Duval County Building Department Guide | How to Get Permits & Schedule

Duval County permit action guide

Find the Correct Duval Permit Office, Use JaxEPICS and Finish Every Inspection

Do not begin with the permit form. First confirm whether the property is handled by Jacksonville, Atlantic Beach, Jacksonville Beach, Neptune Beach or Baldwin.

For most consolidated Jacksonville and Duval County properties, this guide shows how to submit through JaxEPICS, prepare PDFs, understand review statuses, schedule next-business-day inspections, check zoning and flood reviews, search old permits and verify final closure.

Correct city-versus-beach jurisdiction route
JaxEPICS application, status and records steps
Official fees, inspections and local dependencies
Duval permit moving over the St. Johns River from plans to review and inspection An animated Jacksonville skyline, bridge, building plan, JaxEPICS review screen and final inspection check explain the permit process. DUVAL PROJECT PLAN JAXEPICS REVIEW PERMIT FINAL INSPECTION FINALIZED JACKSONVILLE · DUVAL
📄
Use the revised 2026 forms Jacksonville states that previous editions of listed Building Inspection Division forms are no longer accepted beginning June 8, 2026. Download a fresh form immediately before filing.
Most important first step

Duval County Has More Than One Building Permit Office

Property location
Correct starting office
Official route
Jacksonville and most consolidated Duval County
City of Jacksonville Building Inspection Division
Jacksonville Beach
Jacksonville Beach Building Inspection Division
Atlantic Beach
Atlantic Beach Building Division
Neptune Beach
Neptune Beach Planning & Community Development
Town of Baldwin
Town of Baldwin local permitting
Do not use JaxEPICS automatically. A Duval County mailing address does not prove that the City of Jacksonville is the permit authority. Confirm the municipality before submitting or paying.
Start here

Choose the Exact Permit Task

Official Jacksonville contact

Building Inspection Phone, Email, Address and Hours

Building and inspections 904-255-8500 General permit and inspection help
Permit email BIDDocuments@coj.net Documents and general BID assistance
Archives email BIDArchives@coj.net Older CO and permit-record questions
Right-of-way / site review 904-255-8310 ReviewGrp@coj.net
Office hours 7:00 AM–4:00 PM Monday through Friday
Inspector hours 7:00 AM–3:30 PM Normal field schedule
Office location Ed Ball Building, 2nd Floor 214 N. Hogan Street, Jacksonville, FL 32202
Plan examiner consultation: Jacksonville lists Building Plan Examiners as available to the public from 2:00 PM to 4:00 PM daily on a first-come, first-served basis.
Permit finder

Which Jacksonville Permit or Review Fits the Work?

Project
Start with
Also check
New house, addition or structural alteration
Building permit
Zoning, drainage, concurrency, landscape, flood and trade permits
Interior remodel or tenant build-out
Alteration permit
Occupancy classification, fire, accessibility and MEP trades
Roof replacement
Roofing permit
Product approval, deck condition and required inspections
Electrical service, panel, circuits or wiring
Electrical permit
Building permit when walls or structural work change
HVAC replacement or mechanical work
Mechanical permit
Electrical, structural, equipment location and energy documents
Plumbing, irrigation or water heater
Plumbing permit
Gas, electrical and right-of-way work
Pool or spa
Pool permit
Barrier, electrical, plumbing, safety affirmation and zoning
Shed or accessory structure
Accessory-structure permit
Survey, setbacks, flood area, anchoring and size
Driveway, culvert, sidewalk or work in city easement
Right-of-way permit
Bond, maintenance-of-traffic plan and utility jurisdiction
New business or change of use
Certificate of Use / Converting Use
Zoning, occupancy, life-safety plan, Fire and business tax receipt
Electronic submission

Submit a Jacksonville Permit in Seven Clear Steps

Confirm the correct municipality

Use the jurisdiction table before opening JaxEPICS.

Stop here if: The property is in Atlantic Beach, Jacksonville Beach, Neptune Beach or Baldwin.

Check zoning, flood and site-development triggers

Confirm what can be built and whether DSD, Agency or Historic review will apply.

Prepare: Real estate number, legal description, survey and exact proposed use.

Download current forms

Use Jacksonville’s Checklists, Forms and Documents page. Pre-2026 versions listed by the city are no longer accepted after June 8, 2026.

Prepare PDF files

Jacksonville requires online permit packages and PDF documents. Digitally signed plans must not be password protected.

Use the correct folders: Architectural, Structural, Site Plans and Correspondence.

Complete JaxEPICS tabs

Finish Location, Contacts and Specs, upload documents and use a Project Contact email that is monitored.

Important: Upload the completed Permission to Obtain Permits form when required.

Click Submit for Review

A permit number alone does not mean the application was submitted. The status should move from Not Submitted to DSD Review.

Pay, obtain Active status and inspect

Work may begin only when JaxEPICS shows Active. Complete inspections until the record shows Finalized.

Closeout proof: Save the Certificate of Occupancy or Certificate of Completion when issued.
Application readiness

What to Prepare Before Opening JaxEPICS

Property and applicant

  • Exact site address
  • Real estate number
  • Legal description
  • Owner information
  • Contractor or design-professional profile
  • Project Contact email

Plans and supporting files

  • Permission to Obtain Permits form
  • Architectural plans
  • Structural plans
  • Site plan or survey
  • MEP plans or clear no-work notes
  • Agency approval correspondence
Common review delay: Jacksonville says many renovation plans are returned because the extent of mechanical, electrical and plumbing work is unclear. Mark each trade as included or not included.
JaxEPICS status decoder

Know Exactly What the Permit Status Requires

Not SubmittedComplete required tabs, upload documents and click Submit for Review.
DSD ReviewZoning, concurrency, landscape, drainage or Development Services review is underway.
Agency ReviewFlood, Historic, DIA, asbestos, CRA or another location/scope review must finish first.
Sufficiency ReviewThe city is checking prerequisite approvals and required documents.
Pending Review PaymentPay the plan-review fee before BID review begins.
In ReviewBuilding Inspection and Fire review the plans for code compliance.
Return for CorrectionsRead each comment, revise the correct files and resubmit.
Pending PaymentReviews are approved; pay the remaining permit fees.
ActiveThe permit is issued and work may begin. Inspections can be scheduled.
Active – Return for CorrectionsUse Revise to submit changes after permit issuance.
FinalizedRequired work and inspections are complete; the permit is closed.
ExpiredThe permit may remain open because work lacked progress or was abandoned. Contact BID before continuing.
Published review timing

Current Jacksonville Plan-Review Guidance

First building review

25–30 business days

Jacksonville’s official FAQ currently lists this expectation because of submission volume.

Resubmission review

About 10 business days or less

Use a complete response package to avoid another return.

When the clock starts

After prerequisites and review fee

Zoning, concurrency and Development Services approvals must clear first.

Planning note: Published timing is not a guarantee. Agency review, incomplete files, project complexity and corrections can extend the process.
Inspection workflow

Schedule and Prepare for Jacksonville Inspections

Schedule online

  1. Open JaxEPICS.
  2. Find the Active permit.
  3. Select the correct inspection.
  4. Confirm the requested day.
  5. Review the daily schedule when posted.

Schedule by phone

  1. Call 904-255-8500.
  2. Call on a workday from 7:00 AM to 4:00 PM.
  3. Provide the permit number and address.
  4. Name the exact inspection type.
  5. Jacksonville says the inspection will be scheduled for the next business day.

Required at the job site

  • Posted permit
  • Posted Notice of Commencement when required
  • Complete approved documents
  • Weatherproof plan container
  • Safe access to work
  • Adult representative for occupied sites

Before requesting

  • Correct inspection stage complete
  • Work remains visible
  • Active permit confirmed
  • Previous corrections completed
  • Gates and rooms accessible
  • Ladder/access provided where needed
Do not call only for an arrival time. Inspector routes are assigned daily. Use the online daily schedule for a rough route indication and keep access available.
Permit and violation records

Search a Duval / Jacksonville Property in JaxEPICS

Open JaxEPICS and use Guest Sign In

Public users can research permit, Certificate of Occupancy and violation information without using a contractor profile.

Choose Search for → Property by Address

Search the base street address first when a unit or suffix produces no result.

Open the address number

The address link opens associated permits and building-code enforcement details.

Open the permit number

Review status, inspections, documents and closeout information.

Check the CV tab

Jacksonville identifies the CV tab as the complaint/violation area.

Contact Archives when the old CO cannot print

Email BIDArchives@coj.net with the property, permit number and document requested.

Property due diligence: Jacksonville also recommends checking active property-safety issues and abatement liens through Municipal Code Compliance at 904-255-7000 and asking JEA about utility holds.
Official city fee examples

Selected Jacksonville Building Permit Fees

Use the city invoice for the final amount. Jacksonville fees combine BID charges with possible plan review, Development Services, resource-management, landscape, debris, trade and agency fees.
Permit work
Current city fee item
What it means
New enclosed building area through the fourth story
$6.38 BID per 100 sq. ft.
Additional resource, Development Services, landscape, debris and plan-review charges can apply.
Residential new building/addition debris fee
$8.75 per 100 sq. ft.
Listed construction-and-demolition debris fee.
Alteration or tenant build-out
$3.00 BID per $1,000 of cost
Resource, landscape, Development Services, debris and plan review are separate.
General building plan review
67% of BID fee or $90 minimum
Applies to listed building-fee subsections.
Roofing
$10 per 1,000 sq. ft.
Minimum BID fee is listed as $80 without inspection or $150 when inspections are required.
Small residential accessory structure, no final inspection
$45 BID + $15 DSD + $25 debris
Applies to the listed size/value conditions in the city schedule.
Above-ground pool
$75 BID + $25 DSD
Other electrical, plumbing or related permit costs may apply.
Banner sign
$40 per sign
Permanent-sign formulas and plan review differ.

Open the Official Jacksonville Fee Schedule

Approvals that can block review

Check Zoning, Flood, Historic and Right-of-Way Rules Early

Confirm municipality
Check zoning and legal use
Check flood and drainage
Check Historic / DIA / agency review
Complete site or ROW review
Submit building permit
Inspect and finalize

Zoning

Call 904-255-8300 or email Zoning@coj.net for allowed use, setbacks, height and parcel questions.

Floodplain

A project exceeding 50% of the existing building value can be treated as a substantial improvement under flood rules.

Historic property

Exterior work, fencing, driveways and sheds in local historic districts or landmarks may need a Certificate of Appropriateness.

Right-of-way

Driveways, culverts, utility work or materials in a city road, right-of-way or easement can require a separate permit.

Agency Review must finish before BID review. JaxEPICS may route a permit to FEMA/Flood, Historic, DIA, asbestos, CRA or another agency based on project location and scope.
Homeowner permitting

Can a Jacksonville Homeowner Pull the Permit?

Basic eligibility

  • The property is the owner’s primary residence.
  • The property is not for sale or rent.
  • The owner’s name appears on the deed.
  • The owner appears in person at 214 N. Hogan Street, Room 280.

Owner responsibilities

  • Supervise subcontracted work.
  • Use licensed contractors for electrical, plumbing, mechanical and other licensed trades.
  • Associate trade permits with the owner building permit.
  • Schedule and pass all inspections.
Owner-builder is not a shortcut. The owner accepts project supervision and permit responsibility. Call 904-255-8500, Option 4, before arranging the in-person visit.
Notice of Commencement

Record and Post the NOC When Required

When required

Jacksonville’s official FAQ says a Notice of Commencement is required on most jobs over $5,000.

The owner must sign it.

Where to record

Record through the Duval Clerk of Courts at 501 W. Adams Street, 1st Floor, or use the recording office located within the Building Inspection Division offices when available.

Post the NOC with the permit at the job site before inspection.

Commercial space warning

Check Use and Occupancy Before Signing a Lease

Step 1: Zoning

Confirm that the proposed business use is allowed and that parking, alcohol, outside seating and other conditions can be met.

Step 2: Occupancy classification

A previously occupied space may not have the correct Building and Fire Code classification for the new business.

Step 3: COU / Converting Use

A new, expanded or changed business may need a Certificate of Use and a Converting Use permit with a life-safety plan and code summary.

Lease protection: Proper zoning alone does not prove the building is code-ready for the proposed occupancy.
Open and expired permits

How to Recover an Old Jacksonville Permit

Collect first

  • Permit number
  • Property address
  • Original scope
  • Approved plans
  • Contractor history
  • Inspection results

Ask BID

  • Which inspections are missing?
  • Is the permit expired but open?
  • Are revisions required?
  • Can the contractor be changed?
  • Are trade permits still open?
  • What creates Finalized status?
Permit life: Jacksonville’s FAQ lists permits as good for 180 days. Keep work and inspections moving and contact BID before restarting an expired project.
Current code framework

Codes Jacksonville Currently Lists

Florida Building Code

8th Edition (2023)

Building, fuel gas, mechanical, plumbing, accessibility, energy and existing-building provisions.

Electrical

NFPA 70 – NEC 2020

Confirm project-specific amendments and current interpretation with the electrical reviewer.

Fire prevention

2023 Florida Fire Prevention Code, 8th Edition

Fire review may be required before building-permit issuance.

Ready-to-use scripts

What to Say When You Contact Jacksonville

Permit requirement:
“I am planning to [describe exact work] at [full address]. Can you confirm the municipality, permit types, zoning or flood reviews, required documents and inspection sequence before I submit?”
JaxEPICS status:
“Permit [number] shows [status]. Which review, document or payment is preventing the next step, and where should I upload the correction?”
Open permit:
“Permit [number] at [address] is not Finalized. Which inspections, revisions or certificates are still required to close it?”
Final project checklist

Do Not Consider the Permit Finished Until These Are Complete

  • Correct municipality confirmed
  • Zoning and legal use checked
  • Flood and historic screening completed
  • Current 2026 forms used
  • All PDFs uploaded to correct folders
  • Permit reached Active status
  • Permit and NOC posted
  • Approved documents kept onsite
  • Required inspections passed
  • Trade permits closed
  • Permit status shows Finalized
  • CO or Completion certificate saved
Office location

Jacksonville Building Inspection Division Map

Address: Ed Ball Building, 214 N. Hogan Street, 2nd Floor, Jacksonville, FL 32202. Use JaxEPICS or email first when the task can be completed online.
Official resources

Open the Correct Duval / Jacksonville Resource

Frequently asked questions

Duval County Building Department FAQs

Does all of Duval County use Jacksonville JaxEPICS?

No. Most consolidated Jacksonville/Duval properties use the City of Jacksonville Building Inspection Division and JaxEPICS. Atlantic Beach, Jacksonville Beach, Neptune Beach and Baldwin have separate local permit routes.

Where do I apply for a Jacksonville building permit?

Use the official JaxEPICS portal. Jacksonville states that electronic submission is required for all permit types. Complete the required tabs, upload PDFs to the correct folders and click Submit for Review.

How do I schedule a Jacksonville inspection?

Schedule through JaxEPICS or call 904-255-8500 on workdays from 7:00 AM to 4:00 PM. The city says phone requests are scheduled for the next business day.

How do I search a Duval County permit by address?

Open JaxEPICS, use Guest Sign In, choose Search for and Property by Address, then open the address number and permit number. The CV tab contains complaint and violation information.

When may work begin?

Work may begin when JaxEPICS shows Active. Not Submitted, DSD Review, Agency Review, In Review, Return for Corrections and Pending Payment do not authorize construction.

How long is a Jacksonville permit valid?

Jacksonville’s official Building Inspection FAQ lists permits as good for 180 days. Keep inspections and work progressing and contact the city before continuing an expired permit.

When is a Notice of Commencement required?

Jacksonville’s FAQ says a Notice of Commencement is required on most jobs over $5,000. The owner must sign it, and it should be recorded and posted with the permit for inspections.

Can a homeowner pull a Jacksonville permit?

A qualifying homeowner may permit work on a primary residence that is not for sale or rent when the owner is on the deed. The owner must appear in person and remains responsible for supervision, trade permits and inspections.

What does Finalized mean in JaxEPICS?

Finalized means required work and inspections are complete and the permit is closed. A Certificate of Occupancy or Certificate of Completion should be available when applicable.

What extra reviews can delay a Jacksonville building permit?

Common prerequisites include zoning, concurrency, landscape, drainage, flood, Historic Preservation, Downtown Investment Authority, fire, asbestos, CRA and site-development review. JaxEPICS shows these as DSD or Agency Review.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the City of Jacksonville or Duval County government.

This page was checked against the City of Jacksonville Building Inspection Division, JaxEPICS instructions, Services and FAQ pages, Development Services, Zoning, Flood Protection, Historic Preservation, Right-of-Way, City Fees, and the official building pages for Jacksonville Beach, Atlantic Beach, Neptune Beach and Baldwin.

Last reviewed: July 21, 2026.

Forms, fees, codes, review timing, staff and portal procedures can change. Confirm time-sensitive details with the correct permit authority before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.