Wasatch County Building Department | Permits, Inspections & Official Contact

Wasatch County permit action guide

Apply, Upload Plans, Request Inspections and Close a Wasatch County Permit

Use the correct route from the beginning. Wasatch County now uses CityInspect for current permit applications and inspection requests, while older applications may remain in the legacy system.

This guide shows exactly what to prepare, which PDF documents can stop a submittal, how wildland-fire and septic rules affect a project, when to request an inspection and how to verify final closeout.

Current CityInspect and legacy-login routes
PDF, site-plan, septic and WUI requirements
Inspection timing, corrections and certificate steps
Wasatch County permit moving through mountain-site review and inspection An animated mountain site plan, permit document, wildland fire check, plan review screen and final inspection badge explain the county permit process. REVIEWED WUI / SITE REVIEW SITE PLAN + PDF SET PERMIT FINAL INSPECTION PASSED
⚠️
Portal change to know before applying Current applications use Wasatch County CityInspect. The county also keeps a separate login for applications submitted before its CityInspect migration. Use the correct system so your documents and inspection account connect to the right permit.
Start here

Choose the Exact Task You Need

Wasatch County Next-Step Finder

Choose your situation for a county-specific action and the official route.

Official contact panel

Wasatch County Building Department Contact Information

Building Department 435-657-3200 Permits, plan review and inspection process
Building email bldinfo@wasatch.utah.gov Include address and permit number
Physical address 1891 W 3000 S Heber City, UT 84032
Planning Department 435-657-3205 Zoning, setbacks and land-use review
Health Department 435-657-3264 Septic approval-letter questions
Engineering 435-657-3305 Grading, right-of-way and infrastructure permits
Fire District 435-940-9636 Fire-service and district requirements
County directory Open directory Confirm current staff and contact routes
Jurisdiction check

Confirm the County Is the Correct Authority Before You Apply

Start with Wasatch County when

  • The parcel is in unincorporated Wasatch County
  • The county map and Planning office confirm county zoning
  • Your project is directed to the Wasatch CityInspect portal
  • A town or service agreement specifically uses county building review

Check the municipality first when

  • The site is inside Heber City, Midway, Hideout or another incorporated area
  • The mailing address does not match the legal jurisdiction
  • A city has its own land-use or building-permit portal
  • The parcel is in the MIDA land-use area or another special jurisdiction
Do not rely only on “Wasatch County” in the mailing address. Use the county mapping tools, then confirm the permitting authority with Planning before paying for plans or opening an application.
Permit decision table

Which Permit or Review Fits the Project?

Project
Start with
Extra Wasatch County check
New single-family home or major addition
Building permit
Separate site plan, structural calculations, energy documents, septic/WUI/slope items when applicable
Basement finish
Building permit
Scaled floor plan, room labels, dimensions, windows, doors, smoke/CO alarms and structural details if changed
Detached garage
Building permit
Scaled site plan, easements, setbacks, driveway slope, disturbed area, WUI and septic requirements
Small detached accessory structure
Planning check first
County FAQ says detached one-story structures under 200 sq. ft. may not need a building permit, but setbacks still apply
Deck
Building permit check
A deck 30 inches or more above grade requires a permit even when small
Swimming pool
Pool permit
Scaled site plan, setbacks, barrier/cover, electrical protection, equipment and engineering information
Agricultural building
Agricultural permit path
A permit is still required; use the Agricultural Exemption Acknowledgment for the applicable requirements
Grading, major disturbance or retaining work
Engineering permit check
A project disturbing one acre or more may require an engineering permit with the building application
ADU, sign, transient lodging or special use
Planning application first
Conditional use, sign, site-plan or other land-use approval may come before building review
Right-of-way, utility trench or driveway work
Engineering permit
County right-of-way, grading, driveway and seasonal paving restrictions may apply
Online application

Apply Through CityInspect in Seven Clear Steps

Confirm jurisdiction and zoning

Identify the parcel, zoning district, setbacks and any conditional-use or site-plan requirement.

Do first: Call Planning at 435-657-3205 when the use, setback, slope or jurisdiction is unclear.

Choose the correct CityInspect account

Register or sign in to the current Wasatch County CityInspect system. Use the legacy portal only for an application filed before the migration.

Gather information before opening the form

County checklists warn that information may not be saved if the form times out. Prepare owner, parcel, designer and contractor details first.

Keep ready: Owner’s legal name from tax records, parcel number, architect/engineer and all contractor license/contact information.

Upload PDF files only

Wasatch County states that non-PDF uploads will cause the application to be returned as incomplete.

Before upload: Open each PDF, confirm it is readable, unlocked and named using the county naming pattern.

Separate files when the county asks

For a new dwelling, the current application page says the site plan and landscape plan must be uploaded separately from the complete plan set.

Avoid: Hiding the site plan inside one large combined drawing file.

Submit, pay the invoice and resubmit when required

The county sends a plan-review invoice by email. Current single-family guidance says payments are made online and no payments are accepted in the office.

Critical button: After paying or correcting documents, click Submit for Review or the project will not move forward.

Wait for formal issuance

Under Review, Review Cycle or Approved does not automatically mean construction may begin. Download the issued permit and stamped plans after payment and issuance.

Job-site file: Keep the stamped approved plan set available for every inspection.
Complete-submittal checklist

Documents That Commonly Control Approval

Core application

  • Owner’s legal name from tax records
  • Parcel number
  • Project address
  • Architect/engineer details
  • General contractor details
  • Mechanical, plumbing and electrical contractors

Plans and calculations

  • Complete plan set
  • Separate site plan for new dwelling
  • Structural calculations
  • Signed ResCheck or insulation table
  • Foundation, floor and framing plans
  • Elevations and cross-sections

Property-specific documents

  • Septic approval letter
  • Owner-Builder Agreement
  • Slope analysis when required
  • Fire Hazard Severity Form
  • WUI landscape plan
  • Engineering permit for qualifying disturbance
Account-linking trap: County checklists say the contractor email entered in the plan-review portal must match the email used to create the Builder inspection account. A mismatch can stop the accounts from linking correctly.
Site-plan decoder

What the County Wants to See on a New-Home Site Plan

Site-plan item
Why it matters
Common omission
Property lines, setbacks and overhangs
Confirms zoning placement and building-envelope compliance
Showing wall setback but not roof overhang
Easements
Prevents construction in utility or access areas
Using assessor imagery without recorded easements
Topography on lots over 10% slope
Supports slope, grading and foundation review
No natural-grade or contour information
Retaining walls and hard surfaces
Shows grading, drainage and disturbance
Leaving out driveways, parking and patios
Water, sewer and drainage
Coordinates meters, laterals and wastewater route
No sewer lateral or subsurface drainage location
Driveway and street names
Supports access and emergency-response review
No driveway grade or connection point
Nearest hydrant
Affects fire-protection analysis
No hydrant distance or water-source information
Total disturbed area on parcels over one acre
One acre or more may trigger an engineering permit
Counting only the building footprint
Deferred documents

Items You May Need Later—But Before the Related Inspection

Current single-family checklist timing

  • Gas schematic: on site for Gas Line Test & Schematic inspection.
  • Manual J & D: on site for the 4-Way inspection.
  • Required fire-sprinkler plans: on site for Rough Fire Sprinkler inspection.
  • Truss package: uploaded and approved before Roof Framing inspection.

Truss package must include

  • Stamped and signed review letter from the engineer of record.
  • Truss layout.
  • Truss drawings stamped and signed by the truss manufacturer’s engineer.
Fire-sprinkler timing conflict: The county’s sprinkler page says required sprinkler plans and calculations must be submitted with the permit application, while a newer single-family checklist describes them as deferred. Confirm the required timing for your exact address before submitting.
Wildland fire and sprinklers

Check WUI and Residential Sprinkler Rules Early

Wildland Urban Interface documents

  • Check the county WUI map
  • Complete the Fire Hazard Severity Form
  • Provide a landscape plan
  • Show existing and proposed vegetation
  • Show tree distance from the structure
  • Address defensible space

Open the official WUI map

Residential sprinklers are triggered when

  • No qualifying public water system with hydrants exists.
  • The only fire-access road exceeds 10% grade for more than 500 continuous feet.
  • Total floor area inside exterior walls exceeds 10,000 square feet.
  • The dwelling is double the average floor area of qualifying unsprinkled homes in the subdivision.

Read the official sprinkler requirements

Special project checks

Do These Extra Checks Before Applying

Situation
Required action
Useful contact or form
Property uses septic
Obtain the Health Department septic approval letter before a complete building submittal
Owner will act as builder
Upload the current Owner-Builder Agreement and follow portal field instructions
Changing contractors
Use licensed business names, get the owner signature and email the form to Building
Permit needs more time
Submit a permit-extension request before assuming work may continue
Gas system work
Prepare the fuel-gas installation form and schematic; complete meter protection before the Gas Line Test
One acre or more disturbed
Coordinate an Engineering permit with the building application
Inspection action board

Request a Wasatch County Inspection Without Losing Your Place

Permit issued
Builder account linked
Work ready and exposed
Request online
Check email for AM/PM
Save result and correct items

Lead time

24-hour notice is required.

The county reports an average inspection wait of 2–3 business days because requests are first-come, first-served and depend on area availability.

Concrete cutoff

Submit by 2:00 PM on the business day before the pour.

A full schedule may push the request to the next available opening.

Confirmation

The county emails the scheduled date and whether the inspection is AM or PM.

Check junk mail and the portal’s inspection list if no email arrives by close of business.

Have ready

  • Permit number
  • Builder account
  • Correct inspection type
  • Approved stamped plans on site
  • Safe access
  • Work complete and uncovered

Reinspection fees may be issued when

  • Work is not ready
  • Stamped plans are missing
  • Inspection is cancelled the same day
  • Prior corrections were not completed
  • Repeat inspection is requested too early
  • The permit remains flagged until payment processes

Open the Official Inspection Page

Status and correction help

What the Portal Status Means

Draft The form is not fully submitted. Finish required fields and confirm the project was sent.
Under Review / Review Cycle The county is actively reviewing the project. Watch email and the Review Documents tab.
Plan Submission The project has been returned to you. Address emailed or uploaded correction items.
Missing documents Upload the requested PDF using the required file name and document category.
Corrections uploaded This is not enough by itself. Click Submit for Review to return the project to the county.
Plan-review fee due Use the emailed payment link. Current guidance says payments are online and not accepted in the office.
Issued Download the permit and stamped approved plans before construction and inspections.
Inspection flag Pay the reinspection fee through the link shown in the flag and allow up to one business day for processing.
Final inspection and occupancy

Passing Final Inspection Is Not the Last Administrative Step

After the final passes

  1. The inspector notifies the office.
  2. The certificate moves through required county signatures.
  3. The county records the certificate.
  4. A copy is uploaded to the approved-plan documents.

Expected certificate timing

The county FAQ says the certificate process usually takes at least 7–10 business days after the final inspection passes.

Plan for this delay before move-in, closing or a lender deadline.

Closeout check: Confirm the building permit, related trade inspections, special-district requirements and recorded certificate are complete before treating the project as finished.
Fees and budgeting

Build a Realistic Permit Budget

County fee buckets

  • Building permit fee
  • Plan-review fee
  • County impact fees
  • Temporary power or reinspection fees
  • Planning or land-use application fees
  • Engineering permits when triggered

Outside-district charges

  • Fire service
  • Water and sewer district
  • Solid waste
  • Power provider
  • Septic or Health review
  • Utility connection work
Do not use the county FAQ’s old square-foot average as a current quote. That page labels its estimate “as of June 13, 2016.” Use the live CityInspect invoice and current Planning/special-district confirmations for a 2026 budget.

Multi-family or commercial impact fees

Planning: 435-657-3205

Water or sewer districts

Twin Creeks, North Village, Jordanelle or Strawberry questions: 435-657-3244

Fire District

435-940-9636

Avoid returned applications

Eight Wasatch County Mistakes That Stop Progress

  1. Uploading images, CAD files or another format instead of PDF.
  2. Using file names that do not follow the county naming pattern.
  3. Combining a required separate site plan into the complete plan set.
  4. Forgetting the septic letter on a septic property.
  1. Leaving out the WUI form or landscape plan.
  2. Using different emails for the contractor and Builder inspection account.
  3. Uploading corrections without clicking Submit for Review.
  4. Requesting an inspection without stamped approved plans on site.
Ready-to-use scripts

What to Say When You Call

Permit question
“I am planning [exact work] at [address and parcel number]. Is the property under Wasatch County jurisdiction, which permit type should I use, and do I need Planning, Engineering, septic or WUI approval before applying?”
Returned application
“My CityInspect project [number] shows Plan Submission. Can you confirm every missing item, the exact PDF file name/category and whether I must pay or click Submit for Review after uploading?”
Inspection request problem
“Permit [number] is issued, but my Builder account cannot request an inspection. Can you check whether the contractor email matches the inspection account and whether a flag or unpaid fee is blocking the request?”
Certificate question
“The final inspection passed on [date]. Have all signatures been completed, has the certificate been recorded, and where will the recorded copy appear?”
Final checklist

Do Not Finish the Project Until These Are Confirmed

  • Correct jurisdiction confirmed
  • Planning approval complete
  • Engineering permit complete if triggered
  • Septic letter uploaded if applicable
  • WUI documents uploaded if applicable
  • PDF files named correctly
  • Plan-review invoice paid
  • Permit formally issued
  • Stamped plans saved on site
  • Builder inspection account linked
  • Required inspections passed
  • Reinspection flags cleared
  • Final inspection passed
  • Certificate signatures completed
  • Certificate recorded
  • Closeout copy saved
Office map

Wasatch County Building Department Location

Address: 1891 W 3000 S, Heber City, UT 84032. Call 435-657-3200 before visiting. The county’s current single-family guidance says permit payments are made online and are not accepted in the office.
Official resource library

Open the Correct County Portal, Checklist or Form

Frequently asked questions

Wasatch County Building Permit FAQs

Where do I apply for a current Wasatch County building permit?

Use the Wasatch County CityInspect portal for current applications. Register or sign in, choose the correct project type, complete the form and upload the required PDF files.

What if my application was submitted before the CityInspect migration?

Use the county’s separate legacy-application login linked from the official Building Permit Application page. Do not create a duplicate current application unless county staff instructs you to do so.

What file format does Wasatch County accept?

The county states that uploaded documents must be PDF files. Other formats can cause the application to be returned as incomplete. Use the county naming pattern and confirm every PDF is readable and unlocked.

How much notice is required for an inspection?

The county inspection page requires 24-hour notice and reports an average wait of two to three business days. Concrete inspection requests must be received by 2:00 PM on the business day before the pour.

Why does my application say Plan Submission?

Plan Submission means the project was returned to you. Open the Review Documents tab and email notices, correct each item, upload the proper files and click Submit for Review so the county receives the project again.

Does a small shed need a Wasatch County building permit?

The county FAQ says a one-story detached accessory structure under 200 square feet may not require a building permit. Planning setbacks and other land-use rules still apply, so verify the location before building.

When does a deck require a permit?

The county FAQ states that a deck 30 inches or more above the ground requires a permit, even when the deck is under the usual accessory-structure square-foot threshold.

What do I need if the property uses septic?

Upload a septic approval letter when the project is in an area using a septic system or the property has an existing septic system. Contact the Wasatch County Health Department at 435-657-3264.

When are residential fire sprinklers required?

County rules list triggers including lack of a qualifying hydranted public water system, the only fire-access road exceeding a 10% grade for more than 500 continuous feet, a dwelling over 10,000 square feet, or certain homes that are double the subdivision’s qualifying unsprinkled-home average.

How long after final inspection does the certificate take?

The county FAQ says the certificate generally takes at least seven to ten business days after the final inspection passes because it must receive county signatures and be recorded before a copy is uploaded.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not Wasatch County Government.

This page was checked against the official Wasatch County Building Department, Building Permit Application page, inspection page, FAQs, current project checklists, Planning applications, WUI map and residential sprinkler requirements.

Last reviewed: July 22, 2026.

Portal screens, fees, forms, adopted codes, inspection availability and staff contacts can change. Confirm time-sensitive details with the county before filing, paying or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.