Salem Building Department | Permits, Inspections & Official Contact

Salem Massachusetts permit route

Apply Online, Clear Historic and Coastal Reviews, Then Schedule Salem Inspections by Phone

Salem uses OpenGov for applications, payments and permit tracking—but not for inspection requests. Building, plumbing and gas inspections must be scheduled by phone. Electrical permits and inspections are handled through the separate City Electrician’s office.

This guide explains the correct permit route, current valuation-based fees, 10th Edition Massachusetts code, historic-district approvals, demolition delay, ADUs, wetlands, coastal-resilience review, contractor documents and final permit closeout.

OpenGov applications and public permit search
Historic, zoning, wetlands and coastal checks
Separate phone numbers for field inspections
Salem building permit moving through historic, OpenGov and inspection steps A historic Salem house, glowing lantern, digital permit and telephone inspection approval explain the local permit process. HISTORIC CHECK ZONING WETLANDS C-ROD OPENGOV PDF CALL TO SCHEDULE INSPECTION PROPERTY → REVIEWS → OPENGOV → PHONE INSPECTION → FINAL
☎️
Do not request inspections through OpenGov Salem specifically directs applicants to schedule building, plumbing and gas inspections by phone. Electrical inspections use a separate Electrical Department number.
📘
New applications must use the 10th Edition Massachusetts code Salem stopped accepting applications based on the 9th Edition after June 30, 2025. Confirm the current structural and energy-code path before reusing older plans.
🏛️
Historic approval can come before the building permit Exterior work in one of Salem’s four local historic districts can require a Historical Commission certificate. Demolition of a structure at least 50 years old outside those districts can require demolition-delay review.
Start here

Choose the Salem Permit Task You Need

Salem Project Route Finder

Choose the project to see the likely permit path and the local approval most often missed.

Official contact information

Salem Inspectional Services Address, Phone and Hours

Main office 978-619-5641 Building, plumbing, gas and zoning help
Alternate office phone 978-619-5642 Permit administration assistance
Inspection scheduling 978-745-9595 ext. 42200 Building, plumbing and gas inspections
Office address 98 Washington Street 2nd Floor, Salem, MA 01970
Monday–Wednesday 8:00 AM–4:00 PM General office hours
Thursday 8:00 AM–7:00 PM Extended office hours
Friday 8:00 AM–12:00 PM General office hours
Building Commissioner Stavroula Orfanos 978-619-5640
Service window
Published hours
Inspector counter hours
Monday–Thursday: 8–10 AM and 12–1 PM; Thursday: 5–7 PM; Friday: 8–9 AM
Field inspection hours
Monday–Friday: 9 AM–12 PM; Monday–Thursday: 1–4 PM
Counter hours are the best time for inspector questions. Field inspections occur during separate published inspection windows and must be booked by phone.
Separate electrical department

Electrical Permits and Inspections Use Different Contact Details

City Electrician 978-745-6300 Alternate: 978-745-6301
Electrical inspections Ext. 52003 Through 978-745-9595
Electrical office 44 Lafayette Street 2nd Floor, Salem, MA 01970
Inspector office hours 8–9 AM / 1–2 PM Monday through Friday
Building permit display rule: When a building permit is required, it must be displayed before the electrical inspection can be performed.
Property pre-check

Check Five Salem Overlays Before Finalizing the Plans

1. Zoning district

Confirm the allowed use, setbacks, height, lot coverage, parking and whether the property or structure is already nonconforming.

Open zoning maps and ordinance

2. Local historic district

Salem has four local districts: McIntire, Lafayette Street, Washington Square and Derby Street.

Open Historical Commission guidance

3. Wetlands and waterways

Work near wetlands, riverfront, floodplain or coastal resource areas can require Conservation Commission approval.

Open Conservation applications

4. Coastal Resilience Overlay

The C-ROD viewer identifies projected 2070 sea-level-rise base flood elevations inside the City overlay.

Open the C-ROD information page

5. Urban-renewal or design review

Downtown and redevelopment-area projects may require Salem Redevelopment Authority or Design Review Board approval.

Contact Planning and Community Development

Parcel and assessor information

Confirm the map, lot, ownership and property characteristics before searching old records or preparing a site plan.

Open Salem GIS and maps

Do not rely on the street address alone. Use the map and lot, current zoning map and overlay maps when a property is near a district boundary.
Permit decision table

Which Salem Permit or Approval Fits the Project?

Project
Start with
Important Salem requirement
New one- or two-family house
Building permit
Zoning, plot plan, architecture, structure, 10th Edition code, energy, utilities, workers’ compensation and separate trade permits
Addition or structural alteration
Building permit
Existing/proposed plans, setbacks, structural details, energy documents, historic review and trades
Kitchen or bathroom remodel
Building and trade permits
Scope, wall changes, electrical, plumbing, gas, ventilation, smoke/CO and construction value
Accessory dwelling unit
ADU project in OpenGov
Building permit, Certificate of Fitness and applicable electrical, plumbing and gas permits
Deck, porch or exterior stairs
Building permit
Plot plan, setbacks, footings, ledger, stairs, guards and historic approval when visible in a local district
Roofing, solar or wood stove
Building permit category
City currently treats mechanical/sheet metal, pools, roofing, solar and wood stoves under building-permit fees
Exterior windows, doors or siding
Historic check first
Certificate of Appropriateness or Non-Applicability can be required before the building permit
Pool, spa or hot tub
Building permit
Site placement, barrier, alarms, electrical bonding, accessibility where applicable and Conservation review near protected areas
Electrical work or EV charger
Electrical permit
State-licensed electrician and separate City Electrician inspection scheduling
Plumbing or gas work
Plumbing or gas permit
Permit granted to licensed tradespeople and inspection booked by phone through Inspectional Services
Demolition
Demolition and historic review
Utility releases, Health, Fire and municipal signoffs, debris disposal and demolition-delay review when applicable
Business sign
Sign permit
Sign ordinance, zoning, building/electrical scope, historic or design review and landlord authorization
Commercial fit-out or change of use
Zoning and commercial review
Use, occupancy, accessibility, egress, Fire Prevention, Health, electrical, plumbing/gas and Certificate of Occupancy
Online application workflow

Apply Through Salem OpenGov in Eight Steps

Check parcel and zoning
Clear historic or board review
Select permit category
Upload full plan package
Pay through OpenGov
Respond to comments
Download issued permit

Confirm the property and scope

Use GIS and zoning resources to verify the map, lot, district, use and site constraints.

Include one precise scope: State what is existing, what will be removed and what will be installed.

Complete required prior approvals

Historic, Zoning Board, Planning Board, Conservation, SRA, Fire, Health or Engineering approval can be needed before permit issuance.

Create or sign in to OpenGov

An email address and saved password are required to manage applications, payments, revisions and future permit work.

Select the correct department and record type

Choose Inspectional Services for building, plumbing and gas applications. Electrical and Fire applications use their own portal categories.

Upload all plans and supporting documents

Use readable file names and submit the complete coordinated set rather than isolated pages.

Example: Site-Plan.pdf, Architectural-Plans.pdf, Structural-Plans.pdf and Workers-Comp-Affidavit.pdf.

Pay through the legitimate City process

OpenGov supports integrated payment. Plumbing and gas guidance also identifies online credit-card or e-check payment and City check options.

Fraud warning: Historical Commission fees are handled through OpenGov or in person—not through an unsolicited email invoice.

Respond to every correction

Update all affected sheets, include a response letter and confirm that zoning, historic, fire and trade information remain coordinated.

Wait for formal issuance before starting

Download the issued permit and approved documents, display the permit at the site and follow the required inspection sequence.

Required documents

Prepare a Complete Salem Permit Package

Property and approvals

  • Address, map and lot
  • Existing use and occupancy
  • Plot or site plan
  • Zoning decision
  • Historic certificate
  • Conservation order or determination
  • Planning/SRA decision
  • Owner authorization

Construction documents

  • Existing and proposed floor plans
  • Exterior elevations
  • Building sections
  • Foundation and framing
  • Structural calculations
  • Energy-code documents
  • Product specifications
  • Fire and life-safety plans

Legal and contractor forms

  • Workers’ compensation affidavit
  • Construction Supervisor License
  • Home Improvement registration
  • Licensed trade information
  • Construction-control documents
  • Debris disposal affidavit
  • Permit contact sheet
  • Owner insurance waiver when applicable
Construction control: Larger or professionally designed projects can require secondary and final construction-control documents signed by the responsible design professional.

Open Salem Forms and Documents

Current City-listed schedule

Salem Building-Permit Fees and Common Additional Charges

Permit or service
Current City-listed amount
Building-permit base fee
$75 for residential and commercial building permits
One- or two-family residential work
$15 per $1,000 of total project cost, plus the $75 base
Three or more units, large condominium or commercial work
$20 per $1,000 of total project cost, plus the $75 base
Mechanical, sheet metal, pool, roofing, solar or wood stove
Current building-permit valuation rate for the residential or commercial category
Demolition, sign or tent
$75 base plus the applicable residential or commercial valuation rate
Certificate of Occupancy for existing building or separate CO
$150; no separate CO fee listed for new construction tied to its building permit
Permit extension
$65; written request, active work and six-month extension limit
Building reinspection
$75, payable before the reinspection
304 Certificate
$150, plus $25 late charge when applicable
110 Certificate
$100, plus $25 late charge when applicable
Fee schedule date: The current City page labels these building fees effective July 1, 2024. Verify the live OpenGov invoice before paying because the City can amend fees.

Open the Official Building Fee Page

Salem Building-Permit Fee Planning Tool

Enter the total project cost stated in the application. This uses the City’s current $75 base and valuation rate.

Planning estimate only. The City may apply its own valuation, rounding, trade fees, Fire fees, planning charges, state surcharges or additional reviews. The official invoice controls.

Selected electrical fees

Electrical Charges Are Separate From the Building Fee

Electrical item
City-listed fee
Minimum electrical permit
$30
New work or renovation
$3 per $1,000 of building-permit valuation
Pool electrical work
$30
Service-panel change
$40
HVAC/control wiring without building permit
$50 per unit
Electrical reinspection
$30
Electric-vehicle charging station
$30 each
Solar electrical fee
$3 per $1,000 of building-permit valuation

Open Electrical Permit Fees

Accessory dwelling units

Use the OpenGov ADU Project to Group the Required Applications

Confirm current ADU rules
Check zoning and nonconformity
Prepare building plans
Complete trade permits
Obtain Board of Health COF
Pass inspections
Obtain occupancy approval

Minimum permits

Salem identifies a building permit and Board of Health Certificate of Fitness as minimum ADU approvals.

Possible trade permits

Electrical, plumbing and gas permits may also be required depending on the conversion or new construction.

Nonconforming property

A property or principal dwelling that is already nonconforming can require a Zoning Board finding before the building permit or occupancy approval.

Use current rules: Salem amended its ADU ordinance in 2025. Do not rely on an older setback, affordability or detached-unit summary without checking the current ordinance and OpenGov questionnaire.

Open Salem ADU Guidance

Historic and demolition review

Obtain the Historical Commission Certificate Before the Building Permit

Property inside a local historic district

  • Check the McIntire, Lafayette Street, Washington Square and Derby Street maps.
  • Exterior work may require a Certificate of Appropriateness.
  • Work that does not alter regulated appearance may require a Certificate of Non-Applicability.
  • Submit the Historical Commission application through OpenGov.
  • Do not begin exterior work until the certificate and building permit are issued.

Structure outside the district but 50+ years old

  • Check whether demolition-delay review applies.
  • Submit a request to waive the demolition delay through the City system.
  • Complete required public review before demolition-permit issuance.
  • Obtain utility, Fire, Health and municipal demolition signoffs.
  • Document the debris hauler and licensed disposal facility.
Historical Commission timing: Certificate of Appropriateness and Hardship applications are generally due 16 days before the meeting. Current meetings are listed for the first and third Wednesday at 6:00 PM.
Fake fee warning: The Historical Commission states that Salem does not send legitimate application invoices by email. Pay through OpenGov or directly through the City’s approved process.

Open Historical Commission Open Demolition Sign-Off

Related department approvals

Building Issuance Can Depend on Five Other Salem Departments

Department or board
Common trigger
Contact or next step
Planning & Community Development
ZBA, Planning Board, historic, SRA, design review, signs or major redevelopment
98 Washington Street, 2nd Floor; 978-619-5685
Conservation Commission
Wetlands, waterways, riverfront, floodplain and land subject to coastal storm flowage
Submit the correct WPA application through OpenGov
Fire Prevention
Alarms, sprinklers, commercial occupancy, suppression systems, tanks and pre-demolition review
48 Lafayette Street; 978-745-7777; fp@salem.com
Health Department
ADU Certificate of Fitness, food businesses, grease traps, septic abandonment and regulated establishments
Choose the applicable Health application in OpenGov
Engineering / utilities
Water, sewer, street, drainage, utility release, cross-connection and public-way work
Confirm Engineering and municipal-utility requirements before excavation
Current code framework

Use the Massachusetts 10th Edition for New Salem Applications

Building code

Applications filed after June 30, 2025 must use the 10th Edition Massachusetts State Building Code rather than the former 9th Edition.

Energy compliance

Verify the current Massachusetts energy-code and Salem stretch-code requirements for the project’s filing date and building type.

Permit activity

Salem notes that a permit may expire when work does not commence within 180 days unless a valid extension is obtained.

Extension rule: The City lists a $65 fee, requires the request in writing, limits an extension to six months and expects permitted work to remain actively ongoing.

Open Salem Code-Change Guidance

Contractor and owner-builder check

Verify the Correct Massachusetts Credentials

Construction Supervisor License

Permit-required construction must be supervised under the applicable Massachusetts CSL rules unless a lawful exemption applies.

Home Improvement registration

Covered remodeling work on an existing owner-occupied one- to four-unit home generally requires Home Improvement Contractor registration.

Licensed trades

Electrical, plumbing and gas permits must be associated with properly licensed Massachusetts tradespeople.

  • Verify CSL status
  • Verify HIC registration
  • Confirm workers’ compensation
  • Confirm electrician license
  • Confirm plumber/gas-fitter license
  • Use a written construction contract
  • Identify who pulls each permit
  • Require final inspection closeout
Phone inspection workflow

Schedule the Correct Inspection With the Correct Department

Building, plumbing and gas

Call: 978-745-9595, extension 42200

Alternatively, call the specific inspector assigned to the project.

Do not request these inspections in OpenGov.

Electrical

Call: 978-745-6300

Alternative: 978-745-9595, extension 52003.

Electrical Department: 44 Lafayette Street, 2nd Floor.

Confirm the permit is issued

An application or payment receipt is not permission to begin regulated work.

Identify the exact inspection stage

Have the permit number, address, inspection type and responsible contact ready when calling.

Keep the approved documents at the site

Display the permit and provide the approved plans, specifications, product information and required reports.

Keep the work exposed

Do not cover framing, insulation, wiring, plumbing, gas piping or fire-protection work before approval.

Provide safe access

Unlock the site, secure pets, provide required ladders and ensure the inspector can safely reach the work.

Correct every failed item

Complete all listed corrections and pay the $75 building reinspection fee in advance when required.

Complete every linked final

Building Final can depend on electrical, plumbing, gas, Fire, Health, historic, Conservation or planning completion.

Typical inspection sequence

Do Not Conceal Work Before the Required Stage Passes

Stage
Have ready
Do not do yet
Footing and foundation
Excavation, forms, reinforcing, setbacks and site documents
Place concrete before approval
Under-slab or underfloor
Piping, conduit, framing, drainage and required tests
Backfill or conceal the work
Rough building and trades
Framing, wiring, plumbing, gas, mechanical and fire-protection systems exposed
Install insulation or wall finish
Insulation and energy
Insulation, air sealing and required energy documentation
Cover before inspection approval
Final
Completed permitted scope, working safety systems and every related department final
Occupy or use the regulated space without required approval
Permit status help

What Common OpenGov Statuses Mean

DraftThe application is saved but has not been submitted.
SubmittedThe City received the application but may still be checking completeness.
Additional information requiredA plan, affidavit, license, decision or supporting document is missing.
Under reviewInspectional Services or another reviewing department is checking the submission.
Corrections requiredOpen every comment and upload one coordinated revision set.
Payment duePay through the legitimate OpenGov or City payment process.
ApprovedFormal issuance, payment or another department hold may remain.
IssuedWork may begin within the approved scope and inspection sequence.
Inspection failedCorrect every item and pay a required reinspection charge before the next visit.
Final / closedSave the final record and verify all linked trade and occupancy approvals.
Permit records and property research

Search OpenGov First, Then Request Missing Records

Search OpenGov

Use the permit number when available. Otherwise search by property address or applicant information.

Confirm the correct parcel

Compare the address, map, lot, owner, project description and application date.

Review linked permits

Look for electrical, plumbing, gas, Fire, Health, sign, historic or planning records connected to the project.

Check inspection and occupancy history

An issued permit is not proof that the work passed final inspection or received occupancy approval.

Submit a public-record request

Describe the address, map and lot, date range, permit type and exact records needed.

Home-sale warning: Confirm final inspection, Certificate of Occupancy, electrical, plumbing, gas and any historic or zoning conditions before treating old work as legally complete.
Troubleshooting

Fix Common Salem Permit Problems

Problem
Likely reason
Best next action
Inspection request is not confirmed
It was entered in OpenGov instead of booked by phone
Call extension 42200 for building/plumbing/gas or 978-745-6300 for electrical
Building permit is on hold
Historic, zoning, Conservation, Fire, Health or planning approval is incomplete
Ask which department hold is active and what exact document clears it
Exterior work is rejected
Property lies in a local historic district
Apply for the correct Historical Commission certificate before resubmitting
Demolition permit cannot issue
Utility releases, demolition-delay review or debris information is missing
Complete the demolition sign-off and Historical Commission process
Plans reference the 9th Edition
Plans were prepared under an expired code path
Revise the code analysis and affected construction details to the 10th Edition
Inspection fails for missing documents
Permit or approved plans are not displayed at the site
Print and post the complete issued package before requesting reinspection
ADU application is incomplete
Certificate of Fitness, trades or nonconforming-property review is missing
Use the OpenGov ADU project questionnaire and complete every grouped application
Final permit remains open
A trade, Fire, Health or occupancy approval remains incomplete
Request a full written closeout list covering all related permits
Useful contact scripts

What to Say When You Contact Salem

New-project question
“I am planning [exact work] at [address, map and lot]. Which building, zoning, historic, Conservation, C-ROD, Fire, Health, electrical, plumbing and gas approvals must be completed before construction?”
Open-permit question
“Permit [number] at [address] does not appear closed. Which inspection, trade permit, certificate, department hold or occupancy requirement remains outstanding?”
Final project checklist

Do Not Consider the Project Complete Until These Are Saved

  • Parcel and zoning confirmed
  • Historic approval completed
  • Conservation and coastal review completed
  • Planning, SRA and Fire conditions completed
  • Building and trade permits issued
  • Permit displayed at the job site
  • Approved plans kept available
  • Every required inspection passed
  • Reinspection fees cleared
  • Electrical, plumbing and gas finals completed
  • Certificate of Fitness or Occupancy obtained
  • Final portal records downloaded and saved
Office map

Salem Inspectional Services Location

Address: 98 Washington Street, 2nd Floor, Salem, MA 01970. Inspector counter hours are narrower than the general office hours.
Official resource library

Open the Correct Salem Permit Resource

FAQs

Salem Building Department Questions

Where do I apply for a Salem, Massachusetts building permit?

Apply through the City of Salem OpenGov permitting portal. Create an account, select Inspectional Services and the correct permit type, enter the property and project details, upload the required documents and pay the official invoice.

What is the Salem Building Department phone number and address?

Call 978-619-5641 or 978-619-5642. Inspectional Services is at 98 Washington Street, 2nd Floor, Salem, Massachusetts 01970.

How do I schedule a Salem building inspection?

Call 978-745-9595, extension 42200, for building, plumbing or gas inspections. Salem specifically states that these inspection requests should not be submitted through OpenGov.

How do I schedule an electrical inspection in Salem?

Call the City Electrician at 978-745-6300 or call 978-745-9595, extension 52003. The Electrical Department is located at 44 Lafayette Street, 2nd Floor.

How much is a Salem residential building permit?

The current City fee page lists a $75 base fee plus $15 per $1,000 of total project cost for work on one- and two-family dwellings. Trade, Fire, planning, reinspection and other fees can be additional.

How much is a commercial Salem building permit?

The current City fee page lists a $75 base fee plus $20 per $1,000 of total project cost for three or more dwelling units, large condominium properties and commercial spaces.

Does exterior work in Salem require historic approval?

Exterior work in the McIntire, Lafayette Street, Washington Square or Derby Street local historic district can require a Certificate of Appropriateness, Non-Applicability or Hardship before the building permit is issued.

What permits are required for a Salem ADU?

At minimum, Salem identifies a building permit and Board of Health Certificate of Fitness. Electrical, plumbing and gas permits may also apply, and a nonconforming property can require Zoning Board review.

Which building code does Salem use in 2026?

New applications must use the 10th Edition Massachusetts State Building Code. Salem stopped accepting applications based on the 9th Edition after June 30, 2025.

How do I find an old or open Salem building permit?

Search the public OpenGov portal using the permit number or property address. Review linked trade permits and inspection history. Submit a City public-record request when the needed plan or document is not available online.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent informational website and is not the City of Salem or the Commonwealth of Massachusetts. Applications, payments, inspections, zoning decisions, historic approvals and official records must be handled through the responsible government agency.

This page was rebuilt from Salem’s current Inspectional Services, OpenGov, fees, inspection scheduling, Electrical Department, 10th Edition code, Historical Commission, Conservation Commission, ADU, GIS, Planning and public-record resources.

Last reviewed: July 22, 2026.

Fees, office hours, personnel, code requirements, ADU rules, inspection procedures and portal functions can change. Confirm time-sensitive details before filing, paying, purchasing materials or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.