City Of Richmond Building Department | Permits, Inspections & Official Contact

Richmond permit action center

Move Your Richmond Project From Address Check to Issued Permit, Inspection and Final Closeout

A Richmond mailing address does not automatically mean the independent City of Richmond issues the permit. The property may be in Henrico or Chesterfield County and use a different portal, fee schedule and inspection office.

For projects inside the city, this guide explains the Online Permit Portal, residential and commercial plan requirements, separate trade permits, zoning and historic-district reviews, current fees, inspection scheduling, corrections, expiration and final closeout.

Homeowners get a simple action path; contractors, architects, engineers, developers and business owners get deeper review, code and multi-agency checkpoints.

Official permit portal Richmond-specific fees Zoning, historic and inspection help
Richmond permit moving through plan review and inspection RICHMOND PROJECT PLAN REVIEWED PERMIT FINAL INSPECTION READY
📌
Current service snapshot The Permit Center lists walk-in service Monday–Friday, 8:00 AM–1:00 PM; phone service 8:00 AM–5:00 PM; and field inspections Monday–Friday, 7:00 AM–3:30 PM. Inspections are scheduled by day, not a guaranteed appointment time.

Richmond Permit Route Finder

Select the situation that matches your project.

Start here

Choose the Exact Richmond Permit Action You Need

Jurisdiction first

Confirm the Property Is Inside the Independent City of Richmond

Use Richmond’s portal when

  • The parcel is inside city limits
  • The portal finds the property
  • The city zoning map identifies it
  • Records do not name Henrico or Chesterfield

Verify before filing when

  • The mailing address only says Richmond
  • The property is near a county boundary
  • The portal cannot find the address
  • A contractor provides a county link
Do not rely on the postal city. A Richmond mailing address may be in Henrico or Chesterfield County. Check city zoning and permit systems before paying or uploading plans.
Official contacts

Richmond Permits and Inspections Address, Hours and Phone Numbers

Permit Center 900 E. Broad St., Room 108 Richmond, VA 23219
Walk-in hours 8:00 AM–1:00 PM Monday–Friday
Phone hours 8:00 AM–5:00 PM Monday–Friday
Inspections 7:00 AM–3:30 PM Monday–Friday
Scheduling help 804-646-1628 Inspection assistance
Portal help CSSHelp@rva.gov Account and portal issues
Portal login update: Existing users should create the updated login with the same email previously associated with the portal so older applications link to the account.
Permit decision table

Match the Project to the Correct Richmond Permit Path

Project
Likely route
Prepare first
Extra check
New home, addition or structural renovation
Residential building
Site, foundation, floor, roof, elevations and details
Zoning, soil, flood, historic and utilities
Commercial construction, fit-out or change of use
Commercial building
Narrative, code/life-safety analysis and sealed plans
Fire, accessibility, zoning, Public Works and CO
Electrical, mechanical, plumbing or gas
Separate trade permit
Licensed contractor, scope and current trade documents
Commercial MEP is not included in the building permit
Shed up to 256 sq. ft.
Possible building exemption
Size, setbacks, height and utility details
Zoning permit still required
Fence, retaining wall or small pool
Project-specific check
Height, depth, location, surcharge and barrier use
Zoning, flood and historic rules
Exterior work in Old and Historic District
CAR review
Photos, materials, colors and drawings
Certificate of Appropriateness
Restaurant, daycare or assembly use
H-CO route
Use, occupant load, plans and prior CO
Fire, zoning and business approvals
Street, alley or sidewalk work
Right-of-way permit
Location, closure, excavation and restoration
Public Works approval before obstruction
Permit exemption check

“No Building Permit” Does Not Mean “No Approval”

Possible exemptions

  • Ordinary repairs
  • Like-for-like windows and doors
  • Cabinetry, trim, paint and wallpaper
  • Qualifying shed up to 256 sq. ft.
  • Some fences and low walls

Approvals that may remain

  • Zoning permit
  • Historic CAR review
  • Flood review
  • Trade permit
  • Pool-barrier compliance
  • Right-of-way permit

Ask this exact question

“Does this scope require a building permit, zoning approval, historic COA, trade permit, flood review or right-of-way permit at this address?”

Application workflow

How to Submit a Strong Richmond Permit Application

Confirm jurisdiction, zoning and legal use

Verify city limits and identify zoning, historic, flood and public-space conditions before final drawings.

Expert: Test setbacks, lot coverage, parking, occupancy and overlay requirements.

Write a clear scope and construction value

Describe what is new, altered, removed or repaired and include labor and materials in the estimated value.

Identify every permit

Building and trade work use separate applications. Create a parent-and-subpermit list before filing.

Apply through OPP

Register, choose Apply, select the correct plan type, upload files and save the application number.

Upload coordinated PDFs

Use descriptive names and make the scope, value, plans and permit types consistent.

Commercial: Use the city’s accepted file types; separate MEP PDFs by discipline.

Pay intake fees and monitor reviews

Building, Zoning, Planning, CAR, Public Works, Utilities, Fire and other divisions may review simultaneously.

Answer corrections item by item

Repeat each comment, identify the revised sheet and upload one coordinated current set.

Confirm issuance before work

Download the issued permit and approved plans. Approval or payment alone is not permission to start.

Complete inspections and closeout

Leave work visible, pass building and trade finals and save the final/closed record.

Plan preparation

What Richmond Residential and Commercial Plans Should Include

Residential package

  • Site plan and setbacks
  • Soil report for new home
  • Foundation, floor and roof plans
  • Existing/new/demolished walls
  • Elevations and sections
  • Construction details
  • Truss information
  • Structural reports when required

Commercial package

  • Project narrative and drawing index
  • Code and life-safety analysis
  • Occupancy and construction type
  • Site and accessible route
  • Architectural and structural plans
  • COMcheck or energy documents
  • Asbestos information
  • Special-inspection documents
Commercial format: Plans must be complete and legible. The current guide lists a minimum architectural scale of 1/8 inch = 1 foot and requires Virginia-sealed plans unless a legal exemption applies.
Review goals

Current Richmond Intake and Initial Plan-Review Goals

Stage
Published goal
What stops or extends it
Online submittal review
3–5 business days
Missing fields, files, account or property issues
Initial review: projects about $1–$1.5 million
5–10 business days
Complexity and other city departments
Initial review: about $1.5–$10 million
10–20 business days
Multi-agency and technical review
Larger/complex projects
20–30 business days or more
Size, complexity and correction cycles

These are bureau goals, not total-project guarantees. Clocks pause while the city waits for applicant information.

Verified fees

Richmond Permit Fees and Common Extra Charges

Item
Published amount
Note
Residential 1- or 2-family, $0–$2,000 value
$63
Fee schedule effective July 1, 2024
Residential over $2,000
$63 plus $6.07 per thousand or fraction
Portal uses higher of estimate or RS Means
Commercial, $0–$2,000
$131
Separate reviews may add charges
Commercial over $2,000
$131 plus $8.50 per thousand or fraction
Final invoice controls
State surcharge
2%
Added to final calculated permit fee
Residential / commercial demolition
$184 / $368
Commercial area adjustment may apply
Residential / commercial reinspection
$32 / $63
Includes listed failure-to-appear condition
After-hours inspection
$110 per hour
Nights, weekends and holidays
Certificate of Occupancy
$263
Includes temporary and partial
Stop-work investigation
$400 per permit
Working without a permit
Permit extension
$25
Approval still required
Zoning and historic review

Resolve Richmond Zoning Before the Building Permit Stalls

Certificate of Zoning Compliance

Use OPP for residential, commercial, short-term rental, accessory-structure and other CZC applications. Assembly uses use the H-CO route.

Board of Zoning Appeals

Current fees: $175 for single- or two-family cases, $550 for other uses and $250 to appeal a Zoning Administrator decision.

Historic district

CAR reviews exterior changes in City Old and Historic Districts and issues Certificates of Appropriateness.

Zoning service
Published fee
Home occupation CZC
$50
One or two dwelling units CZC
$100
Three to 12 dwelling units
$200
Other use up to 5,000 sq. ft.
$300
Other use over 5,000 sq. ft.
$600
Short-term rental, valid two years
$600
Buildable-lot / lot-split letter
$300
Administrative variance
$100
Inspection workflow

Schedule and Prepare for Richmond Inspections

Request online

Sign into OPP and use My Inspections. Scheduling help: 804-646-1628.

Daily window

Inspections are conducted Monday–Friday, 7:00 AM–3:30 PM, by day rather than exact time.

Call ahead

Request a 30-minute call ahead in the scheduling comments when needed.

Stage
Ready condition
Common failure
Footing
Excavation and reinforcement visible before concrete
Concrete placed early
Foundation
Required foundation components visible
Work concealed
Framing
Structure matches approved plans
Unapproved field changes
Rough trades
Electrical, mechanical, plumbing and gas exposed
Wrong permit or covered work
Energy / insulation
Material installed before concealment
Walls closed early
Final
Project and trade finals complete
Outstanding correction or permit
Shower-liner update: The installer performs the test and the contractor/owner provides the completed certification to the building inspector at final inspection under the city’s current policy.
Permit life cycle

Expiration, Revisions, Contractor Changes and Occupancy

180-day validity Building permits are valid 180 days from issuance; each building inspection extends the permit 180 days from the last inspection.
Expired permit Submit the extension form to PDR.Permits@rva.gov and obtain approval before continuing.
Post-permit revision Changes after issuance must be reviewed and approved before incorporation into the work.
Changing contractor If the permit was issued and inspections occurred, the homeowner guide directs cancellation and a new application with new documents.
Residential CO A CO is required before occupancy of a new building or a change of occupancy, not ordinarily for an addition or deck to an existing dwelling with a CO.
Third-party option Approved third-party agencies may handle qualified review/inspection work under city procedures; some finals remain city inspections.
Permit records

How to Search Richmond Permits and Find Missing Records

Confirm city jurisdiction

A missing result may mean the property belongs to Henrico or Chesterfield.

Search by plan or permit number

Use the exact identifier from a permit, invoice, email or inspection notice.

Try the base address

Remove unit information and compare owner, description and dates before selecting a record.

Read the complete record

Check status, issue date, invoices, reviews, inspections and final disposition.

Request missing documents

Email the permit help desk with address, approximate year, prior owner and the exact documents needed.

Troubleshooting

Fix Common Richmond Permit Problems

Problem
Likely cause
Next action
Old records missing after login
New account used a different email
Use the prior portal email and contact CSSHelp@rva.gov
Address not found
Wrong jurisdiction or formatting
Confirm city limits and try base address
Application remains saved
Required field or submit step missing
Confirm an application number was generated
Review not started
Invoice, license or document unresolved
Check workflow and contact permit technician
Corrections repeat
Partial response or conflicting plans
Submit itemized response and coordinated set
Inspection unavailable
Permit hold, expiry or prerequisite
Check My Permits and call 804-646-1628
Field work changed
Unapproved revision
Pause and submit post-permit revision
Open permit during sale
Final never completed
Request full record and written closeout path
Call and email scripts

What to Say to Richmond Permit Staff

Permit question
“I plan to [scope] at [address]. Please confirm city jurisdiction, building and trade permits, zoning or historic review, plans and inspections.”
Status question
“Plan [number] shows [status]. Which review, invoice, document or correction is preventing the next step?”
Correction response
“The response addresses each comment and identifies the revised sheet. Please confirm acceptance and any remaining review.”
Inspection request
“I need [inspection] for permit [number]. The work is ready and visible. Please add a 30-minute call-ahead request.”
Completion checklist

Do Not Finish the Project Without These Confirmations

  • City jurisdiction confirmed
  • Zoning and legal use checked
  • Historic and flood checks completed
  • Building and trade permits identified
  • Right-of-way work identified
  • Plans coordinated
  • Invoices paid
  • Reviews resolved
  • Permit formally issued
  • Approved plans on site
  • Required work left visible
  • Building and trade finals passed
  • Revisions approved
  • CO obtained when required
  • Records show final or closed
  • Closeout proof saved
Office location

Richmond Permit Center Map

Permit Center: Richmond City Hall, 900 E. Broad St., Room 108, Richmond, VA 23219. Bring the address, permit/plan number and documents. Call before a special trip.
Official resources

Open the Correct Richmond Permit Resource

🏗️ Permits and InspectionsMain office, notices, review goals, codes and requirements 🖥️ Online Permit PortalApply, search, pay, print and schedule inspections 📂 Current FormsBuilding and trade applications, checklists and requirements 🏠 Homeowner Permit GuideApplication, inspection, expiration and CO workflow 💵 Permit Fee SchedulePermit, inspection, CO and extension charges 📍 Zoning AdministrationCZCs, zoning map, letters and variance routes 🏛️ Historic ReviewOld and Historic District COA requirements 👷 Third-Party ProgramQualified plan-review and inspection alternatives Virginia Contractor LookupVerify license, classification and status
Frequently asked questions

City of Richmond Building Permit FAQs

Where do I apply for a City of Richmond building permit?

Use the official Online Permit Portal. Register or sign in, select Apply, choose the correct plan or permit type, upload documents and monitor invoices and reviews.

What is the Richmond permit office phone number?

Call 804-646-4169 or email PDRPermitsAndInspections@rva.gov. The Permit Center is at 900 E. Broad St., Room 108.

What are the Permit Center and inspection hours?

Walk-in service is currently listed Monday–Friday, 8:00 AM–1:00 PM; phone service 8:00 AM–5:00 PM; inspections 7:00 AM–3:30 PM.

How do I check permit status?

Open the Online Permit Portal and use Search. Search by plan or permit number when possible and open the complete record.

Does a shed require a permit?

A qualifying one-story shed not exceeding 256 square feet may be exempt from a building permit, but a zoning permit is still required. Historic and flood rules may also apply.

How long does plan review take?

Published goals include 3–5 business days for online intake and size-based initial-review goals from 5–10 to 20–30 business days or more. Other departments and applicant delays extend the total time.

How are permit fees calculated?

The current schedule lists residential and commercial base fees, per-thousand additions for values over $2,000, and a 2% state surcharge. The portal invoice is the final payment source.

How do I schedule an inspection?

Sign into OPP and use My Inspections. Inspections are scheduled by day. Request a 30-minute call ahead in comments and call 804-646-1628 for assistance.

When does a permit expire?

A building permit is valid for 180 days from issuance. Each building inspection extends it another 180 days from the last inspection. Obtain an approved extension before continuing expired work.

Do historic-district projects need extra approval?

They may. CAR reviews exterior changes in City Old and Historic Districts and issues Certificates of Appropriateness when required.

Independent guide

Source and Update Notes

Building-Department.org is independent and is not the City of Richmond. Applications, payments, inspections and official decisions must use city systems.

Researched from current Richmond permit pages, 2025 plan guides, the July 2024 permit-fee schedule and December 2025 zoning fees. Refreshed July 21, 2026.

Forms, fees, staff, review goals and procedures can change. Confirm time-sensitive details before filing or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment