Download the Right Form, Submit Complete Plan Sets and Schedule Clinton Township Inspections Online
Clinton Township does not use one large permit portal for every step. Applicants download the correct building or trade form, prepare the required drawings and plot plans, submit payment and licensing documents, and wait for approval before construction.
This guide shows what minor residential projects need, when five commercial plan sets are required, how to avoid a contractor-license delay, which pool and accessory-building rules are locally important, and how to request every inspection through the township’s online form.
Choose the Exact Clinton Township Permit Task
Clinton Township Building Department Phone, Email, Address and Hours
Clinton Township Uses Downloadable Forms, Not One Full Permit Portal
Applications and plan review
- Download the correct township form.
- Complete every applicable section.
- Prepare the required drawing and plot-plan copies.
- Include payment when the form requires it.
- Include current state and township licensing documents.
- Submit to the Building Department.
- Wait for approval and formal permit issuance.
After permit issuance
- Keep the permit and approved plans at the site.
- Do not conceal work before inspection.
- Request each inspection online.
- Correct failed items before reinspection.
- Keep the permit active with required progress inspections.
- Pass every building and trade final.
Match the Project to the Correct Clinton Township Form
Project |
Start with |
Also prepare or check |
|---|---|---|
New home or major addition |
Building permit |
Plan examination, two residential plan sets, plot plans, grading/drainage, electrical, plumbing and mechanical permits |
Commercial or industrial construction |
Building permit + zoning verification |
Five plan sets, original design-professional seals, proposed use, Fire review and separate trades |
Basement finish or egress window |
Building permit |
Two drawings, wall section, plot plan when exterior work occurs, electrical, plumbing and mechanical scope |
Deck, arbor, gazebo or porch |
Building permit |
Mortgage survey, setbacks, footings, framing, stairs, guards and electrical work |
Shed or detached garage |
Accessory building permit |
Two surveys, wall section, elevation, floor plan, fire separation, easements and rear-yard limits |
Fence |
Fence permit |
Two plot plans, gates, roads, structures, easements, fence height and corner-lot visibility |
Above-ground or in-ground pool |
Building + plumbing + electrical |
Mechanical when applicable, plot plans, utilities, barrier, setbacks and grading approval for in-ground pools |
Roof replacement |
Reroof permit |
Roof area, underlayment, ventilation, product specifications, energy information and bond |
Sidewalk or driveway approach |
Sidewalk/approach permit |
Concrete thickness, approach dimensions, county-road jurisdiction and inspection before pouring |
Generator, EV charger or solar |
Electrical permit |
Building or mechanical permit where installation affects structure, gas or equipment |
Commercial sign |
Sign permit |
Zoning district, scaled location plan, foundations, electrical permit, wind design and required bond |
New business occupancy |
Township certification |
Building, electrical, plumbing, mechanical, Fire and Public Services inspections with utilities turned on |
Submit a Complete Permit Package in the Right Order
Verify zoning, easements and property lines
Use the township zoning map and a reliable mortgage survey or plot plan before choosing the structure location.
Download the project-specific application
Use the building, electrical, mechanical, plumbing, reroof, fence, sign, sidewalk or specialty form linked by the township.
Complete every applicable field
Enter the property address, parcel, subdivision, owner, contractor, license numbers, construction cost, square footage and complete scope.
Prepare the correct number of plan sets
Plan-review information calls for two residential plan sets or five commercial/industrial plan sets.
Add original seals and signatures where required
Commercial/industrial plans and qualifying residential work must be prepared under a Michigan-licensed architect or engineer and carry the required original seals and signatures.
Include contractor and applicant identification
Attach current Michigan licenses, local registration information and a driver’s license when required by the project form.
Include the required fee
New residential homes and commercial/industrial plan-review projects generally require the $100 nonrefundable examination/application fee at submission.
Submit through the approved method
Complete packages may be delivered to 40700 Romeo Plank Road. The accessory-building guide specifically allows complete submissions through buildingpermits@clintontownship.com.
Wait for formal approval
The township reviews applications and plans before issuing the permit. Do not begin construction because an application was delivered.
What Clinton Township Expects in the Plan Package
Minor residential project
- Completed application
- Two drawing sets
- Wall section
- Two plot plans or surveys
- All existing structures shown
- Proposed project location
Residential plan review
- Two complete plan sets
- Site or plot plan
- Foundation information
- Floor and framing plans
- Elevations and sections
- Engineering where required
Commercial or industrial
- Five complete plan sets
- Proposed-use description
- Zoning verification
- Original seals and signatures
- Fire-suppression documents
- Separate trade applications
Accessory Building, Pool, Fence, Roof and Driveway Rules
Shed or detached garage
- Submit two copies of the mortgage survey, wall section, elevation and floor plan.
- Show openings and header sizes.
- Include the applicant’s driver’s and builder’s licenses.
- Do not locate the structure in an easement.
- Accessory structures are generally limited to the rear yard.
- The guide lists a maximum of one story or 14 feet.
Accessory-building setbacks
- Attached garages follow the main dwelling’s setbacks.
- A detached structure less than three feet from the dwelling needs fire-rated construction.
- A detached structure over 200 square feet needs five feet from the side line or qualifying fire rating.
- The guide lists six feet from the rear line and three feet from a side line.
- Confirm the parcel-specific zoning before relying on a summary.
Residential pool, spa or hot tub
- Rules apply to pools holding 24 inches or more of water.
- Building, plumbing and electrical permits are required.
- A mechanical permit is required when applicable.
- Do not place the pool in an easement.
- Current guide: 25 feet from front lot line, four feet from another building and six feet from side/rear lines to the water’s edge.
In-ground pool grading
- Submit a sealed grading plan to Public Services.
- Show grades, elevations, drainage slopes, utilities and structures.
- Obtain grading approval before building-permit issuance.
- Submit two installation plan sets and the proposed plot plan.
- Provide a Final Grade Certificate before the final building inspection.
Fence
- Submit two plot plans or scaled drawings.
- Show gates, adjoining roads, structures and easements.
- Current review fee: $60 due at submission.
- Current form lists six feet maximum for obscured fencing and 54 inches for non-obscured fencing.
- No fence is permitted in the front yard.
- The smooth side faces neighboring property or the right-of-way.
Reroof
- Submit the complete application, payment, driver’s license and builder’s license.
- Identify underlayment and intake/exhaust ventilation.
- Commercial flat roofs need product and energy specifications.
- Recovering a commercial roof can require sealed load calculations.
- Verify the permit requirement before adding a second shingle layer because the current reroof form contains a specific second-layer exception.
Sidewalk or approach
- The current permit fee is $75.
- Sidewalk and approach concrete within the approach area must be six inches thick.
- Request inspection before concrete is poured.
- Patterned concrete and pavers are not allowed in the sidewalk area.
- Approaches on roads without curb and gutter may require Macomb County Department of Roads permitting.
Tree removal
- The township FAQ says Planning review is required when removing more than four trees over four inches in diameter.
- Lot-line trees require special care.
- Do not remove the neighboring portion of an overhanging tree.
- Call Planning before clearing a construction site.
Resolve Grading and Soil-Erosion Requirements Before Excavation
Projects that may trigger controls
- New construction
- Site grading
- Excavation
- Work affecting drainage or runoff
- Land disturbance near waterways or drainage areas
- Pool, driveway and large accessory-building work
Applicant responsibilities
- Install required erosion controls before active work.
- Maintain barriers during construction.
- Repair damaged controls promptly.
- Keep sediment off streets and neighboring property.
- Follow the approved grading plan.
- Complete directed drainage corrections.
Verify State Licensing and Township Registration Before Submission
Contractor checklist
- Michigan license is active
- License classification matches work
- Township registration is current
- Expiration date checked
- Insurance information available
- Applicant is authorized to sign
Homeowner permit warning
- A homeowner may apply for qualifying work on the homeowner’s own property.
- Homeowner trade affidavits require the homeowner to arrange inspections.
- Work may not be concealed or placed into operation before approval.
- The township warns against using a homeowner permit to avoid contractor licensing.
- A contractor should normally pull the permit when performing the work.
Use the Current Form and Fee Schedule for the Exact Amount
Permit or service |
Currently published amount |
Important condition |
|---|---|---|
Building contractor registration |
$15 |
Current township fee schedule |
New-home or commercial/industrial plan examination |
$100 nonrefundable |
Required at submission unless the Building Official determines otherwise |
Residential fence review |
$60 |
Due at submission; application is not accepted without payment |
Residential reroof |
$110 plus $75 bond |
Current reroof application; commercial reroof is listed at $175 plus bond |
Sidewalk or approach |
$75 |
Inspection is required before concrete is poured |
Basement egress window |
$120 |
Current fee schedule; structural or trade scope can add fees |
Basement waterproofing |
$120 |
Drainage, excavation and structural repairs can affect the permit route |
Residential solar building permit component |
$120 permit + $55 plan review |
Electrical permit is also required |
Electrical application |
$75 nonrefundable |
Add service, circuit, device and inspection fees from the electrical form |
Generator, solar panels or EV charger electrical item |
$48 each listed item |
Application and other required item or inspection fees are additional |
New-business township certification |
$345 |
Current form says this includes a $75 Fire Department inspection |
Credit-card processing |
2.8% |
Added to the one-time credit-card authorization transaction |
Payment methods
- Cash
- Check
- Money order
- Credit card where accepted
- One-time authorization form for eligible remote payments
Before paying
- Confirm the current application version.
- Calculate every trade item.
- Add required inspection fees.
- Add bonds where the form lists them.
- Ask the department to verify uncertain totals.
Pay Without Delaying the Application
In-person payment
- Confirm the correct total with the form or department.
- Bring the application and project address.
- Use cash, check, money order or an accepted card.
- Keep the receipt with the permit file.
One-time card authorization
- Download the current authorization form.
- Enter the exact amount and payment date.
- Identify the permit and project address.
- Sign the form.
- Follow the Building Department’s submission instructions.
- Account for the 2.8% processing fee.
Request Every Clinton Township Inspection Online
Required request method
Use the township’s online Building Inspection Request form rather than the former telephone scheduling system.
Information required
Address, requested date, “P” permit number, inspection type, onsite contact, phone number and email.
Timing
Request the desired date early enough for township processingh3>Timing . The online form does not promise same-day service.
Inspection |
What should be ready |
Do not do this first |
|---|---|---|
Footing |
Excavation, forms, dimensions and reinforcement visible |
Pour concrete before approval |
Rat wall or foundation |
Required wall, foundation or reinforcement stage complete and exposed |
Backfill or conceal the work |
Underground or below-slab trade |
Piping, conduit and underground work exposed and tested |
Cover trenches or pour the slab |
Rough building |
Framing and structural connections complete with approved plans onsite |
Install insulation or wall finishes |
Rough electrical, plumbing or mechanical |
Complete trade work visible under the correct trade permit |
Conceal or operate regulated systems before approval |
Pool |
Required construction stage, plumbing, electrical, barrier and approved plans ready |
Fill or use the pool before required approvals |
Sidewalk or approach |
Forms, base, thickness and approach dimensions ready |
Pour cement before inspection |
Final |
All permit items complete, utilities operational and prior corrections resolved |
Schedule a partial final when several permit items remain incomplete |
Before submitting the request
- Permit is active
- Correct permit number used
- Correct inspection type chosen
- Work complete for that stage
- Work remains exposed
- Onsite contact is available
Job-site readiness
- Approved plans onsite
- Permit available
- Safe access provided
- Address visible
- Gates and structures accessible
- Utilities on for applicable finals
Do Not Let the Permit Sit Without Inspections for 180 Days
General inactivity rule
Township permit materials use a 180-day framework:
- Work must begin within 180 days after issuance.
- Work cannot remain suspended or abandoned for 180 days.
- Required inspections should be requested as work progresses.
- Contact the department before the deadline when delay is unavoidable.
Building versus trade permit treatment
- The general building fee schedule allows a written renewal request in some cases.
- It lists a possible 180-day renewal at 50% of the original permit fee.
- The Building Official can require justifiable cause.
- Current electrical and mechanical forms state that cancelled trade permits cannot be refunded or reinstated.
Complete Township Certification Before Opening a New Business
Departments listed on the certification
- Building
- Electrical
- Plumbing
- Mechanical
- Fire
- Public Services
Prepare the building
- Keep the property open for inspector access between 8:30 AM and 4:30 PM.
- Turn all utilities on before inspection.
- Describe the proposed and previous use accurately.
- Resolve unpermitted alterations first.
- Use the email where the Certificate of Occupancy should be sent.
Codes Clinton Township Currently Lists
Code |
Township-listed effective date |
Typical use |
|---|---|---|
2021 Michigan Building Code |
April 9, 2025 |
Commercial and applicable nonresidential building work |
2015 Michigan Residential Code |
February 8, 2016 |
Qualifying one- and two-family residential construction |
2021 Michigan Rehab Code |
April 9, 2025 |
Existing-building rehabilitation work |
2021 International Property Maintenance Code |
April 9, 2025 |
Property-maintenance and existing-condition enforcement |
ICC A117.1-2017 |
April 9, 2025 |
Accessibility provisions |
2023 Michigan Electrical Code / 2023 NEC |
March 12, 2024 |
Electrical permits and inspections |
2021 Michigan Mechanical Code |
March 12, 2024 |
HVAC and mechanical work |
2021 International Fuel Gas Code |
March 12, 2024 |
Fuel-gas piping and equipment |
2021 Michigan Plumbing Code |
March 12, 2024 |
Plumbing systems and fixtures |
2015 International Fire Code |
June 5, 2017 |
Fire and life-safety requirements |
Find an Open Permit or Request Formal Record Copies
Collect the property information
Have the complete address, owner name, subdivision, parcel number, approximate project date and contractor name.
Look for the permit number
Review contractor invoices, permit cards, inspection stickers, closing documents and prior owner records.
Call the Building Department for status
Ask whether the permit is applied, approved, issued, expired, cancelled or final and which inspection remains.
Check separate trade permits
A building permit may have connected electrical, plumbing and mechanical permits with separate finals.
Request formal copies through FOIA
Use the township FOIA form for copies, certified copies or inspection of public records when informal status help is not enough.
Describe records precisely
Request the permit application, approved plans, inspection history, certificate, correspondence or violation records for the exact address and date range.
Save final proof
Keep the building and trade finals, Certificate of Occupancy where applicable, approved plans and closed permit record with the property documents.
What Common Permit Stages Mean
Fix Common Clinton Township Permit Problems
Problem |
Likely reason |
Best next action |
|---|---|---|
Application is not accepted |
Payment, plan copies, survey, signature or licensing document is missing |
Compare the package with the project form line by line |
Plan review is delayed |
Incomplete drawings, wrong number of sets or missing original seals |
Submit two residential or five commercial sets with all required documents |
Contractor cannot obtain permit |
State license or township registration is expired |
Verify the Michigan license and submit current local registration documents |
Shed location rejected |
Easement, yard, setback, fire-rating or lot-coverage conflict |
Revise the survey location using the accessory-building guide and zoning map |
Pool permit will not issue |
Grading approval, sealed site information or trade permits are missing |
Coordinate Public Services grading review before building-permit issuance |
Inspection request cannot be processed |
Wrong permit number, incomplete request, inactive permit or wrong inspection type |
Use the “P” number and complete every required online-form field |
Final inspection fails |
Trade finals, utilities, site work, plans or permit items remain incomplete |
Complete every permit item before scheduling another final |
Permit has been inactive |
No qualifying inspection occurred within 180 days |
Contact Building before performing more work; renewal may not be available for every permit type |
Boxes or furniture need to be moved in early |
Final approval has not been issued |
Obtain specific approval from the Building Official or assistant before moving items in |
What to Say When You Contact the Building Department
“I am planning [exact work] at [full address]. Can you confirm the correct building and trade forms, number of plan sets, plot-plan requirements, fees and inspections?”
“I submitted [permit type] for [address] on [date]. Can you confirm whether payment, plans, licensing, zoning verification or corrections are still required?”
“Permit P[number] at [address] needs a [inspection type]. The work is complete and exposed, approved plans are onsite and the field contact is [name and phone].”
“Permit P[number] at [address] is not final. Which building or trade inspection remains, and is the permit active, expired or cancelled?”
Do Not Consider the Project Finished Until These Are Complete
- Township jurisdiction confirmed
- Zoning and easements checked
- Correct permit form selected
- Separate trade forms completed
- Correct plan-set quantity prepared
- Plot plans or surveys included
- Original seals supplied when required
- Contractor licenses verified
- Township registration current
- Submission payment included
- Drainage and grading approved
- Permit formally issued before work
- Approved plans kept onsite
- Work kept exposed until inspection
- Inspection requests submitted online
- Failed items fully corrected
- Building and trade finals passed
- Final certificate and records saved
Clinton Township Building Department Location
Hours: Monday–Friday, 8:30 AM–4:30 PM.
Building Department: 586-286-9323.
Open the Correct Clinton Township Form or Guide
Clinton Township Building Permit FAQs
Where do I obtain a Clinton Township building permit application?
Download the building permit from the official Clinton Township Building Department page. The township also provides separate electrical, mechanical, plumbing, reroof, fence, sign, sidewalk and specialty applications.
What is the Clinton Township Building Department phone number?
Call 586-286-9323. The Building Department is at 40700 Romeo Plank Road, Clinton Township, Michigan 48038, and is open Monday through Friday from 8:30 AM to 4:30 PM.
Can I schedule a Clinton Township building inspection by phone?
The township is phasing out telephone inspection scheduling. Use the official online Building Inspection Request form with the address, requested date, permit number, inspection type and onsite contact information.
What must be submitted for a minor residential permit?
Submit the completed application, two sets of construction drawings with a wall section and two plot plans or mortgage surveys showing existing structures and the proposed project location.
How many plan sets does Clinton Township require?
The township plan-review page calls for two plan sets for residential projects and five plan sets for commercial or industrial projects. Commercial plans and other qualifying projects require original professional seals and signatures.
How much is the Clinton Township plan-examination fee?
The currently linked building information and fee schedule list a $100 nonrefundable examination or application fee for new residential homes and commercial or industrial projects, unless the Building Official determines otherwise.
What permits are required for a residential pool?
Clinton Township’s pool guide requires building, plumbing and electrical permits for pools holding 24 inches or more of water. A mechanical permit is required when applicable. In-ground pools also require Public Services grading-plan review.
Can a homeowner pull a permit in Clinton Township?
A homeowner may apply for qualifying work on the homeowner’s own property. The township recommends that a hired contractor pull the permit so the contractor remains responsible for improperly completed work. A homeowner permit is not faster or cheaper.
When does a Clinton Township permit expire?
Township permit materials use a 180-day inactivity rule. A permit can become invalid when work does not begin within 180 days or remains suspended without required inspections for 180 days. Renewal treatment differs between building and trade permits, so contact the department before the deadline.
How do I prove a Clinton Township permit is closed?
Confirm that all required building, electrical, plumbing and mechanical inspections passed, the Certificate of Occupancy was issued when required and the Building Department identifies the permit as final or closed.
Official Information Used for This Guide
Building-Department.org is an independent informational guide and is not Clinton Township, Michigan.
This page was rebuilt using the Clinton Township Building Department, building and trade applications, plan-review page, fee schedule, online inspection request, accessory-building guide, deck and pool requirements, zoning map, contractor-license guidance, payment information, current code list and township FOIA form.
Last reviewed: July 21, 2026.
Forms, fees, staff, codes, zoning rules and inspection procedures can change. Confirm time-sensitive requirements with the Clinton Township Building Department before filing, paying, scheduling or beginning construction.