West Bloomfield Building Department | Permits, Inspections & Official Contact

West Bloomfield permit action guide

Apply, Track, Inspect and Close a West Bloomfield Permit in the Right Order

Use the correct Township portal: West Bloomfield Charter Township uses BS&A Online municipality ID 652 for permit applications, records, payments and inspection requests.

This guide shows the exact portal choices, correct department phone, local inspection timing, project documents, zoning checkpoints and final closeout steps—without sending you through generic permit advice.

Correct West Bloomfield BS&A portal
Inspection request and time-window steps
Project, zoning and closeout checklists
West Bloomfield permit moving from plans to online review and final inspection An animated lakeside house plan, permit document, BS and A review screen and inspection approval show the permit process. LAKESIDE PROJECT PLAN BS&A ONLINE REVIEWED PERMIT FINAL INSPECTION PASSED WEST BLOOMFIELD
⚠️
Use municipality ID 652—not 511. BS&A municipality ID 652 is West Bloomfield Charter Township. ID 511 belongs to Bloomfield Township, a different municipality.
Start here

Choose the Exact Township Task

Verified contact panel

West Bloomfield Building Division Phone, Address and Hours

Building Division 248-451-4842 Permits, plan reviews, inspections and certificates
Township main line 248-451-4800 General Township assistance
Planning & Development 248-451-4818 Planning, zoning and environmental questions
Code Enforcement 248-451-4880 Property-maintenance and code-enforcement concerns
Office address 4550 Walnut Lake Road West Bloomfield, MI 48323
Public hours 8:00 AM–4:30 PM Monday through Friday
Online portal BS&A ID 652 Applications, records, payments and inspections
Inspection-time call 8:00–9:00 AM Call 248-451-4842 on the scheduled inspection date
Best call format: “I am calling about [permit number] at [address]. The portal shows [status]. What exact item must be completed before the next step?”
Jurisdiction check

A West Bloomfield Mailing Address Does Not Always Prove Township Jurisdiction

Use Township BS&A when

  • The parcel record identifies West Bloomfield Charter Township.
  • BS&A municipality ID 652 returns the property.
  • The Building Division confirms Township jurisdiction.
?

Verify before applying when

  • The property is near Orchard Lake Village, Keego Harbor, Sylvan Lake or another boundary.
  • The postal city says West Bloomfield but the legal municipality may differ.
  • The Township portal cannot locate the address.
Fast verification: Search the address at West Bloomfield BS&A. Confirm the municipality, address and parcel number before starting an application.
Permit finder

Which Permit or Review Fits the Project?

Project
Start with
Prepare first
Also check
New house, addition or structural alteration
Building permit
Site plan, construction plans, valuation and licensed professionals
Zoning, engineering, environmental, electrical, plumbing and mechanical
Kitchen remodel or finished basement
Building permit
Existing/proposed layout and complete work description
Egress, structural work and trade permits
Deck, porch or exterior stairs
Building/zoning review
Plot plan, setbacks, framing, footing, stairs and guard details
Easements, waterfront rules and HOA restrictions
Roof, siding, windows or exterior doors
Building permit
Scope, material, quantity and contractor details
Building-envelope and house-wrap inspection sequence
Electrical service, circuits or wiring
Electrical permit
Licensed contractor and exact electrical scope
Building permit for associated construction
Heating, cooling, generator or mechanical equipment
Mechanical permit
Equipment data, location and licensed contractor
Electrical, gas, zoning and screening requirements
Water, drains, fixtures or plumbing changes
Plumbing permit
Fixture scope and licensed plumbing contractor
Building or mechanical permit when work overlaps
Fence, shed, pool or accessory structure
Zoning check first
Plot plan, location, dimensions and property lines
Barrier, electrical, waterfront, easement and HOA rules
Commercial fit-out or change of use
Planning/building pre-review
Proposed use, floor plan, occupant load and accessibility information
Fire, site plan, parking, signs and certificate of occupancy
Demolition
Demolition permit path
Ownership, structure, utilities and site-restoration details
Environmental, utility and Township sign-offs
Township-confirmed permit examples: The Building FAQ lists new buildings, additions and renovations/alterations such as kitchen remodels and finished basements among projects requiring building permits.
BS&A application steps

Apply Online Without Creating the Wrong Record

Open the correct municipality

Use West Bloomfield Charter Township, UID 652.

Do not use: UID 511, which belongs to Bloomfield Township.

Create or sign into a free BS&A account

An account lets you apply, manage permit activity, pay fees and receive notifications.

Choose “Apply for a Permit”

Select the building or trade permit that matches the actual work. Do not place electrical, plumbing or mechanical work only inside a building-permit description.

Before clicking: Write a one-sentence scope and list every trade involved.

Match the property correctly

Search by address or parcel. Confirm the municipality and owner/property details before continuing.

Address not found? Call 248-451-4842 instead of creating a record against a similar property.

Upload a review-ready document set

Plans should be readable, correctly oriented and consistent with the project description.

Useful names: Plot-Plan.pdf, Existing-Floor-Plan.pdf, Proposed-Floor-Plan.pdf and Structural-Details.pdf.

Watch email and BS&A for requests

The Township says additional-information requests are sent by email through the building system.

Check: Inbox, spam folder and the BS&A record dashboard.

Pay only the Township-issued charge

Use the building-fee payment service after the record shows an amount due.

Do not start until the permit is issued

BS&A’s contractor portal states that once a permit is issued, it can be printed and work may begin.

Save: Issued permit, approved plans and every condition or inspection note.
Application checklist

Prepare These Items Before Opening BS&A

Property and people

  • Correct Township address
  • Parcel number
  • Owner legal name
  • Applicant contact details
  • Contractor license information
  • Owner authorization when needed

Project and plans

  • Clear scope of work
  • Estimated project value
  • Plot or site plan
  • Existing/proposed plans
  • Structural or product details
  • Planning/zoning approvals
Consistency test: The application description, valuation, plot plan, floor plan and trade permits should describe the same project.
Project-specific preparation

What to Show for Common West Bloomfield Projects

Project
Show clearly
Common delay
Deck or porch
Property lines, setbacks, dimensions, footings, framing, stairs, guards and house connection
Plot plan missing or structure too close to lot line/easement
Basement finish
Room use, ceiling height, emergency escape, smoke/CO alarms and trade changes
Bedroom or living space shown without code-compliant egress
Roof or siding
Material, quantity, sheathing or wall-envelope work and contractor
Required house-wrap/building-envelope inspection not planned before covering
Pool
Location, setbacks, barrier, gate, equipment and electrical bonding
Fence/barrier or electrical scope not coordinated
Generator
Location, clearances, fuel, electrical connection, screening and manufacturer data
Mechanical, electrical and zoning items submitted separately or inconsistently
Commercial use
Existing/proposed use, occupancy, accessibility, exits, fire protection and site conditions
Lease signed before use and code feasibility are confirmed
Planning before permitting

Check Land-Use Issues Before Final Construction Plans

Confirm Township parcel
Check proposed use
Check setbacks and site rules
Apply for planning/zoning if needed
Complete building/trade permits
Inspect and close

Planning or zoning first

Use this route for land use, setbacks, accessory structures, signs, parking, site plans, variances and changes of use.

Open BS&A and choose the planning/zoning/engineering process

Building permit next

After Planning & Zoning approval, the Township FAQ says applicants may be referred to the Building Division for building and electrical permits.

Waterfront and environmental check

West Bloomfield contains extensive lakes and wetland areas. Ask Planning & Development Services whether environmental or engineering review applies before design is final.

248-451-4818

Do not rely on HOA approval: An association approval does not replace Township zoning, building, trade or environmental approval.
Local inspection workflow

Request the Inspection, Wait for Confirmation, Then Get the Time Window

Open the Township inspection request

Use the West Bloomfield BS&A inspection service and select the record and requested date.

Wait for the Township decision email

BS&A states that the Township reviews the request and emails whether it was accepted or denied.

Do not assume: Selecting a date is not confirmation.

Call on the inspection date

For inspection times, call 248-451-4842 between 8:00 and 9:00 AM on the scheduled date.

Have ready: Permit number, address and inspection type.

Leave required work visible

Do not cover framing, wiring, plumbing, mechanical systems, insulation or envelope work before the required inspection.

Local siding note: The Township Building page calls for a building-envelope/house-wrap inspection before brick flashing or siding inspections.

Read and save the result

Check BS&A for inspection status and correction notes. Complete every correction before requesting reinspection.

Complete final approvals

The Township FAQ directs applicants to receive all final approvals and obtain a Certificate of Occupancy or Certificate of Completion, as applicable.

Before the inspector arrives

  • Permit is issued
  • Request was accepted
  • Approved plans are available
  • Work is ready and uncovered
  • Site is safely accessible
  • Address is visible

If the inspection fails

  • Read every correction
  • Take clear reference photos
  • Confirm whether plan revision is needed
  • Fix all cited items
  • Request reinspection only when ready
  • Save the passing result
BS&A status decoder

What the Permit Status Means

Draft The application has not been fully submitted. Reopen it and complete missing fields or attachments.
Submitted The Township has the record. Watch email and BS&A for requests.
In review Plan, zoning or trade review is underway. Do not start work.
Corrections required Download or read each comment, revise the correct files and respond clearly.
Approved Payment, contractor registration or formal issuance may still be required.
Issued Print the permit, follow the approved scope and arrange required inspections.
Inspection denied/not accepted Check the reason, permit readiness and selected date before requesting again.
Finaled The building record shows final completion. Save proof and verify related trade records too.
Permit and property records

Search an Existing Permit or Investigate an Open Record

Search the record number first

Use the detailed Building Department search when you have a permit or application number.

Search by address or parcel

The BS&A homepage supports address, name and parcel-number searches.

Tip: Search the base street address before adding a unit or directional variation.

Open the complete building record

Review the record type, number, status, issue date, inspection history and any listed activity.

Do not confuse “found” with “closed”

A record can exist without having final approval. Look for a finaled status and completed required inspections.

Call for missing or unclear history

Contact 248-451-4842 with the address, parcel, approximate work date and the document or status you need.

Buying or selling? Check additions, finished basements, decks, pools, generators and major remodels against the Township record before closing.
Open permit recovery

Old Permit Not Finaled? Use This Checklist

Collect

  • Record number
  • Property address
  • Original scope
  • Inspection history
  • Approved plans if available
  • Current site photos

Ask

  • Which inspection is missing?
  • Is the record expired?
  • Can it be reactivated?
  • Are revised plans needed?
  • Are trade permits open?
  • What proves final completion?
Fee and payment guide

Get the Actual Township Fee—Not a Generic Estimate

Use this sequence

  1. Choose the correct permit type.
  2. Enter accurate scope, quantities and valuation.
  3. Wait for the Township-issued charge.
  4. Open the building-fee payment search.
  5. Confirm unexplained line items before paying.

Check every separate cost

  • Building permit
  • Plan review
  • Electrical permit
  • Mechanical permit
  • Plumbing permit
  • Planning, zoning or engineering process
  • Reinspection or correction-related charges
  • Online convenience fee, when shown
Official payment route: Pay a West Bloomfield Building Department fee. The Township directs permit-fee questions to 248-451-4842.
Contractors and homeowners

Confirm Who Is Legally Responsible for the Work

Licensed contractor

  • License matches the trade
  • Name matches the contract
  • Contractor is registered as required
  • BS&A account is connected correctly
  • Inspection responsibility is written
  • Final payment requires closeout proof

Open the BS&A contractor portal

Homeowner applicant

  • Confirm homeowner eligibility
  • Understand code responsibility
  • Use licensed trades where required
  • Coordinate every inspection
  • Keep approved documents on site
  • Obtain final certificate or completion
Current code notice

Use the Township’s Current Code List

Township update: The Building Division page posts a “Codes in Effect” update dated January 27, 2026 and links residential, building, electrical, plumbing and mechanical code information. Check the official page before designing or submitting because adopted code editions and effective dates can change.

Open Building Division Code Updates

Troubleshooting

Fix Common West Bloomfield Permit Problems

Problem
Likely cause
Best next action
Portal shows Bloomfield Township
Wrong municipality UID
Return to West Bloomfield UID 652 before applying or searching.
Address is not found
Wrong municipality, address format or parcel mismatch
Search by parcel, remove unit text and call 248-451-4842.
Application remains in draft
Missing field, attachment or final submission step
Open every section and confirm a record number was generated.
No email arrived
Spam filter or account email issue
Check spam and the BS&A dashboard, then verify the account email.
Inspection date selected but no appointment
Request not yet accepted
Wait for the Township acceptance email; then call 8:00–9:00 AM on the date for timing.
Siding inspection fails
Envelope/house-wrap inspection was missed or work was covered
Contact the Building Division before removing or reopening materials.
Permit is approved but cannot print
Fee, issuance or contractor item remains incomplete
Open the full activity and payment record, then call with the record number.
Old permit is not finaled
Missing final inspection, trade approval or certificate
Ask the Township for the exact outstanding closeout requirement.
Ready-to-use scripts

What to Say When You Contact the Township

Permit question
“I am planning [exact work] at [address]. The parcel is in West Bloomfield Township. Which building, zoning and trade permits are required, and what plans should I upload?”
Status question
“My BS&A record is [number] and shows [status]. What exact review, fee or document is preventing issuance?”
Inspection question
“My accepted inspection request is for [type] at [address], permit [number]. Can you provide today’s inspection time window?”
Open permit question
“The property record shows permit [number] is not finaled. Which inspection, trade approval or certificate is still required?”
Final project control

Do Not Consider the Project Complete Until These Are Confirmed

  • Correct Township and UID confirmed
  • Correct permit types selected
  • Planning/zoning approvals completed
  • Documents accepted
  • Township fees paid
  • Permit formally issued
  • Approved plans on site
  • Inspection requests accepted
  • Required work left visible
  • Corrections resolved
  • All trade finals passed
  • Certificate of Occupancy or Completion obtained
  • Main record finaled
  • Closeout proof saved
Office location

West Bloomfield Township Hall Map

Address: 4550 Walnut Lake Road, West Bloomfield, MI 48323. Public hours are listed as Monday–Friday, 8:00 AM–4:30 PM. Call 248-451-4842 before visiting for a specific reviewer, file or inspection issue.
Official resource library

Open the Correct Township Page

Frequently asked questions

West Bloomfield Building Permit FAQs

Which BS&A portal is correct for West Bloomfield Township?

Use West Bloomfield Charter Township municipality ID 652. Do not use ID 511, which belongs to Bloomfield Township.

What is the West Bloomfield Building Division phone number?

Call 248-451-4842 for building permits, plan reviews, inspection scheduling questions, certificates of occupancy and code interpretations.

What are the Township office hours?

West Bloomfield Township lists public hours as Monday through Friday, 8:00 AM to 4:30 PM, at 4550 Walnut Lake Road.

How do I apply for a West Bloomfield permit online?

Open BS&A UID 652, create or sign into an account, choose Apply for a Permit, match the correct property, select the permit type, upload documents and monitor email and the portal for requests.

How do I schedule a West Bloomfield inspection?

Submit an inspection request through the Township BS&A service. The Township reviews the request and emails whether it is accepted or denied. For the inspection time, call 248-451-4842 between 8:00 and 9:00 AM on the scheduled date.

Does a kitchen remodel or finished basement need a permit?

The Township Building FAQ lists renovations and alterations, including kitchen remodels and finished basements, among projects that need building permits.

What inspection is important before siding is covered?

The Township Building page calls for a building-envelope or house-wrap inspection before brick flashing or siding inspections. Confirm the sequence before covering the wall assembly.

How do I search an old permit?

Use the West Bloomfield BS&A detailed Building Department search. Search by record number first, or use address, owner name or parcel number. Open the full record and review its status and inspection history.

Can I start work when the application is approved?

Start only after the permit is formally issued. Pay required charges, print the permit and follow the approved plans and inspection conditions.

What proves a West Bloomfield project is complete?

Complete all required final approvals and obtain the applicable Certificate of Occupancy or Certificate of Completion. Confirm that the main and trade permit records show final completion.

Source and freshness note

Official Information Used for This Guide

Building-Department.org is an independent guide and is not West Bloomfield Charter Township.

This page was rebuilt using the Township Building Division, official Building FAQ, staff directory, Planning and Zoning FAQ, forms center and West Bloomfield BS&A UID 652.

Last reviewed: July 22, 2026.

Portal links, fees, codes, staff and inspection procedures can change. Confirm time-sensitive details with the Township before paying, ordering plans or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment