Apply, Review, Inspect and Close a Birmingham Building Permit Without Missing the Site Steps

Birmingham uses BS&A Online for permit applications, planning processes, payments, record searches and inspections. But a portal application alone may not complete the submittal.

New construction, additions, pools and other large projects can also require an Engineering Site Evaluation, certified survey, topographic elevations, tree locations, separate trade permits and hard-copy plan sets. This guide puts those requirements in the correct order.

BS&A apply, search, payment and inspection actions
Site Evaluation, survey and impervious-surface checks
Zoning, BZA, demolition and final-occupancy workflows
Birmingham permit moving from survey and plans through review and inspection An animated certified survey, BS&A permit screen, site evaluation marker and final inspection check show the Birmingham approval process. CERTIFIED SITE PLAN SETBACKS • GRADES • CITY TREES BS&A ONLINE APPLY • PAY • INSPECT REVIEWED SITE EVAL PERMIT FINAL INSPECTION CLOSED BIRMINGHAM CITY HALL
⚠️
Important correction to the old article The official Building Department number is 248-530-1850, not 248-530-1880. The department is in Community Development, Room 223 on the second floor of City Hall, and its published office hours are Monday–Friday, 8:00 AM–5:00 PM.
Start here

Choose the Exact Birmingham Task You Need

Birmingham Permit Next-Step Finder

Select the situation that matches your project.

Official contact

Birmingham Building Department Phone, Address and Staff Hours

Main Building Department 248-530-1850 Permits, applications and inspection help
Office location Community Development #223 Second floor, 151 Martin Street
Office hours Mon–Fri, 8 AM–5 PM Call first for a specific inspector
Inspector question windows 8–9 AM and 4–5 PM General published availability
Building Official 248-530-1849 jzielke@bhamgov.org
Assistant Building Official 248-530-1853 mmorad@bhamgov.org
Electrical Inspector 248-530-1858 rreese@bhamgov.org
Best call format: “The project is at [address]. I plan to [exact work]. Does it need a building permit, Site Evaluation, certified survey, trade permits, Planning approval or BZA relief?”
Jurisdiction and address check

Confirm the Property Is Inside Birmingham Before Applying

Use Birmingham BS&A when

  • The site is inside the City of Birmingham, Michigan.
  • The Birmingham BS&A property or permit search returns the address.
  • The city—not a neighboring township or city—controls the parcel.
?

Verify before filing when

  • The mailing address resembles Bloomfield, Beverly Hills, Troy or another municipality.
  • The project is near a municipal boundary.
  • The property does not appear under Birmingham’s BS&A municipality.
Do not select a similar property. Search Birmingham property information in BS&A or call 248-530-1850 with the parcel number.
Permit decision table

Which Birmingham Permit or Review Fits the Project?

Project
Start with
Birmingham-specific check
New home, addition or major structural work
Building + Site Evaluation
Certified survey, four-corner topography, City trees, engineering review, separate trade permits and new-construction packet
Renovation, basement finish, deck, porch, garage or roof
Building permit
Plans, builder license, zoning/setbacks and electrical, mechanical or plumbing permits
Fence
Fence permit
Placement, height, zoning and current fee schedule; city FAQ lists a $50 permit fee
Driveway, patio or walkway over 3 feet wide
Impervious Surface permit
Survey/open-space calculation, runoff protection and zoning compliance
Accessory structure under 200 square feet
Impervious Surface permit
Two site-plan copies, assembly drawings, setbacks and height
Swimming pool or spa
Building + Site Evaluation
Survey, placement, enclosure/safety, electrical and mechanical requirements
Electrical work
Electrical permit
Licensed contractor, or an owner actually performing eligible work at an owner-occupied single-family home
Plumbing work
Plumbing permit
Licensed plumbing contractor/master plumber, or eligible owner work as allowed by state rules
Furnace, A/C, ductwork or refrigeration
Mechanical permit
Refrigeration is merged into mechanical; outdoor condenser placement may require a plot plan
Exterior commercial changes, paint or sign
Planning approval first
Planning approval is required before the Building Department can issue the permit
Complete or partial demolition
Demolition permit
Utility disconnects, survey, neighbor notices, photos, fencing, erosion control and obstruction permit
BS&A application workflow

Apply Online Without Leaving Out the Offline Requirements

Choose the correct Birmingham service

Open the City of Birmingham municipal page in BS&A and choose Apply for a Permit or Apply for a Planning, Zoning or Engineering Process.

Create and verify the BS&A account

Complete registration, verify the email address and sign in. For inspection scheduling, the city says applicants must obtain a PIN or call the Building Department to link the account to Birmingham.

Save: The login email, application number and account-linking details.

Confirm zoning and Site Evaluation before final plans

New construction, additions, pools and other large projects require an Engineering Site Evaluation. Exterior commercial changes may need Planning review first.

Do next: Identify every prerequisite review before paying for a final drawing package.

Prepare the complete plan package

The city’s published construction procedure calls for two folded sets of complete drawings, a certified survey when required and all relevant project documents.

Important: Online application does not automatically eliminate hard-copy plan requirements. Confirm the current delivery format with staff.

Pay Building and Engineering review fees

Birmingham states that Building and Engineering plan-review fees must be paid before the project can be submitted for review.

Do next: Use BS&A payment tools and save the receipt.

Monitor review and answer comments

The city publishes an approximate two-to-three-week review period for complete plans. Staff may request revisions or additional information.

Reply clearly: Use an item-by-item response and coordinated revised plans.

Wait for issuance, then complete inspections

Do not begin before the permit is issued. Keep approved plans on site, schedule inspections through BS&A and close all building and trade permits.

Final check: Mechanical, electrical and plumbing finals must be approved before a Final Certificate of Occupancy.
Submission checklist

What to Prepare Before the Application Enters Review

Property and applicant

  • Exact site address
  • Owner name
  • Parcel information
  • Applicant contact details
  • Builder license copy
  • Project valuation

Plans and survey

  • Two folded plan sets when required
  • Certified survey
  • Four-corner topographic elevations
  • City trees in right-of-way
  • Existing/proposed conditions
  • Structural information

Related approvals

  • Engineering Site Evaluation
  • Planning approval
  • BZA decision if required
  • Trade permit applications
  • Demolition documents
  • New-construction packet signature
Plan consistency test: The scope, survey, architectural plans, engineering, project value and permit categories should describe the same project.
Engineering dependency

When a Birmingham Site Evaluation Is Required

Projects specifically identified by the city

  • New construction.
  • Additions.
  • Pools.
  • Other large projects that affect the site.

Apply through BS&A under the Planning, Zoning or Engineering process or submit the city’s Engineering Plan Review materials.

What the review protects

  • Grades and drainage.
  • City trees and right-of-way conditions.
  • Driveways, walks and impervious surface.
  • Neighboring property from runoff.
  • Engineering requirements before building review.
Sequencing rule: Building and Engineering review fees must be paid before the project is submitted for review. Do not assume the building application alone starts every required review.
Impervious surfaces

Driveways, Patios, Walkways and Small Accessory Structures

Local rule
What it means for the applicant
Permit trigger
New or replacement driveways, patios and walkways over three feet wide require an Impervious Surface Permit.
Materials covered
Concrete, asphalt, brick, stone pavers and similar surfaces that prevent water infiltration.
Survey/open-space test
A registered survey may be required to show zoning compliance and at least 50% open space, unless the Building Official accepts other documentation.
Drainage proof
Documentation must show that runoff will not negatively affect neighboring properties.
Accessory structure under 200 sq. ft.
An Impervious Surface Permit is required before installing or replacing the structure.
Small-structure submittal
Provide two site-plan copies showing placement and construction drawings showing assembly.
Status, payment and records

Use the Correct BS&A Action

Apply

Select Apply for a Permit for construction and trade permits.

Search

Select Building Department Record Search for available public records.

Pay

Select Pay a Building Department Fee for an existing charge.

Inspect

Select Schedule an Inspection after the account is linked and permit is eligible.

Draft / incomplete Finish required fields and attachments before relying on the application.
Submitted The city has the application, but fees or intake review may remain.
Waiting for Site Evaluation Engineering review or site documents may be preventing building review.
Plan review Allow approximately two to three weeks for complete submissions, subject to complexity and workload.
Corrections required Answer every review comment and replace the correct documents.
Approved / ready to issue Confirm payments, licenses and prerequisite approvals are complete.
Issued Work may proceed within the approved scope and inspection sequence.
Final / closed Save the final record and verify all related trade permits are complete.
Inspection workflow

Schedule Birmingham Inspections Through BS&A

Permit issued
Correct construction stage ready
Sign in to BS&A
Select Schedule Inspection
Keep plans accessible
Correct failed items
Obtain finals and occupancy

First-time account setup

  1. Select Birmingham in the Municipal Directory.
  2. Create and verify the BS&A account.
  3. Call 248-530-1850 for the PIN/account link.
  4. Return to Schedule an Inspection.

Before requesting

  • Permit is issued
  • Correct inspection type selected
  • Work is complete for that stage
  • Work remains uncovered
  • Safe access is available
  • Approved plans are on site
Final occupancy rule: Final mechanical, electrical and plumbing inspections must be completed and approved before the Building Inspector issues the Final Certificate of Occupancy.
Current fees

Use Birmingham’s 2026 Fee Schedule—Not Generic Percentages

Correct way to budget

  1. Identify every building, trade, engineering, planning or zoning process.
  2. Use the 2026 citywide fee schedule updated July 1, 2026.
  3. Pay Building and Engineering plan-review charges before review begins.
  4. Review the BS&A invoice before payment.
  5. Ask about an unexplained line item instead of filing a duplicate application.

Why the old article was unreliable

It claimed that plan review was “typically 50%” of the permit fee and referenced technology fees without tying those statements to Birmingham’s current schedule.

This article does not use a generic fee calculator because Birmingham’s current city schedule controls.

Fence note: Birmingham’s official FAQ states that a fence permit is required and lists a $50 fee. Confirm the amount against the current 2026 fee schedule before paying.

Open the 2026 Fee Schedule Link

Zoning and Board of Zoning Appeals

Check Setbacks and Paving Before Finalizing the Design

Residential placement

Required setbacks may differ from the rules in effect when the existing home was built. Confirm current setbacks before designing a new home or addition.

Front-yard paving

Birmingham requires at least 65% of front open space to remain free of paved surface.

Commercial exteriors

Exterior changes—including painting and signage—must receive Planning approval before permit issuance.

BZA detail
Current city information
Meeting
Second Tuesday of each month at 7:30 PM in the City Commission Room.
Filing deadline
Application and checklist items are due by the 12th of the month before the meeting.
Agenda limit
The agenda is limited to seven appeals; the first seven complete applications are heard.
Contact
Building Official Jeff Zielke, 248-530-1849.
Appeal window
Certain Planning or administrative decisions must be appealed to the BZA within 21 days.

Open Birmingham BZA Information

Demolition workflow

Residential Demolition Requires More Than a Permit Form

Utility releases

  • DTE electrical disconnect.
  • Consumers Energy gas disconnect.
  • Telephone/cable disconnection verification.
  • Water disconnect and meter removal process.

Property documents

  • Survey showing structures to be demolished.
  • Proof of notice to adjoining owners.
  • Front, rear and both-side color photos.
  • Contractor contact and anticipated dates.

Site protection

  • Rigid perimeter fencing.
  • Buried silt fencing.
  • Address posted on fencing.
  • Sidewalk and street kept clear.
  • City trees protected.
  • Engineering obstruction permit.
Application acceptance rule: The city says a demolition application will not be accepted without all required items and applicable fees.

Open Official Demolition Requirements

Current code editions

Codes Listed by Birmingham for Current Projects

Code
City-listed effective date
2021 Michigan Building Code
April 9, 2025
2015 Michigan Residential Code
February 8, 2016
2021 Michigan Mechanical Code
March 12, 2024
2021 Michigan Plumbing Code
March 12, 2024
2023 National Electrical Code and Michigan Part 8 Rules
March 12, 2024
2021 Michigan Uniform Energy Code
April 22, 2025
2025 Michigan Rehabilitation Code Rules
April 9, 2025
Project-specific interpretation: The Building Department interprets applicable codes but does not provide design services. Use a qualified design professional when plans or calculations are required.
Open permit recovery

Old Permit Not Closed? Use This Checklist

Gather first

  • Permit or record number
  • Property address
  • Original scope
  • Approved plans
  • Contractor details
  • Inspection history
  • Current photographs
  • Sale/refinance deadline

Ask the department

  • Which final is missing?
  • Is the permit expired?
  • Are revised plans needed?
  • Can the contractor change?
  • Are trade permits open?
  • Is Site Evaluation incomplete?
  • Are fees outstanding?
  • What proves closure?
Construction-site conduct

Local Site Rules That Protect the Permit and the Neighborhood

Communicate

Tell adjoining neighbors the project, expected duration and contact person before disruptive work begins.

Control the site

Maintain safe fencing, controlled access, open walkways and organized deliveries without overloading the right-of-way.

Protect public property

Protect City trees, sidewalks, curbs, streets and utilities. Builders are responsible for repair costs and debris cleanup.

Drainage responsibility: Temporary and final grading should prevent runoff or damage to neighboring property.
Problem solving

Fix Common Birmingham Permit Problems

Problem
Likely cause
Best next step
Cannot apply or inspect in BS&A
Account not verified or not linked to Birmingham
Verify email, then call 248-530-1850 for the PIN/account link
Building review has not started
Building/Engineering fees or Site Evaluation still incomplete
Check payment and prerequisite engineering status
Plans are returned
Missing survey, topography, tree locations, license or coordinated details
Answer every comment and submit one coordinated revision set
A/C location is rejected
Condenser is an accessory structure in a restricted side yard
Provide a plot plan and ask the Mechanical Inspector about placement
Driveway/patio permit stalls
Open-space or drainage proof is missing
Provide survey/calculation and runoff documentation
Inspection cannot be scheduled
Permit not issued, account not linked or wrong record
Confirm issuance and call the department for account help
Final occupancy is delayed
Mechanical, electrical or plumbing final is missing
Complete every trade final before requesting the Final Certificate of Occupancy
Neighbor reports site impacts
Noise, debris, unsafe fencing, blocked walk or runoff
Correct the site immediately and use GovAlert/Citizen Requests when official follow-up is needed
Ready-to-use scripts

What to Say When You Contact Birmingham

Permit requirement:
“I plan to [exact work] at [full address]. Does this require a building permit, Site Evaluation, certified survey, impervious-surface permit, Planning approval or separate trade permits?”
Plan review:
“Application [number] is waiting at [status]. Can you confirm whether Building fees, Engineering fees, Site Evaluation, hard-copy plan sets or a reviewer correction is outstanding?”
Old permit:
“Record [number] at [address] is still open. Which inspection, revised plan, payment or trade final is required for closure?”
Final closeout

Do Not Finish Until Every Required Approval Is Complete

  • Correct Birmingham jurisdiction confirmed
  • Correct permit and review types selected
  • Site Evaluation completed if required
  • Certified survey and topography accepted
  • Planning/BZA approvals completed
  • Building and Engineering fees paid
  • Permit formally issued
  • Approved plans kept on site
  • Required work left visible
  • Inspection corrections resolved
  • Electrical final approved
  • Mechanical final approved
  • Plumbing final approved
  • Final Certificate of Occupancy obtained
  • Permit record shows final/closed
  • Closure proof saved
Office location

Birmingham City Hall Building Department Map

Building Department: Community Development Department #223, second floor, 151 Martin Street, Birmingham, MI 48009. Hours: Monday–Friday, 8:00 AM–5:00 PM.
Official resource center

Open the Correct Birmingham Service

Frequently asked questions

Birmingham Michigan Building Department FAQs

Where do I apply for a Birmingham building permit?

Use the City of Birmingham municipal page in BS&A Online and select Apply for a Permit. For zoning, planning, engineering or Site Evaluation, choose Apply for a Planning, Zoning or Engineering Process.

What is the correct Birmingham Building Department phone number?

The official Building Department number is 248-530-1850. The office is in Community Development Department #223 on the second floor of City Hall at 151 Martin Street.

What are the Building Department office hours?

The city lists Monday through Friday from 8:00 AM to 5:00 PM. Inspectors are generally available for questions from 8:00–9:00 AM and 4:00–5:00 PM.

How long does Birmingham plan review take?

The city asks applicants to allow approximately two to three weeks for review. That estimate depends on a complete submission, required payments, project complexity, Site Evaluation and the need for revisions.

Which projects require a Birmingham Site Evaluation?

The city specifically identifies new construction, additions, pools and other large projects for Engineering Department Site Evaluation review.

Does a Birmingham fence require a permit?

Yes. Birmingham’s official FAQ states that a Fence Permit is required and lists a $50 fee. Confirm the amount against the current 2026 city fee schedule before paying.

Do Birmingham driveways and patios require a permit?

New and replacement driveways, patios and walkways over three feet wide require an Impervious Surface Permit. The city may require survey, open-space and runoff documentation.

How do I schedule a building or trade inspection?

Create and verify a BS&A account, call the Building Department for the PIN or account link, sign in and select Schedule an Inspection under Birmingham’s Building Department services.

What must be complete before a Final Certificate of Occupancy?

Final mechanical, electrical and plumbing inspections must be completed and approved before the Building Inspector issues the Final Certificate of Occupancy.

How do I find an old Birmingham permit?

Open Birmingham’s BS&A municipal page and choose Building Department Record Search. When the online information is incomplete, contact the Building Department with the address, approximate year and record type needed.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent informational guide and is not the City of Birmingham.

This article was rebuilt from Birmingham’s official Building Department, BS&A municipal portal, permit procedures, application forms, inspection instructions, current codes, zoning/BZA, demolition and code-assistance resources.

Last reviewed: July 22, 2026.

Staff, forms, fee amounts, review procedures and code requirements can change. Confirm time-sensitive details before filing, paying, printing plan sets or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment