Hollywood Building Department: Permit Search & Inspections

The City of Hollywood Building Division issues all residential and commercial building permits within city limits. Whether you are building a new home, adding an ADU, remodeling, installing a pool, roof replacement, or performing commercial construction in 2026, this complete guide provides the exact micro-steps, official Accela portal links, current fees, full document checklists, inspection scheduling, owner-builder requirements, contractor registration rules, and practical insider tips that save time and avoid costly mistakes.

City of Hollywood Building Department Contact Information 2026

  • Physical Address: 2600 Hollywood Boulevard, Room 204, Hollywood, FL 33020
  • Main Phone: (954) 921-3333
  • Building Official: (954) 921-3333 ext. 2601
  • Email: building@hollywoodfl.org
  • Office Hours: Monday–Friday, 8:00 AM – 4:00 PM (public counter by appointment recommended)

Official Building Division Page: City of Hollywood Building Division

2600 Hollywood Boulevard, Room 204, Hollywood, FL 33020

Hollywood Building Permit Search 2026

Official Accela Portal: Accela Citizen Access – Search Permits

Search Steps:

  1. Visit the Accela portal (no login needed for public search).
  2. Enter address, permit number, owner name, or contractor name.
  3. Click any result to view plans, fees, status, and inspection history.

How to Apply for Hollywood Building Permits Online 2026 – 12 Micro-Steps

All new permit applications are submitted 100% online through the Accela Citizen Access portal. Easy Permits for small projects are available for faster processing.

Official Portal: Accela Citizen Access Portal

  1. Create or log into your Accela account with a valid email.
  2. For small qualifying projects: Use the Easy Permit option for faster approval.
  3. Start a new application and select your permit type (new construction, addition, remodel, ADU, pool, roof, commercial, etc.).
  4. Enter project address, detailed scope of work, and estimated valuation.
  5. Add owner and contractor information (contractor must be registered).
  6. Upload all required documents for electronic plan review.
  7. Provide zoning approval, flood info, or other clearances if required.
  8. Pay all calculated fees online.
  9. Submit the application and monitor real-time status and review comments.
  10. Address plan review comments and resubmit revised documents electronically.
  11. Once approved, pull/print your permit card online.
  12. Record the Notice of Commencement (if required) before scheduling your first inspection.

Hollywood Building Permit Fees 2026

  • Fee Schedules: View Current Fee Schedules
  • Fees are valuation-based with minimum charges and technology surcharges.
  • Work started without a permit triggers double fees plus penalties.

Required Documents Checklist (Upload for Electronic Plan Review)

  • Completed digital application in Accela
  • Sealed architectural and structural drawings
  • Site plan and code analysis
  • Energy calculations and Florida Building Code compliance forms
  • Flood zone determination (if applicable)
  • Contractor license and insurance
  • Owner-Builder Declaration (if applicable)
  • Notice of Commencement (recorded when required)

How to Schedule Hollywood Building Inspections

  1. After permit issuance, log into the Accela portal.
  2. Select “Schedule Inspection” and choose the required inspection type (footing, framing, final, electrical, plumbing, etc.).
  3. Choose preferred date (inspections typically scheduled within 1–2 business days).

Insider Tip: Schedule inspections early in the morning for better availability. Check the portal after 7:30 AM on inspection day for inspector assignment and contact number.

Contractor Registration & Owner-Builder Process

Contractors must be properly licensed in Florida and registered with the City of Hollywood. Homeowners may apply as owner-builders and assume full responsibility and liability. Complete the Owner-Builder Declaration in the Accela portal.

Local Insider Tips & Tricks for Hollywood Permits

  • Use the Easy Permit option for small no-plan-review projects — often approved same or next day.
  • Prepare files for electronic plan review in advance with clear naming conventions.
  • Submit complete packages the first time to avoid delays.
  • Save your application as draft while waiting on zoning or other reviews.
  • Call (954) 921-3333 early in the morning for fastest customer service response.

Frequently Asked Questions – Hollywood Building Permits 2026

Do I need a Notice of Commencement in Hollywood?

Yes — required for most projects above certain valuation thresholds. Must be recorded before the first inspection.

Can I pull my own permit as an owner-builder?

Yes. Complete the Owner-Builder Declaration in the Accela portal.

How do I search existing building permits?

Use the Accela Citizen Access portal by address or permit number.

Are all permits submitted online?

Yes — all new submissions must be submitted digitally through Accela.

Official Resources & Quick Links

This guide is updated April 2026 using only official City of Hollywood sources. Create your Accela account today to start your application. Bookmark this page for your entire project.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment