Fort Lauderdale Building Department: Permit Search & Inspections

Fort Lauderdale permit action guide

Apply, Review, Inspect and Close a Fort Lauderdale Permit Through the Correct City Path

Use this page to complete a real task: confirm city jurisdiction, choose the correct permit, submit through LauderBuild, answer plan-review comments, arrange inspections and verify final closure.

It also catches Fort Lauderdale-specific issues before they delay the project—floodplain requirements, seawalls and docks, trees, zoning, public right-of-way work, historic review, contractor registration and the new 2026 residential permit-exemption request.

Current LauderBuild application and public search links
Flood, seawall, survey and zoning pre-checks
Inspection hours, NOC and closeout guidance
Fort Lauderdale permit moving through digital plan review, flood checks and final inspection An animated plan, permit record, city skyline, waterway, wind check, review screen and passed inspection illustrate the local permit process. LAUDERBUILD PLAN ROOM REVIEWED PERMIT FINAL INSPECTIONPASSED FORT LAUDERDALE
📌
New permit rule effective July 1, 2026Certain cosmetic, nonstructural work under $7,500 on an eligible single-family home may qualify for a permit exemption. It is not automatic: submit the city’s HB 803 exemption request through LauderBuild and receive written approval before starting. Electrical, plumbing, mechanical, gas, structural, multifamily, condominium, commercial and flood-hazard-area work does not qualify.
Start here

Choose the Fort Lauderdale Task You Need

Official contact panel

Fort Lauderdale Development Services Contacts

Permit and inspection help954-828-6520, option 1LauderBuild and general permitting assistance
Property recordsDigital and microfilm recordsPermits and available plans for city properties
Certificate inquiriesCOinquiries@fortlauderdale.govCO and completion-document questions
Customer-service hours8:00 AM–4:00 PMMonday through Friday for the main call center
Inspection windowGenerally 8:00 AM–3:30 PMContact the assigned inspector for access timing
Floodplain group954-828-4255Elevation and flood-development questions
Office addressGreg Brewton Center700 NW 19th Avenue, Fort Lauderdale, FL 33311
Payment-scam warning: The Development Services Department says it does not take payment over the phone and will not demand gift cards, wire transfers, digital currency, passwords or banking details.
Avoid the wrong authority

City of Fort Lauderdale or Another Broward Municipality?

Use LauderBuild when

  • The parcel is inside Fort Lauderdale city limits.
  • The city’s address-verification or property tools recognize it.
  • The record history appears under the FTL LauderBuild portal.
?

Verify first when

  • The mailing address says Fort Lauderdale but the parcel may be in another city.
  • The property sits near Oakland Park, Wilton Manors, Plantation, Davie or another boundary.
  • You only have a Broward folio number.
Fast check: Use the city’s Address Verification page and confirm the folio through the Broward County Property Appraiser before creating an application.
2026 exemption decision

Does the New Under-$7,500 Rule Remove the Permit?

Situation
Possible result
Required action
Single-family home, cosmetic nonstructural work, value below $7,500, outside flood hazard area
May qualify
Submit the HB 803 exemption request and wait for written city approval.
Interior painting, flooring, cabinets or minor drywall repair
Potential examples
Provide the licensed-contractor proposal or estimate and complete the city review.
Electrical, plumbing, mechanical, gas or structural work
Not exempt
Apply for the required permit regardless of value.
Windows, A/C units or work in a flood hazard area
Not exempt
Use the normal permit route and submit required technical documents.
Condo, apartment, multifamily or commercial property
Not exempt
Use the standard permit process.
One larger project divided into smaller contracts
Prohibited
Submit the full project under the normal permit rules.
Permit finder

Match the Project to the Correct City Review

Project
Start with
Fort Lauderdale check
New home, addition or structural alteration
Building permit
Survey, zoning, flood, engineering, landscape and all trades
Roof replacement
Roofing application package
Product approvals, hurricane mitigation and inspection documents
Windows, doors or shutters
Structural permit
Florida approvals, wind data and opening details
A/C change-out or generator
Mechanical/electrical permit
Equipment data, flood elevation, setbacks and gas work
Pool or spa
Pool-spa package
Current survey, barrier, zoning, electrical and drainage
Fence, wall, gate, driveway, patio or shed
Project checklist + zoning
Signed/sealed survey, sight triangle, setbacks and ROW
Dock, seawall or waterfront work
Structural + zoning/engineering
Waterway permission, seawall ordinance, survey and environmental review
Commercial tenant build-out or change of use
Commercial alteration
Zoning, occupancy, ADA, fire, business tax and CO
Road, sidewalk, driveway apron, utility or crane in public space
Engineering/ROW permit
Traffic control, utilities, bonds and restoration
Tree removal or landscape changes
Landscape/tree permit
Protection, replacement planting and site-plan conditions
LauderBuild workflow

Apply in Seven Clear Steps

Confirm the address, folio and permit type

Verify city jurisdiction and identify every building, electrical, mechanical, plumbing, gas, zoning, landscape or right-of-way component.

Do next: Do not choose a small-project category simply because it appears faster.

Check flood, zoning and site constraints

Review flood risk, setbacks, property use, trees, historic status, seawall conditions and public right-of-way work before final design.

Do next: Exterior work generally requires a current signed and sealed survey and site plan.

Prepare the city forms and technical documents

Use the current DSD forms library for the exact project checklist. Obtain digitally signed and sealed documents where a licensed design professional is required.

Do next: Open each PDF and confirm it is readable before upload.

Create or update the LauderBuild account

Registration is free. Registered users can apply, use the Plan Room, schedule inspections and manage contractor credentials.

Submit the application and initial fee

Beginning July 1, 2026, initial permit fees are due when the application is submitted. Additional charges may be assessed during review.

Save: Record number, payment receipt, uploaded files and account email.

Answer every plan-review comment

Use one coordinated revision set. Provide a response explaining each correction and the sheet or document where it appears.

Avoid: Uploading isolated replacement pages that conflict with the rest of the set.

Pay the balance and confirm issuance

Remaining balances must be paid before the final permit is issued. Download the issued permit and reviewed plans before starting work.

Do not start: “Submitted” or “approved” is not the same as an issued permit.
Walk-Thru option

When the LauderBuild Walk-Thru Route May Help

What it is

Registered users can create eligible online Walk-Thru applications at any time. The city says they are processed the next business day, Monday through Friday, during the 8:00–9:30 AM processing window.

What it is not

Walk-Thru does not remove zoning, flood, survey, product, contractor or technical-document requirements. An incomplete or incorrectly classified project can still be held or redirected.

Application readiness

Document Checklist Before Uploading

Property and applicant

  • Exact address and folio
  • Owner’s legal name
  • Authorized-agent form
  • Contractor registration
  • Project valuation
  • Detailed scope

Plans and site

  • Current signed/sealed survey
  • Site plan for exterior work
  • Existing/proposed floor plans
  • Structural calculations
  • Energy/code forms
  • Digitally signed documents

Products and approvals

  • Florida Product Approvals
  • Manufacturer instructions
  • Flood documents
  • Zoning affidavit if allowed
  • Landscape/tree approvals
  • ROW or outside approvals
Exterior-work rule: The city states that exterior work requires a current signed and sealed survey plus a site plan showing the proposed work. Certain fences, driveways, walks, patios, walls, decks, docks, seawalls, sheds and public sidewalks may use survey copies with a completed Zoning Affidavit.
Owner-builder decision

Owner-Builder or Licensed Contractor?

Owner-builder route

  • Limited to an owner of a one- or two-family dwelling.
  • The home must be for the owner’s use and not for sale or lease.
  • The owner must perform the work or provide direct on-site supervision.
  • A signed Owner/Builder Affidavit is required.
  • The owner accepts contractor, safety and lien responsibilities.

Licensed contractor route

  • Commercial property owners must hire a contractor for work requiring permit and inspection.
  • Contractors register and renew through LauderBuild.
  • License, insurance and workers’ compensation information must remain current.
  • The contractor on the application should match the actual responsible company.
Notice of Commencement

Record and Post the NOC When the Contract Exceeds $5,000

Permit application
Complete NOC
Record with Broward County
Obtain certified copy or affidavit
Post at job site
Keep reviewed plans available
Request inspection

City requirement

The city says the homeowner or contractor must record a Notice of Commencement when the contract exceeds $5,000. The recorded copy or an affidavit attesting to recordation must be posted at the site.

Broward recording locations

The city lists Governmental Center West, 1 N. University Drive in Plantation, and Broward County Governmental Center, Room 114, 115 S. Andrews Avenue in Fort Lauderdale.

Review and expiration

Understand the City’s Time Rules

Plan-review targetThe city says approval time depends on complexity and workload, but it generally attempts review within 30 working days.
Unpursued applicationAn application may be treated as abandoned 180 days after filing unless it is pursued in good faith or a permit is issued.
Renewal before expirationThe city FAQ lists a fee of 50% of the original permit fee when renewed before expiration.
Renewal after expirationThe city FAQ lists 100% of the original permit fee after expiration. One renewal is allowed; additional renewals are at the Building Official’s discretion.
Inspection action board

Schedule and Prepare for Fort Lauderdale Inspections

Schedule

Use the issued permit in LauderBuild. Select the correct structural, electrical, mechanical, plumbing, roofing, zoning, landscape or other required inspection.

Typical inspection hours

The city says inspections are generally conducted between 8:00 AM and 3:30 PM.

Specific-time request

Contact the assigned inspector between 7:30 AM and 8:00 AM to request a time accommodation. It is not guaranteed.

Have on site

  • Issued permit
  • Recorded NOC
  • Reviewed plans
  • Survey/site documents
  • Product approvals
  • Manufacturer instructions

Make the site ready

  • Correct stage complete
  • Work remains uncovered
  • Safe access provided
  • Address visible
  • Corrections completed
  • Contact person available
Canceling: Call 954-828-6520, option 1 between 8:00 AM and 4:00 PM or contact the assigned inspector. After-hours inspections require coordination with the discipline chief and may carry an additional fee.
Do not cover work early. Concealed framing, wiring, plumbing, mechanical systems, roofing layers or insulation may have to be reopened when the inspector cannot verify compliance.
Local design and approval checks

Resolve These Fort Lauderdale Issues Before Final Plans

Floodplain

Check flood-risk maps and required elevation, floodproofing, mechanical-equipment or substantial-improvement documents.

Open flood resources

Zoning

Confirm use, setbacks, height, lot coverage, parking, fences, pools, signs and Board of Adjustment needs.

Zoning@fortlauderdale.gov

Seawall and dock

Use the city checklist and current seawall rules. Nothing except a mooring device may be attached to a seawall under the city zoning FAQ.

Landscape and trees

Tree removal, relocation and site changes may require a separate landscape or tree permit and replacement planting.

Historic property

Exterior work in a historic district or on a designated resource may need a Certificate of Appropriateness before permit issuance.

Right-of-way

Sidewalks, driveway aprons, cranes, utilities, dewatering and public-space work use Engineering/ROW review.

Water and sewer capacity

New or intensified development may need a Water and Wastewater Capacity Availability Request through LauderBuild.

Business occupancy

A commercial permit does not replace the City Business Tax Receipt or other operating approvals.

CO checkpoint: The city now requires a separate ADA inspection to be scheduled and passed before a Certificate of Occupancy or Certificate of Completion for structures that will be occupied by people.
Fees and payment

Use the Current City Schedule and LauderBuild Invoice

2026 payment sequence

  1. Submit the application and pay the initial fee.
  2. Review additional discipline or service fees assessed during review.
  3. Check engineering, zoning, landscape, fire and impact fees separately.
  4. Pay the remaining balance before final permit issuance.
  5. Keep every electronic receipt.

Do not use a generic percentage

The city publishes separate Permitting, Engineering/ROW and Urban Design/Zoning fee schedules. Project type, valuation, disciplines, private provider, impacts and after-hours services can change the amount.

Open all DSD fee schedules

Current special fee
Standard city fee
Private-provider fee
Inspection review per discipline
$407
$306
Inspection and plan review per discipline
$632
$316
Building Safety Inspection Program report review
$375
Not the same program fee

The first two fee examples are from the city’s July 1, 2026 HB 803 update. Landscape, zoning and engineering are not covered by the private provider and remain subject to full city rates.

Permit and property records

Find Permits, Inspection History and Old Plans

Search LauderBuild first

Unregistered users can search public records and pay fees. Start with the exact permit number; otherwise use the address.

Open the complete record

Review status, related records, fees, inspections and available attachments. Do not rely only on the search-results row.

Use the Building Permit Tracker

The city GIS tracker provides a map-based way to locate building-permit activity.

Request older property records

The Property Records Office maintains digital and microfilm permits and plans. Submit a records request when the desired file is not available through LauderBuild.

Buyer or seller check: Confirm the permit was issued, required inspections passed, related trade permits closed and the correct CO or completion record exists. An application or permit number alone does not prove lawful completion.
Older building compliance

Building Safety Inspection Program Reports

Digital submission only

The city no longer accepts paper reports for the Building Safety Inspection Program. Reports must be digitally signed and sealed and submitted through LauderBuild.

Review fee

The city lists a $375 report-review fee due at submission. Use the current program notice and report requirements for the specific building.

Open program information

Status decoder

What Common LauderBuild Statuses Mean

DraftThe application has not been submitted. Finish required fields and attachments.
Submitted / intakeThe city received the record and may be checking minimum submission requirements.
In reviewOne or more disciplines are reviewing. Do not start work.
Corrections requiredOpen each comment, coordinate the revisions and upload a response.
ApprovedFees, contractor, NOC or formal issuance steps may remain.
IssuedDownload the permit and reviewed documents; inspections may now be scheduled.
Inspection failedComplete every cited correction before requesting reinspection.
Final / CO / completionSave the document and verify all related discipline records are also closed.
Problem solver

Fix Common Fort Lauderdale Permit Problems

Problem
Likely cause
Best next action
Address not found
Wrong jurisdiction, address format or missing folio match
Use Address Verification and the Broward Property Appraiser before creating a duplicate.
HB 803 exemption denied
Work is regulated, property is in flood hazard area or scope is not cosmetic
Apply for the required normal permit and upload technical documents.
Plan Room submission returns
Missing signatures, unreadable PDFs or inconsistent plan set
Upload one coordinated, digitally signed revision package.
Inspection cannot be scheduled
Permit not issued, account access issue, unpaid fee or missing NOC
Open the complete record and resolve holds before contacting option 1.
Inspector cannot complete visit
Unsafe access, covered work, no plans or incorrect inspection stage
Correct the site and reschedule only when fully ready.
Exterior project held by zoning
Survey, setback, sight triangle, seawall or use issue
Email Zoning with address/folio, survey, plans and a precise question.
Old permit is expired
Permit or application time limit passed
Use the Expired Permit Procedures and renewal form before restarting work.
CO delayed
ADA, fire, zoning, landscape, engineering, fee or related-permit hold
Request a discipline-by-discipline closeout list and complete the separate ADA inspection.
Ready-to-use scripts

What to Say When Contacting Development Services

Permit requirement:
“I am planning to [exact work] at [address and folio]. The property is a [single-family, condo, multifamily, commercial, waterfront, etc.]. Which permit records, plans, flood/zoning reviews and inspections are required?”
Review correction:
“Record [number] has comments from [disciplines]. I uploaded a coordinated revision and response list. Can you confirm which item or reviewer still prevents approval?”
Inspection timing:
“Permit [number] is issued and I scheduled [inspection]. The work is uncovered and accessible. Who is assigned, and may I request a time accommodation?”
Open permit:
“I found permit [number] at [address], but it does not appear closed. Which inspections, fees, documents or related permits remain outstanding?”
Final closeout

Do Not Mark the Project Complete Until These Are Done

  • City jurisdiction confirmed
  • Correct permit records selected
  • Flood and zoning checks completed
  • Survey and site plan accepted
  • Initial and final fees paid
  • Permit formally issued
  • NOC recorded and posted
  • Reviewed plans available
  • Every inspection passed
  • ADA inspection passed if required
  • Related trade permits closed
  • CO or completion record saved
Office location

Fort Lauderdale Development Services Map

Greg Brewton Center: 700 NW 19th Avenue, Fort Lauderdale, FL 33311. Bring the record number, property folio, survey, plans, review comments and a short question list. Use the city appointment page when you need a specific team.
Official resources

Open the Correct Fort Lauderdale Resource

FAQs

Fort Lauderdale Building Permit Questions

Where do I apply for a Fort Lauderdale building permit?

Use the official LauderBuild portal. Register for a free account, select the correct permit or engineering record, complete the application and upload documents through the LauderBuild Plan Room.

Can I search Fort Lauderdale permits without an account?

Yes. The city says unregistered users can search and view records and pay fees. Registration is needed for services such as applying, scheduling inspections and managing licensed-professional information.

Does every project under $7,500 now avoid a permit?

No. Beginning July 1, 2026, only certain cosmetic, nonstructural work on an eligible single-family home may qualify. Submit the HB 803 exemption request and receive written city approval before starting. Regulated trades, structural work, flood-hazard-area property and non-single-family property do not qualify.

Can a Fort Lauderdale homeowner pull an owner-builder permit?

A qualifying owner of a one- or two-family dwelling may act as owner-builder when the home is for personal use and not for sale or lease. The owner must perform or directly supervise the work and sign the city Owner/Builder Affidavit. Commercial property owners must hire a contractor for permitted work.

When is a Notice of Commencement required?

The city says a Notice of Commencement is required when the contract exceeds $5,000. Record it with Broward County and post the certified copy or permitted affidavit at the job site before the applicable inspections.

What time are Fort Lauderdale inspections performed?

The city says inspections are generally conducted between 8:00 AM and 3:30 PM. Contact the assigned inspector between 7:30 AM and 8:00 AM to request a time accommodation.

Does exterior work require a survey?

Yes. The city says exterior work requires a current signed and sealed survey plus a site plan locating the proposed work. Certain simpler exterior projects may use copies of a valid survey with a completed Zoning Affidavit.

How long does Fort Lauderdale permit review take?

Timing depends on the project and workload. The city says it generally attempts review within 30 working days. Incomplete submissions, flood, zoning, engineering, fire or revision requirements can extend the process.

How do I find old Fort Lauderdale building plans?

Search LauderBuild and the Building Permit Tracker first. When the plans are not available online, contact the Property Records Office, which maintains digital and microfilm building permits and plans.

What must pass before a Certificate of Occupancy?

All required permit disciplines, fees and closeout conditions must be complete. Fort Lauderdale also requires a separate ADA inspection before issuing a Certificate of Occupancy or Certificate of Completion for structures that will be occupied by people.

Accuracy and freshness

Independent Guide and Official-Source Note

Building-Department.org is an independent informational guide and is not the City of Fort Lauderdale.

This page was rebuilt using current City of Fort Lauderdale Permitting Services, LauderBuild, HB 803, DSD forms, fee schedules, zoning, flood, engineering, inspection, property-record and contact resources.

Last reviewed: July 23, 2026.

Record types, fees, exemptions, forms, staff assignments, inspection availability and code requirements can change. Confirm time-sensitive details through LauderBuild or the city before filing, paying or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment