San Leandro permit action guide

Apply Online, Pass Plan Review and Final Your San Leandro Building Permit

Start with the correct property, permit type and document package. San Leandro’s Accela portal handles applications, fee payments, permit tracking and inspection requests, but a record is not ready for construction simply because it has been submitted or its plans have been approved.

This guide explains the city’s street-number-only address search, 3–5-business-day intake review, 2025 California codes, project checklists, inspection windows, FY 2026–27 fees, owner-builder rules, ADU and SolarAPP+ options, floodplain review and final closeout.

Accela application, corrections, payments and inspections
Current 2026 code, permit fees and Permit Center hours
ADU, solar, seismic, flood and unpermitted-work help
San Leandro building permit moving through seismic, flood and inspection review A house plan with seismic foundation bolts moves through the online permit portal and reaches final inspection above animated San Francisco Bay waves. HOUSE + SEISMIC PLAN PLAN CHECK PERMIT FINAL INSPECTION FINALED SAN LEANDRO
!
Current 2026 corrections San Leandro’s current construction codes took effect January 1, 2026. The Finance Department now lists the FY 2026–27 fee schedule as current. The Permit Center is closed to the public on Fridays and closes for lunch from noon to 1 PM.
Start with one action

What Do You Need From San Leandro Building and Safety?

San Leandro Next-Step Finder

Select your situation to see the most useful official route.

Official contact panel

San Leandro Building Department Phone, Address and Hours

Building and Safety 510-577-3405 Permit Center and inspection-booking help
Permit and plan review 510-577-3406 Application and plan-review coordination
Inspector line 510-577-3435 Call 7:30–8:30 AM to confirm time window
Permit email PermitsByEmail@SanLeandro.org Include record number and address
Public Works Engineering 510-577-3428 Grading, land development and site work
Permit Center 835 E. 14th Street San Leandro, CA 94577
Entrance North entrance Off Lorraine Boulevard; north parking lot
Before calling: Have the permit number, property address, parcel number, project valuation, exact portal status and one clear question ready.
Permit Center schedule

Do Not Arrive During Lunch or After the Walk-In Cutoff

Day
Public counter hours
Walk-in cutoff
Monday
8 AM–noon and 1–4 PM
3:30 PM
Tuesday
8 AM–noon and 1–4 PM
3:30 PM
Wednesday
8 AM–noon and 1–3 PM
2:30 PM
Thursday
8 AM–noon and 1–4 PM
3:30 PM
Friday
Closed to the public
No walk-ins
Appointments receive priority. Walk-ins should arrive at least 30 minutes before closing, and the Permit Center closes from noon to 1 PM.
City or Alameda County?

Confirm the Property Is Inside Incorporated San Leandro

Use San Leandro when

  • The parcel is inside incorporated San Leandro.
  • The City’s jurisdiction map recognizes the property.
  • The San Leandro portal returns the correct address.
?

Check Alameda County when

  • The mailing address says San Leandro but the parcel is unincorporated.
  • The property is close to a city boundary.
  • The City portal cannot find the address.
  • An older permit was issued by Alameda County.
Use the official map: Open “Am I in San Leandro?” before paying fees or completing a full plan package.
Permit decision table

Which San Leandro Permit Fits the Project?

Project
Starting record
Also check
New house, addition or major structural remodel
Residential building permit
Planning, structural calculations, energy, soils, CalGreen, drainage, fire and utilities
Kitchen or bathroom remodel
Residential remodel
Electrical, plumbing, mechanical, structural walls and water-conserving fixtures
Windows or exterior doors
Residential building permit
Sizes, safety glazing, egress, flashing, Title 24 and structural opening changes
Deck or carport
Building plan review
Setbacks, site plan, foundation, framing, guardrails and drainage
Electrical panel, EV charger or wiring
Electrical permit
Load calculation, service capacity, utility coordination and equipment location
Plumbing or water-heater work
Plumbing permit
Gas, venting, seismic restraint, drainage and water-conserving fixtures
HVAC replacement or ductwork
Mechanical permit
Electrical, HERS testing, energy forms and equipment location
Reroof
Residential reroof permit
Layers, sheathing, roof material, ventilation, solar conflicts and fire classification
Residential solar or battery storage
PV or SolarAPP+ permit
Licensed contractor, business license, SolarAPP eligibility and owner acknowledgement
Accessory dwelling unit
ADU building permit
Zoning, utilities, flood, landslide, fees, address and separate-unit requirements
Commercial tenant improvement or change of use
Commercial plan review
Planning entitlement, accessibility, occupant load, egress, Fire and Public Works
Grading, trench or public right-of-way work
Engineering permit
Grading threshold, encroachment permit, drainage, utilities and erosion control
Official portal workflow

Apply Through Accela Without Missing the Local Portal Steps

Create and fully complete the account

Register in the San Leandro Online Permit Portal and complete every account-setup step so Permit staff can locate and connect the profile.

Portal problem: Clear the browser cache and allow pop-ups before creating another account.

Select “Create an Application” under Building

Use the blue question-mark help in the portal when you are unsure which record type matches the work.

Avoid: Selecting a simple trade record for a structural project requiring plan review.

Search the address using only the street number

Enter only the street number first, then select Search and allow the remaining address information to populate.

Example: Enter “835,” not “835 E 14th Street.”

Complete the licensed-professional section

Add the contractor, architect, engineer or designer. When the owner is acting as applicant before choosing a contractor, select Look Up, choose Designer and enter Owner in the state-license field as instructed by the City.

Permit issuance: The final responsible contractor must be properly licensed and documented.

Upload clearly named PDF files

Select Add, upload the plans and supporting records, choose the correct file type, enter a clear description and select Save.

Useful names: Site-Plan.pdf, Architectural-Plans.pdf, Structural-Calcs.pdf, Energy-Forms.pdf and Response-Letter.pdf.

Pay the filing and application charges

The portal accepts Visa, Mastercard and Discover and adds a 2.5% transaction charge. American Express is not accepted.

Avoid the card charge: Schedule a Permit Center appointment to pay by check.

Allow 3–5 business days for intake quality check

The initial “Submitted” status means the City received the record. Permit staff must check the package before routing it for plan review.

After the fifth business day: Email PermitsByEmail@SanLeandro.org when no instructional email has arrived.

Pay plan-check fees and respond to comments

Plan review begins after required information and plan-check fees are complete. Download the review comments, revise the full plan set and upload a numbered response.

Official range: Initial plan review may take approximately 5–20 business days depending on project complexity.

Complete final packaging and permit issuance

Approved plans are not permission to start. Add contractor information, business-license information, signatures and final documents requested by the City, then pay issuance fees.

Start work only when: The record is formally Issued.

Print the issued permit and schedule inspections

Download the issued permit documents, keep approved plans onsite and request the first inspection through the online account.

Inspection eligibility: Status must be Issued or Ready for Inspection.
Portal status map

Know What Must Happen Before Construction Begins

Account complete
Application submitted
3–5 day intake check
Plan review and corrections
Final packaging and fees
Issued permit and inspections
Document preparation

Build a Complete Plan Package Before Uploading

Property and zoning

  • Correct jurisdiction
  • Property address and parcel number
  • Zoning district and permitted use
  • Property lines and easements
  • Setbacks and lot coverage
  • Parking and access

Construction documents

  • Scope and code analysis
  • Existing and proposed plans
  • Site plan and elevations
  • Structural and foundation details
  • Electrical, plumbing and mechanical scope
  • Energy-compliance documents

Supporting records

  • Soils report when required
  • CalGreen checklist
  • C&D diversion form
  • Flood worksheet when applicable
  • Special-inspection agreement
  • Owner-builder or subcontractor forms
Current code: San Leandro’s 2025 California Building, Residential, Electrical, Energy, Fire, Green Building, Mechanical and Plumbing Codes took effect January 1, 2026. The City also applies local amendments for conditions such as seismic design.
Project-specific checklists

Use the Exact City Guide for the Work

Project
Prepare before filing
Common delay
Kitchen remodel
Existing and proposed layout, appliance locations, electrical, plumbing, ventilation and structural changes
Scope says cosmetic work while plans show wall or system changes
Bathroom remodel
Fixture layout, electrical, ventilation, waterproofing, plumbing and glazing information
Relocated plumbing or changed window omitted from scope
Windows and doors
Opening sizes, locations, energy values, glazing, egress and flashing details
Product data does not match the plan or existing opening
Deck
Site plan, dimensions, footings, framing, ledger, guards, stairs and setbacks
Unclear attachment to house or property-line distance
Swimming pool or spa
Site plan, structural details, equipment, barrier, electrical and drainage information
Easement, utility or barrier conflict
Commercial tenant improvement
Use, occupancy, occupant load, egress, accessibility, Fire, MEP and CalGreen documents
Proposed business use is not approved by Planning
Demolition
Utility clearances, debris plan, environmental records, site restoration and replacement-project information
Missing air-quality, hazardous-material or utility coordination
Flood-zone construction
Flood map, elevation information, substantial-improvement worksheet and flood-compliance design
Project valuation submitted without all labor and material costs
Construction-waste closeout

Plan for the 65% C&D Diversion Requirement

Before permit submission

  • Complete the City’s C&D Diversion Submittal Plan.
  • Upload the form with the building application.
  • Choose Green Halo or a compliant recycling facility.
  • Tell contractors where debris must be taken.

Before permit final

  • Keep recycling and disposal receipts.
  • Track salvaged and reused material.
  • Verify at least 65% of nonhazardous waste was recycled or salvaged.
  • Provide receipts to the inspector before final approval.
The FY 2026–27 fee schedule lists a $219 charge for failed C&D debris compliance. Keep the records throughout construction rather than trying to reconstruct them at final inspection.
Older-property requirement

SB 407 May Require Water-Conserving Plumbing Fixtures

For buildings constructed on or before January 1, 1994, additions, alterations or improvements may trigger replacement of noncompliant plumbing fixtures before final permit approval or issuance of a Certificate of Occupancy.

  • Check toilets and urinals
  • Check showerheads
  • Check interior faucets
  • Document compliant replacements
  • Coordinate plumbing permits
  • Finish before final inspection
Inspection command center

Schedule, Confirm and Prepare for San Leandro Inspections

Scheduling Online portal Contractor or homeowner account required
Normal morning window 8:30 AM–noon Request morning when the site will be ready
Normal afternoon window 1–4 PM Request afternoon when appropriate
Confirm time window 7:30–8:30 AM Call 510-577-3435 on inspection day

Before requesting

  • Permit is Issued or Ready for Inspection
  • Correct permit number entered
  • Correct inspection stage selected
  • Required prior inspections passed
  • Work fully ready
  • Contact information current

Before the inspector arrives

  • Approved plans onsite
  • Permit and job documents available
  • Work visible and uncovered
  • Gate and rooms accessible
  • Safe ladder provided
  • Animals secured
After-hours and weekend inspections may be available for an additional fee. The City requests at least two business days’ advance notice.
Do not cover regulated work before inspection. Concealed framing, reinforcement, plumbing, electrical, mechanical or insulation may need to be reopened.
Typical inspection order

Book Inspections in the Sequence Shown on the Issued Permit

Footing, foundation and underground
Under-slab plumbing and electrical
Rough trades
Framing and structural
Insulation, energy and drywall
Trade finals and building final
The exact sequence depends on the permit. Check the issued job card and online record rather than relying on a generic inspection list.
FY 2026–27 fee schedule

Useful Current Building-Permit Fees

Filing and issuance $219 Per permit
Permit extension $109 Request before expiration
Reopen expired permit $656 Separate from remaining permit costs
Revision after issuance $328 Re-filing fee per occurrence
Selected fee
FY 2026–27 amount
Important note
General permit valuation $1–$5,000
$547
Filing, plan check, technology and other charges may be additional
Plan-check valuation $1–$5,000
$219
Plan-check fee is in addition to the permit fee
Residential main-dwelling reroof
$656
Current flat fee shown in the adopted schedule
Accessory garage reroof with main dwelling
$328
Applies when permitted at the same time
Residential EV charger
$328
One- or two-family residence
Residential PV up to 15 kW
$464
$15.45 for each additional kW over 15 kW
Plan A residential seismic retrofit
$83
For qualifying one- and two-family Plan A projects
Earthquake gas shutoff-valve inspection
$155
Per permit
Minor residential OTC plan check
$790
Confirm project eligibility with staff
Certificate of Occupancy
$219 minimum
One-hour minimum under the schedule
Current-source warning: The Building forms page may still display a 2025–26 fee link. For work submitted after July 1, 2026, verify the Finance Department’s FY 2026–27 adopted schedule and the live permit invoice.

General Building Permit and Plan-Check Estimator

Enter the declared construction valuation. This estimates the FY 2026–27 filing, general permit and plan-check components.

The calculator is not an invoice. Technology fees, community-planning fees, state charges, energy review, trade permits, Fire, Public Works, school, utility, development-impact and credit-card charges may apply.

Open FY 2026–27 Fee Schedule Verify on Finance Page

Fee structure

Why the Invoice Is Higher Than One Permit-Fee Line

Multiple payments

The City explains that a building permit normally has at least two payments: filing and issuance first, followed by permit-issuance charges.

Plan-check payment

Projects requiring plans have a separate plan-check fee that must be paid before the package is routed for technical review.

Percentage fees

The FY 2026–27 schedule lists a 6.92% technology fee and a 10.84% community-planning fee when applicable.

The schedule says the community-planning percentage is not charged on ADUs, stand-alone mechanical, plumbing and electrical permits, minor residential remodels and minor tenant improvements.
Owner-builder protection

Bring the Current Owner-Builder Form and Photo ID to the Permit Center

Owner-builder choice
Your responsibility
Owner-builder as worker
You personally perform the construction work and remain responsible for permits and inspections.
Owner-builder as contractor
You act as general contractor and hire CSLB-licensed subcontractors with current San Leandro business licenses.
Owner-builder as employer
You hire persons who are not licensed subcontractors and provide required workers’ compensation insurance.
Project supervision
You schedule, supervise and pay workers and subcontractors and arrange every inspection.
$1,000 employment threshold
The June 2026 form warns that using nonlicensed workers on work totaling at least $1,000 may make you an employer.
Sale within 12 months
The form explains legal restrictions and possible liability when the property is offered for sale within 12 months after final completion.
Do not pull an owner-builder permit for an unlicensed contractor. The property owner becomes the responsible party of record and may face worker, insurance, tax, defect and financial liability.

Open June 2026 Owner-Builder Form Verify Contractor License

Accessory dwelling units

Check the Parcel Before Choosing the Pre-Reviewed ADU Route

Pre-reviewed program purpose

The City’s program is designed to accelerate permits for new detached ADUs in incorporated San Leandro.

Properties currently excluded

The pre-reviewed route is not available for parcels in a landslide zone, flood zone or nonresidential zone.

Master plans

The City is accepting master-plan applications, but the approved-master-plan section is still marked “Coming Soon.”

Impact-fee waivers

City Council waived Park Impact Fees and Development Fees for Street Improvements for all ADUs beginning in 2025.

Fees that may remain

Building, plan check, utility, wastewater connection and other project-specific charges may still apply.

Start with zoning

Use the City’s ADU tools and zoning handout before paying for complete architectural or structural plans.

A pre-reviewed design does not mean the parcel is automatically approved. Site placement, utilities, drainage, address, fire access, flood, landslide and owner-specific conditions still require review.

Open San Leandro ADU Resources Open Pre-Reviewed ADU Program

Solar, flood, seismic and grading

Special Project Routes That Need Extra Screening

Instant SolarAPP+ permit

  • Residential property must be in incorporated San Leandro.
  • The system cannot be ballasted.
  • Contractor must hold an eligible B, C-10 or C-46 license.
  • Contractor needs a current San Leandro business license.
  • Contractor must be registered with SolarAPP+.
  • Permit runners cannot apply for the instant permit.
  • Upload approved SolarAPP documents and signed owner acknowledgement.

Flood-zone project

  • Check the City’s FEMA comparison map.
  • Determine the 100-year flood elevation.
  • Prepare the Substantial Improvement Worksheet.
  • Include all labor and material costs.
  • Projects at or above 50% of structure value may trigger full flood-compliance requirements.
  • Substantially improved buildings may need elevation to or above flood elevation.

Earthquake retrofit

  • Older raised-floor homes may qualify for strengthening resources.
  • Use the City’s Plan Set A when the project qualifies.
  • Hillside homeowners should contact Building and Safety directly.
  • Multi-unit soft-story buildings may be subject to the City ordinance.

Grading and right-of-way work

  • A grading permit may apply at 50 cubic yards or more of soil movement.
  • Excavation or trenches five feet deep or more can trigger grading review.
  • Work in the public right-of-way requires an encroachment permit.
  • Coordinate drainage, erosion control, utilities and traffic safety.
Planning and zoning

Ask Planning Before Filing Certain Building Permits

Residential projects

Planning permits may be required for new dwelling units, some additions in RS-VP areas, additions doubling existing floor area and certain second- or third-story additions.

Commercial projects

Verify that the proposed business or occupancy is allowed and determine whether a use permit, site-plan review or other entitlement is required.

Planner-on-Duty request

Send the property address, contact information and a sketch or draft plan to help Planning provide a useful answer.

Planner on Duty: 510-577-3325 or planner@sanleandro.org.

Open Planning Division Open Zoning Map and Code

Permit and property records

Find the Permit, Then Verify It Was Finaled

Search the online permit portal

Use the permit number when available. When scheduling an inspection, the City specifically advises entering only the permit number in the record-information field.

Open all associated records

Building, electrical, plumbing, mechanical, solar, Fire, Planning and Engineering records may be separate.

Review inspection history

Finding an issued permit does not prove the work passed final inspection or received occupancy approval.

Save the approved closeout records

Keep the issued permit, approved plans, revision approvals, inspection history, final result and Certificate of Occupancy or Compliance when applicable.

Research missing records

Schedule a property-record research appointment or submit a public-record request when older plans and documents are not visible online.

The FY 2026–27 schedule lists $547 to reproduce a lost permit package containing plan sets, supporting documents and the job card.
Unpermitted work

Do Not Assume Old Work Is Legal Because It Already Exists

Permit-required work includes

  • Construction, enlargement and alteration
  • Repairs regulated by building code
  • Demolition or building movement
  • Change of occupancy
  • Electrical, gas, mechanical and plumbing changes

Possible correction steps

  • Document existing conditions
  • Prepare as-built plans
  • Obtain Planning approval
  • Open concealed work
  • Complete required upgrades
  • Pass all correction inspections
Paying an investigation or violation fee does not make the work compliant. The work must still satisfy applicable codes and inspections.

Open Unpermitted Work Guidance

Status decoder

What the Portal Status Means

Submitted The City received the record. Intake quality review has not necessarily been completed.
Additional Info Required A license, business license, signed form, contractor detail or other document is missing.
Plan Review Technical review is underway after the plan-check payment and complete routing.
Plan Check Comments Download every comment and submit a coordinated revision plus response letter.
Final Packaging Plans may be approved, but contractor information, signatures, fees or final documents remain.
Issued The permit is active and work may begin within the approved scope.
Ready for Inspection The permit is eligible for online inspection scheduling.
Finaled Required inspections are complete. Save the record and confirm associated permits also closed.
Troubleshooting

Fix Common San Leandro Permit Problems

Problem
Likely reason
Best next action
Address does not populate
Full address entered instead of street number, or wrong jurisdiction
Enter only the street number and confirm incorporated San Leandro.
No email after submission
Intake quality check is still pending or account email is incorrect
Allow five business days, check spam and email Permit staff with the record number.
Plans are approved but work cannot start
Final packaging, contractor information or issuance fees remain
Complete all final-packaging requirements and confirm Issued status.
Inspection cannot be scheduled
Wrong search field, permit not issued or account not linked
Enter only the permit number and call 510-577-3405 for registration help.
Plan review is delayed
Plan-check fee, incomplete plans or another department’s review is pending
Open all fees, comments and conditions and request the exact outstanding item.
Final inspection is blocked
C&D receipts, trade final, HERS, Fire, Planning or Public Works item is missing
Request a complete closeout list for every associated record.
Permit expired
The permit was not extended before its expiration date
Ask whether the permit can be reopened and what updated plans or inspections are required.
Old work has no permit
Work was performed without approval or records cannot be located
Research records first, then ask for the legalization and inspection requirements in writing.
Ready-to-use communication

What to Say When You Call or Email

Permit-route question
“I plan to [describe exact work] at [full address and parcel number]. Is this inside City jurisdiction, which Building record should I create, and which Planning, Fire or Engineering approvals apply?”
Application intake question
“My application is [record number] for [address] and was submitted on [date]. Has intake review been completed, and what exact item prevents routing to plan review?”
Plan-check question
“I received comments for [record number]. Should I upload a complete revised plan set, individual sheets, a numbered response letter or additional supporting documents?”
Open-permit question
“I found permit [number] for [address], but I cannot confirm final approval. Which inspection, trade permit, C&D record or department sign-off remains?”
Final project checklist

Do Not Consider the Permit Complete Until These Are Confirmed

  • City jurisdiction confirmed
  • Correct permit type selected
  • Account fully completed
  • Address searched by street number
  • Planning and zoning cleared
  • Plans and supporting forms accepted
  • Plan-check comments resolved
  • Contractor and business license complete
  • All issuance fees paid
  • Permit status shows Issued
  • Approved plans kept onsite
  • Inspections completed in sequence
  • C&D receipts accepted
  • Building and associated permits finaled
Permit Center location

San Leandro Building and Safety Map

Address: San Leandro City Hall, 835 E. 14th Street, San Leandro, CA 94577.
Entrance: Use the north entrance off Lorraine Boulevard.
Parking: North parking lot, with driveways on Peralta Street and Lorraine Boulevard.
Official resources

Open the Correct San Leandro Permit Resource

Frequently asked questions

San Leandro Building Department Questions

Where do I apply for a San Leandro building permit?

Apply through the City’s Accela Online Permit Portal. Create an account, select Create an Application under the Building heading, enter only the property’s street number when searching the address and upload the required PDF files.

What is the San Leandro Building Department phone number?

Call Building and Safety Services at 510-577-3405. The Inspector Line is 510-577-3435, and the Permit and Plan Review contact is 510-577-3406.

What are the San Leandro Permit Center hours?

The Permit Center is open 8 AM to noon and 1 to 4 PM on Monday, Tuesday and Thursday. Wednesday hours are 8 AM to noon and 1 to 3 PM. It is closed to the public on Friday and during lunch from noon to 1 PM.

How long does San Leandro plan review take?

The City first requests three to five business days for intake quality review. After the package is complete and plan-check fees are paid, initial technical review may take approximately five to 20 business days depending on complexity.

How do I schedule a San Leandro building inspection?

Log into the Online Permit Portal and schedule the inspection after the permit shows Issued or Ready for Inspection. Enter only the permit number when searching. Call 510-577-3435 between 7:30 and 8:30 AM to confirm the inspection-day window.

How much is a San Leandro building permit?

Fees depend on valuation and project type. The FY 2026–27 schedule lists a $219 filing and issuance fee, a $547 general permit fee for projects valued from $1 to $5,000 and a separate $219 plan-check fee for that valuation range. Other percentage, trade, state and development fees may apply.

Can I apply as an owner-builder?

Yes, but the owner becomes responsible for the permit, workers, subcontractors, inspections, code compliance and final approval. The completed June 2026 Owner-Builder Acknowledgement and photo ID must be brought to the Permit Center.

Does San Leandro offer instant residential solar permits?

Yes, for qualifying projects submitted by eligible California-licensed contractors registered with SolarAPP+. The property must be in incorporated San Leandro, the system cannot be ballasted and the required SolarAPP documents and owner acknowledgement must be uploaded.

What happens when a flood-zone project exceeds 50% of the building value?

A reconstruction, rehabilitation, addition or other improvement costing at least 50% of the structure’s market value is considered a substantial improvement. The building may need to comply with the City’s flood-damage-prevention rules, including elevation requirements.

How do I prove that an old San Leandro permit was completed?

Find the permit in the portal, review its inspections and check every related trade record. Save the final inspection result and any Certificate of Occupancy or Compliance. Request a property-record search when older plans or records are not online.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the City of San Leandro.

This page was checked against San Leandro Building and Safety, the Online Permit Portal, Applying for a Permit, Permit Center, Inspection Services, Permits and Plan Review, FY 2026–27 fee schedule, June 2026 Owner-Builder Acknowledgement, Planning, ADU, SolarAPP+, Floodplain Management, grading and unpermitted-work resources.

Last reviewed: July 21, 2026.

Forms, fees, code requirements, office schedules, portal functions and inspection availability can change. Confirm time-sensitive information with the City before filing, paying or beginning construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.