City of Delray Beach Building Department

Delray Beach permit action guide

Apply, Review, Inspect and Close a Delray Beach Building Permit Online

Start with the parcel, not the project. A Delray Beach mailing address may still be in unincorporated Palm Beach County. City properties normally have a Parcel Control Number beginning with 12; county properties generally begin with 00.

After jurisdiction is confirmed, this guide shows the exact eServices steps, express-permit options, drawing rules, contractor documents, Notice of Commencement timing, inspections, flood and historic reviews, and permit closeout checks.

Current eServices application and inspection route
City-versus-county PCN check
Flood, historic and coastal project warnings
Delray Beach permit moving through online review, coastal checks and final inspection A digital permit plan, coastal waves, palm tree, review screen and final inspection check illustrate the Delray Beach permitting process. DIGITAL PERMIT PLAN REVIEWED PERMIT FINAL INSPECTION PASSED DELRAY BEACH
!
Current online system Delray Beach launched its current eServices platform in June 2025. Registration is required to submit applications, connect to existing records, request inspections, pay invoices and download permits.
Start with the task

Open the Correct Delray Beach Service

The first local decision

City of Delray Beach or Palm Beach County?

12

PCN begins with 12

The city’s eServices guidance says properties inside Delray Beach city limits have a Parcel Control Number beginning with 12.

Use: City of Delray Beach eServices.

00

PCN begins with 00

The city’s guidance says a PCN beginning with 00 indicates unincorporated Palm Beach County.

Use: Palm Beach County Planning, Zoning & Building.

Do not rely only on the mailing address. A property can use “Delray Beach” in its postal address while sitting outside the city’s permitting jurisdiction. Confirm the PCN before paying a designer or opening the application.
Official contact panel

Delray Beach Building Division Phone, Address and Hours

Building main line 561-243-7200 Plan review, permits and inspections
Permit technician help 561-243-7200, option 3 Ask which documents match the scope
Code Enforcement 561-243-7203, option 2 Construction-site and code complaints
Office hours 8:00 AM–5:00 PM Monday through Friday, excluding holidays
Office location Development Services 100 NW 1st Avenue, Delray Beach, FL 33444
Entrance note North of City Hall entrance Use the Development Services entrance
Fax 561-243-7221 Confirm before sending time-sensitive material
Permit decision table

Which Delray Beach Permit Path Fits the Project?

Project
Likely route
Local issue to check
New home, addition or structural alteration
Building permit
Zoning, drainage, landscape, flood, fire, energy and utility reviews may apply.
A/C change-out
Express permit
Emergency replacement may be accommodated when submitted within 24 hours of the work.
Water-heater replacement
Express permit
Emergency replacement may use the 24-hour submission accommodation.
Reroof
Express reroof
Complete documents are required up front; roofing affidavits and product information may be required.
Windows, doors or shutters
Building permit
Product approvals, opening protection and installation details may be required.
Pool, deck, driveway extension or pathway
Building + site review
A recent survey and post-project impervious-area calculation may be required.
Commercial tenant improvement
Commercial permit
Contractor, fire, accessibility, occupancy, zoning and business-tax reviews.
Exterior work in a historic district
Certificate of Appropriateness first
Designated properties and districts require historic review before applicable building work.
Demolition
Demolition application
Historic, utility, asbestos, landscape and site-restoration documents may apply.
Sign, fence, hardscape, tree or irrigation work
Specialized permit
Building, zoning, landscape or historic review depends on the exact work and location.
Simple rule: If the work changes a structure, system, occupancy, use, exterior opening, roof, site drainage or protected landscape, confirm the permit path before starting.
eServices workflow

Apply for a Delray Beach Permit in Six Clear Steps

Verify PCN and jurisdiction
Choose application type
Upload PDFs and drawings
Answer review comments
Pay invoice
Download permit and plans

Use the correct account email

Register in eServices. For an existing permit, use the same email already connected to the record whenever possible.

Prepare the PCN and job cost

The city tells applicants to have the Parcel Control Number and the project cost ready before starting.

Check: PCN begins with 12 for city jurisdiction; verify the owner and site address.

Use the application assistant

Search for the permit type and read each description. Choose the record that matches the actual scope, not the fastest-looking option.

For trade work: A sub-permit may be started from Apply or from the master permit’s Sub-Records area.

Upload only the requested PDF files

Separate supporting documents from drawing sheets. Use the city’s required naming, orientation, sheet size and digital-signature rules.

Do not combine the full plan set into one PDF. Plan sheets must be uploaded as individual single-page files.

Read and answer every comment

If intake rejects the submission or reviewers request corrections, the city sends conditions through the record. Upload the corrected files directly to that permit.

Best practice: Add a numbered response letter showing the file and sheet where each issue was corrected.

Pay and download the certified permit set

Open My Work, then My Invoices, select the invoice, add it to the cart and check out. After requirements are met, download the approved files from the portal.

Job-site check: Print or retain the city-certified permit and approved plans as instructed.
Faster permit path

Delray Beach Express Permits

A/C change-out

Considered an express permit. The city says complete express applications are expedited and typically issued within three days.

Emergency: Submit within 24 hours after the work.

Water-heater replacement

Also treated as an express permit when the application and documents are complete.

Emergency: The 24-hour post-work accommodation may apply.

Reroof

Reroofs are express permits when every required document is uploaded up front and the file can go directly to review.

Expected: Most complete express permits are issued within three business days.

Express does not mean automatic. Missing contractor registration, PCN, affidavits, product approvals, signatures or application details can stop the three-day path.
ePlans file rules

Format Drawings Correctly Before Uploading

File rule
Delray Beach requirement
Common rejection
Supporting documents
PDF only; letter, legal or tabloid/ledger; single or multi-page
Wrong file type or incorrect naming
Plan sheets
Each drawing uploaded as a single-page PDF
Entire drawing set combined into one document
Orientation
Every plan sheet must be landscape
Portrait or rotated plan pages
Approval-stamp area
Leave a 3-inch by 2-inch blank area at the upper-right corner
Notes or title information placed in the city stamp area
Residential sheet size
Minimum 17×11 inches; maximum 36×24 inches
Plans outside the accepted size range
Commercial sheet size
Minimum 17×11 inches; maximum 48×36 inches
Oversized or undersized sheets
Sheet name
Use the exact sheet number and title, such as A-4.0 – Roof Plan.pdf
Generic names such as plan1.pdf or revised.pdf
Professional signatures
Third-party certificate-based digital signature and seal where required
Scanned, flattened or self-signed professional seal
Survey requirements

When a Recent Property Survey Is Important

Site improvements

A survey no more than 12 months old is required for commercial permits with site improvements over 200 square feet and for residential pools, decks, driveway extensions, pathways or similar work that increases impervious area.

Submit the total impervious area after the proposed work.

Complex new construction or alterations

The city’s plan-set guidance lists a current survey no more than six months old among the minimum materials for complex permit packages.

Confirm the applicable survey age with the permit checklist for the exact project.

Notice of Commencement

Record the NOC Before the First Inspection When Required

Most projects

A recorded Notice of Commencement is required before the first inspection for permits valued above $5,000.

A/C replacement

For air-conditioning replacements, the city lists a higher NOC threshold of $15,000 or more.

Where to record

Record through the Palm Beach County Clerk. The city notes a courthouse location at 200 W. Atlantic Avenue, south of City Hall.

Do not wait until inspection morning. Confirm that the recorded NOC is associated with the permit before requesting the first inspection.
Contractor and owner-builder

Who Can Pull the Permit?

Licensed contractor

Every contractor performing licensed work in Delray Beach must maintain a city contractor registration.

  • Active Florida license
  • Workers’ compensation insurance or exemption
  • General liability insurance
  • City listed as certificate holder
  • Registration updated when documents change
  • Documents uploaded through eServices

Owner-builder

An owner may use the Florida owner-builder exemption for qualifying owner-occupied property. The owner must personally appear and sign the permit application.

  • Owner occupies the home
  • Owner supervises the work
  • Licensed trade subcontractors used
  • Owner-builder affidavit completed
  • Personal responsibility understood
  • Commercial and multi-family limits confirmed
Contractor warning: A contractor telling the homeowner to pull an owner-builder permit can shift supervision, insurance and legal responsibility to the owner.
Coastal and neighborhood review

Local Conditions That Can Add Review Before the Building Permit

Floodplain

Delray Beach applies FEMA floodplain rules through Land Development Regulations Chapter 10. Check the flood zone, required elevations and substantial-improvement limits before design.

Open city flood information

Historic property or district

Exterior improvements and alterations to designated historic sites or properties inside designated historic districts require a Certificate of Appropriateness.

Open historic applications

Landscape and trees

Pools, additions, driveways, hardscape, tree removal and commercial improvements may require landscape calculations, tree surveys or separate landscape permits.

