Hillsborough County Building Department: Permit Search & Permits

Hillsborough County permit action guide

Plan, Submit, Inspect and Close a Hillsborough County Permit Without Using the Wrong Jurisdiction

Hillsborough County Development Services handles building permits for unincorporated Hillsborough County. It does not issue City of Tampa, Temple Terrace or Plant City permits.

This practical guide gives you the correct HillsGovHub portal, permit-type tool, zoning and flood checks, residential and commercial checklists, inspection cutoff, Notice of Commencement rules, owner-builder limits, fee risks, older-record search paths and Certificate of Occupancy closeout steps.

Correct HillsGovHub application and permit-search workflow
Unincorporated-county jurisdiction, zoning and flood checks
Inspection, NOC, impact-fee and CO closeout guidance
Hillsborough County permit moving through property, zoning, flood, plan review and inspections An animated site plan, digital permit dashboard, tree, flood symbol and final inspection check show the Hillsborough County permitting process. HILLSBOROUGH SITE PLAN 8 REVIEW AREAS BUILDING ZONING FLOOD ELECTRIC PLUMBING MECHANICAL REVIEWED PERMIT INSPECTIONS + FEES CO READY
📍
Jurisdiction comes before the permit application Hillsborough County handles permits for unincorporated Hillsborough County. A Tampa mailing address does not automatically mean the property is inside the City of Tampa. Check the county map before applying.
🔒
Payment scam warning Hillsborough County says Development Services payments are billed through HillsGovHub and appear inside the customer’s HillsGovHub account. Treat unexpected outside payment requests as suspicious.
Start here

Choose the Hillsborough County Task You Need

Official contact panel

Hillsborough County Development Services Contact Information

Main phone 813-272-5600 Permitting, inspections and Development Services
Permitting email Permitting@HCFL.gov Building and construction assistance
Contractor licensing licensing@hcfl.gov 813-272-5600
Natural Resources naturalresources@hcfl.gov Trees, clearing and wetland setbacks
Right-of-way permits ROWPermits@HCFL.gov Driveways, access and work in public right-of-way
Tech Center location County Center, 16th Floor 601 E. Kennedy Blvd., Tampa, FL 33602
Tech Center hours Monday–Friday 8:00 AM–4:00 PM
What the Tech Center does: It assists customers who do not have equipment for digital submittals or whose documents are not being accepted online. Permit applications remain online through HillsGovHub.
Do not file with the wrong government

County Permit or City Permit?

Property location
Likely permit authority
What to do first
Unincorporated Hillsborough County
Hillsborough County
Use the county Map Viewer and HillsGovHub.
Inside City of Tampa limits
City of Tampa
Use Tampa’s official construction-services system.
Inside Temple Terrace limits
Temple Terrace
Use the Temple Terrace building department.
Inside Plant City limits
Plant City
Use the Plant City building division.
Tampa mailing address outside city limits
Verify boundaries
A mailing address does not decide jurisdiction. Search the parcel.
Fast check: Open the Hillsborough County Map Viewer, enter the address and generate the property report before opening a paid permit application.

Hillsborough County Permit Route Finder

Select the situation that best matches your project.

Application workflow

Apply Through HillsGovHub in the Correct Order

Confirm county jurisdiction
Identify permit type
Research zoning and flood
Open project checklist
Submit in HillsGovHub
Complete review and pay
Inspect and obtain CO

Confirm the property is in unincorporated Hillsborough County

Search the address in the county Map Viewer. Review zoning, flood-zone information, future land use and applicable property data.

Save: Property address, folio number, zoning district and flood-zone result.

Use the county’s Online Permit Types tool

Select the project rather than guessing which HillsGovHub application category applies.

Open the exact county checklist

Use the residential, mobile-home, commercial, site, subdivision or miscellaneous checklist that matches the project.

Do not rely on a generic list: Each project has different site-plan, utility, flood, natural-resource and plan requirements.

Create or sign into HillsGovHub

Start the correct application and enter the complete owner, property, contractor, scope and valuation information.

Upload coordinated plans and supporting approvals

Submit the site plan, construction plans, energy documents, contractor information, septic or utility approvals, flood documents and other checklist items.

File naming: Site-Plan.pdf, Architectural-Plans.pdf, Structural-Plans.pdf, Energy-Forms.pdf.

Answer every review comment

Building, electrical, gas, mechanical, plumbing, land use, zoning and flood-damage-control reviews may be handled separately.

Best practice: Submit one response letter matching every comment to a revised sheet or document.

Complete fees and obtain permit issuance

Pay building, subtrade, fire, impact, mobility or other assessed fees. Confirm that the permit is formally issued before starting work.

Security: Verify every Development Services payment inside HillsGovHub.

Upload the recorded Notice of Commencement when required

Record and certify the NOC with the Clerk, then upload it to the HillsGovHub permit record before the first inspection when the threshold applies.

Complete inspections and final closeout

Schedule required inspections through the permit record. When all inspections and fees are complete, the Certificate of Occupancy can be issued where required.

Project decision table

Match the Project to the Correct County Permit Path

Project
Likely permit route
Important additional check
New single-family home
Residential building permit
Zoning, site plan, water/sewer or septic, flood, trees, energy and impact fees
Single-family addition
Addition permit
Utility receipt or septic application, NOC, owner-builder form and flood review
Interior alteration or remodel
Alteration permit
Structural work, trade permits, energy, occupancy and flood 50% rule
Residential pool
Residential miscellaneous—building
Scaled site plan, easements, setbacks, trees, wetlands, flood design and NOC
Accessory structure over 150 square feet
Accessory-structure permit
Setbacks, flood zone, engineered plans and foundation/anchoring
Roof, window or exterior-door work
Building permit or exemption application
HB 803 conditions, flood hazard, structural work and product approvals
Solar photovoltaic system
Electrical/building permit
System plans, structural attachment, electrical details and virtual-inspection options
Mobile home on private property
Mobile-home setup permit
Zoning, roadworthy affidavit, utility receipt, septic and flood elevation
Commercial buildout or change of use
Commercial construction route
Parcel sufficiency, zoning, fire, accessibility, Health, site and CO requirements
Tree removal, clearing, grading or filling
Natural Resources review
Tree permit, land-alteration permit, wetland setback and environmental review
Driveway or public right-of-way work
ROW permit
Access, drainage, temporary traffic control and utility requirements
Permit-exemption check

Work That May Not Need a Standard Building Permit

Exempt does not mean unregulated. Zoning, floodplain, HOA, contractor-license, product-approval or safety rules may still apply. Some exemptions require an application through HillsGovHub.
Work
County guidance
Important condition
Painting, flooring, cabinets and wallpaper
Typically exempt
No structural, electrical, plumbing, mechanical or gas alteration
PVC, wood or chain-link privacy fence
Building permit may not be required
Check zoning, height, location, easements and HOA rules
Electrical or concrete fence
Permit required
Use the proper building or electrical permit path
Residential shed or greenhouse under 150 square feet
Building permit may not be required
Check zoning, placement, flood and HOA requirements
Porch
Permit required
All porches require a permit under the county guidance
Nonstructural work under $7,500 on a single-family residence
HB 803 exemption application
Submit through HillsGovHub; not available in flood hazard areas or for structural/trade work
Minor plumbing leak or stoppage repair
May be exempt
Replacing concealed traps or defective piping requires a permit

Check the Official Exemption Rules

Application readiness

Prepare These Items Before Opening HillsGovHub

Property information

  • Exact property address
  • Folio and legal description
  • Owner’s legal name
  • Current zoning district
  • Flood-zone result
  • Existing and proposed use

Project documents

  • Detailed scope of work
  • Total construction value
  • Scaled site plan
  • Architectural plans
  • Structural details
  • Energy and product documents

Supporting approvals

  • Contractor license verification
  • Owner-builder disclosure
  • Utility receipt or septic application
  • Recorded Notice of Commencement
  • Elevation certificate or flood worksheet
  • Tree, wetland or ROW approval
Project-specific preparation

Important Documents for Common County Projects

Project
Prepare before submission
Question to answer first
Single-family addition
Site plan, addition plans, utility receipt or septic application, NOC and contractor/owner-builder documents
Will the addition affect setbacks, flood compliance or septic capacity?
Residential pool
Scaled site plan, setbacks, easements, wetlands, tree information, engineered pool plan and barrier details
Is the pool in an SFHA, CHHA, CAZ, floodway or wetland setback?
Roof replacement
Scope, value, product approvals, contractor information and flood-zone status
Does the HB 803 exemption apply, or is a standard permit required?
Commercial buildout
Code analysis, occupancy, accessibility, life-safety, MEP plans, zoning and Fire information
Is the proposed use permitted and does it require a new CO?
Mobile-home installation
Setup details, roadworthy affidavit, paid utility receipt or septic documentation, zoning and flood elevation
Is the site approved for the mobile home and required utilities?
Tree removal or clearing
Scaled site plan, tree locations, species, trunk sizes, photographs and owner authorization
Is this individual tree removal or land alteration/clearing?
Notice of Commencement

When Hillsborough County Requires an NOC

General construction threshold

A Notice of Commencement is required when improvements to real property cost more than $5,000.

Mechanical-only threshold

For a permit involving only mechanical work, including repair or replacement of an existing heating or air-conditioning system, the threshold is $15,000 or more.

What to do

  1. Complete the NOC.
  2. Record and certify it with the Clerk.
  3. Upload it to the HillsGovHub permit.
  4. Complete this before the first inspection.

Open County NOC Forms and Instructions

Inspection scheduling

Schedule Hillsborough County Inspections Correctly

Next-business-day cutoff: Submit an in-person inspection request through the permit record in HillsGovHub by 11:59 PM for the following business day.

Standard inspection

  1. Open the issued permit.
  2. Select the required inspection.
  3. Choose the available date.
  4. Confirm the request.
  5. Check the result after the visit.

Failed inspection

Correct every listed item before rescheduling.

The county says a failed inspection may be subject to a $125 reinspection fee.

Time-specific inspection

The Development Services FAQ lists a $102.50 fee, subject to workload and availability.

Request before 12:30 PM the business day before.

813-564-4696

Before requesting

  • Permit is issued and active
  • Correct inspection type selected
  • Required work is complete
  • Work remains visible
  • NOC uploaded when required
  • Previous corrections completed

Before the inspector arrives

  • Address visible from the street
  • Permit and approved plans available
  • Gates and work areas accessible
  • Safe ladders or access provided
  • Animals secured
  • Site contact reachable
Virtual inspection option

Which County Inspections May Be Completed Virtually?

Virtual inspection
Common eligible work
Practical requirement
Building final
Window, exterior-door or garage-door replacement
Submit all required photographs or videos through VuSpex Go.
Electrical rough-in
Solar photovoltaic systems
Follow the county’s virtual-inspection media checklist.
Electrical final
AC changeout, water heater, service repair or PV work
Photograph equipment, labels, connections and required installation details.
Mechanical final
Air-conditioning changeout
Provide complete equipment and installation media.
Plumbing final
Water-heater replacement or plumbing repipe
Show required piping, valves, supports and completed work.
Roof dry-in or final
Re-roof projects
Use the exact county checklist; missing media can delay approval.
No live video appointment: Hillsborough County currently uses an offline virtual process. Submitted photos and videos are assigned to an inspector for review.

Open Virtual Inspection Instructions

Owner-builder decision

Can a Hillsborough County Homeowner Pull the Permit?

General eligibility

  • The property is in the homeowner’s name.
  • The property is the homeowner’s primary residence.
  • A recently purchased property may require a recorded certified deed.
  • The Owner Builder Disclosure Statement must be submitted.
  • The owner assumes contractor responsibilities.

Important restriction

The county’s homeowner guidance states that the property cannot be sold for one year from the date the work was completed.

Owner-builders accept responsibility for permitting, supervision, workers, code compliance, inspections and project closeout.

Do not use an owner-builder permit to hide an unlicensed contractor. Confirm eligibility and responsibilities before signing the disclosure.

Open Owner-Builder Guidance

Contractor verification

Confirm the Contractor Before Adding Them to the Permit

Verify these items

  • Correct legal business name
  • State or local license status
  • HillsGovHub license verification
  • General liability insurance
  • Workers’ compensation status
  • Contract scope matches permit scope

Trades may use different agencies

Fire protection, septic systems, well drilling, LP gas and mobile-home installation may involve licensing or approvals from other state or local agencies.

licensing@hcfl.gov · 813-272-5600

Open Contractor Licensing

Flood, trees and wetlands

Complete Environmental and Flood Checks Before Final Plans

Special Flood Hazard Area

An application may require an Elevation Certificate marked “Construction Drawings” or a signed and sealed site plan showing flood boundaries and elevations.

During construction

After the foundation establishes the lowest floor, submit a “Building Under Construction” Elevation Certificate or qualifying foundation tie-in survey.

Before the CO

A complete “Finished Construction” Elevation Certificate must be reviewed and corrected before the Certificate of Occupancy is issued when required.

50% rule: In a Special Flood Hazard Area, improvement or repair costs equal to or exceeding 50% of the pre-improvement or pre-damage market value may require the building to be brought into flood-compliance.

Tree removal

The official page currently lists an $81.65 application fee, plus $24.93 per acre for parcels over five acres.

Use a scaled site plan and identify trees proposed for removal.

Land alteration

Clearing, grubbing, grading, filling or excavating may require a Natural Resources permit or a land-alteration component within the building application.

Wetland setback

County guidance identifies setbacks ranging from 30 to 50 feet from wetlands and natural water bodies.

The current page lists a $270 EPC fee for the encroachment request.

Zoning and site pre-check

What to Verify on the Property Map

  • Correct parcel and jurisdiction
  • Current zoning district
  • Future land-use category
  • Flood-zone designation
  • Property boundaries
  • Easements and right-of-way
  • Wetlands or conservation areas
  • Previous zoning cases
  • Allowed property use
  • Applicable setbacks and lot standards
Map warning: The Map Viewer is a general-information tool. Request formal zoning or professional survey confirmation when the project depends on an exact boundary, setback, flood elevation or legal-use decision.
Permit budget

Building, Impact and Mobility Fee Planning

Building fees

Use the county’s current building fee schedule rather than a generic percentage estimate.

Permits and services not specifically listed may be calculated by the Building Official using the current fee-study methodology.

Impact and mobility fees

New development and some additions or remodels that increase usable area may trigger impact and mobility fees.

These fees are assessed before building-permit issuance.

Do not let the permit expire

The county warns that mobility and impact fees are reassessed at current rates when an expired permit is reissued.

The new amount may be higher.

New residential development: County guidance says it generally pays three impact fees plus a mobility fee. Most non-residential development pays a fire impact fee plus a mobility fee, with listed exceptions.
Permit status help

What Common HillsGovHub Statuses Mean

Draft The application has not been submitted. Complete required fields and attachments.
Submitted or intake The county received the record and may be checking basic completeness.
Under review One or more review disciplines are evaluating the application.
Additional information required Open every review comment and upload the requested correction to the existing record.
Fees due Review may be complete enough for charges, but formal issuance has not occurred.
Issued Construction may begin within the approved scope and permit conditions.
Inspection failed Correct all listed deficiencies before requesting reinspection.
Expired Contact Development Services before continuing. Updated plans, fees or impact assessments may apply.
Finaled The permit inspections are complete. Verify subtrade permits and certificate requirements.
Certificate of Occupancy issued Required inspections and fees are complete and the structure is approved for occupancy.
Certificate of Occupancy

What Must Be Complete Before a County CO Is Issued?

Inspections

All required building, electrical, gas, mechanical, plumbing, fire and other final inspections must be approved.

Fees

All permit fees and assessed impact and mobility fees must be paid.

Final documents

Required elevation certificates, special-inspector documents, trade finals and other closeout records must be accepted.

Do not occupy early: Permit issuance allows construction. It does not automatically authorize occupancy. Wait for the required Certificate of Occupancy or completion approval.

View Permit and CO Activity

Permit and CO records

Use the Correct Records Search for the Permit Date

Record date
Correct search path
What to prepare
1976–2004
Submit a records request
Year built, address, previous addresses, folio and permit-application year when known
2005–January 19, 2021
Building Permit Reports
Address, permit number, owner or contractor information
January 20, 2021–present
HillsGovHub
Record number or exact property address
Detailed older plans and attachments
PGM Store or records request
Permit number, folio, year and document type
Elevation Certificate
PGM Store or records request
Year built, current/previous address and folio
Certificate of Occupancy
Use county date-range instructions
Permit number, address and issuance date
Property-sale check: Search for the permit application, approved plans, inspection results, elevation certificate and CO. A permit number alone does not prove the project was completed legally.

Open the Official Records Guide

Open or expired permit

How to Resolve an Older Permit That Was Never Closed

Collect before calling

  • Permit or record number
  • Property address and folio
  • Original scope of work
  • Approved plans if available
  • Inspection history
  • Current photographs

Ask Development Services

  • Is the permit active or expired?
  • Which inspections remain?
  • Are revised plans required?
  • Can the contractor be changed?
  • Will impact fees be reassessed?
  • What proves final closure?
Code complaints

Report Possible Unpermitted Construction

Prepare the facts

  • Exact property address
  • Description of work
  • When the work was observed
  • Visible safety issue
  • Photos when lawful and safe
  • Your valid contact details

Submit the report

Choose the construction-code or unpermitted-construction category on the county’s violation form.

Code Enforcement: 813-274-6600

Open the official complaint page

Immediate danger: Call 911 for an active fire, collapse, gas leak, exposed live wiring or another urgent threat. Do not wait for an online code complaint.
Ready-to-use scripts

What to Say When You Contact Development Services

Permit requirement
“I am planning to [describe exact work] at [full address and folio]. Can you confirm that the property is in unincorporated Hillsborough County and identify the permit, zoning, flood, natural-resource and inspection requirements?”
Review correction
“For record [number], I uploaded a coordinated revision set and response letter. Which review discipline remains outstanding, and is another document or outside approval required?”
Inspection question
“I need the [inspection type] inspection for permit [number] at [address]. The work is complete and visible. Is this inspection eligible for virtual review, or must it be scheduled in person?”
Open permit
“Permit [number] appears open or expired. Which inspections, fees or documents remain, and will impact or mobility fees be reassessed if it is reissued?”
Final project control

Hillsborough County Permit Closeout Checklist

  • County jurisdiction confirmed
  • Correct permit type selected
  • Zoning report reviewed
  • Flood zone checked
  • Tree and wetland issues checked
  • Utility or septic documents uploaded
  • Contractor license verified
  • Permit formally issued
  • NOC uploaded when required
  • Permit and plans available onsite
  • Inspection requests submitted before cutoff
  • Failed inspections corrected
  • Building and subtrade finals passed
  • Impact and mobility fees paid
  • Final flood documents accepted
  • CO or completion approval issued
In-person digital-submittal help

Hillsborough County Development Services Tech Center Map

Current location: County Center, 601 E. Kennedy Blvd., 16th Floor, Tampa, FL 33602.
Hours: Monday–Friday, 8:00 AM–4:00 PM.
Phone: 813-272-5600.
Official resource library

Hillsborough County Permit Portals, Checklists and Records

Frequently asked questions

Hillsborough County Building Department FAQs

Does Hillsborough County issue permits for properties inside the City of Tampa?

No. Hillsborough County Development Services handles permitting for unincorporated Hillsborough County. Properties inside Tampa, Temple Terrace or Plant City generally use the applicable municipal building department.

What is the official Hillsborough County permit portal?

The official online permitting, licensing and inspection system is HillsGovHub. Applicants can submit and track permit applications, research records and manage inspections through the portal.

How late can I schedule an inspection for the next business day?

Hillsborough County says an in-person inspection request must be placed through HillsGovHub by 11:59 PM for the following business day.

How much is a failed-inspection reinspection fee?

The county’s inspection page states that failed inspections may be subject to a $125 reinspection fee. Correct every cited item before requesting another inspection.

When is a Notice of Commencement required?

An NOC is required when improvements to real property cost more than $5,000. For a project requiring only a mechanical permit, including qualifying heating or air-conditioning repair or replacement, the listed threshold is $15,000 or more.

Can a homeowner pull a Hillsborough County permit?

Generally, an eligible homeowner may act as an owner-builder when the property is in the homeowner’s name and is the primary residence. The owner must submit the disclosure and accept direct permit, supervision and inspection responsibilities.

Does a shed under 150 square feet need a county building permit?

County guidance lists residential sheds and greenhouses under 150 square feet among work that may not require a building permit. Zoning, floodplain, setback and HOA requirements may still apply.

Can roof, window or door work qualify for the $7,500 exemption?

Some nonstructural work on a single-family residence valued under $7,500 may qualify under the county’s HB 803 exemption process. An exemption application must still be submitted through HillsGovHub, and the exemption does not apply in flood hazard areas or to structural, electrical, plumbing, mechanical or gas work.

Where do I find an older Hillsborough County building permit?

Use a records request for 1976–2004 records, Building Permit Reports for 2005 through January 19, 2021, and HillsGovHub for records from January 20, 2021 to the present.

What must be complete before a Certificate of Occupancy is issued?

All required inspections must be approved, all permit and assessed impact or mobility fees must be paid, and required final documents such as elevation or professional compliance records must be accepted.

Source and accuracy note

Official Hillsborough County Information Used

Building-Department.org is an independent informational guide and is not Hillsborough County Government.

This page was checked against Hillsborough County Development Services, HillsGovHub, the county Map Viewer, residential and commercial checklists, inspection scheduling, virtual-inspection guidance, permit-exemption rules, owner-builder requirements, NOC instructions, flood requirements, Natural Resources, fee pages and Development Services record-search instructions.

Last reviewed: July 23, 2026.

Office floors, fees, forms, code requirements, inspection availability and portal procedures can change. Confirm time-sensitive details with Hillsborough County before filing, paying or starting construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.