Harrison Building Department | Permits, Inspections & Official Contact

Harrison, New York permit action guide

Submit the Correct Paper Application, Clear Engineering or ARB Review and Close the Permit Properly

Harrison no longer accepts new building applications through eTRAKiT. New applications must be delivered as hard-copy packages at the Building Department counter or mailed to the department.

eTRAKiT remains useful for parcel information, existing-application payments, review comments and inspection scheduling. This guide explains which paper form applies, how many plans and surveys to prepare, when Engineering or Architectural Review Board approval is triggered and what is needed for the final Certificate of Occupancy or Compliance.

Paper application and mailing workflow
Engineering, ARB, Planning and Fire routes
Inspections, records, fees and final CO
Harrison paper permit moving through the Building Department, Engineering, Architectural Review Board and inspections An animated municipal building, paper application, review board, Engineering approval, inspection and Certificate of Occupancy explain the Harrison permit process. HARRISON BUILDING DEPT. COUNTER • MAIL • PAPER PLANS ENGINEERING GRADING • FLOOD • DRAINAGE ARB / PLANNING EXTERIOR • SITE • SIGNS INSPECTION / CO APPROVED PAPER APPLICATION FINAL INSPECTION CO / COMPLIANCE
📌
Do not submit a new application through eTRAKiT Effective September 3, 2024, Harrison stopped accepting new electronic applications through eTRAKiT. Submit new applications in person during counter hours or mail the complete hard-copy package to the Building Department.
Start here

Choose the Harrison Building Department Task You Need

Harrison Permit Route Finder

Select the work or problem to see the correct form, review route and first action.

Official contact panel

Harrison Building Department Address, Phone and Counter Hours

Main phone 914-670-3050 Permits, applications, inspections and records
Fax 914-835-7491 Confirm before sending time-sensitive material
Office address 1 Heineman Place Harrison, NY 10528
Counter hours 9:00 AM–5:00 PM Monday–Friday; summer hours 9:00 AM–4:00 PM
Engineering 914-670-3102 Drainage, floodplain, grading and land development
ARB / Planning / ZBA staff 914-670-3077 Board applications, agendas and submission questions
Fire Prevention 914-670-3130 Fire permits, oil tanks and fire inspections
Public Works 914-670-3100 Trees in Town right-of-way or on Town property
Before calling: Have the property address, block and lot, zoning district, project description, application or permit number, contractor name and exact question ready.
Who handles what?

Use the Correct Harrison Department Before Submitting Plans

Office
Handles
Common trigger
Building Department
Building permits, zoning checks, construction-code review, inspections and Certificates of Occupancy
New construction, additions, alterations, accessory structures, fences, driveways and trades
Engineering Department
Stormwater, grading, FEMA floodplain, drainage and residential land development
Land disturbance of 500 square feet or more and site-development work
Architectural Review Board
Exterior design of residential and commercial structures and commercial signs
New structures, exterior alterations, additions, signs and awnings
Planning Board
Site plans, subdivisions and larger development proposals
New commercial construction, site development or parcel division
Zoning Board of Appeals
Variances after a zoning-related denial by the Building Inspector
Setback, coverage, height, use or dimensional noncompliance
Bureau of Fire Prevention
Fire sprinklers, commercial fire alarms, oil tanks, propane, tents and fire inspections
Commercial life safety, fire-protection systems and regulated tanks
Westchester County Health
Septic systems and private wells
Property not served by public sewer or water
Westchester Joint Water Works
Public water-service questions
New service, relocation, shutoff or water availability
Correct application workflow

Submit a Harrison Building Permit in the Right Order

Confirm zone, block and lot
Choose one permit type
Complete Engineering or board reviews
Prepare paper plans and forms
Submit at counter or by mail
Pay, track and obtain issuance
Inspect and obtain CO

Research the property before drawing plans

Use eTRAKiT or Harrison GIS to confirm the owner, zone, block, lot, acreage, flood status and property information.

Save: Zone, block/lot, owner name, parcel dimensions and known permit history.

Choose one permit type per application

The long building application instructs applicants to select only one permit type. Separate applications may be needed for a pool, fence, driveway, electrical work, plumbing or other project parts.

Complete Engineering review when required

New construction and qualifying site work involving at least 500 square feet of land disturbance require Town Engineer approval before the building permit can move forward.

Prepare: Survey, engineered site plan, grading, drainage, erosion-control and flood information.

Prepare the hard-copy application package

Most full applications require a property survey and three plan sets. Residential plans must be no larger than 24 × 36 inches and signed and sealed by a New York-licensed design professional when required.

Add ARB materials when the project is referred

Prepare two additional 11 × 17 plan sets and photographs of the subject property and at least two nearby structures.

Attendance: The applicant or representative must attend the ARB meeting.

Sign, notarize and include required fees

Applications must be signed and notarized where applicable. Include the nonrefundable application fee and Certificate of Occupancy fee when required.

Submit in person or by mail

Deliver the complete package to 1 Heineman Place during counter hours or mail it to the Harrison Building Department.

Incomplete packages: The department states that incomplete mailed applications will be returned.

Use eTRAKiT after filing

Use the portal for available review comments, payments on existing applications, parcel information and inspection scheduling.

Wait for formal permit issuance

Engineering, ARB or Planning approval does not itself authorize construction. Begin only after the Building Department issues the permit.

Complete inspections and final closeout

Request inspections 24–48 hours ahead, resolve corrections and submit the Certificate of Occupancy application and final documents.

Form and permit finder

Match the Project to the Correct Harrison Application

Project
Form or permit
Important preparation
Extra route
New building or major addition
Full Building Permit Application
Survey, three signed/sealed plan sets, zoning data, construction cost and contractor documents
Engineering and usually ARB; commercial projects may need Planning
New shed, cabana or accessory structure
Full Building Permit Application
Survey, plans, anchoring, dimensions and proposed location
Engineering and ARB may apply
Deck, patio, pool, driveway, wall or sports court
Full Building Permit Application
Survey, three plan sets, setbacks, coverage and drainage
Engineering if land disturbance reaches 500 square feet
Roof, windows, exterior doors, insulation, chimney lining or residential HVAC
Residential Short Form
Scope, cost, product information, contractor license and insurance
ARB or structural review when exterior design or framing changes
Interior alteration
Full Building Permit Application
Existing/proposed floor plans, structure, trades, occupancy and cost
Fire-sprinkler affidavit may apply
Residential or commercial solar
Solar Panel Application
Layout, equipment, mounting, structural and electrical information
ARB referral is listed under Category E
Electrical work
Electrical Permit
Licensed contractor, equipment, circuits, service details and associated building permit
Final electrical approval may be required before CO
Plumbing, sewer, gas equipment or fixtures
Plumbing & Sewer Permit
Licensed plumber, fixture count, gas appliances and sewer scope
New sewer line requires two site-plan sets
Demolition
Demolition Application
Survey, property card, utility cutoff letters, asbestos report and abatement documentation
Fire, utility and site-restoration coordination
Fill, regrading or excavation
Site-Work Permit
Three engineered plan sets, volumes, square footage, fill source and wetland information
Approved Land Development Application
Tree removal
Tree Removal Permit
Two site plans, tree locations, diameter/species and marked trees
HOA approval when applicable; Public Works for Town trees
Sign or awning
Full Application / Category E
Three drawing sets showing dimensions, elevations, colors and materials
Architectural Review Board approval
Application category decoder

What Harrison Permit Categories A Through E Mean

Category
Project types listed on the form
Typical submission route
Category A
New construction, new accessory structure, additions or exterior alterations
Survey, three plan sets, Engineering for qualifying disturbance and ARB referral
Category B
Deck/patio, pool, regrade, fill, excavation, wall, driveway and sports court
Survey, three plan sets and Engineering approval; generally no ARB referral
Category C
Interior alteration, generator, fence/pool barrier, commercial HVAC and roof work
Survey and three plan sets where applicable; generally no Engineering or ARB review
Category D
Demolition
Survey, property card, utility cutoff letters, asbestos report and abatement records
Category E
Signs, awnings and solar panels
Three 11 × 17 plan sets and Architectural Review Board referral
Only one permit type per application. A larger project can require several applications—for example, addition, pool, fence, electrical and plumbing permits.
Submission readiness

Prepare the Hard-Copy Permit Package Before Visiting

Property information

  • Street address
  • Zone
  • Block and lot
  • Owner information
  • Current and proposed use
  • Property survey
  • Existing structures
  • Flood or easement information

Plans and calculations

  • Three plan sets when required
  • Plans no larger than 24 × 36
  • Site plan
  • Floor plans
  • Elevations and sections
  • Structural details
  • Energy-code information
  • Construction-cost estimate

People and authorizations

  • Licensed NY design professional
  • Westchester contractor license
  • Liability insurance
  • Workers’ compensation documents
  • Owner affidavit
  • Notarized signatures
  • Hold-harmless agreement
  • Application and CO fees
Construction-cost definition: Harrison’s application instructs applicants to include labor, materials, plumbing, electrical, scaffolding, fixed equipment, professional fees, donated work, hardscape and site work in the estimated project cost.
Architectural Review Board

Most Exterior Residential Work Needs an ARB Check

What the ARB reviews

Exterior design for residential and commercial buildings, additions, alterations and commercial signs.

Regular meeting

The official ARB page lists meetings on the second Tuesday of each month at 7:00 PM in the Municipal Building.

Administrative contact

914-670-3077

Confirm the current deadline, agenda placement and meeting requirements.

ARB item
What to prepare
Common delay
Building application
Submit the Building Permit Application first so the project can be referred
Trying to join the ARB agenda without a Building Department application
Reduced drawings
Two additional 11 × 17 plan sets, including the site plan
Submitting only full-size plans
Property photographs
Photos of the subject property and at least two neighboring or nearest structures
Arriving without printed photographs
Applicant attendance
Owner, design professional or informed representative
No person available to answer design questions
Final building permit
Complete all remaining Building Department requirements after ARB approval
Starting construction because the ARB approved the design
ARB approval is not a building permit. Wait for formal Building Department issuance before construction.
Engineering and land development

Check Engineering Before Disturbing 500 Square Feet or More

Engineering reviews

  • Stormwater management
  • Grading
  • Drainage
  • FEMA floodplain development
  • Residential site plans
  • Commercial site development
  • Subdivisions
  • Public improvements

Land-development package

  • Current survey
  • Engineered site plan
  • Existing and proposed grades
  • Drainage system
  • Erosion controls
  • Disturbance area
  • Floodplain information
  • Wetland proximity
Site project
Information the form requests
Practical warning
Fill
Cubic yards, origin, material type, trucker and independent inspector
Do not bring fill before permit and Engineering approval
Regrading
Square footage affected, proposed contours and drainage
Changing runoff toward neighboring property can stop approval
Excavation
Cubic yards, location, retaining or stabilization details
Coordinate excavation with erosion control and structural plans
Floodplain disturbance
Flood zone, elevations, proposed work and mitigation
Building records do not replace Engineering floodplain review
Steep slope
Slope analysis, grading, stabilization and inspection plan
A separate slope permit and inspection fee may apply
Pool, deck or sports court
Location, disturbance area, drainage and setbacks
Hardscape can trigger Engineering review even when the structure is small
Pool permit control

Harrison Pool Applications Need Separate Barrier and Electrical Planning

Pool permit package

The Town pool sheet requires a survey, three site-plan sets and three construction-drawing sets prepared by a licensed professional.

Separate barrier application

A separate building permit application is required for the pool fence or barrier.

Separate electrical permit

Pool electrical equipment cannot be installed without an electrical permit.

Local setback warning: Harrison’s pool requirements vary by zoning district. The posted sheet references 10-foot or 20-foot side/rear setbacks and 60-foot or 75-foot street setbacks depending on the district. Confirm the exact district before placing the pool or equipment.
Tree-removal workflow

Private Trees Four Inches or Larger Require a Permit

Identify the trees

List the species, diameter and reason for removal. Diameter is measured four feet above the ground.

Prepare two site plans

Show the buildings, property boundaries, improvements, drainage areas and exact tree locations.

Mark the trees physically

Use ribbon, string or another visible marker so the inspector can identify each tree before removal.

Include HOA approval when applicable

The current tree application asks whether the property has a homeowners association and requires its approval.

Pay the tree fee

The current form lists $25 for the first three trees and $5 for each additional tree.

Town-owned or right-of-way tree: Contact Public Works at 914-670-3100 instead of removing it under a private-property permit.
Demolition preparation

Do Not File a Demolition Permit Without Utility and Asbestos Records

Core demolition documents

  • Current property survey
  • Assessment property card
  • Building dimensions and stories
  • Estimated completion date
  • Utility cutoff letters
  • Asbestos report
  • Abatement report when applicable
  • Site-restoration plan

Before demolition begins

  • Permit formally issued
  • Utilities disconnected
  • Fire Prevention requirements cleared
  • Erosion controls installed
  • Waste-hauling route confirmed
  • Neighboring property protected
  • Required inspections scheduled
  • Final grading documented
Contractor and owner-builder rules

Verify Licensing, Insurance and Workers’ Compensation Before Filing

Licensed contractor route

  • Westchester County contractor license
  • Correct license classification
  • Liability insurance
  • Workers’ compensation documentation
  • Matching company information
  • Signed hold-harmless agreement
  • Trade contractor details
  • Change-of-contractor form if needed

Homeowner acting as contractor

  • Complete the Owner’s Affidavit
  • Complete workers’ compensation exemption documents
  • Accept responsibility for all work
  • Coordinate every trade permit
  • Schedule all inspections
  • Maintain insurance when workers are used
  • Do not conceal an unlicensed contractor
  • Obtain final CO or Compliance
Insurance format: The applications page specifies hard copy or PDF for insurance and workers’ compensation documentation.
Current fee planning

Use the March 2026 Harrison Fee Schedule Before Writing Checks

Freshness note: The Building Department currently links a schedule labeled March 2026. Reopen that official schedule before filing because application, CO, trade, site-work and board fees may change.
Fee example
Residential
Commercial
What it means
Primary-structure initial filing
$100
$200
Nonrefundable application charge
Accessory-structure initial filing
$50
$50
Separate from the construction-value permit charge
Building permit rate
$15 per $1,000
$30 per $1,000
Based on actual total cost of construction
Amended plans
$50
$75
Submit the Plan Amendment form and three revised plan sets
Primary-structure CO
$150
$250 plus listed floor charges
CO fee is generally submitted with the application when applicable
Electrical permit
$100
$250
Separate supplemental permit
Plumbing permit
$175 up to five fixtures
$225 up to five fixtures
Current plumbing form includes the $50 application fee; $10 per additional fixture
Reinspection
$50
$50
Applies to not-ready and no-show inspections
Tree removal
$25 first three; $5 each additional
Confirm project treatment
Submit the survey/site plans and mark the trees
Steep-slope permit
$50 filing + $250 permit + $250 inspection
Same listed charges
Additional Engineering or professional review costs may apply

Illustrative residential example

For a $50,000 primary-structure project:

  • $100 initial filing fee
  • $750 building permit fee at $15 per $1,000
  • $150 primary-structure CO fee

Illustrative subtotal: $1,000, before electrical, plumbing, Engineering, board, fire, reinspection or other charges.

Before paying

  • Use the complete project cost.
  • Confirm residential or commercial classification.
  • Add separate trade applications.
  • Add CO or Compliance fees.
  • Check Engineering and board charges.
  • Confirm accepted payment method.

Open Harrison Fee Schedule

Construction hours

Follow Harrison’s Weekday, Weekend and Holiday Work Limits

Weekdays

The building application states that construction must not start before 7:30 AM or continue after 8:00 PM.

Weekends and holidays

Construction must not start before 10:00 AM or continue after 8:00 PM.

Blasting

Blasting is generally limited to Monday–Friday, 9:00 AM–5:00 PM, unless written special permission is granted.

HOA or permit conditions can be stricter. Review the permit, approved plans, local noise rules and any property-association restrictions before scheduling crews.
Inspection command center

Request Harrison Inspections 24–48 Hours in Advance

Schedule online

Use Harrison eTRAKiT to request an inspection for an existing issued permit.

Open eTRAKiT

Typical inspection window

The official inspection page states that inspections are typically performed from 10:00 AM to 1:00 PM.

Notice period

Request the inspection 24–48 hours in advance. Do not assume a same-day request will be accepted.

Have ready when scheduling

  • Permit number
  • Property address
  • Inspection type
  • Contractor or owner name
  • Site contact phone
  • Access instructions
  • Confirmation work is ready
  • Previous correction status

Before the inspector arrives

  • Approved plans on site
  • Permit available
  • Required work remains visible
  • Animals are secured
  • Adult age 18+ is present indoors
  • Rear-yard access is authorized
  • Site is safe and accessible
  • Corrections are complete
$50 reinspection risk: The Town states that inspections resulting in “Not Ready” or “No Show” receive a $50 reinspection fee.

View Today’s Scheduled Inspections

Plan changes

Get Amended Plans Approved Before Building the Change

Stop the changed portion of work

Do not construct a structural or life-safety revision that differs from approved plans.

Complete the Plan Amendment form

Describe the proposed change and identify the original permit.

Prepare three revised drawing sets

Cloud or clearly identify every change and update all affected disciplines.

Pay the amendment fee

The fee schedule lists separate residential and commercial amendment charges.

Wait for approval

Resume changed work only after the Building Department approves the amended plans.

Final closeout

What Harrison Requires When Construction Is Complete

Final inspection

A final inspection is required before a Certificate of Occupancy or Certificate of Compliance can be issued.

Updated survey

Work changing the property footprint requires an updated survey. The department can also require a final as-built survey for new structures, pools, decks, fences, walls and driveways.

CO application

Submit the Application for Certificate of Occupancy and obtain Fire Marshal or electrical approval when applicable.

  • All building inspections passed
  • Electrical final approval
  • Plumbing final approval
  • Mechanical final approval
  • Fire Marshal approval when required
  • Engineering closeout when required
  • Final as-built survey
  • Application for CO submitted
  • Outstanding fees paid
  • Certificate issued and saved
Property and permit records

Use the Correct Harrison Record Request

Record needed
Correct route
What you receive
Zone, block/lot, acreage or owner
Search eTRAKiT
Available parcel and property information
List of permits and COs
Permit/CO History online request
Emailed block/lot card; Town states requests are filled within 24 hours
Existing survey
Survey Request online form
Available survey already in the Building Department file
Actual permit, CO or violation copies
Municipal/CO search form with required fee
Requested official document copies
Blueprints or permit file
FOIL request through the Town Clerk
Approved file viewing; copying is arranged after review
Oil-tank history
Bureau of Fire Prevention request
Available regulated tank history
Septic or well information
Westchester County Department of Health
Available health-department records
Floodplain or easement information
Harrison Engineering Department
Municipal engineering and GIS guidance
Blueprint privacy: A non-owner generally needs written owner permission and Law Department approval to receive floor plans. Commercial-property treatment may differ.
Permit status decoder

What Common Harrison Permit Statuses Mean

Application received The paper package has been logged but may still need intake review.
Incomplete A form, plan set, survey, fee, signature, notarization or insurance document is missing.
Engineering review Grading, drainage, stormwater, floodplain or land-development approval is pending.
ARB or Planning referral A board must review the exterior design or site proposal.
Corrections issued Revise the listed plans or documents before approval.
Approved Review may be complete, but permit issuance and payment can remain.
Issued Work can begin within the approved scope and construction hours.
Final pending Required inspections, survey, Fire, electrical or CO documents remain open.
Troubleshooting

Fix Common Harrison Building Permit Problems

Problem
Likely cause
Best next step
Online application option is unavailable
Harrison stopped accepting new eTRAKiT applications
Download the form and submit a hard-copy package in person or by mail.
Mailed application was returned
Missing fee, survey, plan set, signature, notarization or insurance
Use the project category checklist and resubmit one complete package.
Project is waiting for Engineering
Land disturbance, drainage, floodplain or site-plan review remains
Ask Engineering for the exact missing plan, calculation or approval.
ARB agenda was missed
Building application, reduced plans, photos or deadline was incomplete
Contact board staff before the next submission deadline.
Permit approved but not issued
Fees, insurance, contractor license or another approval remains
Ask for a written issuance checklist rather than resubmitting plans.
Inspection failed as not ready
Work incomplete, covered, inaccessible or plans missing
Complete every correction before paying and requesting reinspection.
Field work differs from plans
Unapproved project revision
Stop affected work and submit a Plan Amendment with three revised plan sets.
Old permit appears open
Final inspection, survey, electrical, Fire or CO application remains
Request the Permit/CO card and ask for a current closeout list.
Tree contractor is ready but permit is not
Trees were not marked, survey is missing or HOA approval remains
Complete the site plans and pre-removal inspection requirements first.
Zoning denial blocks the project
Setback, coverage, height, use or another zoning provision is not met
Review design alternatives or the Zoning Board of Appeals process.
Current code editions

New York’s 2025 Construction Codes Took Effect December 31, 2025

Residential 2025 Residential Code of New York State Effective December 31, 2025
Building 2025 Building Code of New York State Used with applicable local requirements
Trades 2025 Plumbing, Mechanical and Fuel Gas Codes Coordinate separate trade permits
Energy 2025 NYS Energy Conservation Code Include current compliance documentation
Old plan warning: Plans prepared under an older code edition may need revision. Confirm the applicable code before resubmitting an expired or previously abandoned project.
Ready-to-use contact scripts

What to Say When You Contact Harrison

Permit-route question:
“I am planning [exact work] at [address, block and lot]. Which application category applies, how many plan sets are required and does the project need Engineering, ARB or Planning approval?”
Application-status question:
“Application [number] shows [status]. Which form, plan, fee, insurance document, board approval or correction is preventing the next step?”
Inspection request:
“I need the [inspection type] inspection for permit [number]. The work is complete, visible and accessible, approved plans are on site and an adult will be present.”
Open-permit question:
“Permit [number] at [address] does not have a final CO or Compliance certificate. Which inspections, survey, Fire, electrical or application documents remain?”
Final project control

Harrison Permit Completion Checklist

  • Zone, block and lot confirmed
  • Correct application category selected
  • Separate permit types identified
  • Engineering approval completed
  • ARB or Planning approval completed
  • Survey and plan sets prepared
  • Professional seals included
  • Contractor license verified
  • Insurance and workers’ compensation accepted
  • Application signed and notarized
  • Application and CO fees included
  • Permit formally issued
  • Approved plans kept on site
  • Inspections requested 24–48 hours ahead
  • Corrections completed
  • Final survey submitted when required
  • Fire and electrical approvals completed
  • CO or Compliance certificate issued
Municipal Building location

Harrison Building Department Map

Address: Alfred F. Sulla Jr. Municipal Building, 1 Heineman Place, Harrison, NY 10528.
Counter hours: Monday–Friday, 9:00 AM–5:00 PM; summer hours 9:00 AM–4:00 PM.
Bring: Complete forms, fees, survey, required plan copies, insurance and board or Engineering approvals.
Official resource library

Open the Correct Harrison Permit Resource

Frequently asked questions

Harrison Building Department Questions

Can I submit a new Harrison building permit application through eTRAKiT?

No. Harrison stopped accepting new electronic applications through eTRAKiT effective September 3, 2024. New applications must be submitted as hard copies at the Building Department counter or mailed to 1 Heineman Place.

What is the Harrison Building Department phone number?

Call 914-670-3050 for building-permit, application, inspection, Certificate of Occupancy and record questions.

What can I still do through Harrison eTRAKiT?

Members of the public can use eTRAKiT to look up property information such as parcel ID, acreage, owner information and flood-zone status. Existing applicants can also use it for available payments, review comments and inspection scheduling.

How many plan sets does Harrison require?

The full building application commonly requires a survey and three plan sets. Projects referred to the Architectural Review Board require two additional 11 × 17 drawing sets and photographs. Confirm the exact package for the project type.

When is Harrison Engineering approval required?

The building application states that Town Engineer land-development approval is required for qualifying land-disturbing activity of 500 square feet or more. Engineering also reviews drainage, grading, stormwater and FEMA floodplain issues.

How do I schedule a Harrison building inspection?

Use the Harrison eTRAKiT portal. The official inspection page states that inspections should be requested 24 to 48 hours in advance and are typically conducted between 10:00 AM and 1:00 PM.

What happens if a Harrison inspection is not ready?

The Town lists a $50 reinspection fee for an inspection resulting in Not Ready or No Show. Approved plans must be on site, required work must remain visible and safe access must be available.

Do I need a permit to remove a tree in Harrison?

Yes for private-property trees four inches or larger in diameter, including dead or storm-damaged trees. Submit two site plans, mark the trees and include HOA approval when applicable. Contact Public Works for trees in the Town right-of-way or on Town property.

How do I obtain Harrison permit and Certificate of Occupancy history?

Use the online Permit/CO History request form to receive the block/lot card listing building permits and Certificates of Occupancy. Use a municipal search or FOIL request when actual document copies or plans are needed.

What is required to close a Harrison building permit?

Complete the final inspection, submit an updated or as-built survey when required, obtain applicable Fire Marshal and electrical approvals and submit the Application for Certificate of Occupancy or Certificate of Compliance.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent guide and is not the Town/Village of Harrison or Westchester County.

This page was rebuilt using official Harrison Building Department, applications, eTRAKiT, inspection, Engineering, Architectural Review Board, Planning Board, Zoning Board, Fire Prevention, records, tree, pool, fee and New York State code resources.

Last reviewed: July 21, 2026.

Forms, fees, staff assignments, meeting dates, submission quantities and inspection procedures can change. Confirm time-sensitive requirements with the responsible Harrison department before filing, mailing, paying or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.