Open landscape permits

Beach and coastal property

Projects near the beach may trigger flood, turtle-lighting, dune, environmental and coastal construction questions. Ask Planning before final exterior design.

Central Business District

Downtown properties can have additional form, design, parking, streetscape, signage and development standards.

Large downtown buildings

New buildings of 50,000 square feet or more in the CBD may be subject to Delray Beach green-building requirements such as LEED Silver or an accepted equivalent.

Current codes

Building Codes Used by Delray Beach

Florida Building Code

Delray Beach identifies the Florida Building Code, 8th Edition, for building, plumbing, mechanical and fuel-gas work.

Electrical code

The city’s code page identifies the 2023 National Electrical Code.

Fire code

The Florida Fire Prevention Code, 8th Edition, applies where required.

Coastal construction tip: Roofing, exterior doors, windows and shutters may require Florida product approvals, wind-design information and approved installation details. Use the permit checklist for the exact product and opening.
Inspection control

Schedule and Pass Delray Beach Inspections

Use the issued permit’s inspection list

The required inspections are shown on the permit placard and in the permit record. Do not guess the next inspection.

Applicant responsibility: The owner-builder or contractor must request every required inspection before work proceeds.

Schedule through eServices

Registration is required. Open the permit record and choose the available inspection request option.

Keep work visible and plans available

Do not cover framing, roofing components, electrical, plumbing, mechanical or other concealed work before the required inspection.

Upload required affidavits when allowed

Some permit workflows use specific inspection-document requests. For example, the city’s quick-reference guide directs reroof applicants to request the Roof Re-Nailing Affidavit inspection item in the permit record.

Complete all finals

New dwellings require all fees and required inspections before a Certificate of Occupancy. Minor projects may qualify for a Certificate of Completion upon request.

Permit clock: The city says a permit becomes void when work does not begin and an inspection is not requested within 180 days. After work starts, another 180-day period without inspection activity can also cause expiration.
Status, comments and records

Find a Permit and Understand the Next Action

Existing eServices permit

  1. Log in using the email connected to the record.
  2. Open My Work.
  3. Select My Permits.
  4. Review status, comments, invoices, documents and inspections.

Permit does not appear

  1. Confirm the record is tied to the same email.
  2. Check city-versus-county jurisdiction.
  3. Verify the PCN and address.
  4. Call 561-243-7200 for linking or record help.
Saved / incompleteFinish required questions and attachments before submission.
Rejected at intakeRead the email conditions and add the missing information to the same permit.
In reviewOne or more city disciplines are reviewing the record. Do not start work.
Corrections requiredReplace the affected files and answer every comment clearly.
Invoice dueOpen My Work and My Invoices, pay the listed balance and confirm checkout.
ApprovedConfirm the permit is issued and the approved files are available before starting.
IssuedUse only the approved scope and follow the required inspection sequence.
Final / closedSave the CO, CC or final inspection proof for the owner and future property transaction.
Fees and payment

How to Get the Correct Permit Cost

Pay through the permit record

  1. Log in to eServices.
  2. Open My Work.
  3. Select My Invoices.
  4. Open the invoice number.
  5. Add it to the cart.
  6. Review and complete checkout.

Why the amount changes

Delray Beach says permit cost depends on the permit type, project scope and contracted value. Plan review, inspections, revisions, sub-permits, certificates and after-the-fact work can affect the total.

Best source: The current eServices invoice and city fee schedule linked from the permit page.

Work completed without permits

After-the-Fact Permit Risks

Stop-work action

Code Enforcement may issue a stop-work notice when required work starts without a permit.

Tripled permit cost

The city’s Building FAQ states that an after-the-fact permit can be charged at triple the normal cost.

Concealed work

Closed walls, roofs or finishes may require exposure or third-party engineering analysis so compliance can be verified.

Do not continue covering the work. Photograph current conditions, gather contracts and plans, stop additional construction and ask the Building Division what must be exposed or documented.
Change of contractor

Replacing a Contractor on an Active Permit

Prepare before applying

  • Active permit number
  • Completed affidavit
  • Required signatures
  • Notarization
  • New contractor registration
  • Updated insurance documents

Use eServices

Delray Beach allows a change-of-contractor request through eServices. Upload the signed and notarized Change/Release of Contractor Affidavit to the permit workflow.

Open the official instructions

Condominium safety

Milestone Inspection Is Separate From a Normal Remodel Permit

Florida milestone-inspection requirements apply to qualifying condominium and cooperative buildings that are three stories or more. Associations and owners should use the city’s dedicated milestone-recertification process rather than assuming a unit-remodel permit satisfies the building-wide requirement.

Open Delray Beach milestone recertification

Ready-to-use scripts

What to Say When You Contact Development Services

Permit requirement:
“I am planning [exact work] at [address and PCN]. The PCN begins with [12 or 00]. Can you confirm jurisdiction, the permit type, required plans, zoning review and inspection sequence?”
Portal problem:
“My permit is [record number] and the connected email is [email]. It does not appear under My Work. Can you confirm the record owner and explain how it should be linked?”
Correction response:
“I uploaded revised files for [permit number]. The response letter addresses each review comment and identifies the updated sheet. Please confirm the resubmittal is complete.”
Open permit:
“Permit [number] at [address] does not appear final. Which inspection, fee, affidavit or certificate is still outstanding, and what must the current owner provide?”
Final closeout

Do Not Consider the Project Finished Until These Are Complete

  • PCN and jurisdiction confirmed
  • Correct permit type selected
  • Planning review completed
  • Historic approval completed if required
  • Flood requirements resolved
  • Landscape permits completed
  • Contractor registration current
  • NOC recorded when required
  • Permit formally issued
  • Approved plans available
  • All inspections passed
  • Sub-permits finaled
  • CO or CC obtained
  • Final record saved
Office location

Delray Beach Building Division Map

Address: Development Services – Building Division, 100 NW 1st Avenue, Delray Beach, FL 33444. The entrance is north of the main City Hall entrance. Hours: Monday–Friday, 8:00 AM–5:00 PM.
Official links

Delray Beach Building Permit Resources

Frequently asked questions

Delray Beach Building Permit FAQs

Where do I apply for a Delray Beach building permit?

Use the City of Delray Beach eServices portal. Registration is required to submit a new application, connect to existing records, upload documents, request inspections, pay fees and download permits.

How do I know whether the city or Palm Beach County issues the permit?

Check the property’s Parcel Control Number. Delray Beach says city PCNs begin with 12, while unincorporated Palm Beach County PCNs begin with 00. Confirm the record with the Palm Beach County Property Appraiser before applying.

What are the Delray Beach Building Division hours?

The Building Division lists office hours of 8:00 AM to 5:00 PM, Monday through Friday, excluding holidays. The main phone number is 561-243-7200.

Which permits are considered express permits?

Delray Beach lists A/C change-outs, water-heater replacements and reroofs as express permits. Complete applications are expedited and generally issued within three days. Emergency A/C and water-heater work may be accommodated when the permit is submitted within 24 hours after the work.

When is a Notice of Commencement required?

The city states that a recorded Notice of Commencement is required before the first inspection for permits valued above $5,000, or for an A/C replacement valued at $15,000 or more.

How long is a Delray Beach permit active?

A permit may become void if work does not start and no inspection is requested within 180 days. After work begins, another 180-day period without inspection activity may also cause expiration.

Can a homeowner pull an owner-builder permit?

A qualifying owner-occupant may use the Florida owner-builder exemption, but must personally appear and sign the permit application, supervise the project and use licensed trade subcontractors as required.

What happens if work starts without a permit?

The city may issue a stop-work notice. Its Building FAQ states that an after-the-fact permit can cost three times the normal amount, and concealed work may require exposure or third-party engineering analysis.

What are the main ePlans drawing requirements?

Upload individual single-page PDF plan sheets in landscape orientation, leave a 3-inch by 2-inch blank approval area in the upper-right corner, use the exact sheet number and title as the filename, and apply accepted digital signatures and seals when required.

Does exterior work on a historic Delray Beach property need another approval?

Yes. Exterior improvements and alterations to designated historic properties or properties inside designated historic districts require a Certificate of Appropriateness before or alongside the applicable development and building approvals.

Source and freshness note

Official Information Used for This Guide

Building-Department.org is an independent informational website and is not the City of Delray Beach. Applications, payments, inspections, approvals, certificates and enforcement decisions must be handled through the city or the correct Palm Beach County agency.

This page was checked against Delray Beach Development Services, the Building Division, the June 2025 eServices instructions, ePlans document requirements, contractor-registration guidance, Building FAQ, express reroof guidance, building-code information, historic-preservation materials and flood resources.

Last reviewed: July 23, 2026.

Portal steps, forms, fees, staff, code editions and application requirements can change. Confirm time-sensitive details before paying, signing a contract, submitting professional plans or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.