Planning to build a new home, add an addition, finish a garage, install a pool, replace a roof, or do any other construction or renovation project in the City of Dania Beach, Florida? You will need a building permit from the City of Dania Beach Building Division (part of the Community Development Department).
Most people get stuck on the same questions: “How do I actually apply?”, “What will it cost in 2026?”, “How long does approval really take?”, “What documents do they want?”, and “What are the hidden tricks that make this process go faster?” This long, practical guide answers all of those questions with real-world steps, insider tips, and the exact workflow that experienced contractors and smart homeowners use every day in Dania Beach.
City of Dania Beach Building Department Contact Details 2026
Service | Details |
|---|---|
Building Division Address | 100 W Dania Beach Boulevard, Dania Beach, FL 33004 |
Main Phone | (954) 924-6800 |
Building Permits / Permitting | (954) 924-6805 |
Inspections | (954) 924-6800 x3709 or x3797 |
Permitting Email | permitting@daniabeachfl.gov |
Inspections Email | inspections@daniabeachfl.gov |
Hours (Public Access) | Monday–Thursday 8:30 AM – 3:30 PM (Friday by appointment) |
How to Apply for a Building Permit in Dania Beach, Florida – Complete Micro Step-by-Step Guide (2026)
- Confirm your project is inside the City of Dania Beach limits and review any coastal, flood, or Broward County requirements early.
- Access the ePermits online portal for new applications (recommended for faster processing).
- Prepare detailed construction drawings, site plans, specifications, Notice of Commencement (if required), and all supporting documents.
- Determine if your project qualifies for faster review (many roofing, windows, siding, HVAC, and water heater replacements do).
- Submit the complete application online through ePermits or in person/drop box with all attachments.
- Pay the required application and plan review fees online or in person (credit card service fees apply).
- Monitor your application status in the portal and respond quickly to any review comments.
- Once approved, pay the remaining permit fees and print/post the permit visibly at the job site before starting work.
- Schedule inspections through the portal, email, or by calling the Building Division.
City of Dania Beach Building Permit Fees 2026 – What You’ll Actually Pay
Permit fees are valuation-based (percentage of construction cost) plus fixed inspection fees per discipline (Structural, Mechanical, Electrical, Plumbing — typically $90 each). Plan review fees are tiered by project value. Additional charges include technology surcharges, re-inspection fees, and tree removal fees. Always download the latest fee schedule from the Building Division page before submitting. Under-reporting construction value can lead to penalties or permit revocation.
Insider Tips & Tricks That Save Time and Money in Dania Beach
- Use the ePermits portal for submissions, payments, tracking, and scheduling — it is the fastest and most efficient method.
- Submit complete and clearly labeled drawings the first time — incomplete submissions cause the biggest delays.
- Call early in the morning (954-924-6805) for questions — staff is most responsive then.
- For smaller trade permits (roofing, windows, HVAC, water heater), confirm eligibility for quick review first.
- Record your Notice of Commencement (NOC) before submitting the building permit application.
- Pay with cash or check in person if possible to avoid credit card service fees.
- Schedule inspections well in advance and be ready on site — failed inspections trigger re-inspection fees.
- Coordinate with Broward County Environmental Protection Division early if your project requires it.
Frequently Asked Questions
How do I search for existing building permits in Dania Beach?
Use the ePermits portal public search by service address or contact the Building Division directly.
How long does it take to get a building permit in Dania Beach?
Simple fast-track permits can be issued quickly. Standard projects with full plan review typically take 7–15 business days if submitted completely.
Can I pull my own permit as an owner-builder in Dania Beach?
Yes. Owner-builders can apply but must complete the Owner-Builder Affidavit and take full responsibility for code compliance and job safety. You generally cannot sell the property for one year after final inspection.
What are the re-inspection fees in Dania Beach?
Re-inspection fees apply for failed or missed inspections. Exact amounts are listed in the current fee schedule.
Do I need approvals from other departments or Broward County?
Yes. Many projects require concurrent review from Broward County or other city divisions. The ePermits system helps streamline this.
Last reviewed: April 15, 2026

Khushboo Bobade is a public records researcher and editorial writer specializing in government service documentation and construction permit systems.
Her research focuses on explaining building permits, inspection procedures, zoning regulations, and public permit records maintained by local government building departments across the United States.
Professional profile: View LinkedIn Profile