Escambia County Building Department | Permits, Inspections & Official Contact

Escambia County permit action guide

Apply, Track, Inspect and Close an Escambia County Building Permit

Escambia County uses MGO Connect for online permit access. Start by proving that the property is in unincorporated Escambia County, the Town of Century or another area served by County Building Services—not inside the City of Pensacola.

This guide explains permit types, MGO steps, zoning clearance, flood documentation, Notice of Commencement rules, contractor verification, inspection cutoffs, fees and final Certificate of Occupancy requirements.

County, Pensacola, Century and Pensacola Beach jurisdiction checks
Same-day inspection cutoffs and IVR instructions
Flood certificates, NOC, plans and closeout guidance
Escambia County coastal building permit process An animated wind-resistant home moves through zoning, flood review, MGO permitting and final inspection. ZONING + WIND + FLOOD MGO CONNECT ISSUED PERMIT FINAL INSPECTION CLOSED
⚠️
County permit or City of Pensacola permit? Escambia County Building Services handles unincorporated county properties and provides building services for the Town of Century. A property inside Pensacola city limits uses City of Pensacola Inspection Services instead.
Choose one action

What Do You Need to Do?

Escambia County Permit Next-Step Finder

Select the situation that best matches the work.

Official contact panel

Escambia County Building Services Phone, Email and Offices

Main office phone 850-595-3550 Permits, plans, contractors and inspections
Permit applications permits@myescambia.com Ask before emailing large plan-review packages
Inspection email buildinginspections@myescambia.com Inspection and Building Services questions
Contractor licensing contractorlicense@myescambia.com Registration and renewal documents
Inspection IVR 850-273-4864 Same-day cutoff: 4:30 AM
Main office 3363 West Park Place Pensacola, FL 32505
North office 3470 Highway 29 Cantonment, FL 32533 · 850-587-5770
Before an office visit: Call to confirm the current public-counter hours and whether your permit, plan-review or contractor service is available at the selected location.
Correct authority first

County, Pensacola, Century or Pensacola Beach?

Property location
Building authority
Approval needed before filing
Unincorporated Escambia County
Escambia County Building Services
Zoning, addressing, engineering, environmental, septic/sewer or flood review as applicable
City of Pensacola
City of Pensacola Inspection Services
Use the city’s MGO jurisdiction and city departments—not the county permit application
Town of Century
County Building Services after Town approval
Obtain and submit the required Town of Century approval
Pensacola Beach
County Building Services after SRIA approval
Obtain Santa Rosa Island Authority approval and any beach-specific documentation
Quick verification script: “Please confirm the permit jurisdiction for [address and parcel/reference number] and tell me whether SRIA, Town of Century or City of Pensacola approval is required.”
Permit decision table

Which Project Requires Which Permit?

Project
County requirement
Important extra check
New home, addition or major residential alteration
Residential building permit
Plot plan, sealed plans, wind design, energy, septic/sewer, water, termite and flood documents
Commercial construction or occupancy change
Commercial building and trade permits
Development review, fire/life safety, accessibility, utilities and site approval
Air-conditioning installation or replacement
Mechanical permit
NOC at the applicable HVAC contract threshold, electrical work and equipment anchorage
Electrical circuit, equipment or panel work
Electrical permit
Service change, load calculations, utility coordination and final inspection
Water heater, fixture relocation or water-service replacement
Plumbing permit
Licensed contractor, rough inspection and sewer/septic conditions
Roof replacement over two roofing squares
Roofing permit
Florida Product Approval, roofing affidavit, deck repair and manufacturer specifications
Roof repair under two squares
Generally no building permit
Confirm that work is truly a limited repair and does not include structural damage
Windows, exterior doors, sliding doors or garage doors
Building permit
Florida Product Approval, design pressure and installation details
In-ground swimming pool
Pool and trade permits
Barrier, electrical bonding, setbacks, easements and floodplain placement
Shed with slab or posts installed in the ground
Building permit
Location, anchorage, setbacks, easements and flood conditions
Portable skid-mounted shed under 120 square feet
Generally no building permit
Zoning, placement, floodplain and neighborhood restrictions still apply
Fence
No Building Services permit
Land-use approval and zoning compliance are still required
New or extended driveway
No building permit
County right-of-way permit, sight distance, zoning and environmental rules may apply
Painting, wallpaper, carpet or cabinet replacement
Generally no permit
A permit is still needed when structural, electrical, plumbing or mechanical work is included
MGO application workflow

Apply Online Without Creating the Wrong Record

Confirm jurisdiction
Check zoning and flood
Create MGO account
Upload complete documents
Resolve reviews and fees
Issue, inspect and close

Confirm the parcel and jurisdiction

Use the property address and parcel or reference number. Confirm County, Pensacola, Century or Pensacola Beach routing before starting.

Open MGO Connect

Create an account or sign in to the Customer Portal.

Select Florida and Escambia County

Do not accidentally choose the City of Pensacola when County Building Services controls the property.

Choose the exact permit type

Select the record matching the complete project. Separate permits may be required for electrical, plumbing, mechanical, gas, roofing, pools, signs or wells.

Unsure? Call 850-595-3550 before submitting or paying.

Upload a coordinated package

The application, project value, plot plan, construction plans, contractor information and trade scope must describe the same work.

File names: Building-Application.pdf, Plot-Plan.pdf, Construction-Plans.pdf, Product-Approvals.pdf.

Monitor every review comment

Read zoning, addressing, engineering, environmental, fire, flood and plan-review comments. Answer each item and identify the revised drawing sheet.

Pay and confirm issuance

Do not start because an application number exists. Verify that the permit is issued and that the approved documents can be printed.

📄
Manual plan-review warning The County Plan Review page says some plan-review forms must be printed and returned by hand, mail or fax and that email forms are not accepted. Use MGO for online filing, and call before sending a large plan package by email.
Application checklist

Prepare These Documents Before Filing

Property and approvals

  • Exact property address
  • Parcel or property-reference number
  • Zoning and future land use
  • Town of Century or SRIA approval if applicable
  • Septic approval or sewer-tap receipt
  • Water-tap or water-management permit

Plans and project

  • Complete permit application
  • Detailed scope of work
  • Total construction cost
  • Plot or site plan
  • Building plans and construction details
  • Wind-load design method

Technical and closeout

  • Florida Product Approvals
  • Energy-efficiency forms
  • Termite-treatment letter
  • Flood certificates when applicable
  • Recorded Notice of Commencement
  • Blower-door certification for residential CO
New-construction requirement: The county application calls for two plot or site-plan copies and two complete building-plan sets showing construction details, wind design and electrical, mechanical and plumbing connections.
Project-specific preparation

What to Prepare for Common Projects

Project
Useful documents
Question to answer first
Roof replacement
Roof application, roofing affidavit, contract value, roof type and Florida Product Approval
Will damaged decking or structural framing also be replaced?
Windows or exterior doors
Opening schedule, sizes, design pressures, product approvals and installation details
Are opening dimensions or structural headers changing?
Residential addition
Plot plan, sealed construction plans, energy forms, utilities, flood data and trade plans
Does the addition meet setbacks, septic capacity and flood elevation?
Pool or enclosure
Site plan, pool or aluminum plans, barrier, equipment, electrical bonding and drainage information
Can every component fit outside easements and required setbacks?
Shed or accessory structure
Site plan, dimensions, anchorage, slab or post details and product information
Is it portable and under 120 square feet, or fixed to the ground?
Commercial alteration
Use description, occupancy, accessibility, life safety, fire and complete MEP plans
Is the proposed use allowed and is a change of occupancy involved?
Zoning before plans

Check Land Use, Setbacks and Board Relief Early

Prepare two identifiers

Planning staff need the property address and the 16-digit property reference number to identify zoning and future land use accurately.

Check more than use

  • Front, side and rear setbacks
  • Height and lot coverage
  • Parking and access
  • Accessory structures
  • Sight-distance areas
  • Flood and environmental overlays

Ask before filing for relief

Call 850-595-3475 to schedule an appointment with a planner before submitting a Board of Adjustment application.

Board application
Official listed fee
Use
Variance
$515
Dimensional relief when a qualifying hardship prevents compliance
Conditional use
$1,530
A use allowed only after Board approval and conditions
Administrative appeal
$820
Appeal of an administrative determination
Development-order extension
$260
Request to extend an eligible development order

Open Planning and Zoning Open County GIS Maps

Engineering and development

Building Approval May Depend on Site and Infrastructure Review

Driveways and right-of-way

A building permit is generally not required for a driveway, but a right-of-way utilization permit, zoning and sight-distance approval may be required.

Land disturbance and stormwater

Commercial sites, subdivisions, major grading and drainage work may require a land-disturbance permit, stormwater-management permit and Development Review Committee approval.

Utilities and septic

New construction may require a septic permit, sewer-tap receipt, water-tap receipt, utility approval or executed water/wastewater waiver.

Open Development Review Forms

Floodplain decision center

Prepare the Correct Elevation Documents at Each Stage

🌊
Current flood-map note Escambia County’s updated flood information became effective August 19, 2025. Use the county property lookup and confirm permit-specific requirements with Floodplain Management.
Flood condition
Required document or design
Due point
New construction in a Special Flood Hazard Area
Original pre-construction Elevation Certificate
With permit application
Building under construction in a Special Flood Hazard Area
Under-construction Elevation Certificate
Before framing inspection
Completed building in a Special Flood Hazard Area
Finished-construction Elevation Certificate
Before final inspection
V Zone construction
Original signed and sealed V-Zone certification
As required during permit review
Construction in a designated floodway
Signed and sealed no-rise certification with supporting engineering
Before permit issuance
Equipment below required elevation
Plans showing elevated electrical, mechanical, plumbing, gas and other equipment
During plan review
Flood-resistant construction matters below the required elevation. Plans must identify flood zones, design flood elevations, lowest-floor elevations, enclosure venting, elevated equipment and flood-damage-resistant materials.

Open Floodplain Management Look Up a Property

Notice of Commencement

Record, Submit and Post the NOC Before Inspection

Use the conservative county trigger

  • Plan to record an NOC when construction cost is $5,000 or more.
  • For repair or replacement of an existing HVAC system, use the $15,000 threshold.
  • The owner must sign the Notice of Commencement.
  • Building Services will not approve inspections until the certified recorded copy is provided.

Record with the Clerk

Address: 221 South Palafox Place, 1st Floor, Pensacola, FL 32502

Phone: 850-595-3930

Hours listed in county guidance:
Monday–Thursday, 8:00 AM–5:00 PM
Friday, 8:00 AM–4:00 PM

Complete and notarize the NOC

Match the owner, contractor, property description, lender and permit information.

Record it with the Escambia County Clerk

Obtain a certified recorded copy showing the official recording information.

Send the certified copy to Building Services

Upload it through MGO, email buildinginspections@myescambia.com, fax it or deliver/mail it to 3363 West Park Place.

Display it at the job site

Post the certified recorded copy where the inspector can verify it.

Watch the validity period

The county guidance states that the recorded NOC generally expires one year after recording and becomes void when the contracted improvement does not begin within 90 days.

Open NOC Form and Guidelines

Inspection scheduling

Use the Correct Same-Day Cutoff

MGO online request

Same-day cutoff: 6:00 AM

Sign in, open the permit, select the inspection and verify that it appears in the record.

IVR phone request

850-273-4864

Same-day cutoff: 4:30 AM

Follow the automated prompts and retain the confirmation.

Inspection stage
What should be ready
Common delay
Footing, slab or foundation
Location, forms, reinforcement, depth and approved plans visible
Concrete placed before inspection or setbacks not verified
Underground trades
Electrical, plumbing or gas work exposed and test-ready
Work covered with soil or concrete
Rough framing and trades
Framing, wind connectors, wiring, plumbing and HVAC coordinated
Unapproved field changes or incomplete trade roughs
Flood elevation
Under-construction Elevation Certificate submitted where required
Framing requested before elevation approval
Insulation or enclosure
Prerequisite rough inspections passed
Walls or ceilings closed too early
Final
Project complete, certified NOC posted, plans on site and trade permits finaled
Missing flood certificate, open trade permit, failed blower-door test or unfinished site work
Do not cover work before approval. Footings, wiring, plumbing, gas, mechanical work, wind connectors, insulation and flood-resistant details may need to be reopened when they cannot be inspected.

Open Official Inspection Instructions

Permit expiration control

Keep the Permit Active

Six-month inactivity rule

The county FAQ states that a permit remains valid for six months from issuance or from the last approved inspection.

Request an extension before expiration

A dormant project can expire after six months. A permit extension requires a written request and Building Official approval.

Practical protection: Do not wait until month six. Check the permit status and request the next valid inspection or written extension early.
Fee accuracy

Request an Official Estimate Instead of Guessing

Building estimate form

The county provides a Building Permit Fee Estimate form requesting project type, structure type, dimensions, square footage, roofing squares, scope and construction cost.

The form clearly states that it is not a permit application.

Each trade is separate

Separate estimate forms are provided for building, electrical, gas, mechanical and plumbing work.

Planning, fire, septic, sewer, utility, stormwater, zoning and outside-agency charges may not be included.

Fee question
What to prepare
Best action
How is the project described?
New, addition, alteration, repair, replacement, demolition or occupancy change
Use the exact scope—not a broad label such as “renovation.”
What value should be entered?
Complete labor and material construction cost
Include owner-supplied materials and connected trade work.
Which square footage matters?
Footprint and all square footage under roof
Do not enter only conditioned living area.
Are all agency fees included?
Zoning, engineering, fire, septic, utility and environmental approvals
Ask each reviewing agency about its separate charge.
Is the estimate final?
Approved scope and completed application
Use the final MGO invoice as the amount due.
📠
Fax-number conflict on county materials The online Plan Review page and the older PDF estimate form display different fax numbers. Call 850-595-3550 before faxing a fee-estimate form.

Open Permit Fee Estimate Forms

Owner-builder decision

Understand the Owner-Builder Responsibilities

A qualifying residential owner may apply when

  • The property is a one- or two-family residence.
  • The home is for the owner’s own use.
  • The property is not being offered for sale or lease.
  • The owner personally performs or directly supervises the work.
  • A homeowner affidavit and disclosure are submitted.
  • Licensed contractors perform regulated trade work when required.

The owner becomes responsible for

  • Permit accuracy
  • Code compliance
  • Licensed subcontractors
  • Workers’ compensation obligations
  • Job-site safety
  • Inspection scheduling and correction
Do not pull an owner-builder permit for a contractor. The person controlling and supervising the work must match the legal permit arrangement.

Open Owner-Builder Disclosure

Contractor protection

Verify the Contractor Before Paying

Search the license

Verify state-certified contractors through Florida DBPR and local contractors through the county search.

Match all names

The license holder, business, contract, insurance and permit applicant should match.

Report a problem

Call 850-595-3550 and select option 6 to report contractor-related concerns.

Search Local Contractors Verify a Florida License

Storm-repair route

Repair Storm Damage Without Skipping Flood or Permit Review

Document conditions first

Photograph roof, wall, equipment, flood-water and structural damage before removing materials.

Separate emergency protection

Temporary tarping or securing may differ from permanent repair. Ask which reconstruction work needs a permit.

Request every inspection

The contractor or owner-builder must request the required inspections before proceeding to the next construction stage.

Open Storm Permitting Guidance

Status decoder

What the MGO Permit Status Means

Draft Required fields or documents remain incomplete. The county may not have received the application.
Submitted / intake Staff are checking the package for required forms and review routing.
Zoning or agency review Planning, addressing, engineering, environmental, fire, utility or flood review remains open.
Plan review Building plans are being checked for compliance with adopted codes.
Corrections required Download all comments and submit one coordinated revised package.
Fees due Review the itemized invoice and pay through the official MGO record.
Issued Print the permit and approved documents before beginning work.
Final / closed Save proof and verify every building, trade, fire, site and flood record is complete.
Permit records and due diligence

Find an Old Permit and Confirm Final Closure

Search MGO Connect

Select Florida and Escambia County, then search by permit number or exact address.

Use consistent property information

Try the parcel number, property reference number, owner name and alternate address formatting.

Request the complete file

Ask for the application, approved plans, revisions, inspection history, NOC and Certificate of Occupancy or Completion.

Check separate trade records

Electrical, plumbing, mechanical, roofing, pool, fire and site permits can close separately.

Submit a public-record request when necessary

Use the county public-record route when the online permit record is incomplete or a certified file is needed.

Buying or selling? Compare the current property with the approved plans and records for additions, converted garages, finished rooms, pools, sheds, roof work, HVAC systems and windows or doors.

Open Public Records

Current code

Confirm the Code Edition Shown on the Permit

Current statewide edition

The Florida Building Commission identifies the 8th Edition (2023) Florida Building Code as the current statewide edition during this review, together with applicable supplements.

Why confirmation matters

Code editions, supplements, electrical standards and product approvals can change. Follow the code and documents identified on the issued permit.

Open Florida Building Code

Troubleshooting

Fix Common Escambia County Permit Problems

Problem
Likely reason
Best next action
MGO cannot find the address
Wrong jurisdiction or address format
Confirm city limits, parcel number and County versus Pensacola authority.
Application remains incomplete
Missing notarized signature, plot plan, contractor or agency approval
Compare the file against the county application instructions.
Plan review has not started
Zoning, addressing, septic, flood, engineering or intake issue remains
Ask which reviewing agency currently holds the record.
Plans keep returning
Comments were answered separately or plans conflict
Submit a numbered response and one complete coordinated revision set.
Inspection did not schedule
Same-day cutoff missed or incorrect permit/inspection selected
Use the next available date or call 850-595-3550.
Inspection cannot be approved
NOC, plans, permit card, flood document or visible work is missing
Correct every prerequisite before requesting reinspection.
Fence or driveway application is confusing
Building permit may not be required, but land-use or right-of-way approval is
Contact Planning and Zoning or Public Works before installation.
Permit expired
No approved inspection for six months
Stop work and ask the Building Official about extension, renewal or a new permit.
Final inspection passed but no certificate
Trade, flood, septic, utility, fire or site closeout remains open
Request a written list of every remaining closure condition.
Ready-to-use scripts

What to Say When You Contact the County

Jurisdiction question:
“Please confirm whether Escambia County, the City of Pensacola, the Town of Century or SRIA handles the building permit for [address and property reference number].”
Permit requirement:
“I am planning [exact work] at [address]. Which building, zoning, flood, engineering and trade permits are required, and which documents should be uploaded in MGO?”
Inspection question:
“Permit [number] is issued, but I cannot request [inspection type]. Can you confirm whether the NOC, fee, flood certificate, preceding inspection or another hold is missing?”
Open-permit search:
“Please provide the permit, approved plans, inspection history and final certificate for work completed around [year] at [address].”
Final project control

Do Not Consider the Project Finished Until These Are Complete

  • Correct jurisdiction confirmed
  • Zoning and future land use verified
  • Century or SRIA approval completed if applicable
  • Septic, sewer and water documents completed
  • Flood requirements resolved
  • Correct MGO applications submitted
  • Contractors and trades verified
  • Plans and product approvals accepted
  • Fees paid and permits issued
  • Certified NOC submitted and posted
  • Approved plans available on site
  • Rough inspections passed before concealment
  • Building final passed
  • Electrical final passed
  • Plumbing final passed
  • Mechanical final passed
  • Fire and site finals completed
  • Final Elevation Certificate accepted if required
  • Blower-door and termite documents accepted
  • Certificate of Occupancy or Completion issued
Main office location

Escambia County Building Services Map

Main office: 3363 West Park Place, Pensacola, FL 32505 · 850-595-3550.
North office: 3470 Highway 29, Cantonment, FL 32533 · 850-587-5770.
Official resource library

Open the Correct Escambia County Page or Portal

Frequently asked questions

Escambia County Building Department FAQs

Which areas does Escambia County Building Services cover?

County Building Services handles permits, plan review and inspections in unincorporated Escambia County and provides building services for the Town of Century. Properties inside the City of Pensacola use City of Pensacola Inspection Services.

Where do I apply for an Escambia County building permit?

Use the MGO Connect Customer Portal. Create an account, select Florida and Escambia County, choose the correct permit type, upload the documents and monitor the record for reviews, fees and inspections.

What is the Escambia County Building Department phone number?

Call 850-595-3550 for the main Building Services office. The North Office in Cantonment is listed at 850-587-5770.

What is the cutoff for a same-day building inspection?

Online same-day inspections can be scheduled through MGO until 6:00 AM. Same-day IVR requests can be made by calling 850-273-4864 by 4:30 AM.

Do I need a building permit for a fence?

The county FAQ states that a Building Services permit is not required for a fence, but land-use approval and compliance with zoning regulations are required. Contact Planning and Zoning at 850-595-3475 before installation.

Do I need a permit for a shed?

A shed with a poured slab or posts installed into the ground requires a building permit regardless of size. A portable skid-mounted shed under 120 square feet is generally listed as not requiring a building permit, but zoning and flood rules still apply.

When is a Notice of Commencement required?

Use the conservative county trigger of $5,000 or more for construction work and $15,000 or more for repair or replacement of an existing heating or air-conditioning system. The certified recorded copy must be provided to Building Services and posted before inspection.

What flood documents are required for new construction?

New construction in a Special Flood Hazard Area may require pre-construction, under-construction and finished-construction Elevation Certificates. V Zone construction requires a signed and sealed V-Zone certification, and floodway construction requires a signed and sealed no-rise certification.

How long is an Escambia County building permit valid?

The county FAQ states that the permit is valid for six months from issuance or the last approved inspection. A project dormant for six months can expire unless the Building Official approves a written extension.

How can I estimate Escambia County permit fees?

Use the official building and trade fee-estimate forms. Enter the full construction cost, project type, dimensions and square footage. The estimate is not a permit application, does not include every agency charge and is finalized only after application review.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent informational guide and is not Escambia County. Applications, zoning decisions, flood determinations, fees, inspections and final certificates must be confirmed with the responsible government agency.

This page was rebuilt using Escambia County Building Services, MGO Connect, permitting, plan-review, inspection, floodplain, Planning and Zoning, contractor-licensing, development-review, NOC and Florida Building Commission resources.

Last reviewed: July 21, 2026.

Forms, portal functions, fees, staff, flood maps, code editions and inspection procedures can change. Recheck the official source before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment