinspection
$50
Charged for each reinspection
$2,000 building project
$50
The calculated $24 fee becomes the $50 minimum
$10,000 building project
$120
$12 multiplied by ten units of $1,000
$25,500 building project
$312
Rounded to $26,000 before calculation

Plumbing and Gas Fees

Permit
Fee
Included or special rule
Residential plumbing
$100 plus $5 per fixture
Separate permit for each dwelling unit
Nonresidential plumbing
$100 plus $8 per fixture
Use the full commercial fixture count
Residential gas
$100 plus $5 per fixture
Separate permit for each dwelling or business
Nonresidential gas
$100 plus $8 per fixture
Hood inspection is listed separately
Residential hot-water replacement
$60
Gas permit required for a gas-fired water heater
Nonresidential hot-water replacement
$85
Confirm plumbing and gas scope
Sewer connection
$60
DPW sewer permits and charges may also apply
External grease trap
$150
Coordinate plumbing, Health and sewer requirements
Gas hood inspection
$150
Other Fire or mechanical approvals may apply
Plumbing or gas reinspection
$50
Each additional inspection or reinspection
Work without a plumbing or gas permit: The Town posts a $100 fine, and the subsequent permit fee is doubled. Obtain the respective permit before starting the regulated work.

Selected Electrical Fees

Electrical work
Current fee
Inspection or processing note
New residential unit
$100 plus $0.60 per amp
Three inspections; SELCO number required
Pool
$80
Two inspections
Addition or remodeling
$80
Confirm the complete wiring scope
Solar
$80
Two inspections; SELCO number required
Service upgrade
$50
One inspection; SELCO number required
HVAC, burner or water heater
$50
Mechanical or gas permit may also apply
Fire alarm, security or low-voltage wiring
$50
One inspection; Fire approval may also apply
Commercial electrical
$100 plus $10 per $1,000
Based on full electrical construction cost
Additional inspection or reinspection
$50
Charged for each additional visit
Paper electrical application
$15 extra
Manual-entry fee; processing may take up to three business days
Use the processed invoice as the payment amount. Project valuation, fixture counts, amperage, outside reviews, DPW charges, Fire permits and zoning applications can change the complete project cost.

Open Official Fee Page

Inspection action board

Request and Pass Shrewsbury Permit Inspections

Permit issued electronically
Permit card posted
Correct work stage completed
Inspection coordinated
Corrections completed
Final approval recorded

Request route

Open the issued OpenGov permit and use the available inspection request or scheduling action.

Call 508-841-8512 when the request option is unavailable or inspector coordination is needed.

Inspector appointments

Appointments are required.

Inspector office hours are Monday–Thursday, 8:00–9:00 AM and 3:00–4:30 PM; Friday, 8:00–9:00 AM.

Reinspection fee

$50 per reinspection

Correct every cited item before requesting another visit.

Before the inspector arrives

  • Permit is issued
  • Permit card is posted
  • Approved plans are available
  • Correct inspection stage is complete
  • Concealed work remains visible
  • Safe access is provided

After a failed inspection

  • Read the entire correction notice
  • Identify the responsible contractor
  • Correct all related deficiencies
  • Keep corrected work exposed
  • Pay a reinspection charge if assessed
  • Confirm the new result in OpenGov
Typical construction sequence

Plan Inspections Before Covering the Work

Project stage
Typical inspection
Do not proceed until
Excavation and foundation
Footings, reinforcing, forms, foundation and underground work
Required elements are visible and approved
Rough trade work
Electrical, plumbing, gas and sheet-metal rough inspections
Concealed trade systems pass
Framing
Structure, connections, fire blocking, egress and plan layout
Applicable rough trade approvals are complete
Insulation
Insulation, air sealing and energy-code details
Wall and ceiling cavities are approved
Final trades
Operational fixtures, equipment, alarms and completed systems
All trade permits receive final approval
Building final
Complete project, safety, accessibility and approved use
Final approval or occupancy authorization is issued
This sequence is a planning guide. The issued permit, approved plans and inspector instructions control the actual project. Pools, demolition, fire-protection systems, commercial work and engineered structures can require additional inspections.
Permit status decoder

What Common OpenGov Statuses Usually Mean

Draft The application is not submitted. Complete required fields and confirm final submission.
Submitted The Town received the application and may be checking it for completeness.
Additional information required A plan, license, survey, approval or other required item is missing.
Department review Building, zoning, Planning, Fire, DPW or another reviewer is evaluating the project.
Corrections requested Upload revised plans and a clear response addressing every comment.
Payment due Review the invoice, confirm the permit record and complete payment.
Issued Work can begin within the approved scope after the permit card is printed and posted.
Final or closed Required inspections and closeout conditions have been accepted.
Commercial occupancy

Check Zoning Before Leasing or Altering a Business Space

Confirm the proposed use with Planning

Use the GIS property viewer to identify the zoning district, then ask Planning whether the exact business activity is permitted.

Call: 508-841-8549 or email planning@shrewsburyma.gov.

Determine whether land-use approval is required

A site plan, special permit, variance, administrative review or other Planning/ZBA process may be required before building permits.

Prepare alteration and occupancy plans

Show the legal use, occupant load, floor layout, accessibility, egress, toilet facilities, fire protection and all construction changes.

Apply for building and trade permits

File building, sign, electrical, plumbing, gas, sheet-metal and Fire applications required for the complete tenant work.

Complete inspections

Finish all building, trade, Fire, Health and other required inspections.

Obtain occupancy authorization

Do not open or use the altered space until the required Certificate of Occupancy or other final authorization is issued.

Do not rely on the previous tenant’s approval. A new business activity, occupant load, floor arrangement or occupancy classification can trigger zoning, building-code and fire-safety review.

Open Shrewsbury Business Permit Guide

Zoning relief

When a ZBA Application May Be Needed

Current published filing fees

Special permit or variance: $300

The Town states that multiple requests can be included in one application.

Comprehensive permit: $1,000 plus $100 per proposed unit.

Before applying

  • Confirm the exact zoning deficiency
  • Prepare an accurate certified survey
  • Review setback and dimensional rules
  • Obtain owner authorization
  • Prepare project plans and narrative
  • Ask whether consultant fees may apply
Contact: Patricia Sheehan serves as Inspector of Buildings and Zoning Enforcement Officer. Call 508-841-8512 or email zbastaff@shrewsburyma.gov.

Open Zoning Board of Appeals

Periodic inspections

Some Existing Buildings Need a Certificate of Inspection

Building use
Published fee
Certificate period
Churches, church halls, restaurants, clubs and athletic facilities
$100
One year
Private schools and educational facilities
$100
One year
Childcare facilities
$100
One year
Institutions, hospitals and nursing homes
$100 first 100 beds; $2 each additional 10 beds
Two years
Hotels and motels
$100 up to five units; $2 per additional unit
One year
Multifamily buildings
$75 plus $2 per dwelling unit
One year
Certificate of Occupancy and Certificate of Inspection are different. A Certificate of Occupancy confirms approved construction or use. A periodic Certificate of Inspection applies to specified existing occupancies on the State Building Code schedule.
Permit records

Find an Application, Permit or Inspection Record

Log in to OpenGov

Use the account that filed the application to view real-time status, comments, invoices and issuance.

Search by permit or property information

Use the permit number, property address, applicant or other available search field.

Open every related trade record

A single project can have separate building, electrical, plumbing, gas, sheet-metal and Fire permits.

Review inspections and final status

Confirm that rough, final and occupancy-related inspections passed.

Check the Town’s permit reports

Published reports can help identify older applications or activity by period.

Request unavailable records

Use the Town’s Public Records process when older documents, plans or complete files are not available online.

An issued permit is not proof of completion. Confirm final inspection and closed status for the building permit and every separate trade permit.
Unpermitted work

How Shrewsbury Addresses Work Started Without a Permit

Stop and identify the work
Prepare current-code plans
Submit all required permits
Expose concealed work if directed
Complete corrections and inspections
Verify final recognition
The property owner is responsible for resolving unpermitted work. Shrewsbury states that the application must describe the project as if it were being constructed today. Installed materials may need to be removed for inspection, and work that does not meet current code may be required to be replaced.

Prepare before contacting the Town

  • Property address
  • Approximate construction date
  • Complete work description
  • Photos of visible conditions
  • Contractor information
  • Any old invoices or plans
  • Proposed legalization plans
  • Licensed professional when required
Common delays

Ten Shrewsbury Permit Problems to Avoid

  1. Starting work before the permit is electronically issued.
  2. Submitting a vague project description.
  3. Using a construction value that excludes labor or materials.
  4. Omitting the certified plot plan or survey.
  5. Ignoring zoning setbacks, easements or lot coverage.
  1. Missing the SELCO Work Request number.
  2. Letting a homeowner pull a permit for a contractor-led project without understanding the risk.
  3. Failing to submit separate electrical, plumbing, gas or sheet-metal applications.
  4. Covering framing or trade work before inspection.
  5. Assuming the building final automatically closes every trade permit.
Ready-to-use communication

What to Say When Contacting Shrewsbury Staff

Permit requirement:
“I am planning [exact work] at [address]. Which building, zoning, electrical, plumbing, gas, sheet-metal, Fire and DPW approvals apply?”
Application correction:
“OpenGov application [number] received comments dated [date]. I uploaded a complete revised set and a response identifying where each comment was corrected.”
Inspection question:
“Permit [number] is ready for [inspection type]. The work is exposed, approved plans are on site and access is available. What is the correct request procedure?”
Old permit:
“I found permit [number] at [address], but it does not appear closed. Which inspection, trade permit, fee or occupancy document remains outstanding?”
Final completion checklist

Do Not Treat the Project as Finished Until These Are Complete

  • Shrewsbury jurisdiction confirmed
  • Correct permit types identified
  • Zoning use and setbacks confirmed
  • Certified plot plan completed
  • Planning or ZBA approval completed
  • SELCO request obtained when required
  • Contractor credentials verified
  • Complete documents submitted
  • Review comments resolved
  • Fees paid
  • Permit issued electronically
  • Permit card posted
  • Inspections completed in sequence
  • Trade permits finalized
  • Certificate of Occupancy obtained when required
  • OpenGov record shows final or closed status
Office map

Shrewsbury Building Inspector Office Map

Address: 100 Maple Avenue, Shrewsbury, MA 01545.
Building office: 508-841-8512.
Inspector appointments are required. Call before visiting or delivering materials that cannot be submitted through OpenGov.
Official resource library

Open the Correct Shrewsbury Portal, Guide or Rule

Frequently asked questions

Shrewsbury Building Permit FAQs

Where do I apply for a Shrewsbury building permit?

Use the Town of Shrewsbury OpenGov permit portal. Create an account, choose the correct application, enter the project information and upload all documents required by 780 CMR and the Town.

What is the Shrewsbury Building Department phone number?

Call the Building Inspector’s Office at 508-841-8512. The office is at Town Hall, 100 Maple Avenue, Shrewsbury, Massachusetts 01545.

How much is a Shrewsbury building permit?

Residential and commercial building permits cost $12 per $1,000 of construction value, rounded up to the next whole $1,000. The minimum building permit fee is $50.

Does a shed require a Shrewsbury building permit?

The Town’s current FAQ lists an accessory building not greater than 200 square feet as exempt from a building permit. Zoning setbacks, easements, height, lot coverage and other requirements still apply.

Does a fence require a building permit in Shrewsbury?

The Town FAQ lists a fence up to seven feet high as exempt from a building permit. Confirm property lines, zoning, corner visibility and any special site restrictions before installation.

Can a homeowner pull their own Shrewsbury permit?

An owner may apply for a building permit for an owner-occupied home, but assumes responsibility for code compliance and may lose Home Improvement Guaranty Fund protection. Electrical, plumbing and gas permits must be submitted by the licensed tradesperson.

What does a contractor need for a building application?

The Town identifies the applicable Construction Supervisor License, Home Improvement Contractor registration and workers’ compensation certificate as core contractor documents.

How do I schedule a Shrewsbury inspection?

Use the issued OpenGov permit record to request or coordinate the required inspection. Call 508-841-8512 when the portal does not provide the needed option or an inspector appointment is required.

What happens if work was completed without a permit?

The owner must apply as though the work were being built today. Concealed work may need to be exposed, and materials that do not comply with current code may need to be removed or replaced before inspections can be approved.

How do I check a Shrewsbury permit’s status?

Log in to OpenGov to view status updates, missing documents, departmental comments, invoices and issuance. Review every connected building and trade permit before treating the project as closed.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the Town of Shrewsbury.

This page was checked against the official Building Inspector page, OpenGov portal, application instructions, current fee page, permit FAQs, project guides, staff directory, zoning and Planning pages, SELCO work-request guidance and Massachusetts 10th Edition Building Code resources.

Last verified: July 23, 2026.

Fees, staffing, permit categories, office hours, code interpretations and online screens can change. Confirm time-sensitive details with the Town before filing, paying, purchasing materials or beginning construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.