City Of Stuart Building Department | Permits, Inspections & Official Contact

Stuart permit action guide

Check City Limits, Use OpenGov, Clear Coastal Reviews and Close a Stuart Building Permit

Stuart has replaced the old Accela workflow with OpenGov. The first decision is whether the property is actually inside City limits; the next is whether the project needs a permit, qualifies for Stuart’s new July 2026 exemption process, or fits the narrow emergency-repair rule.

This guide gives homeowners, contractors and design professionals a practical route for applications, state contractor licensing, Planning and zoning, flood and wind documents, inspections, impact fees, existing permit migration and final closeout.

New OpenGov permit and contractor portal
July 2026 under-$7,500 exemption decision
24-hour inspection line and closeout workflow
Stuart project passing city-limits, exemption, OpenGov and inspection gates An animated coastal property card moves from a Stuart city-boundary check through the 2026 permit-exemption gate, OpenGov review and final inspection. STUART PROPERTY CHECK CITY LIMITS → PERMIT ROUTE OPENGOV DECISION GATES CITY JURISDICTION EXEMPTION CHECK PLAN REVIEW PERMIT ISSUED APPROVED ROUTE PERMIT / EXEMPT PROJECT FINAL INSPECTION CLOSED
📌
New permit-exemption process effective July 1, 2026 Certain non-structural projects at a single-family residence valued under $7,500 may qualify—but the owner or contractor must submit a written exemption request and receive Building Department approval before work. Flood-zone, electrical, plumbing, mechanical, gas and structural work do not qualify.
Start here

Choose the Exact Stuart Building Task

Stuart Permit Route Finder

Select the project that most closely matches your situation.

File with the correct government

City of Stuart or Martin County: Check the Address First

🏙️

Address is inside Stuart city limits

Use Stuart OpenGov, the City Building Division and the City Planning & Zoning Department.

Check the official City address lookup

🌴

Address is in unincorporated Martin County

Use Martin County Building and its Accela portal rather than Stuart OpenGov.

Open Martin County Building

A Stuart mailing address is not proof of City jurisdiction. Confirm the exact parcel before opening a permit record or paying an application fee.
Official contact panel

Stuart Building Department Phone, Address and Hours

Building Division 772-288-5326 Permits, plan review and general help
24-hour inspection line 772-600-1212 Automated inspection requests
Building Official / emergency 772-600-1249 Lou Hatten · lhatten@stuartfl.gov
Planning & Zoning 772-600-1245 Use, setbacks, site plans and variances
Fire Prevention 772-288-5360 Business/change-of-occupancy and fire review
Open-permit linking permitting@ci.stuart.fl.us Send permit numbers to connect old active records
Office hours 8:30 AM–5:00 PM Monday through Friday
Office address 121 SW Flagler Avenue Stuart, FL 34994
Useful call script:
“I am planning [exact work] at [address and parcel]. Can you confirm City jurisdiction, whether the July 2026 exemption applies, the OpenGov application type, required Planning/Flood/Fire reviews and the inspection sequence?”
Effective July 1, 2026

Do Not Self-Declare the New Under-$7,500 Exemption

A project may qualify only when all are true

  • Single-family residence
  • Total labor and materials under $7,500
  • Work is non-structural
  • Property is outside flood zone/hazard area
  • No electrical work
  • No plumbing work
  • No mechanical work
  • No gas work
  • Written exemption request submitted
  • City approval received before work

These common projects still need permits

  • Roofing
  • Load-bearing walls
  • Elevated decks
  • Windows and exterior doors
  • Storage sheds
  • HVAC or A/C work
  • Electrical panels or rewiring
  • Plumbing repairs/replacements
  • Gas appliances
  • Water softener installation

Prepare a written Permit Exemption Request

Describe the exact work, property and responsible owner/contractor.

Attach proof of cost and scope

Include project documentation and a signed contract with an itemized labor-and-material cost breakdown.

Wait for written Building approval

Do not start merely because the project appears inexpensive or non-structural.

Understand the inspection tradeoff

City inspectors do not inspect approved exempt work. The owner and contractor remain responsible for legal and code-compliant construction.

No project splitting: Florida law prohibits dividing a larger project into smaller contracts or phases to avoid permitting.

Open Official Exemption Instructions

Permit finder

Which Stuart Permit or Review Fits the Project?

Project
Start with
Important Stuart check
New single-family home or addition
Planning + building plan review
Site plan, survey, grading, flood, wind, utilities, product approvals and impact fees
Roof, window, door, shed or elevated deck
Building permit
Structural work is excluded from the under-$7,500 exemption
Fence, pool, screen enclosure or accessory building
Planning + building route
Planning reviews these projects for site and zoning compliance
Generator
Electrical + gas/building package
Submit related permits together with specs, risers, site/flood information and transfer-switch details
Interior residential remodel
Building permit
Include every electrical, plumbing, mechanical and structural change
Commercial tenant improvement
Commercial building + zoning review
Occupancy, ADA, Fire, utilities and business-tax requirements
New business or change of use/occupancy
Planning + Fire + Building
Verify use before signing lease; vacancy over 180 days can trigger current site requirements
Dock, seawall, boat lift or waterfront work
Building + environmental/waterway review
Confirm property control, shoreline, flood, environmental and outside-agency approvals
Emergency water heater, A/C or listed electrical repair
Notify Building Official
Submit OpenGov permit next business day; contractor must be registered/licensed
Potential non-structural work under $7,500
Exemption request
No work until written approval; flood and trade work do not qualify
Current online workflow

How to Apply Through Stuart OpenGov

Confirm City limits
Choose permit/exemption route
Create OpenGov ID
Register contractor
Upload complete package
Clear comments and fees
Obtain issuance

Confirm that Stuart is the permitting authority

Use the official address lookup and parcel information before starting the application.

Decide whether the work needs a permit, exemption approval or emergency route

Structural and trade work normally needs a permit. A 2026 exemption or emergency exception requires its own documented City process.

Create an OpenGov ID

Open the portal, select Building & Permitting, choose Sign Up and create or use an existing OpenGov ID.

Verify the contractor is eligible and registered

Effective July 1, 2025, Stuart no longer accepts a local Certificate of Competency as contractor licensure for covered work. Use a State Registered or State Certified contractor where Florida law requires it.

Select the correct Building & Permitting application

Choose the exact project category and enter the complete scope, valuation, owner, contractor, design professional and site information.

Do not create duplicate records: Call 772-288-5326 when the correct application is unclear.

Upload readable, coordinated documents

Plans, surveys, product approvals, calculations, affidavits and outside-agency approvals must match the application scope.

Suggested names: Application.pdf, Survey.pdf, Site-Plan.pdf, Architectural.pdf, Structural.pdf, Product-Approvals.pdf.

Respond to every reviewer and invoice

Open comments by discipline, upload one coordinated correction set and pay required fees shown in the portal.

Fee source: Stuart directs applicants to Resolution 86-2025 and the live OpenGov invoice.

Confirm formal issuance before beginning work

Approval comments or paid invoices do not replace an issued permit. Save the approved documents and follow the listed inspection sequence.

Migrating an active permit: Email permitting@ci.stuart.fl.us with the old permit numbers so staff can link them to your new OpenGov account.
Application readiness

Documents to Prepare Before Opening the Permit Record

Property and applicant

  • Exact address
  • Parcel ID and legal description
  • Owner contact information
  • Applicant contact information
  • Clear scope of work
  • Labor-and-material valuation

Contractor and design team

  • State contractor license
  • OpenGov registration
  • Trade subcontractors
  • Architect/engineer information
  • Signed owner authorization
  • Owner-builder affidavit if used

Plans and compliance

  • Current survey/site plan
  • Existing and proposed plans
  • Structural calculations
  • Florida Product Approvals
  • Energy documents
  • Flood/wind information
For a new home or major addition: Plan for grading/drainage, utility coordination, product approvals, energy calculations, flood-zone documents and impact-fee confirmation—not only architectural floor plans.
Planning before permit issuance

When Stuart Planning and Zoning Must Review the Project

Common site projects

Planning reviews accessory buildings, additions, fences, pools, screen enclosures, single-family homes, multifamily and commercial structures.

Zoning Determination Letter

Request a written letter when the allowed use, setbacks, height, density, lot size or zoning designation must be documented.

Pre-Application Meeting

Use OpenGov to request coordinated early feedback for complex development before investing in final plans.

Special exception or rezoning

Planning accepts future-land-use amendments, annexations, special exceptions and zoning-change applications.

Variance

Variance applications are considered by the Board of Adjustment. Confirm the filing sequence before preparing a hearing package.

Commercial lease or business opening

Verify zoning before signing a lease. A new business or change in location/ownership may also require Fire inspection and Business Tax steps.

Vacant commercial space warning: Stuart’s business requirements say a property vacant more than 180 days can be required to meet current landscaping, parking and building standards before a Business Tax Receipt is issued.

Open Planning & Zoning

Emergency-only exception

Emergency Repairs That May Start Before Normal Permit Approval

Listed emergency repairs

  • Water heater replacement
  • Air-conditioning replacement
  • Weatherhead repair
  • Breaker malfunction repair

This is for an actual emergency, not routine convenience or scheduling.

Required follow-up

  1. Notify Building Official at 772-600-1249.
  2. Use a registered, licensed contractor.
  3. Submit the OpenGov permit on the next business day.
  4. Complete the permit within the City’s 24–48-hour emergency window.
  5. Arrange required inspection and closeout.
Limited owner exception: A homesteaded property owner may apply for their own water-heater permit. Do not extend that statement to A/C or electrical work without written City confirmation.

Open Emergency Permitting Rules

Owner-builder responsibility

Understand the Owner-Builder Affidavit Before Signing

The owner becomes the responsible contractor

  • Directly supervise the work on site.
  • Obtain permits and inspections.
  • Hire only properly licensed contractors when a license is required.
  • Correct failed or unsafe work.
  • Handle tax, employment and workers’ compensation duties when workers are treated as employees.

Use and sale restrictions matter

  • The work must be for the owner’s own use or occupancy.
  • One- or two-family residences and qualifying farm outbuildings are addressed by the disclosure.
  • Commercial owner-builder work has statutory limits.
  • Sale or lease within one year can create a presumption that the exemption was misused.
  • The owner must sign and notarize the disclosure.

Open Owner-Builder Affidavit

Coastal design checks

Verify Flood, Parcel and Wind Information Before Final Plans

FEMA flood zone

Check whether the property is in a Special Flood Hazard Area. The City says an Elevation Certificate may be required for a permit in that area.

Open FEMA Map Service Center

Parcel and ownership

Use the Martin County Property Appraiser to confirm the parcel, owner, site address and assessed-property information.

Open Property Appraiser

Site-specific wind

Use the ASCE Hazard Tool for design wind information, then have the design professional apply the correct code criteria and product approvals.

Open ASCE Hazard Tool

Exemption conflict: The July 2026 under-$7,500 permit exemption does not apply to a property in a flood zone or flood hazard area.
Project-specific preparation

Documents Common Stuart Projects Often Need

Project
Prepare
Question to answer first
New home or duplex
Signed/sealed plans, survey, site/grading plan, energy documents, product approvals, utility and flood information
What Planning, flood, utility and impact-fee reviews must clear before issuance?
Addition or major remodel
Existing/proposed plans, structural details, survey, energy, product approvals and complete trade scopes
Does the addition change setbacks, flood compliance, drainage or occupancy?
Generator
Manufacturer data, transfer-switch details, electrical and gas risers, site plan and flood information
Can electrical and gas permits be submitted together under one coordinated project?
Roof/windows/doors
Current Florida Product Approvals, opening/roof layout, fastening and wind-design information
Does any component require structural engineering or flood review?
Pool or screen enclosure
Survey/site plan, barrier/safety details, structural plans, equipment and trade applications
What setbacks, easements and overhead/underground utility conflicts apply?
Commercial tenant improvement
Code summary, use/occupancy, ADA, Fire, existing/proposed plans, energy and trade drawings
Is this only construction, or also a change of use/occupancy?
Dock, seawall or boat lift
Survey, waterfront/site plan, structural details, ownership and outside-agency approvals
Which environmental, waterway or county/state approvals must be obtained?
Inspection workflow

How to Request and Pass a Stuart Inspection

Confirm the permit is issued and active

Required fees, contractor registrations, plans, outside approvals and Notice of Commencement conditions must be complete.

Use the 24-hour automated request line

Call 772-600-1212 and follow the prompts for the permit and inspection requested.

When unsure: Call Building at 772-288-5326 before entering the wrong inspection.

Request the correct construction stage

Follow the approved plans and permit sequence. Do not request final while rough, structural, trade or prerequisite inspections remain open.

Keep the permit, plans and required documents on site

Provide safe access and leave work visible. Product approvals, engineering documents and Notice of Commencement should be available when applicable.

Read the complete result

Correct every listed item. When field work differs from approved plans, obtain a revision rather than repeatedly requesting the same inspection.

Use the after-hours form only when needed

Stuart publishes an After Hours Inspection Request in its Building Division online forms. Confirm availability and fee before relying on it.

Final every trade and obtain the occupancy/completion document

Check building, roofing, electrical, plumbing, mechanical, gas, Fire and other related records before final payment or occupancy.

Have ready for inspection

  • Permit number
  • Approved plans
  • Safe access
  • Correct stage complete
  • Work visible
  • Required affidavits

Prevent a failed visit

  • Do not cover work early
  • Clear prior corrections
  • Use correct inspection type
  • Coordinate unit/gate access
  • Keep contractor contact available
  • Confirm all prerequisite trades
Use current resolution and live invoice

How to Confirm the Real Stuart Permit Cost

Building and plan-review fees

  1. Select the exact OpenGov application.
  2. Enter the complete labor-and-material valuation.
  3. Upload plans so staff can identify required disciplines.
  4. Review the invoice generated under Resolution 86-2025.
  5. Ask staff about any unclear fee before paying.

Costs outside the base building fee

  • Planning or zoning applications
  • Fire review and inspection
  • Reinspection or after-hours inspection
  • Revisions and added scope
  • City impact fees
  • Martin County impact fees
  • Utility or environmental approvals
  • Private-provider administration
New development can owe two impact-fee systems. Stuart states that property inside City limits may be required to pay both City of Stuart and Martin County impact fees.
Avoid generic calculators: Final cost depends on valuation, work type, disciplines, outside approvals and development impacts. Use Resolution 86-2025 plus the current OpenGov invoice rather than an old flat-fee chart.

Open Resolution 86-2025 Open Impact Fee Guidance

Private provider option

Use a Private Provider Only After Building Official Approval

Approval comes first

The Building Official must approve the private-provider route before permit submittal.

Plan review and/or inspections

A qualifying Florida code administrator, engineer or architect may perform selected code plan review or required inspections.

Other reviews remain

Private-provider service does not replace zoning, Fire, environmental, FEMA, land-use or other agency review.

Fee adjustment: Florida law requires permit fees to exclude the code-review or inspection services performed by the approved private provider. Confirm the City’s administration and remaining-review charges before selecting this route.

Open Private Provider Rules

Permit status decoder

What Common OpenGov Statuses Mean

Draft The application has not been submitted. Finish required questions, uploads and the final submission step.
Submitted / intake Staff is checking completeness, application type and required reviews.
In review Building, Planning, Fire or another discipline is reviewing the project. Do not begin work.
Corrections required Read every comment and upload one coordinated response and plan set.
Approved Approval may still be waiting for final fees, contractor registration or formal issuance.
Issued Work may proceed within the approved scope and inspection sequence.
Inspection failed Correct the listed field condition and obtain a plan revision when the approved design changes.
Final / closed Save the record and confirm every related trade and occupancy document is also complete.
Troubleshooting

Fix Common Stuart Permit Delays

Problem
Likely reason
Best next action
Old instructions mention Accela
The City migrated to OpenGov
Use the current Stuart OpenGov portal and ask staff to link active old permits
Address is not accepted
Property may be outside City limits or address format differs
Use the City address lookup and Martin County Property Appraiser
Contractor cannot be added
License is not State Registered/Certified or OpenGov registration is incomplete
Verify DBPR license and complete Stuart contractor registration
Small project exemption is denied
Flood, structural, trade or $7,500 limitation is not met
Submit the normal permit rather than dividing the project
Plan review keeps returning
Comments are partly answered or documents conflict
Use a numbered response letter and one coordinated replacement set
Emergency repair has no permit record
Next-business-day OpenGov follow-up was missed
Contact the Building Official immediately and submit the required record
Inspection fails repeatedly
Wrong stage, concealed work or unresolved field changes
Stop, correct all items and obtain a revision before reinspection when required
Permit does not appear in the new account
Legacy active permit has not been linked
Email permitting@ci.stuart.fl.us with every permit number
New-development invoice is higher than expected
City and Martin County impact fees or outside reviews apply
Request a written breakdown before paying
Old permit affects sale or occupancy
Trade final, Fire approval or completion document is missing
Search all related records and request a closeout checklist
Permit records and migration

Find a Stuart Permit, Link an Old Record and Prove Closeout

Search OpenGov first

Use the public search for current permit records.

Link active legacy permits to the new account

Email permitting@ci.stuart.fl.us with the permit numbers and the email used for the OpenGov ID.

Review the complete permit family

Check the master permit plus roofing, electrical, plumbing, mechanical, gas, Fire and other linked records.

Use JustFOIA for missing historic City records

Request older plans, correspondence or files that are not available in the portal.

Save final proof

Keep final inspection results, Certificate of Completion/Occupancy, approved plans and any exemption approval with property records.

Records request wording:
“Please provide or link the permit application, approved plans, revisions, inspection history and final/occupancy record for [address/parcel], permit [number], involving [project]. My OpenGov email is [email].”
Final project control

Do Not Consider the Stuart Project Complete Until These Items Are Confirmed

  • City or County jurisdiction confirmed
  • Permit or exemption route approved
  • State contractor license verified
  • Contractor registered in OpenGov
  • Planning/zoning reviews cleared
  • Flood and wind documents complete
  • City and County impact fees checked
  • Permit formally issued
  • Notice of Commencement handled when required
  • Approved documents available on site
  • Every required inspection passed
  • All field changes revised
  • Every trade permit finaled
  • Fire approval completed when applicable
  • CO/CC obtained when required
  • OpenGov record shows final/closed
Office location

City of Stuart Building Division Map

Building and Planning office: 121 SW Flagler Avenue, Stuart, FL 34994 · Monday–Friday, 8:30 AM–5:00 PM · Building: 772-288-5326.
Official action links

Stuart Permit Portal, Forms, Maps and Compliance Resources

Frequently asked questions

City of Stuart Building Permit FAQs

Where do I apply for a City of Stuart building permit?

Use the City’s OpenGov portal. Select Building & Permitting, create or log in with an OpenGov ID, choose the correct application and upload the required project documents. The old Accela workflow is no longer the current City application route.

How do I know whether an address is inside Stuart city limits?

Use the City’s official address-lookup map and confirm the parcel. A Stuart mailing address may be in unincorporated Martin County, which uses the County Building Department and County Accela system.

What is the Stuart Building Division phone number?

Call 772-288-5326 for permit and plan-review help. The 24-hour automated building-inspection request line is 772-600-1212. Emergency permit questions go to the Building Official at 772-600-1249.

Can a project under $7,500 be completed without a permit?

Only a limited non-structural single-family project may qualify under the July 1, 2026 exemption. Flood-zone property and electrical, plumbing, mechanical, gas or structural work do not qualify. Submit a written request, work documents and an itemized signed contract, then wait for City approval.

Which Stuart projects still require permits even when inexpensive?

Examples listed by the City include roofing, load-bearing walls, elevated decks, windows, doors, storage sheds, HVAC, electrical panels or upgrades, plumbing repairs or replacement, gas appliances and water-softener installations.

What work can proceed under Stuart’s emergency permit rule?

During an actual emergency, listed water-heater replacements, A/C replacements and electrical repairs involving a weatherhead or breaker malfunction may proceed after notifying the Building Official. A registered licensed contractor must submit the OpenGov permit on the next business day.

How do I schedule a Stuart building inspection?

Call the City’s 24-hour automated inspection request line at 772-600-1212. Have the issued permit information and correct inspection stage ready. Contact Building at 772-288-5326 when the inspection type or permit status is unclear.

What contractor license does Stuart accept?

Effective July 1, 2025, Stuart no longer accepts local Certificates of Competency as contractor licensure for work covered by Florida contractor-licensing law. Contractors must use the appropriate State Registered or State Certified license and register in OpenGov.

How do I link an old active permit to OpenGov?

Create the new OpenGov account, then email permitting@ci.stuart.fl.us with the active permit numbers and the email used for the account. Staff can link the existing permits to the new profile.

How do I know a Stuart permit is fully closed?

Confirm the master permit and every related roofing, electrical, plumbing, mechanical, gas, Fire or specialty permit has an approved final inspection. Save the final OpenGov record and the required Certificate of Completion or Occupancy.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the City of Stuart.

This page was rebuilt from the City’s Building Division, OpenGov application instructions, July 2026 permit-exemption rules, emergency-permitting page, Planning & Zoning Department, Building Forms, private-provider guidance, impact-fee page, flood/wind links, contractor-license update and public-records system.

Last reviewed: July 21, 2026.

Permit categories, fees, staffing, forms and portal functions can change. Confirm time-sensitive details in OpenGov or with the City before paying, beginning work, using an exemption or relying on emergency-permit treatment.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment