Rochester Hills Building Department | Permits, Inspections & Official Contact

Rochester Hills permit action center

Apply, Track, Inspect and Close a Rochester Hills Building Permit Online

Rochester Hills accepts building and trade permit applications online through BS&A. New users may need an account and a City-issued PIN before the account can be linked to the correct property and permit records.

This guide explains the correct Rochester Hills—not City of Rochester—portal, application fees effective December 22, 2025, contractor registration, plan review, zoning and floodplain charges, online payments, inspections, permit expiration and final occupancy approval.

BS&A applications, property search, payments and inspections
Current building, zoning, floodplain and reinspection fees
Michigan code, contractor, plan-review and closeout guidance
Rochester Hills permit moving from plans through online review and final inspection An animated plan, BS and A permit screen, green hills, bicycle trail, permit document and final inspection check explain the Rochester Hills permitting process. PROJECT PERMIT PLAN BS&A ONLINE APPLY • PAY • INSPECT APPROVED PERMIT FINAL INSPECTION CLOSED ROCHESTER HILLS • MICHIGAN
📌
Current fee and code update Rochester Hills’ building permit fee schedule is effective December 22, 2025. Michigan currently lists the 2021 Building Code for nonresidential construction, while the state’s code page continues to list the 2015 Michigan Residential Code as current because implementation of the proposed residential update remains affected by litigation.
Start here

Choose the Exact Rochester Hills Permit Task

Rochester Hills Permit Next-Step Finder

Select the situation that best matches the project.

Official contact panel

Rochester Hills Building Department Contact Information

Building Department 248-656-4615 Permits, inspections and BS&A linking
Department email Building Email Forms, registration and general questions
Fax 248-656-4623 Confirm before sending critical documents
Building address 1000 Rochester Hills Drive Rochester Hills, MI 48309
City Hall hours Monday–Friday 8:00 AM–5:00 PM
Clerk / FOIA 248-656-4630 Public-record requests
DPS / drainage 248-656-4640 Roads, drainage and stormwater
Fastest support call: Have the project address, parcel number, BS&A record number, permit type and the exact error or review message ready.
Avoid the most common local mistake

Rochester Hills and the City of Rochester Use Different Permit Systems

Use Rochester Hills BS&A when

  • The legal property is inside the City of Rochester Hills.
  • BS&A municipality UID 385 recognizes the address.
  • The prior permit was issued by Rochester Hills.

Use the City of Rochester system when

  • The property is legally inside the smaller City of Rochester.
  • The existing permit lists Rochester City Hall at 400 Sixth Street.
  • The property appears under the City of Rochester BS&A municipality.
A Rochester mailing address does not prove the permit jurisdiction. Search the parcel in BS&A or call the applicable building office before paying an application fee.
Permit or no permit?

Ask Before Treating the Work as a Minor Repair

Permit commonly required

  • New home or building
  • Addition or structural alteration
  • Finished basement
  • Deck, porch or balcony
  • Detached garage or accessory building
  • Pool, spa or hot tub
  • Roof structural repair
  • Change of occupancy
  • Demolition
  • Electrical work
  • Plumbing work
  • Mechanical work

Work that still needs verification

  • Roof covering repair versus structural roof repair.
  • Window or door replacement without changing the opening.
  • Small sheds and detached accessory structures.
  • Minor electrical repairs and fixture replacement.
  • Interior cosmetic work with no structural or trade changes.
  • Fences that may be zoning-controlled even when no building permit is needed.

A building-permit exemption does not automatically remove zoning, electrical, plumbing, mechanical, fire or HOA requirements.

Rochester Hills provides project-specific guidebooks. Use those local documents instead of relying on a generic Michigan permit list.
Permit decision table

Match the Project to the Correct Rochester Hills Permit Path

Project
Start with
Important Rochester Hills dependency
New single-family home
New residential building
Plot plan, grading and drainage, zoning, energy, structural plans, drive approach and separate trades
Home addition
Residential addition
Survey or plot plan, setbacks, structural design, energy compliance and trade permits
Finished basement
Basement finish permit
Floor plan, emergency escape, smoke/CO alarms, fire separation and later trade permits
Deck
Residential alteration/accessory
Site plan, setbacks, footing design, ledger or freestanding details and guards
Detached garage, shed or accessory building
Accessory structure permit
Zoning, plot-plan review, easements, size, height, foundation and lot coverage
Swimming pool, hot tub or spa
Pool permit
Plot plan, barrier, electrical bonding, equipment placement, drainage and trade permits
Roof repair
Roof repair guide
Structural repair or replacement of more than 10% of roof sheathing triggers fuller plan review
Electrical, plumbing or mechanical work
Separate trade permit
Trade permits can be filed online after the related building permit is issued when one is required
Solar or EV charging
Building/electrical review
Structural loading, electrical design, equipment location, zoning and screening
Commercial alteration or tenant work
Nonresidential alteration
Change-of-use check, accessibility, fire, energy, structural and separate systems review
Change of business occupancy
Change of occupancy
Building, electrical, fire, mechanical, plumbing/cross-connection and site inspections
Demolition
Demolition permit
Utility disconnects, environmental documents, site restoration and safety controls
BS&A application workflow

Apply Online in Seven Practical Steps

Confirm the correct municipality and property

Search the address under City of Rochester Hills and verify the parcel before beginning the application.

Open the local application guide

Use the City’s online application page and the project-specific form or guidebook.

Create a BS&A account and obtain a PIN

Applicants may need to call 248-656-4615 so City staff can provide a PIN and link the account to the municipal system.

Do not create repeated accounts when an existing contractor or property account can be linked.

Register the residential contractor

Residential builders must register their license with Rochester Hills before applying for permits.

Current fee: $30 registration and administration fee.

Upload the complete PDF package

Complete the online steps and attach the application, plans, plot plan, energy information, contractor documents and supporting approvals.

Clear file names: Address-SitePlan.pdf, Address-Architectural.pdf and Address-Structural.pdf.

Pay the application and initial review charges

The application fee and base plan-review portion must be paid before the review process can fully begin.

Payment options: Online credit card or eCheck, or payment at City Hall.

Answer comments and pay the final balance

Monitor email and BS&A, upload corrected documents, pay the remaining plan-review and permit fees and wait for the issued permit.

Permit email: After all required fees are paid, the applicant receives the permit electronically.
Application readiness

Prepare These Items Before Starting BS&A

Property and project

  • Street address
  • Parcel number
  • Legal owner
  • Applicant contact
  • Detailed work scope
  • Estimated project value
  • Occupancy or use
  • Project square footage

Plans and plot information

  • Site or plot plan
  • Existing structures
  • Proposed structure
  • Property lines and setbacks
  • Architectural plans
  • Structural details
  • Energy compliance
  • Product information

Contractor and approvals

  • Michigan builder license
  • Contractor registration
  • License-holder ID
  • Electrical contractor data
  • Plumbing contractor data
  • Mechanical contractor data
  • Fire documents if required
  • Planning approval if required
Professional plans may be required. Project complexity, structural design, occupancy, building size and Michigan licensing law determine whether an architect or engineer must prepare and seal the documents.
Digital submission

Make the Online Plan Package Easy to Review

Upload one coordinated design

  • Use readable PDF documents.
  • Keep each plan sheet correctly oriented.
  • Show dimensions, elevations and construction details.
  • Use matching information across site, architectural and structural sheets.
  • Show existing and proposed work differently.
  • Keep professional digital signatures valid.

Avoid common PDF problems

  • Scans too faint to read.
  • Plans cropped at the title block.
  • Unlocked revisions mixed with old sheets.
  • Missing parcel or project address.
  • Energy forms that do not match the plans.
  • Separate files with conflicting dimensions.
Large commercial projects: The City may request a hard copy when a submission is unusually large or complex, even though the main application process is electronic.
Current Michigan construction codes

Use the Correct Code Edition for the Project

Code area
State-listed current edition
Effective or status note
Nonresidential building
2021 Michigan Building Code
Effective April 9, 2025
Residential
2015 Michigan Residential Code
Still listed as current by Michigan; proposed 2021 implementation remains affected by litigation
Existing-building rehabilitation
2021 Michigan Rehabilitation Code
Effective April 9, 2025
Mechanical
2021 Michigan Mechanical Code
Effective March 12, 2024
Plumbing
2021 Michigan Plumbing Code
Effective March 12, 2024
Electrical
2023 National Electrical Code with Michigan rules
Effective March 12, 2024
Commercial energy
2021 Michigan Commercial Energy Code
Effective April 22, 2025
Residential code caution: Michigan’s residential-code status has changed through rulemaking and court action. Confirm the edition accepted by Rochester Hills on the application date before finalizing structural or energy plans.

Check Current Michigan Codes

Fee schedule effective December 22, 2025

Rochester Hills Building Permit Fee Highlights

Fee item
Current amount or formula
Residential contractor registration
$30
Residential addition, alteration or accessory application
$100 nonrefundable
New residential building application
$250 nonrefundable
Nonresidential addition, alteration or accessory application
$250 nonrefundable
New nonresidential building application
$750 nonrefundable
Renew expired permit within 180 days
$50
Residential zoning review
$90
Accessory structure plot-plan review
$90
Floodplain determination
$280
Reinspection
$90 per reinspection
Demolition up to 1,000 square feet
$195 per structure
Construction Board of Appeals application
$1,000

Building permit valuation formula

ICC-calculated project valuation
Building permit fee
Up to $1,000
$100
$1,000.01–$10,000
$100 plus $22 for each additional $1,000 or part over $1,000
More than $10,000
$298 plus $8.25 for each additional $1,000 or part over $10,000

Building plan-review formula

Project classification
Plan-review fee
R-3 and U occupancies
0.00162 of ICC-estimated construction cost or $90 minimum
Other projects up to $1,250,000
0.00244 of ICC-estimated construction cost or $195 minimum
Other projects above $1,250,000
First $1,250,000 at 0.00244, plus 0.0008 of the amount above $1,250,000
Additional review after initial review and one rereview
$90 per hour
Accepted expedited plan review
1.5 times normal plan-review rates

Quick Residential Permit Planning Estimate

Enter the ICC-based project valuation and choose the residential application type.

Estimator limitation: It includes the listed residential application fee, R-3/U plan review and building permit formula. It excludes contractor registration, zoning, plot plan, floodplain, drive approach, trade permits, fire, consultants, state surcharges and other project charges.

Open the Current Fee Schedule

Payment sequence

Fees Are Due at Different Stages

Application accepted

Pay the nonrefundable application fee and the initial plan-review portion before full processing begins.

Plan review completed

The City determines the final plan-review, building, zoning and related permit charges.

Permit ready

Pay the remaining balance before the issued permit is released by email.

Online payment: The City accepts credit/debit cards and eCheck for permit payments. Its payment page lists a 2.75% card service fee with a $1.50 minimum; the City states that it does not receive that processing charge.

Open Permit Payment Methods

Plan review and corrections

Understand the Status Before Calling the City

Application started Required fields, property linking or uploaded documents may still be incomplete.
Application accepted The City accepted the submission, but initial payment may still be required.
In review Building, zoning, plot plan, fire, engineering or another reviewer is evaluating the package.
Corrections requested Read every comment and upload coordinated revised documents.
Approved pending payment Final plan-review and permit charges must be paid before issuance.
Permit issued Download the issued permit and approved documents before beginning work.
Inspection activity Review scheduled, approved and failed inspections in the BS&A project record.
Final or occupancy complete Confirm the building permit and every trade permit show final approval.

Small residential projects

Current Rochester Hills guidebooks say basement, pool and accessory-structure applications may be reviewed within about five working days when workload and project complexity allow.

New homes and complex projects

Review time varies based on workload, completeness, zoning, grading, outside consultants, fire systems and the number of corrections.

Five working days is not a guaranteed issuance date. It is a guidebook target for certain complete, simpler residential applications when workload permits.
Plan-review fees cover two reviews: The initial review and one rereview. Additional reviews are charged at the current hourly rate.
Contractor registration

Register the Residential Builder Before Applying

Registration package

  • Completed registration form
  • Original license-holder signature
  • Michigan builder license copy
  • License-holder driver license copy
  • Current contact information
  • $30 registration fee

Email route

Current residential project guides say contractors may email the completed registration form to:

building@rochesterhills.org

Use Contractor Registration in the subject line and follow City instructions for the original signature and identification.

Registration follows the license expiration. Contractors actively working in Rochester Hills must renew City registration when the builder license is renewed.
Homeowner permits

Owner-Occupants Take Full Inspection Responsibility

Homeowner affidavit meaning

Trade permit applications include an affidavit for an owner who personally performs work in a home the owner occupies or is about to occupy.

The owner accepts responsibility for code compliance and arranging inspections.

Important restrictions

  • Do not use a homeowner permit to hide an unlicensed contractor.
  • Do not conceal or operate trade work before required approval.
  • Check Michigan licensing law before performing specialized work.
  • Use separate electrical, plumbing and mechanical permits when required.
Owner-builder status is not a safety exemption. The homeowner remains responsible for approved plans, inspections, corrections and final permit closure.
Inspection workflow

Schedule Every Inspection Through the Correct BS&A Record

Permit issued
Correct work stage ready
Request in BS&A
Keep plans onsite
Leave work visible
Correct failed items
Obtain final approval

Before scheduling

  • Permit is issued
  • Correct inspection selected
  • Work stage is complete
  • Required trade permits issued
  • Approved plans available
  • Work remains uncovered
  • Access is safe
  • Prior corrections completed

After the inspection

  • Check BS&A for approved or not-approved status.
  • Read the complete correction list.
  • Do not proceed to a dependent construction stage before approval.
  • Correct every item before requesting another inspection.
  • Verify final inspections on all trade permits.
Two inspections per type: Rochester Hills guidebooks state that permit fees generally cover two inspections for each inspection type. A reinspection charge can apply to the third and later attempt.
Current reinspection fee: $90. Avoid scheduling before the work and all prior corrections are ready.

Open BS&A Inspection Scheduling

Inspection stage examples

Do Not Cover Work Before the Required Approval

Construction stage
Schedule before
Typical readiness check
Footing
Concrete placement
Excavation, size, reinforcement, soil and approved plan dimensions visible
Foundation
Backfill or concealment
Foundation construction, waterproofing and required drainage ready
Underground plumbing
Slab or backfill
Piping supported, tested and visible
Rough electrical, plumbing and mechanical
Insulation or drywall
All rough systems complete, tested and exposed
Framing
Insulation and wall covering
Structural framing and required rough trade approvals complete
Insulation
Drywall
Approved insulation values, air sealing and energy details visible
Pool barrier and electrical
Use of pool or final approval
Barrier, gates, alarms, bonding, equipment and required trades complete
Final
Occupancy or permit closure
All work, documents, trade finals, site items and fees complete
Residential project shortcuts

Use the City Guidebook That Matches the Work

Basement finishing

Use the guide for egress, ceiling height, fire separation, alarms, rooms, insulation and inspection order.

Open basement guide

Accessory structure

Use the guide for lot placement, zoning, foundations, framing, contractor registration and inspections.

Open accessory structure guide

Pool, hot tub or spa

Use the guide for plot-plan review, barriers, alarms, trade permits and inspection sequencing.

Open pool guide

New home or addition

Use the guide for plans, grading, zoning, application, payment, trade permits and closeout.

Open home construction guide

Residential zoning

Use the zoning guide for setbacks, fences, pools, solar equipment and common residential placement rules.

Open residential zoning guide

Commercial development

Use the development guide for Planning Commission, engineering, fire, utilities, construction and occupancy.

Open commercial development guide

Zoning and plot-plan review

Check Property Placement Before Designing the Structure

Use the City’s interactive maps

The Planning and Economic Development map provides property details, parcel information, zoning designation and links to public BS&A records.

Open Rochester Hills maps

Confirm these items

  • Zoning district
  • Front setback
  • Side setback
  • Rear setback
  • Lot coverage
  • Maximum height
  • Easements
  • Steep slopes
Residential zoning review costs $90. Accessory additions, garages and pools can also require a separate $90 plot-plan review under the current Building Department schedule.
Fence and solar placement

Some Exterior Projects Are Primarily Zoning Questions

Residential fences

  • Side and rear fences are generally limited to six feet.
  • Front-yard placement is more restricted.
  • Fabric fences are not permitted.
  • Pool enclosures must meet residential and pool-code requirements.
  • Check corner-lot visibility and easements.

Ground-mounted solar

  • Front-yard systems must meet the front setback.
  • Front-yard systems are limited to 42 inches and require screening.
  • Side or rear systems require at least a five-foot property-line setback.
  • Side or rear systems are limited to ten feet at maximum tilt.
Confirm current zoning before purchasing equipment. Lot shape, subdivision restrictions and later ordinance amendments can affect placement.
Floodplain, grading and stormwater

Resolve Water and Drainage Impacts Before Construction

Floodplain determination

The current Building Department fee schedule lists a $280 floodplain-determination fee.

Steep-slope analysis

The current schedule lists steep-slope analysis at $90 per hour.

Stormwater impacts

New roofs, driveways and hard surfaces increase runoff and may require drainage or detention review.

Rochester Hills does not own every storm pipe. The City explains that many common storm systems serving developments remain owned by the benefiting development or property owners.
Commercial and change-of-use projects

A New Business May Need Approval Even Without Major Construction

Change-of-occupancy review

The current fee schedule lists a $540 change-of-occupancy request fee.

Required pre-inspections can include building, electrical, fire, mechanical, plumbing/cross-connection and site review.

Prepare before leasing

  • Confirm the proposed use is allowed by zoning.
  • Check occupancy classification and occupant load.
  • Review accessibility and restroom compliance.
  • Identify cooking, hazardous material or fire-system needs.
  • Check parking, signage and site requirements.
Do not sign a final lease based only on the prior tenant’s approval. A change in use, operations, equipment or occupant load can trigger a new review.

Open Change-of-Occupancy Application

Permit and property records

Search BS&A Before Filing a FOIA Request

Open the Rochester Hills BS&A municipality

Search by street address, parcel number, owner name or Building Department record number.

Review Building Department records

Check permit numbers, application type, status, fees and inspection activity.

Check the City’s permit reports

The Building Department publishes monthly reports of permits applied for and permits issued.

Use FOIA for unavailable documents

Request plans, correspondence, older inspection records or other documents not available in the public search.

For a home purchase: Search the building permit plus the electrical, plumbing and mechanical records. An issued permit is not proof that every final inspection passed.
Inactive and expired permits

Act Before Six Months of Inactivity Creates a Larger Problem

Application not yet issued

Rochester Hills residential guidebooks state that the permit should be secured within six months of the application date or the application may be canceled.

Issued permit with no activity

Issued permits with no activity for more than six months may be canceled, and a new permit may be required to finish the project.

Situation
Best next step
Permit is nearing six months without inspection
Contact Building before expiration and schedule a valid construction inspection when the work is ready
Permit expired within the prior 180 days
Ask whether the $50 expired-permit renewal route is available
Permit expired longer ago
Ask whether new applications, current-code plans and new fees are required
Contractor changed
Provide the required cancellation, change and new contractor-registration documents
Work differs from approved plans
Submit and obtain approval of revised plans before continuing the affected work
Final permit remains open
Identify missing building, electrical, plumbing, mechanical, site or occupancy approvals
No automatic refund after inactivity: The current fee schedule states that permits expiring because of 180 days of inactivity receive no refund.
Final occupancy

Close the Main Permit and Every Trade Permit

Certificate outside a building permit

The current schedule lists a $250 Certificate of Occupancy request when it is not part of a building permit.

Temporary residential occupancy

A temporary Certificate of Occupancy request or extension for a single-family project is $300.

Other temporary occupancy

A temporary Certificate of Occupancy request or extension for other projects is $600.

A Certificate of Occupancy cannot be issued until required fees are paid. Trade finals, site work, fire systems and outstanding review conditions can also block occupancy.
Problem solving

Fix Common Rochester Hills Permit Delays

Problem
Likely cause
Best next step
BS&A account is not linked
The applicant needs a City PIN or has a duplicate account
Call 248-656-4615 before starting another account
Property does not appear
Wrong municipality, address format or parcel record
Confirm Rochester Hills jurisdiction and search by parcel number
Review has not started
Application or base plan-review fee remains unpaid
Open the payment email and clear the initial invoice
Plans returned as incomplete
Missing plot plan, dimensions, energy data, structural detail or contractor document
Compare the upload against the City project guidebook
Accessory structure cannot be placed as proposed
Setback, easement, lot coverage, height or drainage conflict
Resolve zoning and plot-plan review before revising construction plans
Inspection was not approved
Incomplete work, plan deviation, concealed work or unresolved corrections
Complete every correction and review the correct inspection guide
Repeated inspection fee
The project reached a third or later attempt for that inspection type
Pay the $90 fee and verify all corrections before rescheduling
Permit email was not received
Final balance, spam filtering or account email issue
Check BS&A payment status and confirm the applicant email with Building
Final permit remains open
Trade final, site approval, fee, document or occupancy condition remains incomplete
Ask for a written list of every remaining closeout item
Residential plan cites the wrong code
Michigan residential code implementation changed through litigation
Confirm the code edition accepted by Rochester Hills before resubmitting
Ready-to-use scripts

What to Say When Contacting Rochester Hills

Permit requirement:
“I plan to [exact work] at [full address and parcel]. Which building, electrical, plumbing, mechanical, zoning, plot-plan, floodplain or fire approvals are required?”
BS&A account:
“My BS&A email is [email]. I need a PIN or account link for the Rochester Hills permit at [address]. Can you check whether an account already exists?”
Review status:
“Application [number] shows [status]. Can you identify the exact payment, reviewer, correction or outside approval preventing the next step?”
Open permit:
“Permit [number] has not closed. Which building, electrical, plumbing, mechanical, site or occupancy item remains incomplete?”
Final closeout

Do Not Finish Until Every Related Record Is Final

  • Rochester Hills jurisdiction confirmed
  • BS&A account linked
  • Correct application selected
  • Residential contractor registered
  • Plot plan and zoning accepted
  • Floodplain review completed
  • Building application paid
  • Plans formally approved
  • Permit formally issued
  • Trade permits issued
  • Approved plans kept onsite
  • Work inspected before covering
  • Failed items corrected
  • Trade finals approved
  • Site conditions completed
  • Occupancy or final closure confirmed
Office location

Rochester Hills Building Department Map

City Hall: 1000 Rochester Hills Drive, Rochester Hills, MI 48309.
Hours: Monday–Friday, 8:00 AM–5:00 PM.
Building phone: 248-656-4615.
Official resource center

Open the Correct Rochester Hills Resource

Frequently asked questions

Rochester Hills Building Department FAQs

Where do I apply for a Rochester Hills building permit?

Use the City of Rochester Hills online permit instructions and BS&A portal. New applicants may need to call 248-656-4615 for a PIN that links the BS&A account to the City system.

What is the Rochester Hills Building Department phone number?

Call 248-656-4615. The Building Department is located at Rochester Hills City Hall, 1000 Rochester Hills Drive, Rochester Hills, Michigan 48309.

What are the Rochester Hills Building Department hours?

City Hall and the Building Department list Monday through Friday hours of 8:00 AM to 5:00 PM, excluding City holidays.

Is Rochester Hills the same permit jurisdiction as the City of Rochester?

No. Rochester Hills and the City of Rochester are separate municipalities with different building departments and separate BS&A records. Confirm the legal municipality before applying.

How much is a Rochester Hills building permit?

The amount includes a project-specific application fee, plan review and a building permit based on ICC-calculated construction valuation. The current building permit formula starts at $100, while other zoning, plot-plan, floodplain and trade charges may also apply.

How long does Rochester Hills plan review take?

Some complete basement, pool and accessory-structure applications may be reviewed within about five working days when workload and complexity allow. New homes, commercial projects, corrections and multi-department reviews can take longer.

How do I schedule a Rochester Hills inspection?

Sign in to the Rochester Hills BS&A portal, open the issued permit and select the required inspection. Keep the approved plans onsite and leave required work uncovered.

Do residential contractors need to register in Rochester Hills?

Yes. Residential contractors must register their Michigan license with the City before applying. The current registration and administration fee is $30 and registration remains valid until the license expires.

When can a Rochester Hills permit expire?

City project guides state that an application may be canceled if the permit is not secured within six months. An issued permit with no activity for more than six months may also be canceled. Contact Building before the inactivity period ends.

How do I search old Rochester Hills permits?

Use Rochester Hills BS&A to search by address, parcel number, owner or Building Department record number. Submit a FOIA request through the City Clerk for plans or records not available online.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent informational guide and is not the City of Rochester Hills.

This page was rebuilt using the official Rochester Hills Building Department, BS&A, December 2025 fee schedule, forms, residential and commercial guidebooks, inspection, payment, zoning, map, stormwater, permit-report and FOIA resources, together with the Michigan Bureau of Construction Codes.

Last reviewed: July 23, 2026.

Fees, code editions, portal steps, forms, staff and inspection procedures can change. Confirm time-sensitive requirements with Rochester Hills before submitting, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment