Building Inspection Guide | Schedule, Requirements & What to Expect

San Francisco DBI permit action guide

Switch Onto the Correct San Francisco Permit Track Before You Submit Plans or Join the Permit Center Queue

San Francisco does not use one universal permit portal yet. Your project may belong in PermitSF, the instant contractor-permit system, an Over-the-Counter review, an In-House Review portal, or a separate Fire, Planning, Public Works or Health process.

This guide helps you choose that route first, prepare the correct forms, search both new and legacy records, schedule inspections, understand fees and close every related permit.

PermitSF versus OTC versus In-House Review
24/7 inspection scheduling and job-site readiness
Planning, Fire, Public Works and records handoffs
San Francisco permit cable car switching between online, over-the-counter and in-house review tracks An animated property plan, permit route switch, cable car, digital review screen, bay water and final inspection explain the San Francisco Department of Building Inspection process. SF PROJECT + ROUTE PLAN ROUTE OTC / IHR ONLINE PERMIT REVIEW ISSUED BUILDING PERMIT FINAL INSPECTION PASSED SAN FRANCISCO DBI
PermitSF is expanding, but it is not yet the only San Francisco permit system Check the City’s “Where to apply” page before creating an application. Some permits are fully online, some instant contractor permits use a separate route, and many OTC or In-House applications still follow DBI and Permit Center procedures.
2025
New code cycle with no grace period Applications filed on or after January 1, 2026 must use the 2025 California Codes and the 2025 San Francisco amendments. DBI states that there is no grace period for using the earlier code edition.
Start here

Choose the Exact San Francisco DBI Task

San Francisco Permit Route Finder

Select the situation closest to your project.

Verified contact panel

San Francisco DBI Contact Information

DBI Customer Service 628-652-3200 General DBI questions and customer assistance
Customer email dbicustomerservice@sfgov.org Include the address and application number
Permit Services 628-652-3240 Building, electrical and plumbing/mechanical permit support
Permit processing email dbi.cpbrequest@sfgov.org Central Permit Bureau processing questions
Electronic review support dbi.epr@sfgov.org Electronic Permit Review assistance
Permit Center Help Desk 628-652-4900 Leave a voicemail and include an email address
Inspection scheduling 628-652-3401 Automated system available 24 hours a day
Inspection email dbi.inspectionservices@sfgov.org Inspection and expired-permit questions
Records Management 628-652-3420 Plans, job cards, certificates, permits and 3R reports
Records email dbi.records3R@sfgov.org Include address, permit number and exact record
Permit Center 49 South Van Ness Avenue 2nd Floor, San Francisco, CA 94103
Permit Center hours Mon 9–5; Tue–Fri 8–5 Individual agency counters may have shorter hours
Useful message format: “I am contacting you about application [number] at [address/block-lot]. The record shows [status/station]. Which form, plan sheet, agency approval, fee or inspection is preventing the next step?”
Choose the application track

PermitSF, Instant Online, OTC and In-House Review Are Different Routes

Route
Best match
How it works
Do not assume
PermitSF
Permit types already migrated to the new online system
Apply, upload, pay, communicate and retrieve digital records in the PermitSF account
Every DBI, Planning, Fire, Public Works or Health permit is available there
Instant online trade
Eligible electrical, plumbing, mechanical and boiler permits
Registered contractors enter the scope, pay and can receive an eligible permit immediately
A trade permit replaces the building permit or Planning approval
Over-the-Counter
Qualifying smaller residential or commercial projects
Follow the OTC form and plan-review route shown by DBI; in-person review is available at the Permit Center
OTC means guaranteed same-day issuance or no Planning review
In-House Review
Structural, complex, multi-agency, addition, ADU, change-of-use or larger projects
Submit the application and plans through the current IHR route, then track sequential reviews and corrections
DBI is the only reviewing department
Site Permit
Major projects using staged approval before construction details are complete
Planning and site-permit approval is followed by addenda for the detailed construction scope
A site permit alone authorizes all construction
Live-catalog rule: PermitSF is being expanded in phases. Check the current City route page instead of relying on an older article, bookmarked portal or contractor habit.
Permit decision table

Match the Project to the Likely San Francisco Permit Path

Project
Start with
Prepare first
Other review to check
In-kind door, window or siding replacement
PermitSF
Existing and replacement information, location, dimensions, product and contractor details
Historic-resource, Planning, egress, energy and visible-street-elevation rules
No-plans reroofing
Online reroof route
Roof type, area, layers, valuation, contractor authorization and structural condition
Deck repair, equipment, solar removal, fire classification and historic conditions
Kitchen or bathroom remodel
Online or OTC check
Existing/proposed plans, fixture layout, wall changes, ventilation and complete trade scope
Structural, plumbing, electrical, mechanical, Planning and accessibility
Electrical, plumbing or mechanical work
Instant trade permit
Registered contractor, exact devices/fixtures/equipment and job valuation
Building, Fire, Planning, Health or Public Works permit where affected
Solar photovoltaic system
Solar application
SolarAPP+ or project-specific plans, roof information, electrical diagram and equipment
Structural, Fire access, battery storage and electrical inspection
Interior residential alteration
OTC eligibility check
Form 3/8, existing and proposed plans, owner forms, energy and trade information
Planning, structural, housing-code, lead and tenant-notification issues
Addition, structural alteration or ADU
In-House Review
Architectural, structural, site, energy, accessibility and agency documents
Planning, Fire, Public Works, PUC, Rent Board and utility requirements
Commercial tenant improvement
OTC or IHR screening
Existing/proposed use, occupancy, plans, valuation, accessibility and life-safety scope
Planning, Fire, Health, Public Works and business-permit dependencies
Change of use or occupancy
Planning before DBI
Legal existing use, proposed use, occupancy load, egress and accessibility
Planning authorization, Fire, Health, impact fees and certificate requirements
Sign or awning
Online sign/awning route
Dimensions, location, attachment, electrical information and property authorization
Planning, historic, Public Works, accessibility and electrical permit
Fire alarm or sprinkler work
PermitSF Fire permit
System plans, calculations, equipment, contractor and building-permit relationship
SFFD plan review, DBI trade permits and fire inspection
Excavation, sidewalk, curb, street tree or public way
Public Works permit
Site plan, dimensions, restoration, utility and contractor information
Building permit, Planning, street-space and utility coordination
Demolition
Planning + DBI
Existing building information, demolition plans, hazardous-material and utility records
Historic, tenant, Planning Commission, environmental, Fire and Public Works rules
Application workflow

Build the Permit Package in San Francisco’s Actual Review Order

Research the property before drawing the project

Check the assessor block and lot, legal use, permit history, open complaints, Planning zoning, historic-resource status and any active enforcement case.

Confirm whether Planning authorization is required

Resolve use, height, rear-yard, neighborhood notification, historic, dwelling-unit, storefront and other Planning issues before relying on DBI issuance.

Choose PermitSF, instant online, OTC or In-House Review

Use the City’s current route page. Do not create duplicate applications in several systems because the first route did not immediately issue a number.

Use the correct building application form

Most traditional building applications use Form 3/8, commonly called the pink form. Other project types have dedicated online forms or supplemental documents.

Identify the legal permit applicant

Only the property owner, a California-licensed contractor or an authorized agent may apply. Complete the required applicant, agent, contractor or owner-builder disclosures.

Enter a complete scope and valuation

Include all construction, finishes and permanently installed electrical, plumbing, mechanical, fire-protection and other systems—even when separate trade permits will be issued.

Upload or bring coordinated plans

The title sheet, architectural sheets, structural plans, energy forms and agency documents must describe the same property, dimensions and work.

Complete multi-agency intake

Planning, Fire, Public Works, Public Utilities, Health or another department may review the project before DBI can issue the building permit.

Track each station or department

Use PermitSF for migrated records and the legacy Permit Tracking System for applicable DBI records. Read the station history instead of relying only on a broad “under review” label.

Respond to every correction together

Submit a response letter and coordinated replacement sheets. A correction to one discipline can affect Planning, structural, energy, accessibility or Fire review.

Complete the issuance declarations

Provide the Property Owner disclosures, Licensed Contractor’s Statement, Permit Applicant and Authorized Agent form and Final Declaration when required.

Pay the final calculated fees and obtain the issued record

For traditional permits, obtain the issued job card before construction. For migrated PermitSF permits, retrieve the digital permit documents shown in the account.

Document control

Prepare Forms, Plans and Disclosures Before Intake

Application and authorization

  • Correct application type
  • Assessor block and lot
  • Existing legal use
  • Complete work description
  • Project valuation
  • Property-owner information
  • Applicant and agent disclosure
  • Contractor or owner-builder statement

Plan package

  • Cover and code-analysis sheet
  • Site or plot plan
  • Existing floor plans
  • Proposed floor plans
  • Exterior elevations
  • Building sections
  • Structural plans and calculations
  • Energy and Green Building forms

Project-specific records

  • Planning approval
  • Historic-resource documents
  • Title 24 calculations
  • Accessibility details
  • Product or equipment information
  • Special-inspection statement
  • Geotechnical report
  • Fire life-safety information

Issuance and job-site records

  • Final Declaration
  • Owner authorization
  • Contractor license verification
  • Issued job card or digital permit
  • Approved plans
  • Special-inspection forms
  • Required notices
  • Inspection results
Owner-builder warning: Signing as owner-builder makes the owner responsible for permit accuracy, construction supervision, job-site safety, employment obligations, inspections and code compliance. Do not use the exemption to let an unlicensed person function as the contractor.
Multi-agency review

DBI May Be Only One Stop in the Approval Chain

Agency
What it reviews
When to contact it
SF Planning
Use, zoning, historic resources, dwelling units, neighborhood notification, height and bulk
Before final design when the project affects use, exterior appearance, size or unit count
Department of Building Inspection
Building, housing, electrical, plumbing and mechanical code compliance
For permit intake, plan review, issuance, inspection and code enforcement
San Francisco Fire Department
Fire alarm, sprinkler, suppression, egress, occupancy and life-safety conditions
For commercial, assembly, multifamily and fire-system projects
Public Works
Sidewalk, curb, street space, excavation, street trees, public right-of-way and certain encroachments
Before work extends beyond the property line or affects the public way
Public Utilities Commission
Water, sewer, utility capacity, connections and applicable utility infrastructure
For new buildings, added units, service changes or major utility demand
Department of Public Health
Food facilities, environmental health, hazardous materials and regulated health uses
Before construction for restaurants, food service and other health-regulated businesses
Rent Board / Housing agencies
Tenant-related requirements, notices, protected units and housing-program conditions
Before work displaces occupants, removes housing or affects regulated residential units
Port or OCII
Property-specific jurisdiction, leases and development requirements
When the parcel is under Port or redevelopment-agency control
Routing question to ask: “Which departments must approve this application, in what order, and which approval is currently holding the permit?”
Property pre-check

Research the Address Before Paying for Final Plans

Legal use and units

Compare the proposed use and dwelling-unit count with Planning records, permit history, certificates and the physical building.

Open permits and complaints

Search for permits that were issued but never finaled, Notices of Violation and complaint cases connected with the property.

Historic status

Exterior work that appears to be an in-kind replacement can still require Planning or preservation review on a historic resource.

Soft-story and seismic programs

Check whether the building is subject to an active seismic-safety, facade, boiler or other mandatory inspection program.

Accessibility

Commercial alterations and changes of use can trigger accessible-path, restroom, entrance and other disabled-access work.

Tenant and housing conditions

Confirm whether the scope affects occupied units, tenant protections, housing-code violations or unauthorized rooms.

Inspection workflow

Schedule the Correct Inspection and Keep the Approved Record Available

Confirm the permit is issued

A submitted or approved application does not authorize work. Verify that DBI or PermitSF shows an issued permit.

Identify the inspection division

Building, electrical and plumbing/mechanical permits can use different inspection codes and inspectors. Fire-only work follows the Fire Department route.

Call the automated inspection system

Call 628-652-3401, available 24/7, to schedule, reschedule, cancel or obtain results for eligible DBI inspections.

Use the Permit Tracking System when instructed

Legacy permit records can show the inspection history, scheduled appointments, inspector activity and results.

Use the PermitSF-specific inspection route

For migrated permits, follow the inspection instructions in PermitSF. In-kind door, window and siding permits use the current contact shown by the City.

Current dedicated line: 628-652-3625 on weekdays from 8:00 AM–12:00 PM for the specified online door, siding and window permits.

Keep the correct permit record at the site

Traditional permits require the job card and approved plans. Certain PermitSF permits use digital documents instead of printed plans or a traditional job card.

Complete the full inspection stage

Do not request framing, rough trade, insulation, fire or final inspection when another component of that stage is incomplete.

Keep regulated work visible

Do not conceal structural connections, reinforcement, wiring, piping, mechanical systems, fire stopping or insulation before approval.

Provide safe access

Unlock gates, arrange occupied-unit access, secure animals and provide safe ladders or walking surfaces.

Resolve every correction before reinspection

Read the inspector’s complete notes. A field change may require approved revised plans or an addendum—not only physical correction.

Complete every related trade final

The building permit can remain open when electrical, plumbing, mechanical, fire, elevator or other associated permits have not passed final inspection.

Obtain final completion or occupancy documentation

Confirm whether the project needs a Certificate of Final Completion and Occupancy or another final DBI record.

Inspection-ready checklist

  • Permit is issued
  • Correct inspection code selected
  • Job card or digital permit available
  • Approved plans available
  • Work is complete for the stage
  • Work remains visible
  • Required tests are complete
  • Safe access is available

Before final inspection

  • All rough inspections passed
  • Plan revisions approved
  • Special inspections complete
  • Energy documentation complete
  • Fire approvals complete
  • Trade finals passed
  • Outstanding fees paid
  • Required certificates prepared
Status decoder

What the Permit Status or Review Station Means

Application filed The record exists, but intake completeness and routing may not be finished.
Planning review Land-use, historic, neighborhood or legal-use approval remains open.
DBI plan review Building, structural, accessibility, energy or code review is underway.
Other agency review Fire, Public Works, PUC, Health or another department must act.
Corrections required Open the comments and submit a coordinated response and replacement sheets.
Approved but not issued Fees, declarations, contractor information or another issuance condition remains.
Issued Work may begin within the approved scope and inspection sequence.
Inspection correction Correct all listed items and obtain approval for plan changes before rebooking.
Expired, cancelled or abandoned Stop relying on the record and ask whether extension, renewal or a new application is required.
Complete / CFC issued Save the final record and verify that all related trade permits are also closed.
Permit and property records

Use PermitSF, Legacy PTS, Records Management and the 3R Report Correctly

Tool or record
Best use
Important limitation
PermitSF account/search
Applications and permits processed in the new PermitSF system
Does not yet replace every legacy or agency system
DBI Permit Tracking System
Legacy building permit, inspection, complaint and review-station history
Some new PermitSF records may need to be checked separately
Property Information Map
Zoning, assessor block/lot, historic status, Planning records and property context
Does not prove that all construction received final DBI approval
Public building records request
Plans, permit applications, job cards, trade permits, complaints, NOVs and certificates
You must identify the address, permit number and record type precisely
3R Report
Residential building-record and authorized-use history used in property transactions
Does not include plumbing, electrical or commercial permit history

Available DBI history

The City says building permits are available from 1906 to the present and building-permit job cards from 1933 to the present.

Current 3R application fee

The current 3R application form reviewed for this guide lists $286 per requested report. Verify the live fee before ordering because DBI fees can change.

Records office

Records Management is at 49 South Van Ness Avenue, Suite 400.

628-652-3420
dbi.records3R@sfgov.org

Property-purchase check: Compare visible additions, converted garages, added units, decks, roofs, windows, electrical panels, plumbing fixtures and commercial uses with both permit issuance and final inspection history.
Code complaints and violations

Report the Correct Problem and Track the Case

Construction complaint

Use DBI for unpermitted work, unsafe construction, work outside an approved scope or building-code concerns.

Electrical or plumbing complaint

Identify the exact condition, location and safety concern so the complaint reaches the correct inspection division.

Housing condition

Report substandard residential conditions such as lack of heat, unsafe wiring, leaks, sanitation issues or blocked exits.

Document the location and condition

Provide the exact address, unit or floor, work location, observed condition and dates.

File online or call 311

Use the City’s building-problem form or call 311. Emergency structural, fire, gas or electrical danger should be reported through the appropriate emergency service.

Save the tracking number

Use the 311 number and DBI complaint record to follow inspection and enforcement activity.

Read the Notice of Violation carefully

Identify the code section, correction deadline, permit requirement, inspection requirement and appeal or hearing information.

Obtain the legalization or repair permit

A Notice of Violation is not closed merely because physical work was performed. Obtain the required permit and final inspection.

Confirm formal abatement

Search the complaint record and obtain written confirmation that DBI accepted the correction and closed or abated the case.

Report a Building Problem

Fee calculation and transition

San Francisco Permit Fees Depend on Valuation, Permit Type and Review Services

Fee-change warning for 2026: DBI presented a revised fee ordinance in April 2026 with an expected implementation date around September 1, 2026. That date was an implementation projection, so verify the live DBI fee page and your official invoice before quoting a project.

Building permit valuation

The value used for fees includes the completed construction, finishes, painting, roofing and permanently installed systems.

Plan-review fee

Plan review is separate from permit issuance. Applicant revisions, addenda or scope changes can trigger recalculation or added review charges.

Trade permits

Electrical and plumbing/mechanical permits use category-based schedules and can include several separately charged categories.

Inspection charges

Standard, off-hours, additional, survey and reinspection services can have separate fees.

Agency fees

Planning, Fire, Public Works, Health, PUC and other departmental charges can be added outside DBI’s base permit fee.

Enforcement penalties

Work without a permit, work exceeding the approved scope and violation monitoring can create investigation, penalty and hearing costs.

Fee table
What it covers
What to enter correctly
Building permit fees
New construction, alteration and no-plans permit issuance and plan review
Complete valuation and correct project classification
Other building review fees
Additional plan review, revisions, addenda and special services
Affected scope and disciplines
Plumbing/mechanical
Fixtures, systems, equipment, boilers and related inspections
Full itemized installation
Electrical
Outlets, devices, service equipment, generators, solar and other electrical categories
Devices, service size, floor area and equipment
Inspections and reports
Additional inspections, surveys, demolition, reroofing and residential-record services
Correct record and requested service
Public information
Notifications, records, plan duplication and 3R-related services
Address, permit and document type
Avoid percentage-only calculators. Two projects with the same construction value can have different fees because the permit route, plan review, trade categories, inspections and outside agencies differ.

Open Current DBI Fee Tables

Current code framework

Applications Filed in 2026 Must Use the 2025 Code Cycle

California codes

Applications filed on or after January 1, 2026 must use the applicable 2025 California Building Standards Codes.

San Francisco amendments

The State codes are used together with San Francisco’s locally adopted building, electrical, plumbing, mechanical, housing and related amendments.

No grace period

DBI states that there is no grace period allowing a new 2026 application to use the previous code cycle.

Existing-building classification matters: Repair, alteration, addition, change of occupancy, structural work and major renovation can trigger different provisions. State the complete scope before choosing a code path.

Open Current San Francisco Codes

Application and permit recovery

Act Before an Unissued or Open Permit Is Cancelled or Expires

Unissued application

Use DBI’s current extension or withdrawal form before the application is cancelled. Follow the specific OTC or In-House processing route.

Issued but unfinished permit

Search the inspection history and identify unfinished work, missing finals, expired trade permits or unapproved revisions.

Old permit closeout

Contact Inspection Services with the application number, address, completed scope and exact inspections needed for closure.

Do not continue work under an expired or cancelled record. Ask DBI whether extension, renewal, reinstatement, a new application or current-code review is required.

Open Extension or Withdrawal Form

Troubleshooting

Fix Common San Francisco Permit Problems

Problem
Likely reason
Best next action
Permit type is not visible in PermitSF
The permit has not migrated or uses a different online, OTC or IHR route
Open “Where to apply for your permit” and choose the current system.
Address has several building or unit records
The property has multiple addresses, units or historical records
Confirm assessor block/lot, legal address and unit before applying.
Application is stuck at Planning
Use, historic, neighborhood, unit or zoning issue remains unresolved
Contact the assigned Planning reviewer with the record and exact station.
DBI approved plans but permit is not issued
Another agency, fee, declaration or contractor document is outstanding
Request one complete issuance-condition list.
Contractor cannot obtain instant trade permit
Registration, license information or permit eligibility is incomplete
Verify CSLB status and DBI online registration.
Inspection cannot be scheduled
Permit is not issued, inspection is unavailable or another stage is incomplete
Check PTS or PermitSF status and contact Inspection Services.
Inspector cannot approve field changes
Construction differs from the approved plans
Submit a revision or addendum before concealing or continuing affected work.
3R report appears incomplete
3R does not include plumbing, electrical or commercial permits
Submit a separate public building-record request.
Permit search shows issuance but no legal completion
Final inspections or the final certificate were never completed
Check the job card and all associated trade permits.
Fee estimate changes at issuance
Valuation, scope, addenda, trade categories or agency reviews changed
Request an itemized calculation using the fee schedule in effect.
Notice of Violation remains open after repair
Permit, inspection or formal abatement is incomplete
Obtain final inspection and written complaint-case closure.
Ready-to-use scripts

What to Say When You Contact DBI or the Permit Center

Application route
“I am planning [complete project] at [address/block-lot]. Should I use PermitSF, instant online, OTC, In-House Review or a Site Permit, and which agencies must approve it?”
Review status
“Application [number] is at [station/status]. Which reviewer has it, what exact correction remains and which replacement sheets are required?”
Inspection request
“I need [inspection type] for permit [number] at [address]. The job card or digital permit and approved plans are available, and the work is complete, exposed and accessible.”
Old permit or violation
“Permit or complaint [number] is still open. Which inspection, trade permit, revision, fee or final certificate is required for formal closure?”
Final project control

Do Not Consider the San Francisco Project Complete Until These Items Are Confirmed

  • Property address and block/lot confirmed
  • Legal use and unit count confirmed
  • Historic and Planning status checked
  • Correct application system selected
  • Owner, contractor and agent forms completed
  • Complete valuation entered
  • All reviewing agencies identified
  • Building and trade permits issued
  • Job card or digital permit available
  • Approved plans maintained at site
  • Required notices completed
  • Special inspections completed
  • Plan revisions approved
  • All inspection corrections resolved
  • Electrical final passed
  • Plumbing/mechanical finals passed
  • Fire and agency finals passed
  • CFC or required final record saved
Permit Center location

San Francisco Department of Building Inspection Map

Permit Center: 49 South Van Ness Avenue, 2nd Floor, San Francisco, CA 94103. General hours are Monday 9:00 AM–5:00 PM and Tuesday–Friday 8:00 AM–5:00 PM. Check the current hours-by-counter page because individual departments may stop specific services earlier.
Official resource library

Open the Correct San Francisco DBI Resource

Frequently asked questions

San Francisco Department of Building Inspection FAQs

Where is the San Francisco Department of Building Inspection?

DBI and the San Francisco Permit Center operate at 49 South Van Ness Avenue, San Francisco, CA 94103. Permit Services and the main Permit Center are on the second floor.

What are the San Francisco Permit Center hours?

General Permit Center hours are Monday from 9:00 AM to 5:00 PM and Tuesday through Friday from 8:00 AM to 5:00 PM. Individual agency counters can have shorter schedules, so check the current counter-hours page before visiting.

Does every San Francisco building permit use PermitSF?

No. PermitSF is being introduced in phases. Other projects use instant online contractor permits, Over-the-Counter review, In-House Review, Site Permit or separate agency systems. Check the City’s current “Where to apply” page.

Which permits can registered contractors obtain online?

Eligible contractors can obtain certain electrical, plumbing, mechanical and Boiler to Operate permits through the instant online permit route. Other migrated permit types are available through PermitSF.

How do I schedule a San Francisco DBI inspection?

Call the Voice Inspection Scheduling System at 628-652-3401. The automated service is available 24 hours a day and can be used to schedule, reschedule, cancel or obtain eligible inspection results.

How do I search old San Francisco building permits?

Use DBI’s Permit and Complaint Tracking System for legacy permit, review, inspection and complaint history. Check PermitSF separately for records processed in the newer system.

What is included in a San Francisco 3R report?

A 3R Report provides residential building-permit and authorized-use history. It does not include plumbing, electrical or commercial permit history, which must be requested separately from DBI Records Management.

Which building codes apply to applications filed in 2026?

Applications filed on or after January 1, 2026 must use the applicable 2025 California Codes and 2025 San Francisco amendments. DBI states that there is no grace period for using the previous edition.

Can a property owner apply as an owner-builder?

Yes, when legally eligible, but the owner must complete the required disclosures and becomes responsible for supervision, safety, employment obligations, inspections and code compliance. Licensed trade contractors are still required where State law applies.

What proves a San Francisco building permit is complete?

All required building, electrical, plumbing, mechanical, Fire and other inspections must pass, approved revisions must be incorporated, enforcement conditions must be resolved and the required Certificate of Final Completion and Occupancy or other final record must be issued.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent informational guide and is not the San Francisco Department of Building Inspection or the City and County of San Francisco.

This page was rebuilt using the official DBI, Permit Center, PermitSF, Permit Services, Inspection Services, Records Management, Property Information Map, fee and current-code resources.

Last reviewed: July 23, 2026.

PermitSF services, fee rates, code amendments, counter hours, application systems, forms and inspection procedures can change. Confirm time-sensitive details before filing, paying, ordering plans or starting construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment