Walk Into Room 101 With the Right Plot Plans, Construction Drawings and County-Licensed Contractors
Clarkstown’s official process is different from the online portal described on many third-party pages. The Town directs permit applicants to the Building Department in Room 101 at Town Hall and tells applicants to call ahead to confirm the documents required for the exact project.
This guide turns that process into clear actions: confirm Town-versus-village jurisdiction, prepare three zoning plot plans and two construction-plan sets when required, calculate the published base building fee, coordinate Rockland County electrical and contractor licensing, request inspections and complete the Certificate of Occupancy file.
Choose the Clarkstown Task You Need
Clarkstown Building Department Phone, Address and Hours
Confirm Which Building Department Controls the Property
Town hamlets commonly use Clarkstown
- Bardonia
- Central Nyack
- Congers
- Nanuet
- New City
- Rockland Lake
- Valley Cottage
- West Nyack
Incorporated-village address
Clarkstown also contains all of Upper Nyack and portions of Nyack and Spring Valley. Those villages have their own building-department listings.
- Do not rely only on the postal city name.
- Confirm the parcel’s municipal boundary.
- Ask whether Town or village zoning controls the project.
- File with the office that confirms jurisdiction.
Projects That Require a Clarkstown Building Permit
Project |
Permit direction |
Important extra check |
|---|---|---|
New home, addition or structural alteration |
Building permit required |
Survey, zoning plot plan, setbacks, plans, Energy Code and utility information |
Garage, carport, breezeway or storage shed |
Building permit required |
Accessory-building setbacks, lot coverage, height and sanitary system |
Porch, enclosed porch or deck |
Building permit required |
Footings, guards, stairs, zoning setbacks and survey accuracy |
Install, relocate or remove interior walls |
Building permit required |
Structural support, electrical, plumbing, egress and smoke/CO alarms |
Permanent or temporary pool over 24 inches deep |
Building permit required |
Barrier, alarm, electrical inspection, setbacks and equipment location |
Furnace, heater, wood stove or fireplace |
Building permit required |
Manufacturer details, clearances, chimney/flue and combustion safety |
Business sign |
Sign permit required |
Zoning, dimensions, illumination, landlord approval and possible variance |
Commercial tenant or occupancy change |
Permit and C.O. review |
Allowed use, occupant load, accessibility, Fire Permit and life-safety systems |
Fire-damage repair |
Building permit required |
Damage evaluation, structural repairs, electrical approval and fire-system restoration |
Demolish a house, garage or other building |
Demolition permit required |
Utility disconnects, asbestos, site restoration and agency approvals |
Work the Town Lists as Not Requiring a Building Permit
Work |
Town guidance |
Stop and confirm when |
|---|---|---|
Ordinary repair |
Replace existing material with similar material |
The work affects structure, fire rating, wiring, plumbing or occupancy |
Gutters and downspouts |
Installation or repair is listed as permit-exempt |
Drainage is redirected toward another property or public system |
Siding on a single-family dwelling |
Listed as not requiring a building permit |
Wall sheathing, structure, insulation or hazardous material is affected |
Window replacement |
No permit when no structural work is required |
Opening size, header, egress or fire separation changes |
Private sidewalk |
Installation or replacement on private property is listed as exempt |
Work enters the Town right-of-way or affects drainage |
Roof reshingling |
No permit unless rafters or sheathing are replaced |
Structural decking, framing, chimney or major roof configuration is affected |
Apply for a Clarkstown Building Permit in Eight Steps
Confirm Town jurisdiction
Determine whether the property is under the Town of Clarkstown or an incorporated village building department.
Call Building before designing the final package
Describe the exact project and ask which permit, survey, plot plan, construction drawings and outside approvals are required.
Prepare the zoning plot plans
The Town’s published checklist calls for three copies of a plot plan drawn to scale.
Prepare two construction-plan sets
Plans should be drawn to scale and clearly show the work required for compliance with the New York State Uniform Code, Energy Code and Town requirements.
Complete the permit application
An owner, agent or contractor may apply. Make sure the scope, project cost, ownership and contractor information are accurate.
Submit in Room 101
Bring the complete package to the lower level of Clarkstown Town Hall at 10 Maple Avenue, New City.
Respond to zoning and code comments
Revise every affected drawing and provide any missing survey, contractor, electrical, plumbing or agency information.
Collect and display the permit placard
After approval, post the permit placard at the job site and keep the approved construction plans available throughout construction.
What to Prepare Before Going to Town Hall
Property and applicant
- Full property address
- Map, block and lot
- Owner name and contact
- Applicant or agent details
- Detailed work description
- Total estimated job cost
Zoning plot plan
- Three copies
- Lot size and shape
- All existing structures
- Proposed work or addition
- Setbacks to property lines
- Sanitary and storm sewer provisions
Construction and trades
- Two construction-plan sets
- Structural details
- Energy-code information
- Electrical scope
- Plumbing scope
- Contractor and county-license details
Make the Zoning Review Easy to Understand
Plot-plan item |
What the reviewer needs |
Common mistake |
|---|---|---|
Lot boundaries |
Clearly dimensioned property lines and lot shape |
Using an aerial image without survey dimensions |
Existing structures |
House, garage, sheds, decks, pools and other structures |
Showing only the proposed project |
Proposed construction |
Exact location, size and relationship to the main building |
Using a sketch that is not drawn to scale |
Setbacks |
Distances to every relevant lot line and nearby structure |
Showing only one side-yard distance |
Sanitary system |
Sewer or septic information affected by the project |
Placing an addition over or too close to a utility area |
Stormwater |
How roof and site water will be managed |
Directing runoff onto neighboring property |
Estimate the Clarkstown Base Building Permit Fee
This is a planning estimate for the published building-permit formula. Sign permits, special permits, variances, C.O. fees, fire permits, county licenses, electrical inspections and other charges can be separate.
$1,000 project
$150 estimated base fee
The first $1,000 uses the minimum published amount.
$5,000 project
$222 estimated base fee
$150 + four additional $1,000 units × $18.
$25,500 project
$600 estimated base fee
$24,500 above the first $1,000 rounds to 25 additional units.
Understand the Town Permit and County-License Split
Electrical work
- Electrical work is inspected by a Town-approved third-party electrical inspection agency.
- The agency issues the final electrical certificate of approval.
- Most electrical work must be performed by or supervised by a Rockland County-licensed electrician.
- The electrician files an inspection application and provides a copy to the Building Department.
Plumbing work
- A permit is required for new fixtures, water-supply lines, sanitary or storm drainage and vent lines.
- An owner-occupant of a single-family dwelling may perform their own work after obtaining the required permit.
- In other cases, plumbing must be performed by a Rockland County-licensed or registered plumber.
- Only emergency repairs should occur before issuance, and the required permit must still be obtained.
Home-improvement contractor
Rockland County states that individuals performing home-improvement work must obtain a Home Improvement License under Chapter 286.
Mechanical contractor
Rockland County separately licenses plumbing, heating, air conditioning, sheet-metal and refrigeration contractors.
Verify before signing
Search the County’s licensed-business dashboard and ask about complaint history before paying a large deposit.
Open Rockland Contractor Applications Verify a Licensed Business
Resolve Setbacks, Use and Variances Before Construction Review Stalls
Planning Department
The department supports Planning Board, Technical Advisory Committee and Zoning Board of Appeals review.
Phone: 845-639-2070
Town zoning map
Use the map as an initial visual reference, then confirm the district and regulations with Town staff.
Historic property
Clarkstown states that special standards and reviews apply to designated landmarks and properties within historic areas.
Call Building before changing exterior materials or features.
Clarkstown Does Not Require a Fence Permit—but Zoning Limits Still Apply
Solid fence or wall
The Building FAQ says solid fences and walls, individually or together, cannot exceed approximately 4½ feet along a residential lot line.
Other residential fence
The Town FAQ states that fences cannot exceed six feet along a lot line unless setback by two-thirds of their height.
Street intersection
Corner and intersection fencing must comply with the sight-distance requirements referenced in Town Code Section 250-6.
Request the Correct Inspection Before Work Is Covered
Confirm the permit is issued
Display the permit placard and keep the approved plan set at the job site.
Call the Building Department
Use 845-639-2100 to confirm the inspection-request procedure, available date and required inspection stage.
Provide complete scheduling information
Have the permit number, address, inspection type, contractor contact and access instructions ready.
Keep the work visible
Do not conceal framing, wiring, piping, insulation or structural connections before the required approval.
Complete third-party electrical inspection
Electrical work must receive the required approval certificate from an approved electrical inspection agency.
Read every correction before rebooking
Correct all listed issues and confirm whether revised plans or additional documentation are required.
Foundation or footing
Keep forms, reinforcement, footing dimensions and setbacks visible before concrete placement.
Rough framing and trades
Coordinate framing, electrical, plumbing, mechanical and fire-stopping work before enclosure.
Final inspection
Complete all construction, trade approvals, testing reports, final survey and zoning or fire conditions.
Prepare the Certificate of Occupancy File Before Requesting Final Approval
Core documents
- C.O. application
- Building-permit number
- Owner name and address
- Map, block and lot
- Final electrical certificate
- Final plumbing inspection
Project-dependent documents
- Three final survey copies
- As-built plot plan
- Structural-steel certificate
- Testing-agency reports
- General-contractor certification
- Required affidavits
Fire-system closeout
- Fire-alarm certification
- Sprinkler certifications
- Approved sprinkler drawings
- Knox Box when required
- Truss/fire-wall signs
- Witnessed system tests
Certificate type |
When used |
Important limit |
|---|---|---|
Certificate of Occupancy |
New building, alteration, enlargement or change in use/occupancy |
Issued only when no uncorrected material code or zoning deficiency remains |
Temporary Certificate of Occupancy |
Building is zoning-compliant and near substantial compliance without a safety danger |
Expires after 90 days |
Expired or historic permit closeout |
Permit expired or building predates adopted zoning/building codes |
Town states an additional fee applies |
Businesses and Listed Occupancies Must Apply During January
Common covered occupancies
- Business and mercantile
- Industrial uses
- Garages and service stations
- Multiple residences and condominiums
- Places of assembly
- Hazardous or flammable storage
- Dry cleaning
- Welding or cutting
Responsibility rules
- Apply during January for the coming year.
- Display the permit conspicuously.
- Fire permits are not transferable.
- A change in use or occupancy terminates the prior certificate.
- The tenant obtains the permit for the establishment.
- The landlord handles common-area permits when applicable.
Find an Old Permit Without Relying on a Nonexistent Portal Link
Collect the correct property identifiers
Use the street address plus map, block and lot. These identifiers reduce mistakes involving similar addresses.
Call the Building Department first
Ask whether the permit, C.O. or inspection record can be located directly and what information staff needs.
Request the exact record
State the approximate year, permit type and documents needed: application, approved plans, inspection history, C.O. or violation record.
Use the Clarkstown FOIL Center
Create an account to submit the request, track its status and download responsive records.
Verify final status before buying or selling
A building-permit application or issued permit does not prove final inspection or legal occupancy.
Fix Common Clarkstown Permit Problems
Problem |
Likely reason |
Next action |
|---|---|---|
Application is not accepted |
Missing survey, plot-plan copies, construction plans or signature |
Call 845-639-2100 and compare the package with the exact project requirements |
Zoning review fails |
Setback, lot coverage, use or structure location does not comply |
Contact Planning and determine whether redesign or ZBA relief is required |
Contractor cannot be accepted |
County license, classification, insurance or registration is missing |
Verify the business through Rockland County before resubmitting |
Electrical final is missing |
Approved third-party electrical inspection was not completed |
Contact the inspection agency and obtain the final certificate of approval |
Final inspection is blocked |
Survey, plumbing, electrical, testing, Fire or zoning item remains open |
Ask Building for the exact C.O. deficiency list |
Commercial tenant cannot open |
Use, occupancy, Fire Permit or C.O. has not been approved |
Pause occupancy and coordinate Building, Planning and Fire review |
Old permit affects a sale |
Permit expired or no C.O. was issued |
Request the permit history and written closeout requirements |
Wrong municipality received the application |
Property is inside an incorporated village |
Confirm boundary and file with the responsible Town or village department |
Ask a Question Staff Can Answer Quickly
“I am planning [exact work] at [address]. Is the property under Clarkstown jurisdiction, does the work require a permit, and which application should I use?”
“For [project type], do I need a current survey, three plot-plan copies, two construction-plan sets, structural calculations or Energy Code documents?”
“Permit [number] is ready for [inspection type]. What must remain visible, and how do I schedule the inspection?”
“For permit [number], which final survey, electrical, plumbing, contractor, testing, Fire or zoning documents remain open?”
Clarkstown Permit Completion Checklist
- Town-versus-village jurisdiction confirmed
- Exact permit type confirmed by Building
- Map, block and lot verified
- Three zoning plot-plan copies prepared
- Two construction-plan sets prepared
- Sanitary and stormwater information shown
- Project cost entered accurately
- Rockland contractor licenses verified
- Electrical inspection agency selected
- Permit formally approved
- Permit placard displayed
- Approved plans kept on site
- Work left visible for inspections
- Final electrical certificate obtained
- Final plumbing inspection completed
- Final survey and reports submitted
- Fire and zoning conditions cleared
- Certificate of Occupancy issued
Clarkstown Building Department at 10 Maple Avenue
Open the Exact Clarkstown or Rockland Resource
Clarkstown Building Permit and Inspection FAQs
Where do I apply for a Clarkstown building permit?
Apply through the Clarkstown Building Department in Room 101 on the lower level of Town Hall at 10 Maple Avenue, New City, NY 10956. The Town recommends calling 845-639-2100 before applying to confirm the required documents.
What is the correct Clarkstown Building Department phone number?
The official Building Department number is 845-639-2100. The department lists hours of Monday through Friday from 9:00 a.m. to 5:00 p.m.
Does Clarkstown have an eTRAKiT permit portal?
The official Clarkstown Building pages reviewed direct applicants to Room 101 at Town Hall and do not provide the eTRAKiT application process described on the old article. Use the Town’s published Building page and phone number rather than an unverified portal link.
How many plans are required for a Clarkstown permit?
The Town’s published checklist calls for three copies of a scaled zoning plot plan and two sets of construction drawings. Call before printing because some projects can require additional plans, surveys or technical documents.
How are Clarkstown building permit fees calculated?
The Town’s published formula lists $150 for the first $1,000 of estimated project cost and $18 for each additional $1,000 or part of $1,000. Separate sign, variance, fire, C.O., electrical-inspection and other fees may apply.
Does a fence require a permit in Clarkstown?
The Town states that it does not require a fence permit, but fence and wall height, corner visibility and setback rules still apply under the zoning code. Pool fencing and retaining-wall work can involve additional requirements.
Can a Clarkstown homeowner perform their own electrical work?
An owner-occupant of a single-family dwelling may apply through Rockland County to perform limited basic general wiring. The Town states that this exception does not include swimming pools, electrical services or new additions. Approved third-party inspection is still required.
How do I schedule a Clarkstown building inspection?
Call the Building Department at 845-639-2100 with the permit number, address and inspection type. Keep the permit placard and approved plans at the job site and do not cover work before the required inspection.
What is needed for a Clarkstown Certificate of Occupancy?
A valid Building Permit is required. The final file may include the C.O. application, final electrical certificate, three final-survey copies, final plumbing inspection, testing reports, contractor certification, structural-steel certificate, affidavits and fire-system approvals.
How do I find old Clarkstown permits or Certificates of Occupancy?
Start by calling the Building Department with the address and map, block and lot. For records that require a formal request, use the Clarkstown FOIL Center to submit, track and download the response.
Source and Accuracy Note
Building-Department.org is an independent guide and is not the Town of Clarkstown or Rockland County. Permit decisions, fees, inspections, zoning interpretations and Certificates of Occupancy must be handled through the responsible government office.
This page was checked against the Town of Clarkstown Building Department, Building Permits, Building FAQs, Certificates of Occupancy, Fire Permits, Planning Department, Town Zoning Map, Clarkstown FOIL Center and Rockland County contractor-licensing resources.
Last reviewed: July 21, 2026.
The Town’s Building Downloads area uses a JavaScript file listing, so direct form names and links may change. Open the official downloads page or call 845-639-2100 for the current application.

Khushboo Bobade is a public records researcher and editorial writer specializing in government service documentation and construction permit systems.
Her research focuses on explaining building permits, inspection procedures, zoning regulations, and public permit records maintained by local government building departments across the United States.
Professional profile: View LinkedIn Profile
Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links
Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.
What building department task do you need help with?
Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.
Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.
Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.
Building Permit Type Finder
Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.
Permit Fee Estimate Calculator
Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.
Inspection Readiness Checklist
Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.
Zoning and Setback Pre-check
Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.
Plan Review Timeline Estimator
Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.
Permit Records Search Helper
Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.
Official Building Department Resource Finder
Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.
Building Department vs Planning/Zoning
- Building Department: permits, plan review, inspections, code compliance, certificates.
- Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.
Best sitewide placement
Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.
Important note
This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.