Los Altos Building Department | Permits, Inspections & Official Contact

Los Altos permit action guide

Email the Right Plans, Clear Los Altos Review and Reach Final Inspection Without Guesswork

Los Altos does not accept hard-copy building-plan applications at City Hall. Most projects begin with a complete electronic package emailed to the Building Permits Division. eTRAKiT is then used for permit search, eligible simple permits, payment and every building-inspection request.

This guide separates the jobs that need Planning approval first, explains what must be inside the email, shows the current 2026–27 fee structure, and covers trees, ADUs, Fire, Engineering, green-building documents, corrections and closeout.

Email submittal and eTRAKiT roles clearly separated
Current July 2026 fees and 2025 California codes
Planning, trees, Fire, Engineering and final inspection
Los Altos electronic building plans moving through review and inspection An animated orchard, electronic plan set, email application, review screen, permit document and final inspection approval explain the Los Altos permit workflow. LOS ALTOS PLAN SET PDF EMAIL PLAN CHECK APPROVED ORCHARD CITY PERMIT FINAL INSPECTION PASSED
📧
Electronic plans only Los Altos does not accept hard-copy building-plan applications. Email the completed application, plans and supporting documents to bldpermit@losaltosca.gov.
📌
Current code and fee dates The 2025 California Building Standards Code became applicable January 1, 2026. The current FY 2026–27 city fee schedule became effective July 1, 2026.
Start here

Choose the Los Altos Task You Need

Los Altos Permit Route Finder

Choose the project that most closely matches your work.

Official contact panel

Los Altos Building Division Phone, Email, Address and Hours

Building Division 650-947-2752 General permit and code questions
General building email building@losaltosca.gov General Building Division assistance
Permit-submittal email bldpermit@losaltosca.gov Applications, revisions and resubmittals
City Hall 1 N. San Antonio Road Los Altos, CA 94022
Building counter 8:00 AM–5:00 PM Monday through Friday
Engineering Division 650-947-2780 Grading, drainage and right-of-way inspections
Code Enforcement 650-947-2775 Building and zoning violation questions
Best email subject: “New Permit Submittal – [Address] – [Project Type]” or “Resubmittal – [Permit Number] – Correction Cycle [Number].”
Avoid the wrong department

City of Los Altos, Los Altos Hills or Santa Clara County?

1

City of Los Altos

Use this guide when the parcel is inside incorporated Los Altos and appears in the city GIS and eTRAKiT systems.

2

Town of Los Altos Hills

Los Altos Hills has a separate Building Department, eTRAKiT portal, address and inspection system.

3

Unincorporated county

Properties outside city boundaries use Santa Clara County Planning and Development for building or grading permits.

Postal addresses can mislead. A property using “Los Altos” in its mailing address may be in Los Altos Hills or unincorporated Santa Clara County. Confirm jurisdiction before submitting or paying.

Open Los Altos GIS Check County Jurisdiction

Submission-method decision

Email, eTRAKiT or Planning Application?

Task
Correct starting route
What to do
New house, addition, major remodel or commercial project
Email submission
Email the completed application, plans and supplemental PDFs to bldpermit@losaltosca.gov.
Eligible simple residential permit
eTRAKiT
Sign in and confirm that the exact permit type appears in Apply/New Permit.
Residential reroof
eTRAKiT eligible
Contractors may use the online simple-permit workflow when the project qualifies.
SolarAPP+ rooftop system
SolarAPP+ + eTRAKiT
Obtain SolarAPP+ approval, then enter the approval number and upload approved documents in eTRAKiT.
New house or addition requiring design review
Planning first
Complete Planning approval and incorporate every condition into the building plans.
Tree removal
Planning application
Obtain the required protected-tree approval before relying on the building-permit package.
Inspection request
eTRAKiT only
Open the issued permit and schedule the exact inspection online.
Engineering or Fire inspection
Separate department
Contact Engineering or Santa Clara County Fire directly; a building-inspection request does not schedule them.
Permit decision table

Which Los Altos Permit Path Fits Your Project?

Project
Starting permit
Important Los Altos dependency
New single-family house
Planning + building
Single-family design review, trees, grading, Fire, utilities, CALGreen and Title 24
Residential addition or exterior alteration
Design review may apply
Neighborhood compatibility, setbacks, lot coverage, height and protected trees
Kitchen or bathroom remodel
Building and trades
Electrical, plumbing, mechanical, structural and energy scope
Reroof
Simple residential permit
Contractor eTRAKiT registration and current roofing information
Custom ADU
ADU building permit
ADU checklist, site-specific plans, utilities and protected-tree approval
City permit-ready or pre-approved ADU
Streamlined ADU route
Designer authorization and site-specific adaptation remain required
Solar photovoltaic system
SolarAPP+ or standard solar
Eligibility, active business license, equipment documents and electrical scope
Commercial tenant improvement
Planning + commercial building
Use, accessibility, Fire, health, signage, grease control and business licensing
Protected tree removal
Tree Removal Permit
Planning approval before removal; right-of-way trees use a different city process
Driveway, sidewalk, utility or public-area work
Engineering permit
Encroachment, grading, drainage, sewer or transportation review
Electronic application workflow

Submit a Los Altos Building Permit in Six Clear Steps

Confirm jurisdiction and Planning requirements

Verify that the parcel is inside Los Altos. Check zoning, design review, historical status, trees, grading, drainage and Fire requirements before finalizing plans.

New houses and additions: Obtain required Planning approval first.

Download the exact application and checklist

Use the residential, commercial, ADU, demolition or project-specific submittal requirements from the current Forms and Handouts page.

Do not reuse: an old application saved from a previous project.

Build one complete electronic package

Include the signed application, plan set and every supplemental calculation, report and checklist required for the scope.

Consistency check: The address, scope, valuation, square footage, owner and contractor should match in every file.

Email the package to Building Permits

Send the complete electronic submission to bldpermit@losaltosca.gov. Hard-copy applications are not accepted.

Intake timing: Current city pages indicate approximately two to five business days for processing or completeness verification.

Pay the plan-review invoice

Staff will send payment instructions after processing. The project is routed to the applicable departments after receipt and payment.

Keep: the invoice, receipt, permit number and assigned technician’s contact information.

Respond to comments and wait for issuance

Submit a response letter and a complete revised plan set. Cloud and delta every change and use the same plan size and scale as the original.

Start work only after: the permit and approved plans are issued by email.
Email-package checklist

What to Include Before Pressing Send

Core application files

  • Completed permit application
  • Clear project description
  • Owner and applicant contacts
  • Contractor license information
  • Project valuation
  • Planning approval reference

Plan and design files

  • Cover and code sheet
  • Site plan or survey
  • Floor and roof plans
  • Exterior elevations
  • Building and wall sections
  • Structural details

Supplemental files

  • Structural calculations
  • Title 24 calculations
  • CALGreen checklist
  • Geotechnical report
  • Truss calculations
  • Green-building documents
File-control system

Name Documents So Reviewers Can Find Them

Initial submittal

  • 01-Permit-Application.pdf
  • 02-Architectural-Plans.pdf
  • 03-Structural-Plans.pdf
  • 04-Structural-Calculations.pdf
  • 05-Title-24.pdf
  • 06-CALGreen.pdf

Correction cycle

  • Response-Letter-Cycle-1.pdf
  • Revised-Plans-Cycle-1.pdf
  • Revised-Calculations-Cycle-1.pdf
  • Planning-Response-Cycle-1.pdf

Revision after issuance

  • Revision-Form.pdf
  • Revision-Narrative.pdf
  • Revised-Sheets-Delta-1.pdf
  • Supporting-Calculations.pdf
Correction rule: Submit the full revised plan set—not only changed sheets—unless the assigned permit technician gives different instructions.
FY 2026–27 fees

How Los Altos Building-Permit Fees Are Calculated

🗓️
Effective July 1, 2026 The following figures come from the City of Los Altos FY 2026–27 fee schedule. Confirm the final amount on the city invoice because Planning, Fire, Engineering, impact, sewer and consultant charges can be separate.

Minimum valuation

The city’s fee schedule lists a minimum construction valuation of $591.39 per square foot for residential and commercial construction.

This is a permit-fee valuation basis, not a contractor’s guaranteed construction price.

Building plan check

The published building plan-check charge is 135% of the building-permit fee.

Energy plan check

The published Title 24 energy plan-check charge is 25% of the building-permit fee.

Construction valuation
FY 2026–27 building-permit calculation
$1–$3,000
$251.87
$3,001–$25,000
$251.87 for the first $3,000 plus $32.49 per additional $1,000 or fraction
$25,001–$50,000
$966.65 for the first $25,000 plus $33.46 per additional $1,000 or fraction
$50,001–$100,000
$1,803.36 for the first $50,000 plus $18.19 per additional $1,000 or fraction
$100,001–$500,000
$3,640.86 for the first $100,000 plus $7.95 per additional $1,000 or fraction
$500,001–$1,000,000
$7,915.71 for the first $500,000 plus $12.92 per additional $1,000 or fraction
More than $1,000,000
$14,970.27 for the first $1,000,000 plus $6.46 per additional $1,000 or fraction
ADU building permit
$0 city building-permit fee in the published schedule; other project costs and agency fees may remain
$25,000 example: Published building-permit fee: $966.65. Building plan check at 135%: $1,304.98. Energy plan check at 25%: $241.66. Preliminary subtotal: $2,513.29 before construction tax, state fees, maintenance surcharge, technology surcharge and project-specific charges.
Standalone and closeout fees

Useful Published Los Altos Fees

Fee item
FY 2026–27 amount
Practical note
Water-heater permit
$157.28
Confirm whether electrical, gas or plumbing scope changes the route.
Heat-pump HVAC permit
$300
Equipment location and electrical capacity may require review.
Water line or repipe
$316.67
Building, plumbing or utility coordination may apply.
Sewer or drain line
$316.67
Engineering or sewer-agency fees can be separate.
EV charging station
$314.57
Confirm panel and electrical-service capacity.
Energy-storage system
$419.43
Fire and electrical requirements may apply.
Single-family demolition permit
$244.31
Separate demolition and debris requirements remain.
Commercial/multifamily demolition
$373.29
Hazardous materials, Fire and waste-diversion requirements may apply.
Reinspection
$260.04
Avoid requesting before the work and corrections are ready.
Certificate of Occupancy
$114.29
Issued only after required final approvals.
Temporary Certificate of Occupancy
$684.72
Requires city approval and life-safety readiness.
Revision review
$310.38 per hour
Coordinate changes before submitting repeated revisions.
Other permit charges

Do Not Budget Only the Base Permit Fee

Construction tax

Single-family: $0.42 per square foot.

Commercial/multifamily: $0.70 per square foot.

General Plan fee

7% of the building-permit fee.

Technology fee

5% of the building-permit fee.

State seismic fee

Calculated from valuation using the residential or commercial SMIP rate.

Stop-work risk: The current fee schedule lists stop-work penalties at two to four times all plan-review and permit fees.
Expired permit warning

Check the Permit Expiration Date Before It Becomes Expensive

Time after expiration
Published penalty
Next action
0–30 days
$0 daily penalty
Contact the Building Division immediately about renewal and required inspections.
31–60 days
$205 per day
Stop relying on the expired permit and obtain current instructions.
61–120 days
$410 per day
Request a written fee and reactivation explanation before scheduling work.
121 days and later
$820 per day
Expect significant renewal or reapplication consequences.
Expired-permit charges are based on the original permit fees in addition to the published daily penalty. Track the permit’s live expiration information in eTRAKiT.
Current code framework

2025 California Building Codes Apply in Los Altos

California codes

The city adopted the 2025 California Building Standards Code with local amendments effective January 1, 2026.

Energy and green building

Plans must address the 2025 California Energy Code and applicable 2025 CALGreen mandatory measures.

Property maintenance

The city’s 2025 adoption ordinance also references the 2024 International Property Maintenance Code.

Do not submit an old checklist: Plans prepared under the 2022 code cycle may need updates when submitted under the 2025 California code cycle.
Inspection command board

Schedule Every Building Inspection Through eTRAKiT

Scheduling method

All building inspections must be requested online through eTRAKiT.

Morning window

8:30 AM–12:00 PM.

Afternoon window

12:30 PM–3:30 PM.

Inspector assignment

Check the city’s daily inspection schedule online.

No same-day time call: The city states that the inspector will not call on inspection day to provide a narrower time window.

Have on the job site

  • Issued permit documents
  • Job copy of approved plans
  • Approved calculations
  • Previous correction notices
  • Inspection card or record
  • Safe access instructions

Prepare the work

  • Correct stage is complete
  • Work remains exposed
  • Previous corrections are fixed
  • Required tests are ready
  • Ladders and access are safe
  • Approved plan changes are onsite
Inspections will not be performed when the emailed permit documents and approved plans are not printed and available at the job site.
Separate inspection departments

Building, Engineering and Fire Inspections Are Not the Same Request

Inspection
How to schedule
Common trigger
Building inspection
eTRAKiT
Foundation, framing, trades, insulation and building final
Engineering/stormwater
Call 650-947-2780
Onsite grading, drainage, public improvements or encroachment work
Fire inspection
Call Santa Clara County Fire Prevention at 408-378-4010
Fire sprinklers, alarms, commercial life safety or Fire conditions
Construction-hour rules

Work Only During Los Altos Construction Hours

Residential construction

Monday–Friday: 7:00 AM–5:30 PM

Saturday: 9:00 AM–3:00 PM

Commercial construction

Monday–Friday: 7:00 AM–7:00 PM

Saturday: 9:00 AM–6:00 PM

Construction is not permitted on Sundays or city-observed holidays.
Inspection status decoder

What the eTRAKiT Result Means

Requested Confirm that the request appears under the correct issued permit.
Scheduled Check the daily schedule for the assigned inspector and route information.
Approved Save the result and determine which inspection is next.
Corrections Read every item and correct all cited work before requesting reinspection.
Partial approval Only the listed portion passed. Do not assume the entire phase is approved.
Final Verify Building, Fire, Engineering, Planning and trade conditions are all complete.
Planning before building

Design Review Can Be the Real First Permit

Single-family projects

Exterior alterations, additions and new construction in single-family districts are subject to the city’s design-review requirements.

Commercial and multifamily

Exterior alterations, additions and new construction in non-single-family districts require design approval before building-permit issuance.

Planning submittals

Planning applications are electronic. Physical Planning Division submittals are not accepted.

Building-plan requirement: Incorporate every Planning condition of approval into the building set and provide a response showing where each condition is addressed.
Protected trees

Resolve Tree Removal Before It Stops the Building Application

Private protected tree

A Tree Removal Permit is required before removing a protected tree on private property.

City right-of-way tree

Trees in the public right-of-way use a separate no-fee permit through the city’s Maintenance Division.

Building project coordination

Show protected trees, protection fencing and removal approvals consistently on the site, grading and landscape plans.

Tree-related fee
FY 2026–27 amount
First tree
$314.57
Each additional tree
$157.28
Verified invasive species
$0
In-lieu tree replacement
$1,258.29
Consulting arborist
Actual cost
Accessory dwelling units

Choose the Right Los Altos ADU Route

Custom ADU

Submit the general ADU checklist and site-specific architectural, structural and utility documents by email to the Building Division.

City permit-ready ADU

Use the city’s listed design and submit the required site-specific adaptation documents and liability form.

Pre-approved ADU

Contract with the plan designer, then add the property-specific information needed for building approval.

The current city fee schedule lists the city ADU building-permit fee, ADU plan-check fee and ADU electrical, mechanical or plumbing permit fee at $0. Utility, school, Fire, design, consultant and other project costs may still apply.
A protected-tree removal permit may be required before submitting the ADU building application.
Green building and debris

Track Construction and Demolition Waste Before Final Inspection

Covered projects

Los Altos requires construction-and-demolition diversion for demolition permits and building permits valued at $25,000 or more.

Minimum diversion

The city states that covered projects must achieve at least 65% diversion.

Final closeout

Track disposal and recycling throughout construction instead of attempting to recreate records at final inspection.

Commercial and business projects

A Building Permit Alone Does Not Authorize a Business to Open

Zoning approval

Confirm the proposed business use and any parking, design or use-permit requirements.

Building permit

Complete structural, accessibility, electrical, plumbing and mechanical improvements.

Fire and health

Complete Santa Clara County Fire and County Environmental Health reviews when applicable.

Business license

Complete Los Altos business registration and zoning approval before operating.

Verify legal use and required improvements before signing a long-term commercial lease.
Permit and inspection history

Search Los Altos eTRAKiT Records

Open the public eTRAKiT dashboard

Public users can search permit and project information without relying on a contractor login.

Search the permit number first

Use the exact number when available. Otherwise, try the base street address with fewer optional fields.

Review more than the status label

Check fees, inspections, permit type, issue date, expiration information and related records.

Confirm final completion

An application or issued permit does not prove that the project passed final inspection or received occupancy approval.

Property transaction check: Ask the city when an old permit lacks a final result, when the scope differs from the building, or when related trade permits remain open.
Troubleshooting

Fix Common Los Altos Permit Problems

Problem
Likely cause
Best next action
No intake confirmation
Large attachment, wrong email, incomplete form or processing queue
Verify the sent package, attachment size and receipt after the city’s stated intake period.
Application is incomplete
Missing checklist, signature, calculation, report or Planning approval
Use the exact project checklist and resend one complete package.
Planning approval missing
Exterior residential or commercial work requires design review
Contact Planning before continuing the building review.
Tree conflict discovered
Protected tree or roots are affected by construction
Pause site work and obtain Planning or right-of-way tree instructions.
Correction cycle repeats
Response letter and revised drawings do not match
Answer each comment by number and identify the exact revised sheet.
Inspection refused
Approved permit documents are not onsite
Print the issued permit, approved plans and related documents before rescheduling.
Engineering final remains open
Grading, drainage or right-of-way work used a separate inspection process
Call Engineering at 650-947-2780.
Permit expired
Required activity or renewal was not completed
Contact the Building Division immediately because daily penalties escalate after 30 days.
Ready-to-use contact scripts

What to Say When You Contact Los Altos

Permit route question
“I am planning [exact work] at [address]. Does this require Planning approval before the building application, and should the permit be submitted by email or through eTRAKiT?”
Intake confirmation
“I emailed the permit package for [address] on [date]. The message contained [number] PDF files. Can you confirm whether it was accepted for processing or is missing an item?”
Correction question
“Permit [number] has comments from [departments]. Which comments are still open, and should the response be sent as a complete plan set or only revised sheets?”
Final inspection question
“Permit [number] has passed [listed inspections]. Which Building, Planning, Fire, Engineering or trade final remains before closeout?”
Final closeout checklist

Do Not Finish Until Every Los Altos Approval Is Complete

  • City jurisdiction confirmed
  • Zoning district checked
  • Planning approval completed
  • Protected-tree approval completed
  • Correct permit application used
  • Complete electronic plans submitted
  • Title 24 documents accepted
  • CALGreen documents accepted
  • Plan-review fees paid
  • Permit formally issued
  • Issued documents printed onsite
  • Building inspections passed
  • Engineering inspections passed
  • Fire inspections passed
  • Trade permits finalized
  • CO, TCO or final record saved
Office map

Los Altos Development Services Location

Address: Los Altos City Hall, 1 North San Antonio Road, Los Altos, CA 94022. Building public-service counter hours are Monday through Friday, 8:00 AM–5:00 PM.
Official resources

Open the Correct Los Altos Permit Resource

Frequently asked questions

Los Altos Building Permit FAQs

Where do I submit a Los Altos building-permit application?

Email the completed application, plans and supplemental documents to bldpermit@losaltosca.gov. The city does not accept hard-copy plan applications at City Hall.

What is eTRAKiT used for in Los Altos?

eTRAKiT is used for public permit searches, eligible simple residential permit applications, online payments, SolarAPP+ processing and all building-inspection requests.

How long does initial permit intake take?

Current Los Altos pages indicate approximately two to five business days for processing or verification of completeness. Plan review begins after the submission is accepted and required fees are paid.

How do I schedule a Los Altos building inspection?

Open the issued permit in eTRAKiT and request the correct inspection online. Morning inspections are generally between 8:30 AM and noon, and afternoon inspections are generally between 12:30 PM and 3:30 PM.

What are Los Altos Building Division office hours?

The Building Division public-service counter is open Monday through Friday from 8:00 AM to 5:00 PM at 1 North San Antonio Road.

How are Los Altos building-permit fees calculated?

The base permit fee is valuation based. The FY 2026–27 schedule lists a $591.39-per-square-foot minimum valuation basis, a building plan-check fee equal to 135% of the permit fee, and a Title 24 plan-check fee equal to 25% of the permit fee.

Which construction codes apply in Los Altos in 2026?

The city adopted the 2025 California Building Standards Code with local amendments effective January 1, 2026. The current cycle includes the 2025 California Energy and CALGreen requirements.

Do residential additions need Planning approval?

Exterior alterations, additions and new construction in single-family districts are subject to Los Altos design-review requirements. Confirm Planning approval before submitting the building package.

Do I need approval to remove a tree?

Protected trees on private property require a Tree Removal Permit. Trees in the public right-of-way use a separate city Maintenance Division permit. Resolve tree requirements before demolition or site work.

How do I know whether the property is in Los Altos or Los Altos Hills?

Use the Los Altos Public GIS Viewer and Santa Clara County jurisdiction tools. The City of Los Altos, Town of Los Altos Hills and unincorporated Santa Clara County operate separate permit systems.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the City of Los Altos.

This page was checked against the Los Altos Building Division, electronic Permit Submittal Process, eTRAKiT, Building Inspections, FY 2026–27 fee schedule, Planning Division, Public GIS, ADU, Tree Removal, Green Building and Business Permit resources.

Last reviewed: July 22, 2026.

Forms, fee calculations, codes, staff, processing procedures and inspection schedules can change. Confirm time-sensitive information before submitting, paying or starting construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment