Shasta County Building Department | Permits, Inspections & Official Contact

Shasta County permit action guide

Apply, Inspect and Close a Shasta County Building Permit Without Missing Fire, Snow, Septic or Grading Review

Shasta County’s Building Division serves construction in the unincorporated county and uses the Build Shasta eTRAKiT portal for public searches and selected online applications.

Before submitting building plans, confirm jurisdiction, zoning, local fire-district approval, wildfire construction requirements, snow and wind design, grading, driveway access, well or septic clearance and school-fee clearance.

Build Shasta permit and property searches
2025 California codes effective January 1, 2026
Address-specific fire, snow, septic and grading review
Shasta County mountain property permit review A mountain property plan checks fire access, snow load, grading, septic and construction plans before permit issuance and final inspection. SHASTA SITE REVIEW FIRE • SNOW • SEPTIC • GRADING BUILD SHASTA ISSUED PERMIT FINAL INSPECTION PASSED
2026
Use the correct California code cycle. Building permit applications submitted on or after January 1, 2026 are reviewed under the 2025 California Building Standards Code and applicable Shasta County requirements.
LIMITED
ONLINE
Not every project can be fully submitted through Build Shasta. The portal supports selected building permits and planning projects. Printable applications and in-person submittal remain available at the Central Permit Counter.
Start with the exact task

Choose What You Need to Do

Shasta County Next-Step Finder

Select the situation that best matches the property or project.

Official contact panel

Shasta County Building Division Contact Information

Building Division 530-225-5761 Permits, plan review and general assistance
Inspection request line 530-244-5068 Request the correct inspection stage
General email resourcemanagement@shastacounty.gov Include the address and permit number
Building fax 530-245-6468 Confirm the receiving staff member first
Office address 1855 Placer Street, Suite 102 Redding, CA 96001
Office hours 8:00 AM–5:00 PM Monday through Friday
Building Official Sean Ewing, PE, CBO Director of Resource Management
School-fee office 530-225-0225 Shasta County Office of Education
Best question format: “Property address + APN + exact project + permit number, when one exists + the specific decision you need.”
Avoid the wrong permit office

Unincorporated Shasta County or an Incorporated City?

COUNTY

Use Shasta County when

  • The parcel is in unincorporated Shasta County.
  • The Build Shasta property search recognizes the County parcel.
  • Resource Management confirms County jurisdiction.
CITY

Check a city building office when

  • The property is inside Redding.
  • The property is inside Anderson.
  • The property is inside the City of Shasta Lake.
  • A mailing address differs from the governing jurisdiction.
Septic and well exception: Shasta County Environmental Health can still be involved when property inside Redding, Anderson or Shasta Lake uses an onsite wastewater system or private well.
Correct approval order

Complete the Reviews in This Sequence

Confirm jurisdiction and parcel
Check zoning and legal lot status
Identify fire, snow, flood and grading rules
Resolve septic, well, access and utilities
Submit building and trade permits
Complete inspections
Obtain final approval and occupancy clearance
Permit decision table

Which Shasta County Permit Fits the Project?

Project
Start with
Extra Shasta County review
New single-family home
Residential building permit
Planning, fire, grading, well/septic, driveway, school clearance, energy, snow and wind design
Accessory dwelling unit
ADU or residential permit
Zoning, septic capacity, utilities, fire access, snow load and development fees
Room addition
Residential addition
Setbacks, septic capacity, grading, energy calculations and trade permits
Garage conversion or interior structural remodel
Conversion or alteration permit
Existing and proposed floor plans, bedroom count, septic, egress, energy and fire sprinklers
Deck or patio cover
Structural permit
Setbacks, footings, snow load, ignition-resistant materials and slope
Roof replacement
Re-roof permit
Roof classification, deck repair, WUI materials and smoke/CO declaration
Solar photovoltaic system
Solar permit
Roof or ground-mount checklist, electrical permit, fire access and structural attachment
Electrical, plumbing or HVAC work
Separate trade permit
Related building permit, licensed contractor and required inspection order
Driveway, access road, pad or clearing
Grading and access review
Erosion control, Public Works, fire access, culvert and watercourse protection
Manufactured home installation
Manufactured-home permit
Foundation, state labels, septic/well waiver, fire approval and occupancy recording
Commercial building or tenant improvement
Commercial building review
Planning, accessibility, fire, grading, Environmental Health and utility approvals
Existing unpermitted structure
As-built permit process
Existing-condition plans, engineering, inspections, corrections and possible code-enforcement case
Application workflow

Apply Without Creating an Incomplete Permit Record

Confirm the property is under County jurisdiction

Search the parcel in Build Shasta and verify the assessor parcel number, site address, ownership and land-use information.

Describe the complete project

State exactly what exists, what will be removed and what will be built. Include bedrooms, use, square footage, grading and utility changes.

Avoid vague scopes: “Remodel” is not enough when walls, plumbing fixtures, bedrooms or occupancy will change.

Check whether the permit is available online

Open the Build Shasta portal instructions. Use the online route only when the exact permit type is listed.

Complete the correct application and owner-builder documents

Property owners applying as owner-builders must attach the County owner-builder form. Contractors must use valid license information.

Prepare the coordinated plan package

Plans, plot plan, structural calculations, energy documents, grading information and fire approvals must describe the same project.

Pay the required filing fee

A filing fee, which becomes part of the plan-check fee, is required when plans are submitted.

Final cost comes later: The exact permit total cannot be determined until plan review is completed.

Respond to every review discipline

Building, Planning, Fire, Environmental Health, Public Works and outside agencies can issue separate comments or conditions.

Complete outside clearances and obtain issuance

Submit required school, septic, well, fire, grading and utility clearances, pay the invoice and confirm that the permit is issued before starting work.

Submission checklist

Prepare These Documents Before Applying

Property and planning

  • Exact property address
  • Assessor parcel number
  • Legal owner information
  • Legal parcel confirmation
  • Zoning and land use
  • Required planning approval

Plot plan

  • Property boundaries
  • Existing structures
  • Proposed structures
  • Setback dimensions
  • True north arrow
  • Road and driveway access

Construction plans

  • Dimensioned floor plans
  • Room names and uses
  • Exterior elevations
  • Foundation plan
  • Framing details
  • Wall and roof sections

Engineering and energy

  • Structural calculations
  • Truss calculations and layout
  • Engineer acceptance letter
  • Energy calculations
  • Manual J, D or S
  • Insulation values

Site and environmental

  • Grading cross sections
  • Erosion-control plan
  • Septic or sewer approval
  • Well information
  • Flood-zone information
  • Watercourse protection

Fire and legal documents

  • Fire-district approval
  • Fire-sprinkler plans when required
  • Owner-builder form
  • Smoke and CO declaration
  • Contractor license details
  • School-fee clearance
Shasta County site-specific review

Fire, Snow, Wind, Flood and Grading Can Change the Entire Design

Fire-district review

Building permit applications are reviewed for County fire-safety standards. Local fire-district or CAL FIRE approval can be required before permit submittal or issuance.

Wildland construction

Projects in wildfire-prone areas can require ignition-resistant roofs, vents, siding, decks, access, water supply and vegetation-clearance compliance.

Snow load

Snow load is address-specific and can vary greatly across Shasta County. Obtain the applicable design criteria before purchasing plans or trusses.

Wind design

Plans and product selections must use the correct wind speed, exposure, topographic condition and component pressures for the site.

Floodplain

Flood-zone determinations are commonly completed during permit review but can also be requested before applying.

Grading

A grading permit can be required for roads, driveways, clearing, pads, major earth movement and septic work that changes natural contours.

Do not pre-grade the site. Shasta County states that pre-grading before approval of the applicable building or grading permit is not permitted.
Grading trigger board

When to Check for a Separate Grading Permit

Proposed work
Likely County review
Prepare before filing
More than 250 cubic yards of earth movement
Grading permit
Cut and fill volumes, profiles, cross sections and erosion controls
New private road or driveway
Grading, fire and Public Works
Road profile, width, grades, turnouts, culverts and emergency access
Building or manufactured-home pad
Pad and grading review
Existing and proposed grades, compaction and drainage
Land clearing
Grading and erosion review
Area disturbed, tree removal, erosion control and fire considerations
Work affecting a watercourse
County and outside-agency review
Drainage plan, erosion protection and applicable state approvals
Septic installation requiring contour changes
Environmental Health and grading
Approved septic layout and site grading information
Environmental Health dependency

Check the Septic System and Private Well Before Adding Bedrooms or Structures

Existing septic or well

A permit waiver may be required before a building, structure, manufactured-home utility or installation permit is issued on property using an existing onsite wastewater system or private well.

Bedroom additions

Adding a bedroom or increasing occupancy can require review of septic-system capacity and available replacement area.

Old septic and well records

Environmental Health provides online Digital Reel research for older well and septic permits previously stored on microfiche.

City property can still need County Environmental Health: The waiver process also applies to properties in Redding, Anderson and Shasta Lake that use an onsite septic system or private well.

Open Septic and Well Services

Permit issuance dependency

Plan for School-District Clearance Before the Permit Is Issued

How the process starts

After building plan review, the County sends the applicable form to the Shasta County Office of Education for school-fee or clearance determination.

What the applicant must return

A receipt or clearance from the applicable school district must be presented to the Permit Counter before building-permit issuance.

Office of Education: 1644 Magnolia Street, Room 27, Redding, CA 96001 — 530-225-0225.
2026 code cycle

Which Construction Codes Apply?

2025 California Building Code

Applies to covered commercial, multifamily and other regulated building projects submitted on or after January 1, 2026.

2025 California Residential Code

Applies to covered one- and two-family dwellings, townhouses and related residential construction.

Energy, Green and Fire Codes

California Energy Code, CALGreen, electrical, plumbing, mechanical and fire-code requirements can all apply to one project.

Application date matters. Do not mix details or calculations prepared for a previous California code cycle with a 2026 application.

Open Shasta County’s 2025 Code Update

Inspection workflow

Request the Correct Inspection and Keep the Work Accessible

Inspection request line 530-244-5068 Use the full permit number
Daily schedule Published online Check the Building Division page
General help 530-225-5761 Missing or unavailable inspection
Limited photo review Inspector approval required Selected reinspection items only

Before requesting

  • Permit is issued and active
  • Correct inspection selected
  • Work is complete for that stage
  • Work remains exposed
  • Approved plans are onsite
  • Permit card is available

Prepare the site

  • Visible address
  • Unlocked access or key arrangement
  • Safe ladders and walking surfaces
  • Animals secured
  • Engineering documents onsite
  • Site contact reachable
Inspection stage
Typical work reviewed
Do not continue until
Site, grading and foundation
Location, access, grading, footing, reinforcing and foundation
Required grading, fire and structural approvals are documented
Underground trades
Electrical, plumbing, gas and mechanical work below slabs or grade
The work passes before it is covered
Rough trades
Wiring, plumbing, HVAC, gas and fire-sprinkler installations
Each applicable rough inspection passes
Framing
Framing, trusses, connectors, shear, fire blocking and structural details
Approved plans and truss documentation are onsite
Insulation and energy
Insulation, air sealing and energy-code requirements
The work remains visible and matches approved calculations
Final inspection
Completed construction, safety systems, site conditions and approved scope
The building is complete, unlocked and ready for occupancy
Avoid generic fee calculators

How Shasta County Building Permit Fees Are Built

The final permit cost is not one simple percentage of project value. Shasta County can apply separate filing, plan-check, permit-processing, building, electrical, mechanical, plumbing, grading, Planning, Fire, Public Works, school and outside-agency charges.
Fee category
What affects it
When to verify it
Application filing
Permit type and required review
At initial plan submittal
Building and plan check
Use, size, valuation, complexity and code review
After plans are checked
Electrical, plumbing and mechanical
Fixtures, equipment, service and project scope
When the trade permits are created
Planning review
Zoning, land use, parcel status and project location
Before or during building review
Fire review
Fire district, building use, access and sprinkler requirements
Before issuance
Grading and Public Works
Earth movement, driveway, access, culverts and watercourses
Before site work
Environmental Health
Septic, well, food, pool and other health-related approvals
Before building-permit issuance
School and outside-agency charges
New floor area, use and service district
After plan review and before issuance
Current-fee rule: Use the Shasta County Master Fee List and the official project invoice. Do not rely on an old permit, archived PDF or neighboring city’s fee table.

Open Current Resource Management Fees

Permit records and closeout

Confirm the Permit Was Finaled—Not Merely Issued

Search the exact permit number

Use the number printed on the permit, inspection notice, invoice or approved plan set.

Search the property address and APN

Use parcel search when address formatting, rural addressing or multiple structures make the permit difficult to find.

Open every linked permit

Building, electrical, mechanical, plumbing, grading, fire and planning activities may have separate records.

Review inspection history

Look for failed, canceled or missing inspections and confirm that every correction was cleared.

Verify final approval and occupancy status

Confirm the final inspection, paid fees, outside-agency clearances and any required Certificate of Occupancy before using the building.

Property-sale warning: An issued permit or visible improvement does not prove the project was completed legally. Save the final inspection and occupancy record.
Permit status decoder

What Common Build Shasta Statuses Mean

Applied The application exists, but intake, documents or payment may remain incomplete.
In review Building or another department is checking the plans and project conditions.
Corrections required Submit revised documents and a clear response to every review comment.
Approved Outside clearances, final fees or formal issuance may still be required.
Issued Work may begin within the approved scope and permit conditions.
Inspection correction Correct the listed work before requesting another inspection.
Expired Stop work and ask whether an extension, renewal or new permit is required.
Finaled Save the result and verify every linked trade and site permit is also complete.
Troubleshooting

Fix Common Shasta County Permit Problems

Problem
Likely reason
Best next action
Build Shasta cannot find the property
Wrong jurisdiction, address format or parcel record
Search by APN and confirm whether the property is in Redding, Anderson or Shasta Lake.
The permit type is not offered online
Only selected applications are available through the portal
Download the application and submit it through the Central Permit Counter.
Application was rejected at intake
Missing application, owner-builder form, plot plan or filing fee
Compare the package with the exact County project checklist.
Fire approval is missing
The local fire district or CAL FIRE has not approved access or protection
Resolve access, water supply, sprinklers and wildfire construction requirements.
Environmental Health hold
The existing septic system or well has not been cleared
Apply for the permit waiver or required onsite-system permit.
Grading review was added
The project includes clearing, a pad, driveway, major earth movement or watercourse impact
Submit profiles, quantities, erosion control and responsible-party information.
Permit is approved but not issued
School clearance, fees or another department condition remains
Ask the Permit Counter for a written issuance checklist.
Inspection failed
Work is incomplete, inaccessible, concealed or inconsistent with plans
Correct every item and obtain revised-plan approval when the design changed.
Existing structure was never permitted
Previous owner or builder skipped the required process
Use the County as-built checklist and prepare for engineering and investigative inspections.
Permit is still open after construction
A final, trade permit, grading approval or outside clearance remains incomplete
Review every linked activity and request a closeout list from Building.
Ready-to-use contact scripts

What to Say When You Contact the County

Jurisdiction question:
“The property is at [address] with APN [number]. Can you confirm whether Shasta County or an incorporated city is the correct building-permit authority?”
Permit requirement:
“I plan to [exact work]. Which building, Planning, grading, fire, septic, well, driveway, electrical, plumbing and mechanical permits are required?”
Application hold:
“Permit [number] shows [status]. Which document, fee or department clearance is preventing issuance?”
Closeout question:
“Work under permit [number] is complete. Which building, trade, grading, fire, school or Environmental Health item remains before final approval?”
Final project checklist

Do Not Consider the Project Complete Until These Are Confirmed

  • Correct County or city jurisdiction confirmed
  • Address and APN verified
  • Legal lot and zoning confirmed
  • Fire-district approval complete
  • Wildfire requirements included
  • Snow and wind criteria confirmed
  • Floodplain review complete
  • Grading permit complete
  • Driveway or access approval complete
  • Septic and well clearance complete
  • School clearance complete
  • Correct permit formally issued
  • Approved plans onsite
  • Permit card posted
  • Foundation inspection passed
  • Rough trade inspections passed
  • Framing inspection passed
  • Energy and insulation inspection passed
  • Trade finals passed
  • Grading and site finals passed
  • Building final passed
  • Certificate of Occupancy obtained when required
  • Every linked permit finaled
  • Final records saved
Office location

Shasta County Building Division Map

Address: 1855 Placer Street, Suite 102, Redding, CA 96001.
Hours: Monday–Friday, 8:00 AM–5:00 PM.
Phone: 530-225-5761.
Official resource library

Open the Correct Shasta County Resource

Frequently asked questions

Shasta County Building Permit FAQs

Where do I apply for a Shasta County building permit?

Use the Build Shasta eTRAKiT portal when the exact permit type is available online. Printable applications can also be submitted through the Central Permit Counter at 1855 Placer Street, Suite 102, in Redding.

What is the Shasta County Building Division phone number?

Call 530-225-5761 for permits and plan review. The dedicated building-inspection request line is 530-244-5068.

Does Shasta County issue permits inside Redding?

Shasta County generally serves unincorporated areas. Properties inside Redding, Anderson or the City of Shasta Lake normally use the applicable city building office. County Environmental Health may still be involved for onsite septic systems or private wells.

Which California Building Code applies in 2026?

Building permit applications submitted on or after January 1, 2026 are subject to the 2025 California Building Standards Code and applicable Shasta County requirements.

Can a property owner apply as an owner-builder?

Yes. A property owner applying for a permit must complete and attach the Shasta County Owner Builder Form and accepts responsibility for permit compliance, workers and jobsite safety.

When does Shasta County require a grading permit?

A grading permit can be required for more than 250 cubic yards of earth movement, roads, driveways, clearing, building or manufactured-home pads, watercourse impacts and septic installations that alter natural land contours.

Does an existing septic system need approval before a building permit?

It may. Environmental Health can require a permit waiver before issuing a building, structure, manufactured-home utility or installation permit for property using an existing septic system or private well.

How do I schedule a Shasta County building inspection?

Call the inspection request line at 530-244-5068. Have the complete permit number, property address, inspection type and site-access information ready.

How much is a Shasta County building permit?

The final cost depends on project type, size, valuation, plan review, trade permits, Planning, Fire, grading, Public Works, Environmental Health and outside-agency charges. The exact total is determined after the plans are reviewed.

How do I confirm that a Shasta County permit is closed?

Search the permit in Build Shasta, review every linked building and trade activity, confirm passed final inspections and verify any required Certificate of Occupancy or outside-agency clearance.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent informational guide and is not Shasta County. Permit requirements, fees, inspections, code interpretations and final approvals must be confirmed with the responsible government agency.

This page was rebuilt using official Shasta County Building, Build Shasta, Planning, Environmental Health, Public Works, fee, code-update and inspection resources.

Last reviewed: July 23, 2026.

Forms, portal functions, fees, code requirements, staffing and review procedures can change. Confirm time-sensitive details before filing, paying or beginning construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.