Use the New Novato Permits Portal, Clear Plan Review and Reach Final Inspection
Novato no longer uses its former eTRAKiT process for new applications. Building, Planning and Public Works applications now begin in the Novato Permits portal, where applicants upload plans, pay invoices, track reviews and request inspections.
This guide explains which projects qualify for an instant residential express permit, what must be uploaded for a standard application, how current fees are calculated, when Planning, Fire, Public Works, floodplain or tree approval is needed, and how to close old or new permits correctly.
Choose the Novato Task You Need Right Now
Novato Permit Route Finder
Select the project or problem that most closely matches your situation.
Novato Building Division Phone, Email, Address and Hours
City of Novato or Unincorporated Marin County?
Use the City of Novato when
- The parcel is inside the incorporated city-limit boundary.
- The address appears in Novato Permits.
- The city Planning map identifies a Novato zoning designation.
Use Marin County when
- The property is outside the incorporated city boundary.
- The postal address says Novato but the parcel is unincorporated.
- Marin County property tools identify county jurisdiction.
Express Permit, Standard Building Permit or Planning Application?
Project or request |
Starting route |
Exact next step |
|---|---|---|
Like-for-like residential water heater |
Express permit |
Licensed contractor or qualified agent applies through Novato Permits. |
Like-for-like residential HVAC in the same location |
Express permit |
Confirm no equipment-type or location change before selecting the instant permit. |
Residential electrical-panel replacement in the same location |
Express permit |
Use the express option only when the scope exactly matches the portal description. |
Like-for-like residential reroof |
Express permit |
Roof pitch cannot change, and a roof with existing solar does not qualify. |
Like-for-like residential windows or doors |
Express permit |
Opening location and size must remain unchanged. |
New house, addition, structural remodel or pool |
Standard building permit |
Select the correct standard application and upload a complete plan package. |
Use permit, design review, subdivision or discretionary project |
Planning first |
Complete the entitlement before applying for the related building permit. |
Grading, encroachment or work in the public right-of-way |
Public Works permit |
Apply under the Public Works section in Novato Permits. |
Tree removal |
Planning tree permit |
Upload the application, site plan, photos and arborist letter. |
Building inspection |
My Inspections |
The permit must be issued, and the requester must be a listed record contact. |
Express Permits Have Strict Eligibility Rules
Who may apply?
A licensed contractor or qualified permit agent with a valid California contractor license.
Local business requirement
The contractor must hold a valid City of Novato business license.
What happens?
Eligible express permits can be applied for, paid and issued online without standard plan review.
Apply for a Novato Building Permit in Six Steps
Confirm jurisdiction, zoning and outside reviews
Check the city boundary, zoning, Planning entitlement, Fire requirements, flood zone, trees, grading, utilities and sanitary-district requirements.
Create and validate the portal account
Register in Novato Permits and complete the My Profile credential-validation process before applying or requesting inspections.
Select the exact application type
Search by keyword, read the permit name and description, and make sure the selected option matches the work.
Add every project contact
Include the owner, applicant, contractor, architect, engineer and other responsible people.
Complete details and upload documents
Enter a clear scope, valuation and project information. Upload every file marked as required for that permit type.
Pay, respond and wait for issuance
Monitor the portal for invoices and review comments. Upload a coordinated correction package and wait until the status is issued before starting work.
Prepare These Files Before Opening the Application
Property and people
- Exact project address
- Assessor parcel number
- Owner contact information
- Applicant information
- Contractor license
- City business license
Construction documents
- Cover and code sheet
- Site plan or survey
- Existing and proposed plans
- Exterior elevations
- Building sections
- Structural details
Supporting documents
- Structural calculations
- Energy documents
- CALGreen checklist
- Geotechnical report
- Fire documents
- Planning approval
Make the Plan Set Easier to Review
Use one coordinated set
Architectural, structural, civil, energy and trade drawings should show the same dimensions, equipment and project scope.
Use readable file names
- 01-Application.pdf
- 02-Architectural-Plans.pdf
- 03-Structural-Plans.pdf
- 04-Calculations.pdf
- 05-Energy-CALGreen.pdf
Answer corrections directly
List each comment, provide the response and identify the exact revised sheet and detail.
Common Work That Requires a Novato Building Permit
Building
- Additions and remodels
- Kitchens and bathrooms
- Decks and balconies
- Patio covers
- Garage conversions
- Demolition
Exterior
- Reroofing
- Siding replacement
- New or replaced windows
- Skylights
- Retaining walls
- Pools and spas
Mechanical and plumbing
- Heating or air conditioning
- Duct installation
- Water heaters
- Gas piping
- Water or drain piping
- Solar water heating
Electrical
- Service panels
- New circuits
- Lighting and wiring
- Solar photovoltaic systems
- Pool and spa electrical
- Appliance circuits
Some Work May Be Building-Permit Exempt
Possible exemption |
Published limit |
What still applies |
|---|---|---|
Detached storage shed or playhouse |
One story and no more than 120 square feet |
Zoning, setbacks, wildfire rules and other local regulations |
Retaining wall |
Not over four feet from footing bottom to wall top |
Permit required when supporting a surcharge or regulated liquid |
Sidewalk or driveway |
No more than 30 inches above grade and not over occupied space |
Public Works, drainage and accessibility rules |
Finish work |
Painting, papering, tiling, carpet, cabinets and counters |
A permit is required when structural or regulated-system work is included |
Small prefabricated residential pool |
Under 24 inches deep, no more than 5,000 gallons and entirely above ground |
Zoning, electrical, barrier and flood-zone requirements |
Minor plumbing repair |
Clearing stoppages or stopping leaks without replacing or rearranging piping |
Permit required when valves, pipes or fixtures are replaced or rearranged |
How Novato Building-Permit Fees Are Calculated
Permit issuance
$79
General Plan fee
10% of the permit fee when applicable.
Technology fee
10% of the permit fee when applicable.
Standard plan review
80% of the building-permit fee when applicable.
Total construction valuation |
FY 2026–27 base permit calculation |
|---|---|
$1–$2,000 |
$187.95 |
$2,001–$25,000 |
$187.95 for the first $2,000 plus $22.55 for each additional $1,000 or fraction |
$25,001–$50,000 |
$706.65 for the first $25,000 plus $20.75 for each additional $1,000 or fraction |
$50,001–$100,000 |
$1,225.36 for the first $50,000 plus $13.19 for each additional $1,000 or fraction |
$100,001–$500,000 |
$1,884.76 for the first $100,000 plus $10.37 for each additional $1,000 or fraction |
$500,001–$1,000,000 |
$6,032.29 for the first $500,000 plus $9.05 for each additional $1,000 or fraction |
More than $1,000,000 |
$10,556.77 for the first $1,000,000 plus $5.43 for each additional $1,000 or fraction |
Published Fees for Frequently Requested Work
Permit item |
FY 2026–27 fee |
Important condition |
|---|---|---|
Like-for-like residential HVAC |
$95 per unit |
Different type, relocation or new AC is $189; entirely new HVAC is $252. |
Residential service panel or generator |
$163 per equipment |
Utility and Fire coordination may be required. |
Like-for-like residential water heater |
$94 |
Relocation or type change is $189. |
Residential water-line replacement or relocation |
$189 |
A new line uses the valuation fee table. |
Residential drain-line replacement or relocation |
$189 |
Sanitary-district review may apply. |
Residential reroof up to 2,000 square feet |
$283 |
Add $94 for each additional 1,000 square feet or fraction. |
Up to five residential retrofit windows or sliding doors |
$189 |
Over five: $190 plus $25 for each additional unit. |
Fence permit |
$189 |
Planning, flood and Public Works review may be separate. |
Minor interior demolition up to 500 square feet |
$263 |
Major demolition uses the valuation table. |
Residential solar up to 15 kW |
$330 |
Fire final is required before the city Building final. |
Budget for Review Cycles, Missed Inspections and Permit Changes
Service or problem |
Published charge |
|---|---|
Minimum plan-review fee |
$79 when applicable |
Minor plan review |
$158 |
Flood-zone Building Division plan review |
15% of the applicable plan-check fee |
Revision to approved plans |
Hourly |
Permit extension |
$189 |
Temporary Certificate of Occupancy |
$283 per 30 days |
Reinspection after first reinspection |
$94 each |
Missed inspection |
$94 |
After-hours inspection |
$226 per hour, two-hour minimum |
Investigation for work performed without permits |
An additional amount equal to the permit fee |
Schedule Novato Inspections Through the Permit Portal
Permit status
The permit must show Issued before an inspection can be requested.
Requester access
The person scheduling must be listed as a contact in the permit record.
Portal menu
Sign in and select My Inspections.
Scheduling goal
The city strives to offer next-day inspections when workload allows.
Have ready
- Issued permit number
- Project address
- Correct inspection type
- Onsite contact number
- Gate or access instructions
- Special inspection reports
Prepare the site
- Approved plans available
- Correct phase complete
- Work remains exposed
- Corrections completed
- Safe inspector access
- Required tests ready
Work Only During Authorized Novato Construction Hours
Monday–Friday
7:00 AM–6:00 PM
Saturday
10:00 AM–5:00 PM
Prohibited days
No construction on Sundays or official federal holidays.
What the Portal Inspection Status Means
Some Projects Need an Entitlement Before the Building Permit
Discretionary review
A Use Permit, Design Review Permit, subdivision or another entitlement may require public notice and a hearing before Building review.
Portal route
Create a Novato Permits account and submit the application from the Planning section.
Cost recovery
Some Planning applications use a fixed fee; others require a deposit and charge actual staff and consultant costs.
Resolve Tree Removal Before Demolition or Grading
Application
Submit a Planning application and identify the application type as Tree Permit.
Site plan
Show property lines, structures and the location of every tree proposed for removal.
Photographs
Provide full-tree, surrounding-area and visible-damage photographs.
Arborist letter
Include a signed certified-arborist opinion describing condition and removal need.
Floodplain Projects Need More Than a Standard Plan Set
Confirm the flood determination
Reference maps are not a final determination. Contact Public Works at 415-899-8246 or pw@novato.org.
Elevation and anchoring
New development in a Special Flood Hazard Area may need its lowest level elevated and the structure anchored against flood movement.
Substantial improvement
The city describes substantial improvement or damage as work equal to 50% of the original building’s value.
Choose the Correct Novato ADU, JADU or Amnesty Route
New ADU or JADU
Review local standards, state law, zoning, utilities, Fire and site constraints before filing the building application.
Pre-approved plan
A complete and accurate master-plan or site-specific pre-approved ADU submittal is reviewed under the city’s streamlined process.
Older unpermitted unit
The ADU Amnesty Program covers certain units built before January 1, 2020 and may delay enforcement while legalization proceeds.
Pass the Novato Fire Inspection Before the City Building Final
Do Not Sign a Lease Before Confirming the Legal Use
Planning
Confirm use, parking, design review, signs and entitlement requirements.
Building
Address occupancy, accessibility, structure, energy and tenant improvements.
Fire and utilities
Coordinate Novato Fire, North Marin Water and Novato Sanitary District requirements.
Business license
Complete the city business-license process before operating.
Use the Correct Record Search for the Permit Year
Record date |
Where to search |
Next action |
|---|---|---|
After 2000 |
Novato Permits record portal |
Search the address or permit record and review available permit and inspection information. |
Before 2000 |
Self-service kiosk |
Schedule an appointment at the Permit Center for older plans and records. |
Former eTRAKiT project |
Transferred record |
Create portal credentials and continue the migrated project in Novato Permits. |
Record not found |
Staff assistance |
Email permitinfo@novato.gov with the address, approximate year and document type. |
Kiosk reservation
Appointments are available Monday–Thursday from 1:00 PM–3:00 PM.
Drop-in availability
Drop-in kiosk hours are 9:00 AM–1:00 PM, but staff support and kiosk availability are not guaranteed.
Staff question hours
Staff is available Monday–Thursday from 9:00 AM–11:00 AM on a first-come basis.
Fix Common Novato Permit Problems
Problem |
Likely reason |
Best next action |
|---|---|---|
Portal account cannot apply |
Credentials or profile validation are incomplete |
Complete My Profile verification or contact permit support. |
Wrong permit type submitted |
The application option did not match the project |
Contact staff; the city guide warns that a new application may be required. |
Application remains incomplete |
Required contact, document, scope detail or approval is missing |
Open the Required Documents list and upload one coordinated package. |
Planning hold |
Use permit, design review, zoning or tree approval is unresolved |
Contact planning@novato.gov and request the exact outstanding entitlement. |
Inspection option is unavailable |
Permit is not issued or requester is not a listed contact |
Confirm permit status and ask the record owner to add the requester. |
Inspection date is delayed |
Heavy workload, closure date or holiday |
Choose the next available business day shown in the portal. |
Old project is not in expected account |
Migrated eTRAKiT record is not connected to current credentials |
Contact permit support with the former record number and email address. |
Unexpected payment email |
Possible phishing attempt |
Do not click or pay; verify through Novato Permits or call 415-899-8989. |
What to Say When You Contact Novato
“I am planning [exact work] at [address]. Does this qualify for an express permit, require a standard building application, or need Planning or Public Works approval first?”
“My Novato Permits record is [number]. The portal shows [status]. Which required document, contact validation, payment or department review remains open?”
“Permit [number] is issued. I am a listed contact and need the [inspection type]. The work is complete for that stage and remains visible.”
“I need the permit and final-inspection history for [address] from approximately [year]. Is the record online, transferred from eTRAKiT or available through the pre-2000 kiosk?”
Do Not Finish Until Every Novato Approval Is Complete
- City jurisdiction confirmed
- Zoning and Planning route confirmed
- Tree requirements resolved
- Flood-zone status checked
- Correct permit type selected
- All project contacts added
- Required documents uploaded
- Plan-review comments answered
- Permit formally issued
- Approved plans available onsite
- Fire inspections passed
- Public Works conditions completed
- Building inspections passed
- Trade finals completed
- Permit record shows final status
- Owner receives final documents
Novato Community Development Permit Center Location
Open the Correct Novato Permit Resource
Novato Building Permit FAQs
Where do I apply for a Novato building permit?
Apply through the Novato Permits online portal. Create an account, validate your credentials, select the correct permit type, add every project contact and upload the files requested by the portal.
What are the Novato Building Division hours and contact details?
Community Development is at 922 Machin Avenue, Novato, California 94945. General hours are Monday through Thursday from 9:00 AM to 5:00 PM and alternating Fridays. Public counter hours are Monday through Thursday from 9:00 AM to 11:00 AM. Call 415-899-8989.
Which projects require a Novato building permit?
Permits commonly apply to new construction, additions, remodels, kitchens, bathrooms, decks, demolition, reroofing, windows, siding, pools, retaining walls, HVAC, water heaters, plumbing, electrical panels, wiring and solar systems.
Which projects qualify for a Novato residential express permit?
The express route covers eligible like-for-like residential water heaters, HVAC systems in the same location, electrical panels in the same location, reroofs without a pitch change and windows or doors without a size change. Only qualified licensed contractors or permit agents with a valid city business license may use the route.
How do I schedule a Novato building inspection?
Sign in to Novato Permits and select My Inspections. The permit must be issued, and the person requesting the inspection must be listed as a contact on the permit record.
How are Novato building-permit fees calculated?
Major permit fees are generally based on total project valuation. Standard plan review is 80% of the building-permit fee when applicable. A $79 permit-issuance fee and General Plan, technology, state, Planning, Public Works or agency charges may also apply.
How do I find old Novato permits and plans?
Available records after 2000 can be searched through the Novato Permits record portal. Records and plans dated before 2000 are accessed through the self-service kiosk at the Permit Center by appointment or available drop-in hours.
What additional rules apply in a Novato flood zone?
Special Flood Hazard Area projects may require elevation, anchoring, flood-resistant construction and additional plan review. Obtain an accurate flood determination from Public Works. The city’s permit guide also identifies all fences in a flood zone as requiring a building permit.
What do I need for a Novato tree-removal application?
Prepare the Planning application, a site plan showing the trees, full-tree and surrounding photographs, and a signed certified-arborist letter. A cost-recovery form is required when more than five trees are proposed for removal.
Does Novato have an ADU amnesty or pre-approved plan program?
Yes. The city provides a pre-approved ADU plan process and an amnesty program for certain unpermitted ADUs or JADUs built before January 1, 2020. A complete and accurate pre-approved plan submittal is reviewed through a streamlined process.
Official Information Used for This Guide
Building-Department.org is an independent informational guide and is not the City of Novato.
This article was checked against the City of Novato Building Division, Novato Permits portal, permit-application guide, Schedule an Inspection page, Residential Express Permits, FY 2026–27 Master Fee Schedule, Online Records Search, Planning applications, ADU guidance, Tree Removal Guide, floodplain information and Public Works resources.
Last reviewed: July 22, 2026.
Permit types, portal screens, fees, office calendars, inspection availability, codes and outside-agency requirements can change. Confirm project-specific information before submitting, paying or beginning construction.

Khushboo Bobade is a public records researcher and editorial writer specializing in government service documentation and construction permit systems.
Her research focuses on explaining building permits, inspection procedures, zoning regulations, and public permit records maintained by local government building departments across the United States.
Professional profile: View LinkedIn Profile
Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links
Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.
What building department task do you need help with?
Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.
Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.
Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.
Building Permit Type Finder
Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.
Permit Fee Estimate Calculator
Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.
Inspection Readiness Checklist
Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.
Zoning and Setback Pre-check
Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.
Plan Review Timeline Estimator
Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.
Permit Records Search Helper
Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.
Official Building Department Resource Finder
Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.
Building Department vs Planning/Zoning
- Building Department: permits, plan review, inspections, code compliance, certificates.
- Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.
Best sitewide placement
Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.
Important note
This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.