San Mateo County Building Department | Permits, Inspections & Official Contact

Unincorporated San Mateo County permit guide

Find the Right Permit, Clear Planning Review and Close Your San Mateo County Project

The County does not handle every San Mateo County address. It serves unincorporated areas. Confirm jurisdiction first, then use this guide to apply, pay fees, answer plan comments, schedule inspections and verify final closure.

Coastal zones, design-review districts, steep or geologic sites, septic systems, drainage, fire access and the 2026 urban Midcoast housing cap can change the route. The action cards below show where to start.

Accela application, payment and permit search steps
Current 2026 fees and inspection instructions
Coastal, hillside, septic and Midcoast warnings
San Mateo County coastal and hillside permit workflow An animated parcel map, coastline, building plan, permit review and final inspection show the county permit journey. PARCEL + ZONING CHECK REVIEWED PERMIT FINAL INSPECTION CLOSED
⚠️
Urban Midcoast housing restriction As of the County’s June 22, 2026 update, new building-permit applications for new residential units in the urban Midcoast cannot be accepted until January 1, 2028, unless a Local Coastal Program amendment changes the cap. Planning applications are still accepted, and approved projects may enter the waitlist. Check the official update before spending money on final building plans.
Start with one task

What Do You Need to Do Today?

San Mateo County Next-Step Finder

Select the situation that best matches your project.

Most important first check

Use the County Only for Unincorporated Property

Use San Mateo County Planning and Building when

  • The parcel is outside an incorporated city or town.
  • The County map viewer identifies unincorporated zoning.
  • The Accela County portal accepts the property.
  • The project is in an unincorporated coastal, bayside or rural community.

Use a city building department when

  • The parcel is inside the City of San Mateo.
  • The parcel is inside Redwood City, Daly City or another incorporated city.
  • The city’s parcel or address system confirms city jurisdiction.
  • A city permit counter—not the County—controls the property.
Do not trust the mailing address alone. Get the 9-digit Assessor’s Parcel Number, remove dashes when using the County map viewer, and confirm the parcel is in unincorporated San Mateo County before paying fees.
Official contact panel

San Mateo County Planning and Building Phone Numbers and Hours

Building Counter 650-599-7310 Permits, plans and building intake
Inspections 650-599-7311 Inspection help and scheduling questions
Planning 650-363-1825 Zoning, coastal and planning permits
General information 650-363-1827 Department routing and general help
Code Compliance 650-363-4825 Unpermitted work and violations
Permit question email buildingcounter@smcgov.org Ask whether work needs a permit
Department email plngbldg@smcgov.org Include the address, APN and record number
Counter hours Mon–Thu, 8 AM–4 PM Closed 12–1 PM; Friday–Sunday closed
Office: 455 County Center, 2nd Floor, Redwood City, CA 94063. Call or make an appointment before traveling.
Project-to-permit table

Which Permit Route Fits the Work?

Project
Start with
Extra check before filing
Re-roof, siding, stucco, windows or doors
Online building permit
Design-review district, material change, structural damage or coastal review
Water heater, plumbing, gas or sewer line
Plumbing / mechanical permit
Septic or well review, gas/electrical scope and equipment location
Electrical service, EV charger, generator or storage
Electrical permit
Utility coordination, equipment clearances and fire review
Kitchen or bathroom remodel
Remodel permit
Structural work, plumbing, electrical, ventilation and smoke/CO alarms
Deck, porch, patio, retaining wall or pool
Building + zoning check
Setbacks, survey, drainage, geotechnical, fire and erosion/tree pre-site inspection
Addition, alteration or new house
Planning screen first
Design review, coastal permit, geology, utilities, fire, drainage and survey
ADU or new housing unit
Planning + cap check
Urban Midcoast waitlist/cap, coastal rules and utility capacity
Demolition
Demolition permit
Waste plan, utilities, environmental health, tree protection and site stabilization
Commercial tenant improvement or use change
Building + Planning
Occupancy, accessibility, fire, health, Public Works and utilities
Possible permit exemption? The County directs users to its Building Ordinance exemption pages and provides buildingcounter@smcgov.org for confirmation. Get a written answer before starting work.
Online application

Apply Through Accela in Seven Clear Steps

Confirm County jurisdiction

Verify the parcel is unincorporated. Save the address and 9-digit APN.

Stop here if: The parcel is inside an incorporated city.

Check whether Planning must come first

Design Review, Coastal Zone, Resource Management, Planned Agriculture and hazard-overlay properties require a planning screen before the building route is confirmed.

County rule: When both are required, obtain the planning permit before applying for the building permit.

Choose the correct Accela record type

Open Building for construction permits or Planning and Code Compliance for planning records. Read the category before starting.

Enter the property exactly

Use the County-recognized address and APN. A mismatch can prevent correct routing.

Search tip: When an address fails, confirm the APN and jurisdiction instead of opening a duplicate record.

Upload one coordinated PDF plan set

Use readable sheets, consistent project descriptions and clear file names. New construction and major additions require more extensive site and technical information.

File check: Open every uploaded PDF after saving it to confirm orientation and legibility.

Track department reviews

Projects may route to Planning, Health, Building Inspection, Fire, Public Works and Public Utilities. Answer the complete consolidated comment set.

Do not: Replace only one sheet when the County requests a complete coordinated revision set.

Pay and confirm issuance

Approved plans do not authorize construction by themselves. Pay outstanding fees and confirm the building permit is issued before starting.

Save: Issued permit, approved plans, receipt and record number.
Plan preparation

What a Complete Building Plan Set May Need

Plot plan

  • Minimum scale 1/16 inch = 1 foot
  • APN, property dimensions and setbacks
  • Existing and proposed structures
  • Utilities, drainage, easements and trees
  • Contours when slope exceeds 10%
  • Surveyor-stamped topographic survey for new construction or major additions

Building plans

  • Foundation plan at required scale
  • Floor plans showing rooms and systems
  • Exterior elevations and building sections
  • Framing, stairs, decks and guard details
  • Retaining-wall engineering when required
  • Energy calculations and professional licenses

Outside approvals

  • Sewer and water verification
  • Fire-suppression details or permit
  • Erosion and sediment controls
  • Geotechnical or geology report
  • Waste Management Plan when triggered
  • Workers’ compensation proof or valid exemption
Survey warning: The County lists surveys for new buildings, additions, major alterations, accessory structures, decks, pools, retaining walls, water tanks and similar projects so inspectors can verify setbacks.
Planning before building

These Property Conditions Can Change the Entire Permit Route

Confirm APN and jurisdiction
Open zoning and hazard layers
Identify planning permit
Complete outside-agency review
Submit building plans
Issue, inspect and close

Coastal Zone

A Coastal Development Permit or exemption may be required before building review. Coastal policies can affect use, design, hazards and timing.

Check the Local Coastal Program

Design Review

The County adopted a revised Design Review ordinance on June 23, 2026. It is scheduled to take effect outside the Coastal Zone on July 23, 2026; coastal-zone effectiveness requires Coastal Commission certification.

Check current Design Review rules

Geology and steep sites

Expansive soil, seismic faults, slopes and hazard zones may require geotechnical review, engineering geology and additional drainage work.

Review plan requirements

Septic or private well

Environmental Health may need to confirm adequate sewage disposal and potable water before permit issuance.

County road or drainage

Public Works permits may be required for driveways, sidewalks, road right-of-way, drainage, utilities or lighting.

Open Public Works permits

State highway or utilities

Projects within a State highway right-of-way may require Caltrans approval. Water, sewer and utility providers can also create separate conditions.

Zoning map micro-steps

Find Zoning, Flood, Fire and Utility Information With the APN

Get the 9-digit APN

The County warns that address searching may not return property-specific information.

Open the Planning and Building Map Viewer

Accept the map disclaimer and open the public viewer.

Turn on Unincorporated SMC Zoning

Expand the Land Use layer group and select the zoning layer.

Search the APN without dashes

Choose Find Parcels by APN, enter the digits and open the parcel’s Map Tips panel.

Check other layers

Review service districts, flood, fire, airport hazards, scenic corridors, agricultural land and other relevant layers.

Map limitation: The County map is a screening tool. Confirm legal zoning, boundaries and permit requirements with staff before making design or purchase decisions.
Effective April 1, 2026

San Mateo County Building Permit Fees: Useful Current Examples

Fee item
2026 amount
How to use it
Easy Review filing fee
$60
Examples include water heaters, demolition, roofing material, window replacements and minor work as determined by the Building Official.
Moderate Review filing fee
$298
Examples include small interior remodels, pools, landscaping with plumbing/structural work, greenhouses and accessory structures.
Full Review filing fee
$595
New structures, additions and remodels over 500 square feet or increasing the footprint.
Minimum permit fee
$197 residential / $392 commercial
Minimum applies unless another listed fee controls.
New residential / addition
$8.33 per sq. ft.
Square-footage fee includes permit processing, plan review, inspections and basic geotechnical/drainage review.
Residential remodel
$6.54 nonstructural / $7.74 structural per sq. ft.
Applies to residential alterations, repairs and interior changes.
Re-roof
$197 first 1,000 sq. ft.; $119 each additional 1,000
Additional planning review may apply in design-review districts.
Windows, doors, stucco or siding
$392 first 6; $12 each additional window
Planning review may apply when work is not like-for-like or changes materials.
Reinspection / special inspection
$197
Applies to listed reinspections, pre-application site, house-moving and after-hours inspection types.
Plan revision after issuance
$279 minimum
Additional review depends on the scope of the change.

Worked base example

A 1,500-square-foot residential addition uses the listed $8.33 rate:

1,500 × $8.33 = $12,495

This is the square-footage fee only. The filing fee, planning, fire, Public Works, Environmental Health, impact fees and other charges may be added.

Common surcharges

  • Document storage: 2% of Planning and Building fees
  • Technology: 4% of Planning and Building fees
  • Credit-card processing: 3% of transaction
  • Legal counsel: 5% where applicable
  • Planning administration: 10% for listed project types
Payment timing: The square-footage schedule says 50% is due when the application is accepted and the balance before issuance. Valuation-based projects require 65% of the permit fee before plan review begins.

Open the Official 2026 Fee Schedule

Payment micro-steps

Pay an Outstanding Fee in Accela

Sign into the County portal

Use the account connected to the permit record.

Open Building or Planning and Code Compliance

Choose the department associated with the record.

Open the record number

If it is not shown under Records, use General Search.

Select Payments → Fees

Under Outstanding, choose Pay Fees and verify the amount before checkout.

Choose payment method

Credit-card payments carry a 3% service fee. Bank-account payment is also listed.

Save the confirmation email

Keep it with the permit record and confirm the portal balance updates.

🛡️
Fraud warning The County says it will not call and demand payment. Verify any payment request inside the official portal or by calling the Building Counter.
Inspection scheduling

Schedule the Inspection and Check the Arrival Window

Have this ready

  • Record number
  • Contractor name and phone
  • Full address and unit/suite
  • Exact inspection type
  • Desired inspection date
  • Site access notes

Important timing

  • Inspections are scheduled between 8:00 AM and 3:30 PM.
  • After 7:30 AM on inspection day, check online for the estimated 3-hour window.
  • Each inspection must be scheduled separately.
  • Call 650-599-7311 for help.

Sign in and open the record

Click the record number in your table or search for it.

Choose Record Info → Inspections

Select Schedule or Request an Inspection.

Select the inspection type and date

Verify the project location and contact information.

Add useful site notes

Include gate, parking, unit, access or contact instructions.

Click Finish and verify

Return to Record Info → Inspections and confirm the request appears.

Do not cover inspected work. Keep approved plans available, provide safe access and request the correct stage only when framing, wiring, plumbing, mechanical or other required work is ready.
Permit expiration control

Keep the Permit Active After Work Starts

One-year term

The County FAQ states that new residences, additions and many smaller permits have one-year term limits, subject to the permit type and renewal rules.

180-day progress inspections

After construction starts, obtain a progress inspection showing substantial work in a major trade at least every 180 calendar days.

Request an extension early

When progress inspection is not possible, submit a written extension request before the permit expires and explain the reason.

Old plans and permit history

Request Building Records Without Sending an Incomplete Form

What you need
Correct request
Important limitation
Permit history and general property data
Start with the Assessor’s parcel history or Accela permit search.
Permit history may not include complete plans or inspection details.
Public building or planning records
Submit the Public Records Act Request form.
Describe the address, APN, date range and exact record types.
Copies of official building plans
Submit the PRA form, Authorization for Duplication of Plans and Affidavit for Plans Reproduction.
Owner and design-professional permission may be required under state law.
View plans in person
Arrange viewing during regular counter hours.
The County says it does not have equipment to reproduce plans.
Staff analysis or zoning/building research
Use the Request for Planning/Zoning/Building Research or Review form.
Research exceeding 30 minutes is listed at $197 per staff hour in the 2026 schedule.

Open Official Records Instructions

Status and correction help

What Common Permit Statuses Mean

Draft / incomplete Finish the missing fields or attachments and confirm the record was submitted.
Accepted The County accepted intake; initial payments or reviews may still be required.
In review One or more departments are checking the record. Do not start construction.
Additional information required Download the full comment set, revise the correct documents and answer each item.
Approved Check for outstanding fees, conditions and formal issuance.
Issued Work may begin within the approved scope and permit conditions.
Inspection failed Complete every correction before requesting another inspection.
Final / closed Save proof and confirm every related trade permit is also final.
Troubleshooting

Fix the Problem Instead of Opening a Duplicate Application

Problem
Likely cause
Best next action
Address not found
Wrong jurisdiction or address format
Confirm the APN and unincorporated status in the County map viewer.
No record appears in the account
Different login or record not linked
Use General Search and contact the counter before creating another record.
Comments keep returning
Incomplete response or conflicting plan versions
Submit a numbered response letter and one coordinated revision set.
Fee seems too high
Square footage, valuation, planning or outside-agency fees
Ask for an itemized explanation before paying.
Inspection option missing
Permit not issued, hold exists or wrong record type
Check record status and call Inspections at 650-599-7311.
Old permit is expired
No progress inspection or extension
Ask about reinstatement, updated documents and required inspections before work resumes.
Plans cannot be copied
State-law authorization requirement
Submit the duplication authorization and affidavit, then use the referred private copy firm.
New Midcoast housing application blocked
Urban Midcoast housing-unit cap
Continue planning entitlement or formal CDX waitlist steps and monitor the LCP amendment.
Useful scripts

What to Say When You Call or Email

Permit requirement:
“I am planning [exact work] at [address and APN]. The parcel appears to be unincorporated. Can you confirm the building record type, whether Planning must be completed first, and which documents or outside approvals are required?”
Plan comments:
“For record [number], I have a consolidated response addressing each comment and identifying the revised sheet. Please confirm whether the County expects a complete replacement plan set or only revised documents.”
Fee question:
“Please explain the outstanding charges for record [number], including the filing, square-footage or valuation fee, planning review, outside-agency fees and surcharges.”
Open permit:
“I found permit [number] at [address], but it is not final. Which inspection, correction or document is outstanding, and what must the current owner submit to close it?”
Completion checklist

Do Not Consider the Project Finished Until These Are Confirmed

  • County jurisdiction confirmed
  • APN and zoning checked
  • Planning permit completed if required
  • Outside-agency approvals completed
  • Correct Accela record submitted
  • Plans and responses coordinated
  • Fees paid and permit issued
  • Approved plans kept on site
  • Progress inspections maintained
  • All failed items corrected
  • Trade permits finaled
  • Main permit shows final or closed
  • Occupancy approval obtained if required
  • Closure records saved
Office location

San Mateo County Planning and Building Map

Address: 455 County Center, 2nd Floor, Redwood City, CA 94063. Counter hours are Monday–Thursday, 8:00 AM–4:00 PM, with a 12:00–1:00 PM lunch closure.
Official resource library

Open the Correct County Page

Frequently asked questions

San Mateo County Building Department FAQs

Does the San Mateo County Building Department serve the City of San Mateo?

No. The County Planning and Building Department handles unincorporated San Mateo County. A property inside the City of San Mateo or another incorporated city generally uses that city’s building department.

Where do I apply for a San Mateo County building permit?

Use the official Accela Citizen Access portal for San Mateo County. Register or sign in, choose the correct Building or Planning record type and submit the required PDFs online.

What is the San Mateo County Building Counter phone number?

Call 650-599-7310 for building permit intake, plan requirements and fee questions. The main office is at 455 County Center, 2nd Floor, Redwood City.

How do I schedule a San Mateo County building inspection?

Sign into Accela, open the record, select Record Info, choose Inspections and request each inspection separately. The inspection help number is 650-599-7311.

When can I see the inspector’s arrival window?

After 7:30 AM on the inspection day, check the online record for the estimated three-hour window. County inspections are scheduled between 8:00 AM and 3:30 PM.

What are the Planning and Building counter hours?

The counter is open Monday through Thursday from 8:00 AM to 4:00 PM and closes from 12:00 PM to 1:00 PM for lunch. It is closed Friday through Sunday.

How much is a San Mateo County re-roof permit in 2026?

The fee schedule effective April 1, 2026 lists $197 for the first 1,000 square feet and $119 for each additional 1,000 square feet or fraction. Filing, planning or other fees may also apply.

Do I need Planning approval before a building permit?

Possibly. Design Review, Coastal Zone, Resource Management, Planned Agriculture and hazard-overlay properties require planning review to determine the correct process. When both permits are required, the planning permit comes first.

Can I apply for a new home or ADU in the urban Midcoast in 2026?

The County’s June 2026 update says it cannot accept new building-permit applications for new residential units in the urban Midcoast until January 1, 2028 unless the Local Coastal Program is amended. Planning applications and waitlist steps remain available.

How long does a San Mateo County building permit remain active?

The County FAQ describes one-year term limits for many permits and requires a progress inspection showing substantial work at least every 180 calendar days after construction begins. Request an extension in writing before expiration when needed.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent guide and is not the County of San Mateo. Applications, payments, inspections, zoning decisions, plan approvals and code enforcement must be handled through the County or its authorized systems.

This page was rebuilt using official San Mateo County Planning and Building pages, the Accela portal, the fee schedule effective April 1, 2026, current inspection instructions and the June 22, 2026 urban Midcoast cap update.

Last reviewed: July 21, 2026.

Design Review rules, Midcoast restrictions, fees, forms and portal procedures can change. Recheck the linked official page before filing, paying or commissioning final plans.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.