Jax Beach Building Department | Permits, Inspections & Official Contact

Jacksonville Beach permit action guide

Search COAST, Clear Coastal Reviews and Pass the Correct Jacksonville Beach Inspection

Jacksonville Beach has its own Building Inspection Division. Do not use the consolidated City of Jacksonville permit system for property located inside Jacksonville Beach city limits.

This guide explains the City’s real process: use COAST for records and status, choose the correct e-permit form, clear zoning, flood, Fire, tree and Public Works reviews, prepare for the 10:00 AM–3:00 PM inspection-access window and close the permit before it becomes a property problem.

Correct office, phone, hours and COAST portal
Current City-published fee formulas and inspection rules
Flood, tree, Public Works and permit-closeout paths
Jacksonville Beach permit moving through flood, zoning, plan review and inspection An animated coastal house plan with flood waves, wind, trees and electronic review moves to a permit and final inspection. COASTAL SITE + BUILD PLAN FLOOD • WIND • TREE • SETBACK E-PERMIT REVIEW PLANNING + FLOOD BUILDING + FIRE PUBLIC WORKS ISSUED PERMIT CARD FINAL INSPECTION CLOSED 11 N. THIRD STREET
📌
Correct City contact information The Building Division is at 11 North Third Street, Jacksonville Beach, FL 32250. Call 904-247-6235. Public access hours are Monday–Friday, 8:00 AM–4:30 PM.
⚠️
Do not use the old GovAccess link Jacksonville Beach currently uses City e-permit forms for applications and COAST for public permit searches, fees, plan-review status and inspection results.
Choose one action

What Do You Need to Do?

Jacksonville Beach Permit Route Finder

Select the closest project to see the correct first step.

Official contact panel

Jacksonville Beach Building and Planning Contacts

Permit office 11 North Third Street Jacksonville Beach, FL 32250
Public access 8:00 AM–4:30 PM Monday through Friday
Fourth Tuesday Closes at 3:30 PM Monthly all-division staff meeting
Code Enforcement 904-247-6284 Work without permits and property compliance
Duval Clerk / NOC 904-255-2000 Recording assistance
Jurisdiction first

Jacksonville Beach Is Not the City of Jacksonville Permit System

Use Jacksonville Beach when

  • Property is inside Jacksonville Beach city limits
  • COAST recognizes the property record
  • Jacksonville Beach issued prior permits
  • Planning confirms City jurisdiction

Stop and verify when

  • Address is in Jacksonville but outside Jacksonville Beach
  • Property is near Atlantic Beach or Neptune Beach
  • COAST does not recognize the parcel
  • Another municipality issued prior permits
Best lookup field: COAST recommends using the Duval County Parcel ID—also called the real estate number—when available.
Permit decision table

Choose the Correct Jacksonville Beach Application

Project
Start with
Common supporting review
New one- or two-family home
Residential building package
Zoning, flood, drainage, tree, Beaches Energy, Public Works and trades
Addition or structural remodel
Building e-permit
Survey, site plan, structural plans, flood and trade permits
Commercial or multifamily construction
Commercial / multifamily checklist
Planning, Fire, accessibility, change of use, Public Works and utilities
Roof replacement
Roof e-permit
Product approval, contractor registration, virtual or in-progress inspections
Window, exterior door, siding or shutters
Window / door / siding e-permit
Product approvals, rough, in-progress and final inspections
Swimming pool or screen enclosure
Pool e-permit
Zoning, safety barrier, electrical bonding, plumbing and flood review
Fence, retaining wall or tree removal
Zoning e-permit
Survey, easements, tree survey, footing details and final zoning inspection
Driveway or hardscape
Zoning / hardscape application
Drainage, Public Works, right-of-way and final inspection
Change of use or occupancy
Change-of-use e-application
Planning, Fire, accessibility, parking, utilities and field evaluation
Demolition
Demolition e-permit
Pre-demolition inspection, utility disconnects, tree and post-demolition certificate
Application workflow

Submit a Complete Jacksonville Beach Permit Package

Confirm the permit and zoning route

Identify every building, trade, zoning, Fire and Public Works record connected to the project.

Do first: Search COAST for earlier permits and unresolved property records.

Open the project-specific checklist

Use the residential, commercial, multifamily, pool or Fire checklist—not only the generic building application.

Prepare property and contractor information

Collect the Parcel ID, legal description, owner information, existing and proposed use, complete scope and total value of labor and materials.

Prepare the coordinated plans

Include the survey, site plan, floor plans, structural documents, product approvals and trade information required by the checklist.

Tree work: No protected tree may be removed, damaged or destroyed without the required permit and tree survey.

Submit online or in person

The City accepts permit applications through its e-permit forms or in person at City Hall.

Projects valued at $25,000 or more: Printed and scaled packages may be delivered with the required plan-review fee.

Track the record in COAST

Allow the application to enter the City system, then use COAST to monitor plan review, outstanding fees and permit activity.

No login is required for a public permit query.

Submit corrections with a clear transmittal

Identify the application or permit number, explain each change and upload a coordinated revision set.

Avoid: Uploading isolated sheets that do not match the rest of the approved set.

Pay fees and confirm issuance

Payment can make an electronic application binding, but work may not begin until the permit is approved and posted at the site.

Submission readiness

Documents to Prepare Before Applying

Property and scope

  • Official job address
  • Duval Parcel ID
  • Legal description
  • Owner of record
  • Existing and proposed use
  • Total labor and material value

Plans and site

  • Boundary survey
  • Site plan and setbacks
  • Floor plans and elevations
  • Structural details
  • Product approvals
  • Tree and drainage information

People and approvals

  • Licensed contractor information
  • Insurance documents
  • Owner-builder disclosure if used
  • Private-provider forms if used
  • Notice of Commencement
  • Fire, Planning and Public Works approvals
As-built survey: New construction and certain site improvements may require a final survey showing completed conditions. Confirm this requirement before covering site features or requesting final approval.
Zoning and site controls

Fence, Driveway, Tree and Hardscape Applications Need More Than a Sketch

Survey and site information

  • Property boundaries and easements
  • Existing and proposed improvements
  • Fence or wall location and height
  • Driveway or hardscape dimensions
  • Footing details for applicable walls
  • Flood-zone answer and Parcel ID

Tree-removal information

  • Tree species
  • Diameter at breast height
  • Trees retained and removed
  • Reason for removal
  • Location on survey
  • Required protection during construction
Do not remove or damage protected trees before approval. The City application requires tree protection before permit issuance and during demolition or construction.

Open the Zoning E-Permit

Current City-published schedule

Jacksonville Beach Permit Fee Formula

Project valuation
Published permit calculation
Base fee
$40
$1,000 or less
$20 valuation fee, plus the published base fee
$1,001–$50,000
$20 for the first $1,000 + $5 for each additional $1,000 or fraction
$50,001–$100,000
$260 for the first $50,000 + $4 for each additional $1,000 or fraction
$100,001–$500,000
$460 for the first $100,000 + $3 for each additional $1,000 or fraction
$500,001 and above
$1,660 for the first $500,000 + $2 for each additional $1,000 or fraction

$20,000 example

$40 base + $20 for the first $1,000 + 19 × $5.

Published calculator result: $155 before plan review, trades, Fire, zoning and state surcharges.

Plan-check fee

The schedule lists a nonrefundable plan-check fee equal to one-half of the building permit fee.

Projects valued at $25,000 or more must pay the required plan-review fee at application.

Separate fees

Electrical, plumbing, mechanical, gas, roofing, Fire, zoning, Public Works and other records can create additional charges.

Additional service
Published charge
Demolition permit
$100 per structure
Moving a building or structure
$150
Reinspection, same-day inspection or safety-hazard field evaluation
$40 per inspection
Resubmission or addendum without increased valuation
$40 per review
Change of contractor, active-permit modification or extension
$40
After-hours construction permit
$25 per day
Work started without permit
Double permit fee
Conditional Certificate of Occupancy or Completion
$100
Site clearing and tree removal permit
$150
Zoning verification letter
$50 per parcel
Conditional use or variance application
$500
Fee-source date: The current Building Division page directs applicants to Resolution 2114-2022, effective August 2, 2022. Always compare this schedule with the itemized City invoice before paying.

Open the Official Fee Schedule

Inspection workflow

Request the Correct Inspection and Keep the Site Accessible

Permit issued
NOC filed when required
Correct stage ready
Submit eRequest
Access 10 AM–3 PM
Check COAST result
Correct or continue

City scheduling rules

  • Submit the inspection eRequest
  • Provide access from 10:00 AM–3:00 PM
  • Requests do not guarantee a requested date
  • After-4:00 PM requests are scheduled at City discretion
  • Inspectors do not call for gate codes
  • Use COAST for the inspection result

Job-site readiness

  • Permit card posted
  • Approved documents available
  • Notice of Commencement complete
  • Work fully ready
  • Work remains exposed
  • Gate, unit and floor access provided
Coordinate the trades: The inspection request states that mechanical, electrical and plumbing inspections should be scheduled for the same day as rough framing or building-final inspections when applicable.
Do not email for inspection status. Building staff states that status inquiries will not be returned. Use COAST to view scheduled inspections and results.

Request an Inspection

Common inspection types

Choose the Inspection That Matches the Work Stage

Project stage
Examples in the City request form
Do not cover yet
Foundation
Footing, stem wall, column pads, slab and backfill
Excavation, reinforcement or underslab work
Structural shell
Wall sheathing, roof sheathing, strapping, tie downs, tie beam and columns
Connections, nailing and structural details
Rough construction
Rough framing, electrical rough, plumbing rough and gas-pressure test
Wiring, piping, framing or rated assemblies
Exterior envelope
Window rough, wall dry-in, lath, stucco and waterproofing
Flashing, fasteners and moisture-control layers
Roof
Roof sheathing, in-progress and roof final
Nailing or required in-progress conditions
Pool
Steel, electrical bonding, piping, safety and pool final
Bonding, reinforcement or pressure-tested piping
Final
Building, Fire, zoning, driveway, tree, trade and demolition finals
Until the required certificate has been issued
Coastal and floodplain review

Check Flood Requirements Before Designing the Project

Flood-zone check

Planning provides flood maps, flood-zone information, construction requirements and substantial-damage assistance.

Planning: 904-247-6231

Elevation certificates

The City maintains finished-construction certificates that were submitted for permitting.

The Planning page asks applicants to allow approximately 7–10 business days for information review.

Fill and grading

Floodplain-development rules can apply to reconstruction, rehabilitation, additions, grading and bringing fill onto a property.

50% substantial-improvement test: When the value of an addition, alteration, repair or reconstruction equals or exceeds 50% of the existing building’s market value, the project is treated as substantial improvement and the complete structure may need current flood and building-code compliance.
Do not buy plans before checking the flood file. Confirm the mapped zone, base flood elevation, required design elevation, available elevation certificate and whether cumulative work affects the review.

Open Flood and Planning Resources

Notice of Commencement

Complete the NOC Before the First Inspection

Jacksonville Beach job-site steps

  1. Complete the Notice of Commencement.
  2. Record it with the Duval County Clerk.
  3. Provide the certified copy to the Building Division.
  4. Post the certified copy at the job site.
  5. Complete this before scheduling the first inspection.

Protect the property owner

  • Confirm contractor and supplier information.
  • Obtain partial lien releases before progress payments.
  • Obtain final releases before final payment.
  • Use the Contractor’s Final Payment Affidavit.
  • Terminate the NOC after completion when appropriate.
Failure to record the Notice of Commencement can contribute to an owner paying twice for the same labor or materials. Consult a lender or attorney when lien rights or financing are unclear.

Open NOC and Lien Documents

Owner and contractor paths

Owner-Builder or Licensed Contractor?

Owner-builder requirements

  • Complete the owner-builder disclosure.
  • Personally appear to sign for the permit.
  • Present valid government-issued identification.
  • Provide direct, onsite supervision.
  • Do not use the exemption to hide an unlicensed contractor.
  • Confirm the residence is for the owner’s use—not sale or lease.

The City form also describes a limited owner-builder route for qualifying commercial work costing no more than $75,000.

Open the owner-builder disclosure

Contractor registration

  • Valid Florida contractor credential
  • Business Tax Receipt
  • Liability-insurance certificate
  • Workers’ compensation certificate or exemption
  • Authorized agents listed by name
  • Current documents for every permit application

Registration expires when any required credential or insurance document expires.

Open contractor registration

Public Works dependency

A Building Permit Does Not Authorize Every Site or Right-of-Way Activity

Ask Public Works about

  • Right-of-way work
  • Utility connections
  • Drainage changes
  • Road or sidewalk impacts
  • Work affecting public infrastructure
  • Stormwater questions

Submission location

Public Works Department
1460-A Shetter Avenue
Jacksonville Beach, FL 32250

Phone: 904-247-6219
Email: Publicworks@jaxbchfl.net

The City states that Public Works applications submitted online must be printed, signed and delivered to Public Works or scanned and emailed to the department.
Private provider option

Using a Florida Private Provider

Before filing

  • Register the private-provider company.
  • Submit the Notice to Building Official.
  • Provide the plan-compliance affidavit when applicable.
  • Secure zoning, Fire, flood, electrical-engineering and Public Works approvals.
  • Follow the City filing checklist.

Important limits

The private provider does not replace municipal zoning, Fire, floodplain, Beaches Energy or Public Works review.

The published fee schedule lists adjustments for alternative plan review and inspection services, but required notices must be submitted at the correct stage.

Open Private Provider Forms

Construction schedule

Jacksonville Beach Construction Hours

Allowed hours

8:00 AM–6:00 PM

Monday through Saturday.

No routine construction

Sundays and listed City holidays, including New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas.

An after-hours request should be reserved for urgent necessity involving public safety and submitted at least three working days in advance. The published fee is $25 per approved day.
Current code framework

Codes Used for Jacksonville Beach Applications

Code subject
Edition listed by the City
Building
Florida Building Code, 8th Edition (2023)
Residential
Florida Building Code—Residential, 8th Edition (2023)
Existing Building
Florida Building Code—Existing Building, 8th Edition (2023)
Energy Conservation
Florida Building Code—Energy Conservation, 8th Edition (2023)
Mechanical, Plumbing and Fuel Gas
Florida Building Code, 8th Edition (2023)
Electrical
2020 National Electrical Code
Zoning and development
Jacksonville Beach Land Development Code, updated 2025
Open and expired permits

Close, Extend, Renew or Withdraw the Permit

Abandoned application

An application can be treated as abandoned after 180 days when it has not been pursued in good faith and no permit has been issued.

Expired permit

A permit can expire when work has not started or required progress and approved inspections do not occur within the applicable 180-day period.

Closed permit

Final inspections, final administrative documents and outstanding City fees must be resolved.

Inspection progress
Published renewal fee
No inspections completed
100% of original permit fee
Slab inspection approved
80% of original permit fee
All rough inspections approved
50% of original permit fee
Insulation inspection approved
30% of original permit fee
A final inspection remains
10% of original permit fee

Search the permit in COAST

Record the application number, status, inspections, fees and last approved inspection.

Identify whether work started

The City request asks what work was completed, whether inspections occurred and what remains.

Submit the correct request

Choose close, extend, renew or withdraw and provide the reason plus supporting documents.

Complete field evaluation or final inspections

The Building Official may require a field evaluation, renewed permit, new permit or additional documents.

Request the final certificate

Submit the Certificate of Occupancy or Completion request with the project-specific as-builts, elevation certificate, termite certificate or other final records.

Open the Permit Recovery Form

Certificate request

Documents That May Be Needed for CO or Completion

  • Master permit number
  • All required final inspections
  • Blower-door test results
  • Termite certificate
  • Final as-built survey
  • Finished-construction elevation certificate
  • Architectural or engineering as-builts
  • Private-provider certificate
  • Roof manufacturer evaluation
  • Outstanding fees paid

Request a CO or Certificate of Completion

Status decoder

What the COAST Permit Status Means

Application received The City has the form, but filing fees or construction documents may still be missing.
Plan review Building, Planning, Fire, floodplain, Beaches Energy or Public Works review is underway.
Corrections required Review the cited items and submit a coordinated resubmittal or revision.
Fees due Plan-check, permit, trade, Fire, zoning or other charges remain unpaid.
Approved Confirm that payment and formal permit issuance are complete before starting work.
Active permit Maintain inspection progress and keep the permit card and plans at the site.
Expired Stop work and request renewal, closure, withdrawal or another Building Official decision.
Closed Final inspection, administrative records and fees have been resolved.
Problem solving

Fix Common Jacksonville Beach Permit Problems

Problem
Likely reason
Best next action
Old portal link does not work
The page linked to an unrelated GovAccess system
Use City e-permit forms and COAST.
COAST search returns no property
Wrong jurisdiction, address format or Parcel ID
Confirm city limits and use the Duval real estate number.
Application is not moving
Plan-review fee, documents or municipal approval is missing
Check COAST and compare the file against the official checklist.
Inspection result was not emailed
Building staff directs applicants to COAST
Open Permit Query and review the inspection record.
Inspector could not enter
Gate, unit, floor or lockbox access was not supplied
Provide written access details before the next request.
Fence or hardscape review is delayed
Survey, easement, drainage, wall or tree information is incomplete
Submit a complete zoning package with the correct site details.
Flood review changes the project
Elevation or 50% substantial-improvement requirements apply
Pause design and obtain written Planning guidance.
Permit expired before final
The 180-day activity requirement was not maintained
Submit the extend, renew or close request before continuing work.
Useful call scripts

What to Say When You Contact the City

Permit route:
“I am proposing [exact work] at [address], Parcel ID [number]. Can you confirm the building, zoning, flood, Fire, tree and Public Works records required?”
Plan-review correction:
“Application [number] has comments from [division]. I submitted a response letter and coordinated revised plans. Can you confirm they entered the correct review cycle?”
Inspection access:
“Permit [number] is ready for [inspection]. The plans and permit card are on site, the work is exposed, and access is available from 10:00 AM to 3:00 PM.”
Open permit:
“Permit [number] at [address] is open or expired. The last approved inspection was [type/date]. Which renewal, field evaluation, final document or new permit is required?”
Final project control

Jacksonville Beach Permit Completion Checklist

  • Jacksonville Beach jurisdiction confirmed
  • COAST history checked
  • Correct e-permit form selected
  • Zoning and flood requirements confirmed
  • Tree and drainage documents included
  • Contractor or owner-builder documents accepted
  • Fire and Public Works approvals completed
  • Permit issued and posted
  • NOC completed before first inspection
  • Site access provided from 10 AM to 3 PM
  • All building and trade finals passed
  • Certificate and closed COAST record saved
Permit office location

Jacksonville Beach Building Division Map

Building Division: City Hall, first floor, 11 North Third Street, Jacksonville Beach, FL 32250.
Official resource library

Open the Correct Jacksonville Beach Resource

Frequently asked questions

Jacksonville Beach Building Permit FAQs

Where is the Jacksonville Beach Building Division?

The Building Division is at City Hall, first floor, 11 North Third Street, Jacksonville Beach, FL 32250. The Building Division phone number is 904-247-6235.

What are the public access hours?

Public access hours are Monday through Friday from 8:00 AM to 4:30 PM. Planning and Development closes at 3:30 PM on the fourth Tuesday of each month for a department staff meeting.

Where do I search Jacksonville Beach permits?

Use COAST, the Customer Online Application Services Tool. A public permit query can show historical permits, fees, plan-review status and inspection results without requiring a login.

How do I apply for a Jacksonville Beach permit?

Choose the correct application from the City’s E-Permit Applications page. Applications may also be submitted in person. Projects valued at $25,000 or more may require the plan-review fee and printed or scaled documents.

How do I schedule an inspection?

Submit the Building and Fire Permit Inspection Scheduling eRequest. Provide access to the work from 10:00 AM to 3:00 PM, Monday through Friday, and use COAST to check the result.

What are Jacksonville Beach construction hours?

Construction is allowed from 8:00 AM to 6:00 PM, Monday through Saturday. Routine construction is not allowed on Sundays or the listed City holidays.

Can a homeowner pull an owner-builder permit?

Yes, when the Florida owner-builder exemption applies. The owner must complete the disclosure, personally appear with valid identification, accept legal responsibility and provide direct onsite supervision.

When is a Notice of Commencement needed?

The City’s permit materials instruct owners to record the Notice of Commencement with the Duval County Clerk, provide it to the Building Division and post it at the job site before the first inspection when required.

What is the floodplain 50% rule?

When an addition, alteration, repair or reconstruction equals or exceeds 50% of the existing building’s market value, it is treated as substantial improvement and the full structure may need current flood and building-code compliance.

How do I close an expired permit?

Search the record in COAST, then submit the City request to close, extend, renew or withdraw the permit. The Building Official may require fees, final documents, a field evaluation, additional inspections or a new permit.

Independent guide and freshness

Source and Update Notes

Building-Department.org is an independent informational guide and is not the City of Jacksonville Beach. Applications, fees, reviews, inspections, certificates and enforcement must be handled through the City or another responsible agency.

This page was rebuilt using the current Building Inspection Division, COAST, City e-permit forms, inspection request, Planning Division, Public Works, contractor registration, owner-builder disclosure, flood information, permit-recovery procedures and City-published fee schedule.

Last reviewed: July 22, 2026.

Forms, fees, codes, inspection practices and portal links can change. Confirm time-sensitive information before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment