Livonia Building Department | Permits, Inspections & Official Contact

Livonia permit action guide

Apply, Review, Inspect and Close a Livonia Building Permit

The City of Livonia uses BS&A Online for permit applications, payments, permit searches and inspection scheduling. Contractors must register with Livonia and connect their BS&A account to the City before managing their full permit history.

This guide gives homeowners, contractors, landlords and business owners the exact official route, current fees, document requirements, inspection cutoffs, local project rules and closeout steps.

BS&A application, payment, records and inspection route
Verified construction-value and project-specific fees
Zoning, plot-plan, contractor and occupancy guidance
Livonia building permit moving through zoning, plan review and inspection An animated plan moves from a city property drawing through zoning, plan review and permit approval before a final inspection passes. PLOT PLAN LINES + EASEMENTS ZONING PLANS PERMIT BS&A PLAN REVIEW APPLICATION FINAL INSPECTION PASSED
📌
Three current rules to know Most complete permits have about a two-week lead time. Projects requiring plan review average two to three weeks. Inspection requests verified before 3:30 PM are normally scheduled for the next business day.
Start here

Choose the Exact Livonia Permit Task

Open the Route That Matches Your Project

Each panel identifies the first action and the document most likely to delay approval.

Home addition

Submit the signed building application, construction valuation, two construction-plan sets, two plot plans and truss drawings when applicable. The current checklist also lists a $100 refundable bond. Open addition guide.

Basement finish

Show the complete floor plan, emergency egress, ceiling heights, fire blocking and insulation. Electrical, mechanical and plumbing permits are obtained after the building permit is issued. Open basement guide.

Detached garage

Provide two plot plans, two construction-plan sets and truss details when applicable. Confirm rear-yard placement, lot coverage, building separation, easements and maximum accessory-building area before ordering materials. Open garage guide.

Shed

Structures under 40 square feet are listed as permit-exempt. Sheds from 40 through 200 square feet use the zoning-permit route; structures over 200 square feet require a building permit. Open shed guide.

Fence

A zoning permit is required for a new fence, relocation, major repair or replacement. Submit fence details, a plot plan and the original signed neighbor authorization when required. Open fence guide.

Pool, hot tub or spa

A building permit is required when the water depth is more than 24 inches, the system has permanent recirculation or structural materials are involved. Electrical review is also required. Open pool guide.

New home

Prepare approved plot plans, energy calculations, soil-erosion approval, water and sewer documents, construction plans and truss drawings. The checklist lists a $500 refundable bond. Open new-home guide.

New business or commercial space

Confirm the proposed use, zoning district, site-plan status and occupancy classification before construction. A Zoning Compliance permit and Certificate of Occupancy may be required. Open business guidance.

Official contact panel

Livonia Inspection Department Contact Information

Building and permits 734-466-2580 Building, zoning, plan review and inspections
Zoning and appeals 734-466-2250 Zoning Board of Appeals questions
Planning Department 734-466-2290 Land use, development and site-plan questions
Engineering permits 734-466-2571 Water, sewer, grading, floodplain and right-of-way
Fire Department 734-466-2444 Fire alarm and suppression coordination
Inspection contact Open official form Send questions and attachments
Office address 33000 Civic Center Drive City Hall Annex, Livonia, MI 48154
City Hall hours Monday–Friday 8:30 AM–5:00 PM
Before contacting staff: Have the property address, parcel number, permit number, project valuation, contractor name and exact portal status or reviewer comment ready.
City-versus-county check

Livonia Issues the Local Permit—Other Agencies May Issue Related Approvals

Livonia Inspection Department handles

  • Residential building permits
  • Commercial building permits
  • Electrical permits
  • Mechanical permits
  • Plumbing permits
  • Zoning compliance
  • Construction inspections
  • Certificates of Occupancy

Other approval may be needed for

  • Floodplain work
  • Wetland disturbance
  • Soil erosion
  • Water and sewer connections
  • Public right-of-way work
  • Tree removal
  • Subdivision deed restrictions
  • Civic association approval
Livonia address check: Use the City parcel map and BS&A property search. A postal address alone does not replace confirmation of the legal parcel, property lines or municipal jurisdiction.
Permit decision table

Which Livonia Permit Fits the Project?

Project
Start with
Also check
New home or residential addition
Building permit
Plot plan, zoning, Engineering, energy, trusses and trade permits
Interior alteration or basement finish
Building permit
Egress, structural changes, electrical, mechanical and plumbing
Electrical, furnace, air conditioning or plumbing
Trade permit
Building permit number, licensed contractor and per-item fees
Detached garage over 200 square feet
Building permit
Plot plan, rear yard, setbacks, lot coverage, foundation and trusses
Shed from 40 to 200 square feet
Zoning permit
Ratwall, rear-yard location, easements and building separation
Fence or privacy screen
Zoning permit
Plot plan, neighbor authorization, civic association and final inspection
Deck
Building permit
Footings, attachment, framing, stairs, guards and property setbacks
Swimming pool, hot tub or spa
Building permit
Electrical permit, plot plan, barrier, equipment and refundable bond
Commercial alteration or new building
Planning and building review
Site plan, zoning use, fire, accessibility, Engineering and special inspections
New business or change of occupancy
Zoning Compliance
Construction permits, life safety and Certificate of Occupancy
BS&A workflow

Apply for a Livonia Permit in Seven Steps

Confirm the permit and plan requirements

Use the City’s residential or commercial checklist before opening the application.

Write a precise scope: Include dimensions, rooms, structural work and every building system being changed.

Create and activate a BS&A account

Homeowners and contractors can apply online for building, zoning, electrical, plumbing and heating permits.

Link a contractor account to Livonia

Open Municipalities, choose City of Livonia, select View My Activity and use the “I have a pin” link.

Contractor requirement: Register with the City before using the inspection portal for the first time.

Search the property and choose the permit

Verify the address and parcel before selecting building, zoning or trade work.

Stop if: The property or address does not match the intended job site.

Upload complete plans and supporting documents

Submit the application, plot plan, construction drawings, contractor documents, approvals and valuation information.

File names: Use the address, document type and revision date.

Monitor review and answer every correction

Most permits require about two weeks. Projects with plan review average two to three weeks.

Use BS&A: Check the live record for the latest processing estimate, invoice and reviewer status.

Pay and verify formal issuance

Permit fees are due when the permit is issued. Do not begin work merely because plans were accepted.

Application lifespan: City project guides state that the permit must be issued within six months of application or the application may be cancelled.
Application readiness

What to Prepare Before Opening BS&A

Property and applicant

  • Exact job-site address
  • Parcel number
  • Owner’s legal name
  • Applicant phone and email
  • Detailed project description
  • Estimated construction cost

Plans and site information

  • Plot or site plan
  • Floor plans
  • Building elevations
  • Foundation and framing details
  • Truss drawings when applicable
  • Energy calculations when required

Contractors and approvals

  • Michigan contractor license
  • Livonia registration
  • Driver’s-license copy
  • Workers’ compensation information
  • Civic association approval
  • Engineering or EGLE approvals
Plot plan does not always mean survey. Livonia explains that a plot plan is an overhead property drawing showing property lines, buildings, easements and site features. A licensed survey may still be required when exact boundaries or a formal survey are needed.
Contractor registration

Builders and Trade Contractors Must Register With Livonia

Registration package

  • Completed registration form
  • Current contractor license
  • Master or specialist license when applicable
  • Driver’s-license copy
  • Workers’ compensation details
  • License-holder signature
  • Notarization when required
  • Applicable registration fee

Published registration fees

Residential building contractor: $15 until license expiration

Electrical master or fire alarm contractor: $10 until license expiration

Other trades: $15 until license expiration

Sign erector: $40

Michigan licensing rule: A contractor hired for residential work with a contract price of $600 or more must be properly licensed under Michigan residential-builder laws.

Open Contractor Registration Form

Project-specific rules

Garage, Shed, Fence, Deck and Pool Requirements

Project
Livonia guidance
Practical action
Detached garage
Building permit required when the accessory building exceeds 200 square feet
Confirm maximum area, rear-yard placement, lot coverage and building separation
Accessory-building height
Detached accessory buildings are listed with a 16-foot maximum height and ten-foot maximum sidewall
Show grade, wall height and roof peak on the elevation drawing
Shed under 40 square feet
Current shed checklist states that no permit is required
Still confirm placement, easements and deed restrictions
Shed from 40 to 200 square feet
Zoning permit route with construction drawings, plot plan and required ratwall
Keep the 24-inch-deep concrete ratwall visible for inspection
Shed separation
Minimum four feet from detached garage and ten feet from dwelling or attached garage
Dimension all structures on the plot plan
Fence
Zoning permit required for new, relocated, rebuilt or substantially repaired fence
Submit dimensions, material, plot plan and signed authorization when applicable
Fence inspection
One final inspection normally closes the fence permit
Call MISS DIG 811 and schedule before the permit becomes inactive
Deck
City deck form lists 42-inch footing depth and detailed guard, stair and attachment requirements
Complete the City deck form rather than submitting only a product brochure
Pool permit threshold
Permit required for depth over 24 inches, permanent recirculation or structural construction
Show pool, barrier, equipment, property lines and electrical work
In-ground pool
Current checklist lists a $500 refundable bond and an electrical permit
Keep bond, permit and trade fees separate in the project budget
Flood, wetlands and grading

Check Environmental and Engineering Dependencies Early

Within 500 feet of water

The residential application asks whether the property is within 500 feet of a lake, river, stream, wetland, drain or other open watercourse.

Floodplain or wetland work

Engineering drawings and permits from Livonia or Michigan EGLE may be required before the building permit can be approved.

Tree and right-of-way work

Tree-removal or public right-of-way permits may be required through Engineering or Public Works.

Engineering contact: Call 734-466-2571 before finalizing plans that alter drainage, grading, utilities, public right-of-way, regulated slopes, floodplain or wetland areas.
Business and occupancy

New Businesses Need Zoning and Occupancy Approval

Zoning Compliance

Zoning Compliance identifies the occupant, business type, emergency contact and whether the use is allowed in the zoning district.

Livonia states that it is required for nonresidential moving, alteration, repairs, change of use or change in occupancy type.

Published single Zoning Compliance fee: $111

Certificate of Occupancy

The Inspection Department issues Certificates of Occupancy for new construction and new businesses.

  • Confirm the land use is permitted.
  • Complete construction and trade permits.
  • Resolve fire and life-safety requirements.
  • Pass required final inspections.
  • Do not occupy before authorization.
Do not sign a commercial lease based only on the mailing address or the prior tenant’s use. Confirm the proposed business activity with Planning and Inspection before construction or occupancy.
Residential rental property

Rental Homes Require a Livonia Rental License

Single-family rental

$105

$45 license plus $60 inspection in the published application.

Two-family rental

$145

$55 license plus $90 inspection in the checklist.

Inspection process

The initial fee includes the initial and final inspection. Additional reinspections can create another charge.

Open Rental License Application

Current code framework

Construction Codes Enforced in Livonia

Commercial building 2021 Michigan Building Code Effective April 9, 2025
Existing commercial buildings 2021 Michigan Rehabilitation Code Effective April 9, 2025
Residential 2015 Michigan Residential Code Current City-listed edition
Plumbing 2021 Michigan Plumbing Code Effective March 12, 2024
Mechanical 2021 Michigan Mechanical Code Effective March 12, 2024
Fuel gas 2021 International Fuel Gas Code Effective March 12, 2024
Electrical 2023 Michigan Electrical Code / NEC Effective March 12, 2024
Commercial energy 2021 Michigan Energy Code Effective April 22, 2025

Open Livonia’s current code notice

Official fee board

Livonia Building Permit Fees

General building fees are based on the accepted construction value. The total combines the building fee, plan-review fee and a $45 administration fee.

Accepted construction value
Building
Review
Admin
Published total
Under $1,000
$45
$25
$45
$115
$4,001–$5,000
$85
$25
$45
$155
$9,001–$10,000
$135
$30
$45
$210
$19,001–$20,000
$235
$52
$45
$332
$29,001–$30,000
$335
$74
$45
$454
$39,001–$40,000
$435
$96
$45
$576
$49,001–$50,000
$535
$118
$45
$698
$59,001–$60,000
$635
$140
$45
$820
$69,001–$70,000
$735
$162
$45
$942
$79,001–$80,000
$835
$184
$45
$1,064

Project-Specific Published Fees

Project or service
Published amount
Additional requirement
Wood deck
$120 total
$50 permit + $25 review + $45 administration
Above-ground pool
$130 total
Electrical permit and two plan/plot-plan sets
In-ground pool
$170 total
Electrical permit plus $500 refundable bond
Shed from 40–200 sq. ft.
$111 total
$66 zoning fee + $45 administration
Zoning Compliance
$111
Used for applicable nonresidential occupation or use changes
Residential addition bond
$100 refundable
Permit and plan-review fees are based on construction cost
New-home bond
$500 refundable
Permit, review, Engineering and trade fees are separate
Electrical permit
$40 minimum + $45 administration
Per-item fees and registration may apply
Mechanical permit
$40 minimum + $45 administration
Calculated from equipment and work items
Plumbing permit
$40 minimum + $45 administration
Calculated from fixtures, piping and work items
Use the live invoice as the transaction amount. Livonia may use square footage and the ICC construction-valuation table to determine the accepted project value. Trade permits, bonds, fire review, Engineering and outside reviews can change the final total.

Open Official Building Fee Schedule

Inspection action board

Schedule and Pass Livonia Permit Inspections

Permit issued
Correct work stage completed
Approved plans kept on site
Request before 3:30 PM
Read result and corrections
Pass final and close permit

Online scheduling

Use BS&A Online with the permit number and correct inspection type.

Next-business-day cutoff

Verified requests submitted before 3:30 PM are normally scheduled for the next business day.

Inspection hours

Inspections are generally performed Monday–Friday between 9:30 AM and 3:30 PM, excluding holidays.

On inspection day

  • Call inspector between 8:30 and 9:00 AM
  • Ask for an AM or PM window
  • Keep approved plans on site
  • Provide safe access
  • Leave concealed work visible
  • Have manufacturer instructions ready

Cancellation and corrections

  • Cancel before 9:00 AM on inspection day
  • Read the entire correction notice
  • Call the assigned inspector with technical questions
  • Complete every cited item
  • Keep corrected work visible
  • Schedule reinspection only when ready
Fire inspections use a different confirmation step. Fire suppression and fire alarm inspections are not scheduled until the contractor and Fire Marshal confirm the date and time.
Typical residential sequence

Basement and Addition Inspection Order

Stage
Inspection
Before proceeding
Underground or foundation
Footings, foundation, underground plumbing or utilities when applicable
Keep trenches, reinforcing and underground work visible
Rough trades
Rough plumbing, mechanical and electrical
Complete concealed trade work and fire blocking
Rough building
Framing, structural connections and approved plan layout
Obtain applicable rough-trade approvals first
Insulation
Wall-cavity insulation and energy details
Do not install drywall before approval
Open ceiling
Ceiling systems above removable acoustic tiles when applicable
Leave ceiling cavity accessible
Final trades
Final plumbing, mechanical and electrical
Install and operate all fixtures and equipment
Final building
Final building and project closeout
Complete final trade inspections first
Permit status decoder

What the BS&A Status Means

Draft The application is not fully submitted. Complete all required fields and confirm submission.
Submitted The City received the application and may be checking completeness.
In review Building, zoning, Engineering, fire or trade staff are reviewing the project.
Corrections required Submit coordinated revised plans and answer every reviewer comment.
Approved Payment, contractor registration or formal permit issuance may still be outstanding.
Issued Work may begin only within the approved scope and permit conditions.
Failed inspection Correct all listed items before scheduling another inspection.
Final or closed Save the final inspection and Certificate of Occupancy when applicable.
Correction workflow

How to Resubmit Plans Without Creating Another Delay

Separate comments by department

Identify building, zoning, Engineering, fire, electrical, mechanical and plumbing comments.

Respond to each comment in writing

Use the same numbering as the reviewer and identify the revised sheet or detail.

Update every affected drawing

Do not change the floor plan while leaving conflicting elevations, structural sheets or schedules.

Use clear revision dates

Remove obsolete files and identify the current plan set.

Upload the complete revision package

Check BS&A after submission to confirm that the documents appear in the record.

Wait for issuance before changing the work

A field change can require revised-plan approval before installation continues.

Permit records

Find an Old, Open or Expired Livonia Permit

Open Livonia BS&A

Select Building Department Record Search.

Search by permit number first

Use the number from an invoice, permit card, inspection report or contractor document.

Try the property address and parcel

Remove suite or unit information when a detailed address produces no result.

Review every connected record

A project can have separate building, electrical, plumbing, mechanical, zoning and occupancy permits.

Check the inspection history

Verify that required rough, final and Certificate of Occupancy inspections passed.

Request help when records are incomplete

Use the official Inspection contact form with the address, approximate year, permit number and document requested.

A permit number is not proof that the work was approved. Confirm final inspection and closed status for the building permit and every related trade permit.
Common delays

Ten Livonia Permit Problems to Avoid

  1. Using the wrong phone number or unofficial permit portal.
  2. Starting construction before formal issuance.
  3. Submitting incomplete or inconsistent plans.
  4. Leaving property lines, easements or setbacks off the plot plan.
  5. Using a contractor who is not licensed or registered.
  1. Ignoring civic association or deed restrictions.
  2. Missing Engineering, floodplain, wetland or tree approvals.
  3. Failing to obtain electrical, plumbing or mechanical permits.
  4. Covering work before inspection.
  5. Assuming the building final automatically closes every permit.
Ready-to-use communication

What to Say When Contacting Livonia Staff

Permit requirement:
“I am planning [exact work] at [address and parcel number]. Which building, zoning, Engineering and trade permits apply, and which project checklist should I follow?”
Contractor account:
“I created a BS&A account under [email and company]. Please explain the City registration and PIN-linking step needed to view our Livonia permit activity.”
Plan correction:
“Application [number] received comments dated [date]. I uploaded revised sheets and a numbered response identifying where every item was corrected.”
Open permit:
“I found permit [number] at [address], but it does not appear closed. Which inspection, trade permit, fee or occupancy document is still required?”
Final completion checklist

Do Not Treat the Project as Finished Until These Are Complete

  • Livonia jurisdiction confirmed
  • Correct permit types identified
  • Plot plan or survey completed
  • Zoning approval complete
  • Engineering approval complete
  • Environmental approvals obtained
  • Contractor registered
  • Complete plans submitted
  • Review corrections resolved
  • Fees and bonds paid
  • Permit formally issued
  • Approved plans kept on site
  • Inspections scheduled on time
  • Failed items corrected
  • Trade permits finalized
  • Occupancy document obtained when required
Office map

Livonia Inspection Department Map

Address: 33000 Civic Center Drive, City Hall Annex, Livonia, MI 48154.
City Hall hours: Monday–Friday, 8:30 AM–5:00 PM.
Call 734-466-2580 before making a special trip or delivering large plan sets.
Official resource library

Open the Correct Livonia Portal, Form or Guide

Frequently asked questions

Livonia Building Permit FAQs

Where do I apply for a Livonia building permit?

Use the City of Livonia BS&A Online portal. Homeowners and contractors can apply for building, zoning, electrical, plumbing and mechanical permits.

What is the correct Livonia Inspection Department phone number?

The official Inspection Department number is 734-466-2580. The department is located in the City Hall Annex at 33000 Civic Center Drive.

How long does a Livonia permit take?

The City states that most permits have about a two-week lead time when all required information is provided. Projects requiring plan review average two to three weeks, depending on workload, season, scope and project size.

How do I schedule a Livonia inspection?

Schedule through BS&A using the permit number and inspection type. Verified requests submitted before 3:30 PM are normally scheduled for the next business day.

How are Livonia building permit fees calculated?

General building fees are based on the accepted construction value. The total combines the building fee, plan-review fee and a $45 administration fee. Electrical, mechanical and plumbing permits use per-item fee schedules.

Do Livonia contractors need to register with the City?

Yes. Contractors must register before using the inspection portal for the first time. Residential builders pay a published $15 registration fee until license expiration, while other contractor categories have separate fees.

Does a Livonia shed require a permit?

The current City checklist states that a shed under 40 square feet does not require a permit. Sheds from 40 through 200 square feet use the zoning-permit route, and structures over 200 square feet require a building permit.

Does a Livonia fence require a permit?

A zoning permit is required to erect, replace, relocate, rebuild or substantially repair a fence or privacy screen. A plot plan, fence details and signed neighbor authorization may be required.

When does a pool require a Livonia permit?

A building permit is required when a residential pool, hot tub or spa is more than 24 inches deep, has a permanent water-recirculation system or uses structural construction materials.

How do I find an old or open Livonia permit?

Use Building Department Record Search in Livonia BS&A. Search by permit number first, then by address or parcel. Review all building and trade records and confirm final or closed status.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the City of Livonia.

This page was checked against the official Livonia Inspection Department, BS&A portal, residential and commercial permit libraries, project guidebooks, permit checklists, contractor-registration form, current code notice, fee schedule, staff directory, Planning Department and Engineering contacts.

Last verified: July 22, 2026.

Forms, fees, codes, staffing, inspection availability and online portal screens can change. Confirm time-sensitive information with the City before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment