Collier County Building Department: Permit Search & Inspections

Collier County permit action guide

Apply, Track, Inspect and Close a Collier County Building Permit Without Using the Wrong System

Collier County uses the GMCD CityView Public Portal—not Accela. The correct route depends on the project, property jurisdiction, flood zone, vegetation, utilities, contractor status and permit age.

This guide shows the current portal, inspection methods, three permit-history systems, open-permit recovery process, impact-fee timing and coastal-development checks in a practical order.

GMCD permit application, upload, payment and status tools
Floodplain, vegetation, zoning and utility checkpoints
Inspections, historical records and expired-permit recovery
Collier County coastal home moving through flood review, online permitting and inspection An elevated coastal home, flood elevation line, mangrove, permit portal, permit file and final inspection check illustrate the Collier County process. BFE + REQUIRED FREEBOARD COASTAL PROJECT PLAN GMCD CITYVIEW FLOOD + PLAN REVIEWED PERMIT FINAL INSPECTION CLOSED VEGETATION REVIEW
📌
Important corrections to the existing page Collier County currently uses the GMCD CityView Public Portal, not Accela. Building Permit Fees are governed by Resolution 2025-231, and updated residential/commercial impact-fee rates took effect May 1, 2026.
Start here

Choose the Collier County Action You Need

Collier County Permit Route Finder

Select the project situation to see the best official starting point.

Official contact panel

Collier County Building Permit Phone Numbers and Office

Permit help 239-252-2400 Applications, portal and general building questions
Inspections 239-252-2406 Inspection support and scheduling questions
Voice permit system 239-252-3726 Automated inspection scheduling
Permit outtake 239-252-2428 Final-type and permit-outtake help
Open permit resolution 239-252-2493 Expired permits, extensions and contractor changes
Contractor licensing 239-252-2431 Registration, insurance and licensing questions
Growth Management office 2800 N. Horseshoe Drive Naples, FL 34104
Office hours 8:00 AM–5:00 PM Monday through Friday
Immokalee office 239-252-5733 310 Alachua Street, Immokalee, FL 34142
Impact fee help 239-252-6237 Calculator and assessment questions
Make the call useful: Have the permit number, property address, folio number, project type, contractor name and exact portal condition or reviewer comment ready.
Do not file with the wrong government

Collier County or a City Building Department?

Unincorporated Collier County

Use the GMCD Public Portal for properties outside incorporated city limits.

Open the county portal

City of Naples

Properties inside Naples use the City of Naples Building Department and its separate public portal.

Open City of Naples Building

City of Marco Island

Properties inside Marco Island use Marco Island Building Services and its separate permitting system.

Open Marco Island Building Services

Everglades City: Collier County and Everglades City operate under an interlocal permitting arrangement. Confirm the correct filing location before submitting. A county Everglades City permitting office is listed at 102 Copeland Avenue.
Permit decision matrix

Match the Project to the Correct Collier County Permit Path

Project
Portal route
Key Collier County documents or reviews
New one- or two-family home, addition or guest house
PRFH
Certified site plan, construction plans, energy documents, flood/elevation items, vegetation affidavit, septic or utility information and trade permits.
Residential alteration or remodel
PRFH alteration
Existing/proposed floor plans, structural details, doors/windows, wind pressures, egress and smoke/CO detector locations.
Roof replacement or repair
PRRF
Florida Product Approval or Miami-Dade NOA index, roof scope, solar coordination and required reroof/hurricane affidavits.
Windows, doors or shutters
PRSD
Product approvals, opening information, wind-design data and attachment details.
Pool, spa or screen enclosure
Building/remodel group
Site plan, pool plans, barriers, bonding, electrical, plumbing, spot survey and vegetation/flood review when applicable.
Accessory structure, carport or shed
PRAC or listed accessory permit
Site placement, zoning setbacks, flood requirements, construction plans and vegetation clearing.
Commercial alteration or change of tenant/use
PRCS or PRCU
Zoning Certificate, floor plan, fire approval, accessibility, occupancy/use information and Certificate of Use inspection.
Mechanical, electrical, plumbing or gas only
Trade permit group
Licensed contractor, equipment or fixture details, supporting plans and main-permit association when applicable.
Right-of-way, sign or well work
ROW, Sign & Well group
Site/location plans, contractor details and the applicable transportation, zoning or health approval.
Vegetation removal or fill
Environmental permit group
Folio, acreage, native vegetation, wetlands, listed species and federal/state/county approvals.

The permit prefix and required documents depend on the exact scope. Use the county Application Requirements index rather than copying a checklist from a different project.

Application workflow

Apply Through the GMCD Portal in Eight Clear Steps

Confirm county jurisdiction and property identity

Verify that the property is in unincorporated Collier County and save the correct address and folio number.

Do next: Do not rely only on a Naples mailing address; a Naples postal address may still be outside the City of Naples.

Check zoning, flood, vegetation and utilities

Identify setbacks, use, flood zone, Base Flood Elevation, native vegetation, wetlands, septic/sewer and right-of-way impacts.

Do next: Resolve conditions that could force redesign before completing signed plans.

Open the correct portal group

CityView separates Building/Remodel/Accessory, Trade/Fire, Right-of-Way/Sign/Well, Planning, Environmental and other permit groups.

Use the official application-requirement sheet

Select the county checklist for the exact permit type. Do not upload a generic residential package for a roof, pool, commercial alteration or window permit.

Upload readable and correctly classified documents

Upload plans, surveys, affidavits, calculations and approvals to the correct document classification. Use “miscellaneous” only for material without a listed classification.

Good names: Site-Plan.pdf, Architectural-Plans.pdf, Structural-Plans.pdf, Energy-Forms.pdf and Product-Approval-Index.pdf.

Monitor conditions and reviewer comments

You must be signed into the registered portal account to view building and planning review comments.

Do next: Answer each discipline separately and upload revisions to the existing record—not a duplicate application.

Pay fees and resolve issuance conditions

Review Building Permit, fire, impact, utility and other fees. Upload the recorded Notice of Commencement when the permit condition requires it.

Remember: Payment alone does not clear flood, survey, contractor, NOC or outside-agency holds.

Complete inspections and Certificate closeout

Schedule every required inspection, resolve failed items and upload final surveys, elevation certificates, blower-door tests, compaction reports or compliance letters required by portal conditions.

Finish with: COED, Finaled or another county-defined closed status.
Upload preparation

Documents to Prepare Before Starting the Application

Property and applicant

  • Exact job address
  • Folio or parcel number
  • Owner’s legal name
  • Applicant portal account
  • Detailed scope of work
  • Declared construction value

Plans and technical files

  • Certified site plan
  • Architectural plans
  • Structural plans
  • Energy documents
  • Product approvals
  • Wind-design information

Local conditions

  • Flood-zone documents
  • Elevation certificate
  • Vegetation affidavit
  • Wetland approvals
  • Septic/sewer information
  • Contractor or owner-builder documents
Coastal and environmental review

Complete Flood, Vegetation and Wetland Checks Before Clearing

Special Flood Hazard Area

All development in VE, AE, AH and A flood zones is reviewed for floodplain compliance.

For new residential structures, the county states that the lowest living floor must be above Base Flood Elevation plus one foot.

Open flood-building guidance

Road-elevation requirement

The county also lists minimum finished-floor relationships to the road crown: 18 inches above a paved road or 24 inches above an unpaved road for a new home.

Ask Floodplain Management how both standards apply to the site.

Elevation certificates

Under-construction and finished-construction elevation certificates may appear as portal conditions.

Use digitally signed and certified documents from a Florida licensed surveyor or mapper.

Native vegetation

Native vegetation cannot be removed before the applicable building or vegetation permit is issued.

A new single-family permit may cover clearing up to one acre, but overlays, wetlands and sensitive areas can reduce that allowance.

Golden Gate Estates and wetlands

The county recommends an informal wetland determination for properties in Golden Gate Estates or outside approved subdivisions.

Wetland clearing may also need Florida Department of Environmental Protection approval.

Separate vegetation permit

A Vegetation Removal Permit may be required when clearing is not covered by the building permit or when total clearing exceeds the permitted scope.

Open land-use applications

The vegetation affidavit is not permission to clear. Do not remove native trees, shrubs or ground cover simply because an application has been submitted.
Notice of Commencement

Resolve the NOC Condition Before the First Inspection

When it commonly applies

The county’s current building-permit guidance states that a Notice of Commencement is required for construction improvements totaling more than $5,000 between an owner and contractor.

Different statutory rules or exceptions may apply to certain work, including some HVAC projects. Follow the permit condition and current form instructions.

How to clear the condition

  1. Complete and record the NOC with the Collier Clerk.
  2. Use the correct property and permit information.
  3. Upload the recorded document to the portal condition.
  4. Confirm that the NOC hold is resolved before requesting inspection.
Practical rule: Do not wait until inspection day. An unresolved NOC condition can prevent the inspection from being accepted or completed.
Owner-builder and contractor path

Know Who Must Apply and Supervise the Work

Licensed contractor

  • Florida license is active
  • County registration is current
  • Insurance is current
  • Qualifier matches the company
  • Subcontractors are associated
  • Portal account is authorized

Check contractor status, fees and insurance in CityView

Owner-builder

The property owner may act as contractor only under the Florida owner-builder exemption and accepts direct responsibility for supervision and compliance.

  • Property deeded to applicant
  • Application signed in person
  • County staff notarization
  • Direct onsite supervision
  • Licensed trades when required
  • Personal inspection responsibility
Do not pull an owner-builder permit for a contractor. The owner-builder becomes responsible for workers, inspections, code compliance and completion of the permit.
Inspection scheduling

Schedule a Collier County Inspection Correctly

Permit issued
Sign into CityView
Select Request an Inspection
Enter permit without final 01
Open Inspections
Select date and complete
Read result and close

Portal method

  1. Sign into the GMCD Public Portal.
  2. Click “Request an Inspection.”
  3. Enter the permit number without the final 01.
  4. Open the Inspections section.
  5. Click the inspection’s “Schedule?” link.
  6. Select a date and complete the transaction.

Voice permit system

Call 239-252-3726 and follow the prompts.

  • Permit number
  • Inspection code
  • Requested date
  • Contact phone
  • Access information
  • Confirmation number
Before scheduling: Confirm the permit is issued, contractor licenses are current, required conditions are resolved and the work will remain visible.
Special inspection options

Time-Specific, Live Video and Recorded Video Inspections

Time-specific inspection

Available only for listed concrete-pour inspections such as footings, slabs, tie beams, columns, pool steel and certain underground work.

  • First schedule the inspection normally.
  • Email by 1:00 PM on the prior business day.
  • Available request range: 8:30 AM–2:30 PM.
  • An additional fee applies.

timespecific@collier.gov

Live video inspection

Eligible inspection types may be completed through an Apple FaceTime meeting with a licensed county inspector.

Review the county scheduling reference before assuming the inspection qualifies.

LiveVideo@Collier.gov

Recorded video inspection

Do not schedule this inspection normally in the portal. Confirm the permit is ready, record the required video and email the complete request to county scheduling staff.

RecordedVideo@Collier.gov

Closeout conditions

Upload the Document That Matches the Portal Hold

Portal condition
What resolves it
Closeout warning
Blower Door
Upload the completed blower-door test result.
Use the permit’s condition upload, not a general email.
Compaction Test
Signed and sealed compaction report containing the permit number.
Required before Certificate of Occupancy when listed.
Spot Survey
Survey from a certified land surveyor.
A signed survey is required to clear a CO hold.
Elevation Certificate
Digitally signed under-construction or finished-construction certificate.
Use the correct construction stage and current certificate form.
V-Zone Design
Certificate from a Florida licensed architect or engineer.
Flood design is still reviewed by the county.
Private Provider
Required inspection reports and final Certificate of Compliance.
Do not upload the final certificate until every required inspection is recorded.
Threshold Inspection
Signed and sealed compliance letter and required reports.
Submit before CO when the condition applies.
Permit-history system

Use the Correct Search for the Permit’s Age

Permit period
Search system
What to know
2011 to present
GMCD CityView
Search by property or use Status and Fees with the permit number. This is the current source for status verification.
1989 to 2011
External CD-Plus
Reference only. Records use a CDP prefix, and large portions of status data may be outdated.
Before 1989
Property Appraiser
Permit numbers appear on the property Detail tab. Request permit documents through public records.
Do not trust CD-Plus as the final status. Verify whether the permit was closed using the current GMCD portal or Building Permit Resolution Services.
Status decoder

Which Collier County Permit Statuses Are Closed?

COED Certificate of Occupancy issued. The county identifies this as closed.
Finaled Required work and inspections were finalized. The county identifies this as closed.
Abandoned The application or permit was abandoned and is treated as closed.
Denied The application was denied and is treated as closed.
Cancelled The permit was formally cancelled and is treated as closed.
Any other status The county’s search guidance says another status should be treated as open and investigated.
Open and expired permits

Resolve an Old Collier County Permit Before a Sale

Gather the permit history

Save the permit number, property address, folio, status, original contractor and all visible inspection results.

Request the permit file

Contact the Records Room at 239-252-5730 or GMDPublicRecordRequest@collier.gov.

Older permit timing: The county says files for permits from 1959 through October 2011 may take five to seven business days to arrive.

Contact Building Permit Resolution Services

Use BPRS for expired permits, extensions, cancellation, contractor changes, subcontractor changes and property-sale permit issues.

Contact: 239-252-2493 or BPRS@collier.gov.

Upload the correct request form

Current extension, contractor and permit-status requests must be uploaded to the “Request Changes to Contractor or Permit Status” portal condition.

Complete remaining inspections and documents

The county may require a new job card, current contractor, updated plans, engineer letter, inspection or Certificate closeout.

Do not assume an old permit disappeared. An open permit can affect a property sale, refinancing, insurance or future permit application.
Fees and impact charges

How to Calculate the Real Collier County Permit Cost

Building permit invoice may include

  • Application or permit fee
  • Plan review fee
  • Trade permit fees
  • Fire review fees
  • Technology/admin charges
  • Reinspection or special inspection fees

Open adopted building fee schedules

Impact fees may include

  • Transportation
  • Emergency medical services
  • Libraries
  • Parks and recreation
  • Fire district charges
  • Water and sewer charges

Open impact-fee schedules and calculator

Current impact-fee timing: Updated residential and commercial rates took effect May 1, 2026. Fire impact fees are generally due at permit issuance. Most other building-permit impact fees are paid before Certificate of Occupancy.
Do not use a generic percentage calculator. Construction valuation, minimum fees, fire review, impact fees, utility charges and project-specific reviews can materially change the total.
Commercial occupancy

Opening a Business Requires More Than a Building Permit

No construction work

Use a Certificate of Use permit, PRCU, when occupying a commercial space without alterations.

  • Non-Residential Zoning Certificate
  • Site and parking plan
  • Existing/proposed floor plan
  • Fire compliance certificate
  • PRCU inspection
  • Business Tax Receipt

Construction or use change

Use a Commercial Alteration permit, PRCS, and identify the tenant, use or occupancy change in that application.

  • Building plans
  • Accessibility review
  • Mechanical/electrical/plumbing
  • Fire review
  • Zoning approval
  • Final CO or completion approval
Do not sign a lease based only on the landlord’s statement. Confirm that the proposed business use is allowed and identify construction, fire and Certificate of Use requirements first.
Current code framework

Building Codes Currently Listed by Collier County

Florida Building Code

Collier County lists the Florida Building Code, 8th Edition (2023), effective December 31, 2023.

Fire Prevention Code

The county’s code page lists the Florida Fire Prevention Code, 8th Edition (2021).

Electrical Code

The county’s code page lists the 2020 National Electrical Code.

Local rules still matter: State-code compliance does not replace the Collier County Land Development Code, Floodplain Management Ordinance, environmental rules, fire-district review or utility requirements.
Troubleshooting

Fix Common Collier County Permit Problems

Problem
Best next action
Existing article or contractor says to use Accela
Use the GMCD CityView Public Portal at cvportal.collier.gov.
Review comments are not visible
Sign into the registered portal account; comments are not fully visible while logged out.
Application is waiting on conditions
Open the Conditions section and identify whether the hold is NOC, survey, flood, contractor, vegetation, utility or another agency.
Inspection cannot be scheduled
Check issuance, permit expiration, contractor licenses and unresolved conditions before calling 239-252-2406.
Permit is missing from current search
Use CD-Plus for 1989–2011 or the Property Appraiser for pre-1989 records.
CD-Plus says a permit is open or closed
Treat CD-Plus as reference only and verify status through CityView or BPRS.
Contractor changed or stopped working
Upload the 2026 Request Changes to Contractor or Permit Status form to the matching portal condition.
Field work differs from plans
Stop affected work and submit the required revision before covering or requesting final inspection.
CO is blocked
Check impact fees, final surveys, elevation certificates, compaction, blower door, threshold or private-provider conditions.
Land was cleared before permit issuance
Stop clearing and contact Environmental Review; the vegetation affidavit is not a clearing authorization.
Ready-to-use scripts

What to Say When You Contact Collier County

Permit path:
“I am planning to [exact work] at [address/folio]. Can you confirm the permit prefix and any zoning, flood, vegetation, septic, utility, fire or right-of-way approvals required before submission?”
Portal condition:
“Permit [number] shows the condition [exact wording]. Which document and upload classification will clear that condition?”
Inspection issue:
“Permit [number] is issued, licenses are current and the work is ready. The portal will not allow inspection [code/type]. Which prerequisite or hold is blocking it?”
Open permit:
“Permit [number] at [address] is still open. Please identify the missing inspection, document, contractor action or Certificate requirement needed for closure.”
Final project control

Collier County Permit Completion Checklist

  • Correct county or city jurisdiction confirmed
  • Correct permit group and prefix selected
  • Zoning and setbacks checked
  • Flood requirements confirmed
  • Vegetation and wetlands reviewed
  • Septic or utility approvals completed
  • Contractor or owner-builder documents accepted
  • Application documents classified correctly
  • Review comments resolved
  • Notice of Commencement condition cleared
  • Permit formally issued
  • Approved plans kept onsite
  • Building and trade inspections passed
  • Final surveys/certificates uploaded
  • Impact fees paid
  • COED, Finaled or other closed status confirmed
Office location

Collier County Growth Management Building Permit Office Map

Address: Growth Management Community Development, 2800 North Horseshoe Drive, Naples, FL 34104. Main permit help: 239-252-2400.
Official resource library

Open the Correct Collier County Resource

Frequently asked questions

Collier County Building Permit FAQs

Which portal does Collier County use for building permits?

Collier County uses the GMCD CityView Public Portal. The existing page’s Accela references are outdated. The portal handles building, trade, planning, environmental, right-of-way and other county applications.

What is the Collier County Building Department phone number?

Call 239-252-2400 for general permit and portal help. The inspection support number is 239-252-2406, and the automated Voice Permit System is 239-252-3726.

Where is the Collier County building permit office?

The Growth Management Community Development office is at 2800 North Horseshoe Drive, Naples, Florida 34104. Office hours are generally Monday through Friday, 8:00 AM to 5:00 PM.

How do I schedule a Collier County building inspection?

Sign into CityView, select Request an Inspection, enter the permit number without the final 01, open the Inspections section, choose the available inspection and date, and complete the transaction. The Voice Permit System is also available at 239-252-3726.

How do I search an old Collier County permit?

Use CityView for 2011 to present, External CD-Plus for 1989 to 2011, and the Collier County Property Appraiser for pre-1989 permits. CD-Plus is for reference only; verify final status through the current portal or county staff.

Which permit statuses are considered closed?

Collier County identifies COED, Finaled, Abandoned, Denied and Cancelled as closed statuses. A permit in another status should be treated as open and investigated.

How do I fix an expired or open Collier County permit?

Request the permit file, contact Building Permit Resolution Services at 239-252-2493 or BPRS@collier.gov, and upload the appropriate extension, cancellation or contractor-change request to the portal condition.

Can a homeowner obtain an owner-builder permit?

A qualifying property owner may act as an owner-builder under Florida law but must personally sign the county application, directly supervise the work and accept responsibility for permits, workers, licensed trades and inspections.

Do I need flood documents for a Collier County permit?

Properties in a Special Flood Hazard Area may require flood review, elevation certificates and specific finished-floor elevations. Contact the Flood Information Hotline at 239-252-2942 before finalizing plans.

When are Collier County impact fees paid?

Fire impact fees are generally due at permit issuance. Most other impact fees assessed on a building permit are paid before Certificate of Occupancy. Updated residential and commercial impact-fee rates took effect May 1, 2026.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not Collier County Government.

This page was checked against the official GMCD Public Portal, Building Permits & Construction pages, application requirements, inspection scheduling, permit-history guidance, Permit Resolution Services, floodplain guidance, 2025 fee resolution and May 2026 impact-fee information.

Last reviewed: July 23, 2026.

Forms, portal conditions, fees, code editions, staff and inspection procedures can change. Confirm time-sensitive requirements before filing, paying, clearing land or beginning construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.