City Of Boise Building Department | Permits, Inspections & Official Contact

If you are planning any kind of construction, renovation, addition, deck, fence, roof replacement, solar installation, or other building work in the City of Boise, Idaho, you will need a building permit from the City of Boise Building Division (part of Planning and Development Services).

Many homeowners and contractors search for clear answers about how to apply for a building permit in Boise, what the fees are in 2026, and how to check the status of their application quickly using the Accela online portal.

This guide explains the entire process in simple language so you can understand what to do, what to expect, and how to avoid common problems that slow things down.

Whether you are a homeowner doing your own work or a contractor handling a larger job, the steps are the same and the goal is to get your permit approved smoothly and on time.

Boise Building Department Contact Information 2026

  • Address: 150 N. Capitol Blvd., Boise, ID 83702 (City Hall – Planning and Development Services)
  • Phone: (208) 972-8110
  • Email: building@cityofboise.org
  • Hours: Monday–Friday, 8:00 AM – 5:00 PM

Official Page: Boise Building Division

150 N. Capitol Blvd., Boise, ID 83702

Official Portal: Boise Accela / Tyler EnerGov Online Portal

  1. Go to the Boise online permitting portal (public search available).
  2. Search by property address or permit number.
  3. View the current status, approved plans, fees paid, and inspection history.

How to Apply for Boise Building Permits 2026

Here is the clear step-by-step process that most people follow to get their permit approved as smoothly as possible.

  1. Go to the Boise Accela / Tyler EnerGov online portal and create or log into your account.
  2. Start a new application and choose the right permit type for your project.
  3. Enter the full project address and your best estimate of the total construction valuation.
  4. Upload all required drawings, site plans, specifications, and supporting documents.
  5. Pay the required fees online and submit the complete application.
  6. Check your account regularly and reply quickly if the department asks for more information or corrections.
  7. Once approved, display the permit card at the job site before any work begins.
  8. Schedule your inspections through the portal.

Boise Building Permit Fees 2026

  • Official Fee Schedule: Download the current Building Permit Fee Schedule from the City website.
  • Building permit fees are calculated based on the estimated valuation of the project using ICC valuation tables.
  • Plan review fees are typically 50%–100% of the building permit fee depending on project type.
  • Separate fees apply for electrical, mechanical, plumbing, and other trade permits.
  • Additional charges include technology fees, impact fees, and right-of-way permits where applicable.
  • Work started without a permit can result in double fees plus possible fines or a Stop Work Order.

Required Documents Checklist

  • Completed online permit application via Accela / EnerGov
  • Detailed construction drawings and specifications
  • Site plan showing existing structures and proposed work
  • Proof of contractor license and insurance
  • Owner-Builder Affidavit if you are doing the work yourself
  • Any required trade permit applications

How to Schedule Inspections in Boise

Schedule inspections through the Accela / EnerGov online portal. Have your approved plans and the permit card ready when the inspector arrives. Re-inspection fees may apply for failed or missed inspections.

Contractor Registration & Owner-Builder

Contractors must hold valid Idaho licenses and register in the online system. Homeowners can apply as owner-builders but must take full responsibility for code compliance and job safety.

Local Insider Tips That Really Help

  • Use the Accela / EnerGov online portal for faster submission, payments, status tracking, and inspection scheduling.
  • Submit complete and clearly labeled drawings the first time to avoid delays in plan review.
  • Call (208) 972-8110 early in the day for status checks when lines are less busy.
  • Check for any existing violations or open permits on the property before starting a new application.
  • Review the latest fee schedule and 2024 Idaho Building Code requirements before submitting.

Frequently Asked Questions

How do I search for existing building permits in Boise?

Use the Accela / EnerGov online portal by property address or permit number.

How to apply for a Boise building permit?

Create an account on the Accela / EnerGov portal, select the right permit type, upload your drawings and documents, pay the fees, and submit everything online.

What are the Boise building permit fees in 2026?

Fees are based on the estimated valuation of the project using ICC valuation tables. Plan review fees are typically 50%–100% of the building permit fee depending on project type.

Can I pull my own permit as an owner-builder in Boise?

Yes. You can apply as an owner-builder, but you must take full responsibility for code compliance and job safety.

How long does it take to get a building permit in Boise?

Simple projects can be approved in just a few days. More complicated jobs usually take between one and three weeks depending on how complete your submission is.

Official Resources

Updated April 2026 using only official City of Boise sources. Use the Accela / EnerGov online portal for faster submission and real-time tracking.

Leave a Comment