Washoe County Building Department | Permits, Inspections & Official Contact

Washoe County permit action guide

Find the Right Washoe County Permit Path Before Plans, Fees or Inspections Go Off Track

First confirm jurisdiction. Washoe County Building serves projects in unincorporated Washoe County. Properties inside Reno or Sparks use their city permit systems, while Incline Village and Crystal Bay projects may also need Tahoe-area approvals.

Once jurisdiction is clear, use this guide to choose a permit, submit through OneNV, prepare plans, understand Washoe-specific snow, wind and wildfire rules, schedule inspections and close the record correctly.

OneNV application, status and fee steps
County-versus-city jurisdiction check
Snow, WUI, septic and inspection guidance
Washoe County permit moving through property review, plan check and inspection Mountains, snow, wildfire protection, a permit document and a final inspection check illustrate Washoe County building requirements. WASHOE SITE REVIEW PLAN CHECK WBLD PERMIT FINAL INSPECTIONPASSED COUNTY COMPLEX
!
2026 code updateWashoe County requires the adopted 2024 ICC code editions and 2023 National Electrical Code for new submittals as of January 1, 2026. Projects submitted earlier under the prior code may remain under that original code path.
Start with the task

Open the Correct Washoe County Service

Most important first check

Washoe County, Reno or Sparks: Who Issues the Permit?

WC

Unincorporated Washoe County

Use Washoe County Building and OneNV when the parcel is outside Reno and Sparks city limits.

Check the parcel in regional mapping

R

Inside the City of Reno

Use Reno Development Services, not the county building-permit process.

Open Reno Building Permits

S

Inside the City of Sparks

Use the City of Sparks building and permit system.

Open the City of Sparks website

Tahoe Basin warning: Incline Village and Crystal Bay projects may need Washoe County plus Tahoe Regional Planning Agency, North Lake Tahoe Fire Protection District and utility-district approvals. Do not assume a county permit is the only approval.
Official contact panel

Washoe County Building Phone, Address and Hours

Building main line775-328-2020Permits, plan review and inspection help
Building emailbuilding@washoecounty.govInclude address, APN and record number
Inspection voicemail775-325-8000Request next-day or later inspections by 4:00 PM
Inspection emailinspections@washoecounty.govInclude all five scheduling details
Front-counter hours8:00 AM–4:00 PMMonday through Friday
County address1001 E. Ninth StreetReno, NV 89512
Washoe 311Dial 311Outside service area: 775-328-2003
Permit decision table

Does the Project Need a Washoe County Building Permit?

Project
Likely route
Important local check
New home, addition or structural alteration
Residential building permit
Planning, fire, septic/well, grading, snow load, WUI and utility reviews may apply.
Residential reroof
Reroof or EZ Permit
EZ reroof still requires staff processing and supporting documents.
Like-for-like HVAC, water heater or basic electrical work
Residential EZ Permit
No extra framing, drywall, relocation or additional utility scope.
Pool or spa
Pool permit
Barrier, electrical, plumbing, zoning and fire-access requirements may apply.
Grading, retaining wall or site work
Grading / building review
Drainage, slope, engineering and land-disturbance rules may control the design.
Commercial tenant improvement or new business space
Commercial permit
Licensed contractor, accessibility, fire, health, occupancy and business-license reviews.
Manufactured or mobile home work
Manufactured-home application
Manufactured-home work is not eligible for the EZ Permit process.
Demolition
Demolition permit
Tahoe, utility, environmental, fire and historic requirements may add approvals.
County rule: If the project is not included in the exemption list in Washoe County Code Chapter 100, a building permit is required.
Examples of exempt work

Some Work May Be Permit-Exempt—but Zoning Still Applies

Small detached structures

Washoe County lists sheds or playhouses under 200 square feet as examples of exempt work when they have no plumbing, electrical or mechanical systems.

Still check: Setbacks and Planning rules.

Limited fence work

Examples include fences up to 30 inches in a front yard, up to 6 feet in other areas, and certain same-material replacements under 100 linear feet.

Not included: Pool barriers or required screening.

Do not use examples as the full rule

The official page says to read the complete Chapter 100 exemption list and its conditions before starting.

Open the official exemption guide

OneNV application path

Submit a Complete Washoe County Permit in Six Steps

Confirm jurisdiction and land-use approval

Verify that the site is in unincorporated Washoe County. Ask Planning whether the project, use, setbacks and site layout are allowed.

Prepare: Address, APN, parcel size, current use and proposed work.

Choose the correct application

Use the residential, commercial, demolition, grading, pool, utility, manufactured-home or other project-specific form.

Prepare one coordinated file set

Plans, application, site plan, valuation and project description must describe the same scope.

Use clear names: Site-Plan.pdf, Architectural-Plans.pdf, Structural.pdf and Response-Letter.pdf.

Upload through OneNV

All new permits are submitted online. Create the account, select the permit type, enter the parcel and upload every required file.

Wait for intake and invoicing

A Permit Technician reviews the application for completeness and adds applicable fees. Pay after the invoice appears in the account.

Payment options: Online credit card or e-check; cash and physical checks may be taken to the office.

Download the approved plans and permit

Electronically submitted plans are issued through the online account. Washoe County does not provide paper copies for those plans.

Job-site rule: County-stamped approved plans must remain on site during construction.
Application readiness

Prepare These Items Before Opening OneNV

Property and project facts

  • Project address
  • Assessor parcel number
  • Owner information
  • Exact work description
  • Project valuation
  • Current and proposed use
  • Water and sewer source
  • Fire district or Tahoe location

Plans and responsible parties

  • Site plan
  • Floor plans
  • Elevations and sections
  • Structural information
  • Energy documents
  • Contractor license details
  • Owner-builder documents
  • Outside-agency approvals
Faster residential permits

When the Washoe County EZ Permit Process Can Be Used

Potential EZ Permit
Eligible scope
What disqualifies it
Residential HVAC
Like-for-like replacement of existing equipment
New systems, framing, drywall or added utility work
Residential plumbing
Qualifying replacement work; water heaters use a separate EZ type
Exterior gas lines or new Incline Village boilers require review
Residential electrical
Basic circuits and services up to 400 amps
Expanded scope, relocation or construction beyond the listed work
Water heater
Standalone residential water-heater replacement
Other simultaneous work not covered by the EZ type
Reroof
Qualifying residential reroof
Permit Technician review is still required
Wood or pellet stove
Qualifying residential installation
Staff review and supporting documents are required
EZ does not mean no review. Owner-builder permits, reroofs, wood/pellet stoves and certain Incline Village work require staff processing. Commercial projects and manufactured/mobile-home work are not eligible.
Washoe-specific design checks

Local Conditions That Can Change the Plans

2024 codes now required

New submittals must use the adopted 2024 ICC code editions and 2023 NEC as of January 1, 2026.

See adopted codes

Wind and seismic design

County design criteria identify a 120 mph wind design speed, special-wind-region conditions and Seismic Design Category D2 for residential code use.

Frost and winter design

The published criteria identify severe weathering, a 24-inch frost depth and a 17°F winter design temperature.

Snow load changes by location

Ground snow load depends on elevation, risk category and whether the site is west or east of U.S. 395 or in the Tahoe Basin.

Wildland-urban interface

Many county parcels require WUI and fire-resistance review. The adopted code includes the 2024 International Wildland-Urban Interface Code, Chapter 5.

Red Flag days

The county warns that work capable of creating a fire hazard may not occur on Red Flag Warning days.

Do not copy a Reno-area snow load into a mountain project. Use the parcel elevation, county tables or ASCE Hazard Tool and have the designer confirm the applicable value.
Outside-agency checklist

Other Reviews That May Be Needed Before Permit Issuance

Condition
Agency or review
Contact / action
Private well or septic
Northern Nevada Public Health / Environmental Health
Call 775-328-2434; engineered septic design may be required.
Fire plan review in most unincorporated areas
Truckee Meadows Fire Protection District
Call 775-326-6000, option 4.
Incline Village / Crystal Bay fire review
North Lake Tahoe Fire Protection District
Call 775-831-0351 ext. 8127.
Tahoe Basin land coverage or environmental rules
Tahoe Regional Planning Agency
Call 775-588-4547 or use the TRPA permitting counter.
Incline utility compliance
Incline Village General Improvement District
Call 775-832-1224.
New regional water service
Truckee Meadows Water Authority
New construction: 775-834-8269.
Official fee guidance

Washoe County Building Permit Fees: Useful Published Numbers

Fee item
Published amount or formula
Practical note
Valuation up to $500
$45 building-permit fee
Other sub-fees, taxes or reviews may still apply.
$500.01–$2,000 valuation
$45 for first $500 + $3.36 per additional $100 or fraction
Fee brackets use fractions as a full increment.
$2,000.01–$25,000 valuation
$95.40 for first $2,000 + $15.14 per additional $1,000 or fraction
Final valuation is set by the Building Official.
Reroof or siding
$45
Confirm any additional fees in OneNV.
Wood stove or insert
$45
Supporting documents and inspection remain required.
Outside-hours inspection
$135 per hour, two-hour minimum
Or actual jurisdiction cost if greater.
Additional inspection
$90 per hour, one-hour minimum
May apply under County Code Article 109.
Building-permit renewal
$45 + 10% of original building fee and sub-fees
Other permit renewals may be 100% of original fee and sub-fees.

Incline Village adjustment

The published building-fee page says to add 15% for the Incline Village area.

Example valuation rates

Deck: $15/sq. ft.; fence: $8/linear ft.; carport, awning or patio cover: $20/sq. ft.; unfinished basement: $25/sq. ft.

Request an estimate

Email building@washoecounty.gov. The live OneNV invoice is the best final source before payment.

Inspection scheduling

Schedule a Washoe County Inspection Without Missing the Cutoff

Choose Accela, email or voicemail

Inspections may be requested through the online account, by email or by voicemail.

Contacts: inspections@washoecounty.gov or 775-325-8000.

Request next-day or later service by 4:00 PM

Requested dates and times are not guaranteed.

Include: Permit number, job address, inspection type, requested date, contact name and phone.

Check the time on inspection day

For a more specific time, call 775-328-2020 between 8:00 and 8:30 AM on the day of inspection.

Keep approved plans and required materials on site

County-stamped plans and required certification documents must be available for the applicable inspection.

Do not schedule through the system during a related revision review

When a revision is under review, system scheduling may be unavailable. Only unrelated inspections may be considered directly by the assigned inspector.

Before the inspector arrives: Make the site safe, leave required work visible, provide access and confirm that the correct construction stage is complete.
Permit status and corrections

Search a Permit and Understand What Happens Next

Search fields

  • Property address
  • Assessor Parcel Number
  • Permit number
  • WBLD record format

Open the official permit-status page

What the public search can show

  • Current review status
  • Plan-check comments
  • Project details
  • Related record information
Submitted / intakeA Permit Technician is checking completeness and preparing fees.
Fees dueOpen the OneNV account, review the invoice and pay using an accepted method.
In reviewPlanning, building, fire, health or another reviewer may be checking the project.
Corrections requiredUpload the complete corrected plan set, corrected documents and a response letter.
ApprovedConfirm that fees, contractor information and issuance steps are complete.
IssuedDownload the permit and stamped plans; follow the approved scope and inspection sequence.
Revision in reviewRelated inspections may be blocked until review is complete.
Final / closedSave the final inspection and closure proof for future sale or refinance.
Corrections versus revisions

Upload the Right Document Type

Correction

A correction answers code-review comments while the permit or permit revision is under review.

  • Complete corrected plan set
  • Complete corrected documents
  • Point-by-point response letter
  • Notify the Permit Technician after upload

Revision

A revision changes the approved scope or plans after the permit has been issued.

  • Link the permit to the online account
  • Upload the revision package
  • Explain each change clearly
  • Wait for approval before building the changed work
Owner-builder and contractor rules

Who Can Receive the Issued Permit?

Owner-builder

Owner-builder permits can only be issued to the homeowner. An authorized person may act with a completed Authorization to Act as Agent form.

Important: Every owner-builder permit requires Permit Technician processing before payment and issuance.

Licensed contractor

Commercial permits and residential projects outside the owner-builder exemption must be issued to a licensed contractor.

An authorized individual may act for a contractor after the county receives the contractor authorization form.

Existing illegal work

How Washoe County Handles Work Done Without a Permit

If the work is visible

For many small projects, start the normal permit application process and obtain the required permit before inspection.

  • Describe the completed work honestly
  • Provide plans or product details
  • Keep all work exposed
  • Complete required inspections

If the work is concealed

The county may require work to be exposed or partially exposed so it can be inspected. Additional documentation or professional evaluation may also be necessary.

  • Do not close more walls
  • Photograph current conditions
  • Ask what must be exposed
  • Confirm all trade permits
Sale and insurance risk: Washoe County notes that illegal work can affect disclosure, property value and insurability.
Code complaint route

Report an Unsafe or Unpermitted Property Condition

Start with Washoe 311

Dial 311 or call 775-328-2003.

Code Enforcement email

Code-Enforcement@washoecounty.gov

Emergency danger

Use 911 for an immediate threat to life, active fire, collapse or another emergency.

Ready-to-use scripts

What to Say When You Contact Washoe County

Permit requirement:
“I am planning [exact work] at [address/APN]. The property appears to be in unincorporated Washoe County. Can you confirm the permit type, required plans, outside-agency reviews and inspection sequence?”
Permit status:
“My record is [permit number] at [address]. OneNV shows [status]. Which department or document is holding the next step, and what exactly should I upload or complete?”
Inspection request:
“Please schedule [inspection type] for permit [number] at [address] on [requested date]. The contact is [name/phone], and the approved plans and work will be accessible.”
Old unpermitted work:
“I discovered [describe work] at [address]. It was completed before I owned the property. What plans, exposure, permits and inspections are needed to legalize it?”
Final closeout

Do Not Consider the Project Finished Until These Are Complete

  • County jurisdiction confirmed
  • Planning approval confirmed
  • Correct permit type submitted
  • Outside-agency reviews complete
  • Fees paid
  • Permit formally issued
  • Stamped plans on site
  • Required work left visible
  • All inspections passed
  • Revisions approved
  • Trade permits finaled
  • Main record closed
  • Certificate letters submitted
  • Closure proof saved
Office location

Washoe County Building Program Map

Address: 1001 E. Ninth Street, Reno, NV 89512. Front counter: Monday–Friday, 8:00 AM–4:00 PM. Call before visiting for a project-specific appointment or staff member.
Official links

Washoe County Permit Resources

Frequently asked questions

Washoe County Building Permit FAQs

Does Washoe County issue permits inside Reno and Sparks?

No. Washoe County Building primarily serves unincorporated Washoe County. Properties inside Reno or Sparks use the appropriate city building-permit office. Confirm jurisdiction using regional mapping before applying.

Where do I apply for a Washoe County building permit?

Use the official OneNV portal. Complete the correct project application, upload the plans and supporting documents, wait for Permit Technician intake and pay after fees are invoiced.

How do I search a Washoe County permit?

Use the county permit-search page and search by property address, Assessor Parcel Number or a permit number such as WBLDXX-XXXXXX. The search may show review status, plan-check comments and project details.

What are the Washoe County Building office hours?

The in-office front counter is open Monday through Friday from 8:00 AM to 4:00 PM. The main Building Program phone number is 775-328-2020.

How do I schedule a building inspection?

Schedule through the Accela account, email inspections@washoecounty.gov or leave a voicemail at 775-325-8000. Submit next-day or later requests by 4:00 PM and include the permit number, address, inspection type, requested date, contact name and phone.

Which projects can use a Washoe County EZ Permit?

Qualifying residential like-for-like HVAC, plumbing, electrical, water-heater, reroof and wood/pellet-stove work may use the EZ process. Commercial projects, manufactured-home work and projects with added framing, drywall, relocation or expanded utility scope are not eligible.

What building codes apply in Washoe County in 2026?

For new submittals, Washoe County requires its adopted 2024 ICC code editions and 2023 National Electrical Code as of January 1, 2026, together with Northern Nevada amendments and applicable county rules.

Does a small shed need a Washoe County building permit?

The county lists certain detached sheds or playhouses under 200 square feet as permit-exempt examples when they have no plumbing, electrical or mechanical systems. Planning setbacks and other conditions still apply, so verify the complete exemption rule before building.

Can inspections continue while a revision is under review?

System inspection scheduling may be unavailable while a related revision is under review. Inspections unrelated to the revision may be requested directly from the assigned inspector and remain subject to the inspector’s discretion.

How do I legalize work completed without a permit?

Apply through the normal permit process. Visible work can be inspected after permit issuance, while concealed work may need to be exposed or supported by additional documentation so the county can verify code compliance.

Source and freshness note

Official Information Used for This Guide

Building-Department.org is an independent informational website and is not Washoe County. Applications, fees, inspections, approvals and enforcement decisions must be completed through Washoe County or the correct city or regional agency.

This page was checked against the Washoe County Building Program, OneNV instructions, permit-status page, inspection guide, EZ Permit rules, adopted-code page, design criteria, fee schedule, Planning resources and outside-agency directory.

Last reviewed: July 23, 2026.

Official pages, staff, fees, codes and portal procedures can change. Confirm time-sensitive information before paying, ordering plans or starting construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment