City Of Long Beach Building Department | Permits, Inspections & Official Contact

Long Beach permit action guide

Choose the Correct Long Beach Permit Route Before You Submit Plans or Pay Fees

Long Beach does not use one application route for every construction project. A reroof or water-heater replacement may be issued online, a window replacement may qualify for Express service, an ADU may use over-the-counter review, and a new building requires submitted multi-agency plan review.

This guide helps you choose that route first, prepare the correct forms, avoid coastal or historic-review surprises, track plan corrections, schedule inspections online and verify final approval.

Online, Express, OTC and submitted plan-review paths
Coastal-zone and historic-district approval checks
Inspection scheduling, cancellation and permit records
Four Long Beach permit routes moving toward approval and final inspection A coastal Long Beach scene shows online, express, over-the-counter and submitted plan-review routes joining an issued permit and final inspection. LONG BEACH PROJECT CHOOSE THE CORRECT ROUTE 1 ONLINE PERMIT 2 EXPRESS PERMIT 3 OTC PLAN REVIEW 4 SUBMITTED REVIEW APPROVED PERMIT FINAL INSPECTION PASSED LONG BEACH CITY HALL
📅
Building inspection requests are online only. Long Beach states that telephone requests are not accepted for building inspections. To cancel, email DV-CancelInspections@longbeach.gov by 8:00 AM on the inspection day with your name, project number and project address.
Start here

Choose the Long Beach Action You Need

Long Beach Permit Route Finder

Select the project or problem that best matches your situation.

Official contact panel

Long Beach Building & Safety Phone, Address and Hours

Permit Center 562-570-PMIT (7648) Permits, plan review, records and general Building & Safety help
Community Development 562-570-LBCD (5223) General department assistance
Planning & Zoning 562-570-6194 Zoning, coastal, historic and entitlement questions
Health inspections 562-570-4132 Health inspection scheduling
Monday, Tuesday, Thursday, Friday 8:00 AM–4:00 PM Permit Center public hours
Wednesday 9:00 AM–4:00 PM Permit Center public hours
Daily lunch closure 12:00–1:00 PM Permit Center and many phone lines close
Permit Center address 411 W. Ocean Blvd., 2nd Floor Long Beach, CA 90802
Walk-in limitation: Walk-ins are welcome, but the appointment page says walk-ins are not accepted from 11:30 AM to 1:00 PM or after 3:30 PM. Appointments are strongly encouraged.
Jurisdiction check

Confirm the City of Long Beach Is the Correct Permit Authority

Use Long Beach Community Development when

  • The job site is inside incorporated Long Beach.
  • The City’s permit or property search recognizes the address.
  • The project is not under a separate Port, State or other agency jurisdiction.
?

Verify first when

  • The property is close to Signal Hill, Lakewood, Carson or an unincorporated boundary.
  • The work is inside the Port of Long Beach, harbor or public right-of-way.
  • The mailing address says Long Beach but the city boundary is unclear.
Fast check: Search the property in Long Beach permit records or call 562-570-PMIT with the address before preparing a full application.
The most important decision

Long Beach Uses Four Different Construction Permit Routes

1

Online permit

For listed projects that do not require traditional plan review.

  • Residential PV, ESS and qualifying EV chargers
  • One- and two-family reroof
  • Water-heater changeout
  • Electrical panel changeout
  • Minor kitchen, bathroom or drywall work
2

Express permit

For minor work that does not require a plan check.

  • Window replacement
  • Simple kitchen or bathroom repair
  • Water heater or electrical service work
  • Heating upgrades
  • Other projects listed in IB-058
3

Over-the-counter review

For qualifying minor projects that need an in-person plan review.

  • One-story residential additions
  • Accessory dwelling units
  • Minor tenant improvements
  • Minor storefront alterations
  • Relocation of 50 or fewer sprinkler heads
4

Submitted plan review

For complex projects requiring routed agency review.

  • New buildings
  • Major additions
  • Complex alterations
  • Multidiscipline commercial work
  • Projects not eligible for Express or OTC
Do not choose by project name alone. A kitchen remodel can be a minor online permit, an Express permit or a submitted plan-review project depending on structural, electrical, plumbing, mechanical, accessibility and occupancy changes.
Online permit limits

Projects Currently Listed for the LB Services Online Portal

Online category
Published limitation
What to prepare
Solar photovoltaic and energy storage
One- and two-family dwellings and accessory structures; PV and ESS not exceeding 38.4 kW or 38.4 kWh
System layout, equipment, checklist, contractor or owner authorization
Electric vehicle charging station
Qualifying one- and two-family projects; the City page lists no more than two EVCS
Electrical information, equipment and FORM-019 checklist
Reroof
One- and two-family dwellings and related accessory structures
Roof type, area, layers, contractor and project address
Water-heater changeout
Simple qualifying replacement
Fuel, size, location and contractor or owner authorization
Electrical panel or subpanel changeout
Qualifying simple changeout
Existing and proposed rating, service information and contractor
Minor repair or alteration
Minor kitchen remodel, bathroom remodel or drywall/plaster repair in one- and two-family dwellings
Exact scope and confirmation that plan review is not required
Authorization rule: Owners or contractor agents may need a letter of authorization or FORM-006 Owner/Builder/Contractor Permit Proxy. Approved online permits are emailed after payment.
Long Beach exemption thresholds

Does the Project Need a Building Permit?

Project
Possible exemption
Important condition
Detached shed, playhouse or similar accessory structure
Up to 120 sq. ft.
No more than 8 feet from floor to roof and no plumbing, electrical or mechanical installation
Fence
Up to 6 feet 6 inches
Planning, visibility, coastal and historic requirements may still apply
Retaining wall or planter box
Up to 4 feet
Cannot support a surcharge or sloping earth
Private concrete pathway, driveway or deck
Up to 30 inches above grade
Other zoning, grading or right-of-way rules may apply
Minor roofing
Up to 100 sq. ft.
Limit applies within any 12-month period
Drywall or plaster patch
Up to 10 square yards
Applies to the total repair area in the building
Window awning
Projection up to 54 inches
Must not require additional support
Wall veneer
Less than 48 inches high
Historic or coastal review may still be required
Replacement windows
Permit normally required
The City specifically lists replacement windows as a DIY project requiring a permit
Patio cover or gazebo
Permit normally required
Planning, lot coverage and historic or coastal review may apply
Replacing sink, toilet or dishwasher
Permit may be required
Long Beach specifically warns these DIY replacements require permits
Exemption is not automatic. The Building Official determines whether the exception applies. Historic, coastal, zoning, electrical, plumbing, mechanical and fire requirements may create additional approvals.
Application workflow

Apply for a Long Beach Construction Permit in Seven Steps

Confirm jurisdiction and overlays
Select permit route
Complete forms
Prepare digital plans
Pay plan-check fees
Resolve every review
Issue, inspect and close

Confirm zoning, coastal and historic conditions

Check the property before finalizing the design. Exterior work in a historic district and development in the coastal zone may require separate Planning approval.

Do first: Search the zoning, coastal-zone and historic-district maps.

Choose online, Express, OTC or submitted plan review

Use the least complicated route that actually matches the project. Call 562-570-PMIT when the work crosses multiple disciplines.

Expert check: Structural changes, rated construction, accessibility, occupancy changes or multiple agencies usually move a project out of simple Express service.

Complete the correct application and permittee forms

Use APP-001 for projects involving more than one discipline. Use APP-011, APP-012, APP-013 or APP-014 for qualifying Express building, electrical, plumbing or mechanical work.

Related forms: FORM-005 contractor/owner-builder declaration, FORM-006 proxy and FORM-028 plot plan when applicable.

Prepare coordinated digital documents

For in-person OTC or submitted plan review, bring permit applications, plans, reports and calculations as digital PDFs on a USB device.

File control: Use one current plan set with matching sheet dates, revision clouds and technical calculations.

Schedule the correct Permit Center service

Choose Express Permit issuance, OTC review, submitted plan-review intake, ready-to-issue permit or the appropriate code-question service.

Appointment notes: Include the project address and a brief, accurate description of the work.

Pay fees and follow every assigned reviewer

Submitted projects may be routed to Building, Planning, Fire, electrical, plumbing, mechanical, Health or outside agencies. Each reviewer may send separate comments.

Response method: Create an item-by-item response stating the sheet and detail changed for every comment.

Obtain permit issuance before beginning work

After all approvals, schedule the Ready-to-Issue service if required, pay the remaining fees and obtain the permit and approved plans.

Complete inspections and confirm final status

Schedule inspections online, correct every notice and verify the final inspection or Certificate of Occupancy before treating the project as complete.

Application document guide

Which Long Beach Form Should You Use?

Form
Use it for
Practical note
APP-001 Development Permit Application
Projects involving more than one discipline
Building, grading, Fire, electrical, mechanical, plumbing, landscape and sign work can be consolidated
APP-011 Express Building Permit Application
Qualifying minor building work without plan review
Confirm the project appears in IB-058 before using it
APP-012 Express Electrical Permit Application
Qualifying minor electrical work
Larger or engineered systems may require plan review
APP-013 Express Plumbing Permit Application
Qualifying minor plumbing work
Food facilities, gas systems and larger projects may require additional review
APP-014 Express Mechanical Permit Application
Qualifying minor mechanical work
Equipment size, location and rated assemblies may affect eligibility
FORM-005
California contractor and owner-builder declarations
Required for many issuance and permit appointments
FORM-006
Owner, builder or contractor permit proxy
Use when an authorized agent acts for the owner or contractor
FORM-028
Plot plan information
May be required for Express or OTC projects involving exterior location

Open Building & Safety Forms

Plan-review readiness

Prepare a Package That Can Pass Intake Screening

Core application files

  • Signed permit application
  • Project address and scope
  • Owner and applicant details
  • Contractor or owner-builder forms
  • Plot or site plan
  • Existing and proposed floor plans

Technical documents

  • Structural calculations
  • Energy documentation
  • Geotechnical report when applicable
  • Electrical plans
  • Mechanical and plumbing plans
  • Fire and life-safety information

Outside and overlay reviews

  • Planning approval
  • Historic COA
  • Coastal approval
  • Public Works approval
  • Utilities coordination
  • Health or Harbor approval
One-project appointment rule: OTC and submitted plan-review appointments generally limit applicants to one project per visit. Bring the correct project only and ensure all digital PDFs open before arriving.
Correction workflow

How to Respond When Multiple Long Beach Reviewers Send Comments

Download every checklist and marked plan

Building, Planning, Fire and trade reviewers may send separate emails. Do not resubmit after answering only one discipline.

Create one master correction list

Sort comments by discipline and assign each item to the architect, engineer, contractor or owner.

Prepare an itemized response letter

Repeat each comment, explain the change and identify the updated sheet, detail or calculation.

Coordinate the revised plan set

Update sheet dates, revision clouds, indexes, calculations and supporting reports together.

Schedule the correct recheck route

An OTC project returns through the OTC recheck process. A submitted project follows the assigned plan-review resubmittal instructions.

Confirm every agency approved

Do not schedule Ready-to-Issue service until all required reviewers and outside conditions are complete.

Long Beach overlay checks

Historic and Coastal Approval Can Be Required Before Construction

Historic landmark or district

Exterior changes require a Certificate of Appropriateness before work begins, even when no building permit is required.

  • Windows and doors
  • Repairs and additions
  • Exterior repainting
  • Reroofing
  • Solar installations

Coastal zone

Development in the coastal zone requires either a Local Coastal Development Permit or a Coastal Permit Categorical Exclusion in addition to other permits.

  • Green map areas: City jurisdiction, not appealable to Coastal Commission
  • Yellow areas: City jurisdiction, appealable to Coastal Commission
  • Red areas: California Coastal Commission jurisdiction
Do not rely on the building-permit exemption list alone. Exterior paint, reroofing, windows, solar and other minor work may require historic or coastal approval before work starts.
ADU sequence

Long Beach ADU Plans Currently Begin at the Permit Center

Standard ADU or JADU

  1. Review current State-law and City planning guidance.
  2. Confirm lot and coastal or historic conditions.
  3. Prepare construction documents and applications.
  4. Schedule or visit the Permit Center.
  5. Submit plans in person and pay plan-check fees.
Current City notice: Online ADU plan submittals are not available at this time.

Pre-approved ADU plan

The City’s pre-approved ADU program can reduce design review effort. Qualifying plans may be reviewed over the counter with Building and Planning staff.

  1. Select a City pre-approved design.
  2. Prepare the site-specific plot plan.
  3. Resolve utilities, foundation and site conditions.
  4. Schedule an OTC appointment.
  5. Obtain site-specific approval and issuance.
Pre-approved does not mean automatically approved for every lot. Setbacks, utility connections, fire access, coastal rules, historic resources, foundation conditions and other parcel-specific requirements still apply.
Current code basis

Projects Submitted in 2026 Use the 2025 California Building Standards Code

Effective date

January 1, 2026

Projects must comply with the 2025 California Building Standards Code and Long Beach Municipal Code.

Main code disciplines

Building, residential, electrical, mechanical, plumbing, energy, Fire, existing building, historical and CALGreen standards.

Plan-submittal rule

The code in effect at the time of plan submittal controls the review unless a specific legal exception applies.

Open Long Beach Building Standards

Fee guidance

Build a Realistic Long Beach Permit Budget

Citywide guidance

The City says many construction projects may spend approximately 2% of building cost on plan checks, permits, inspections and other agency fees.

This is planning guidance—not a quote.

Published additions

  • 6% Technology Surcharge on applicable fees
  • 6% General Plan Surcharge on applicable fees
  • $115 processing fee for each plan-check and permit application
  • Separate building, electrical, mechanical, plumbing and Fire charges
  • Possible sewer, impact, school and other agency fees

Surcharge and Processing-Fee Illustration

Enter an applicable quoted permit or plan-check fee. The tool adds the two published 6% surcharges and one $115 processing fee.

Construction and demolition recycling

Certain projects require a waste-diversion deposit at permit issuance. The deposit may be returned after project completion and acceptable recycling proof.

School developer fees

Residential projects may have Long Beach Unified School District fee requirements. Certain eligible residential projects may qualify for deferred payment under SB 937.

Best final estimate

Bring the complete project scope to the Permit Center. Staff can identify the applicable disciplines and outside charges more accurately than a generic calculator.

Do not budget from the 2% figure alone. Coastal, Planning, Fire, Health, sewer, utility, impact, school, recycling-deposit and revision charges can materially change the total.

Open Current Long Beach Fee Schedules

Inspection workflow

Schedule, Find or Cancel a Long Beach Building Inspection

Schedule

Use the official online building-inspection form. Telephone requests are not accepted.

Schedule online

Daily route

Daily inspection schedules are posted by 8:00 AM or earlier.

8:00–10:00 AM appointment

The City says the inspector will also call to confirm when the inspection is scheduled in this window.

Cancel

Email the cancellation before 8:00 AM on the inspection date.

Send cancellation email

Include in a cancellation

  • Your name
  • Project number
  • Project address
  • Inspection date
  • Inspection type
  • Contact information

Prepare the site

  • Issued permit available
  • Approved plans on site
  • Work left visible
  • Safe working ladder provided
  • Adequate lighting
  • Clean, unlocked access
Unsafe access causes rescheduling. Long Beach requires contractors and property owners to provide safe access, including a working ladder, adequate lighting and a clean inspection area when needed.
Separate agencies: Call 562-570-4132 for Health inspections. For Fire inspections, call the Fire inspector identified on the job or permit notice card.
Status decoder

What to Do at Each Permit or Plan-Review Stage

Application not accepted Complete missing forms, digital files or basic intake information before review can begin.
Project number assigned Save it immediately. The project number is required to search plan-review status.
Assigned to reviewers The project is routed to applicable Building, Planning, Fire and trade staff in received order.
Corrections issued Download each reviewer’s checklist and marked-up plans, then coordinate one complete revision.
Approved by one reviewer Other disciplines may still be open. Confirm every assigned review before issuance.
Ready to issue Schedule the Ready-to-Issue appointment, bring permittee forms and pay remaining fees.
Permit issued Begin only the approved work and schedule inspections at the required stages.
Final date shown Save the permit history and confirm all related trade and occupancy approvals are complete.
Permit records and history

Use the Correct Long Beach Record Search

What you need
Search tool
Required information
Current plan-review status
Plan Review Status
Project number assigned after intake
Permit status or permit history
Permit Status / History
Address, permit or project information
Permit number, description and inspection final date
Permit History
Search the property or project record
Certificate of Occupancy, plot plan or report
Permit Records archive
Project address
Architect-drawn plans
Permit Center Resource Center
Visit in person; plans are not available online
Document not found online
Public Records Act request
Detailed address, record type and approximate project date
Architectural plans: The City states that architect-drawn plans are not available online. They may be viewed in the Permit Center’s Resource Center through the Laserfiche database. A Plan Duplication Application is available upon request.

Open Permit Status and Records

Owner-builder and contractor

Confirm Who Is Legally Pulling the Permit

California licensed contractor

  • Correct CSLB license classification
  • License status active
  • Name matches application
  • Workers’ compensation information
  • FORM-005 completed
  • FORM-006 proxy when an agent appears

Owner-builder

Long Beach says a homeowner may obtain a permit and perform construction, alteration or repair on the home and accessory structures when the owner resides or will reside in the dwelling.

  • Read owner-builder responsibilities carefully
  • Complete the required declaration
  • Understand labor, insurance and supervision duties
  • Use licensed trades when required
Do not pull an owner-builder permit only because a contractor asks you to. The permit holder accepts legal responsibility for the work, inspections and compliance.
Ready-to-use scripts

What to Say When You Contact Long Beach

Permit-route question:
“I am planning [exact work] at [address]. The project includes [building/electrical/plumbing/mechanical work]. Does it qualify for online, Express or OTC service, or does it need submitted plan review?”
Plan-review status:
“Project [number] at [address] has reviews assigned to [disciplines]. Which review or correction is still preventing Ready-to-Issue status?”
Historic or coastal question:
“The property at [address] may be in a historic district or coastal zone. Which Planning approval must be issued before I submit or begin the proposed [work]?”
Old permit question:
“I am researching [address]. Please confirm whether permit [number] received a final inspection and whether any related trade permits or occupancy approvals remain open.”
Final closeout

Do Not Treat the Project as Finished Until These Are Confirmed

  • Long Beach jurisdiction confirmed
  • Coastal-zone status checked
  • Historic status checked
  • Correct online, Express, OTC or submitted route selected
  • Correct application and permittee forms completed
  • Plans and technical reports coordinated
  • All agency comments resolved
  • All applicable fees paid
  • Permit formally issued
  • Approved documents kept on site
  • C&D recycling conditions completed
  • Building inspections passed
  • Trade inspections passed
  • Health or Fire approval completed when required
  • Final inspection or CO confirmed
  • Owner receives final records
Permit Center location

Long Beach Development Permit Center Map

Permit Center: 411 W. Ocean Blvd., 2nd Floor, Long Beach, CA 90802. Bring required forms and digital PDFs on a working USB device for plan-review services.
Official resource library

Open the Correct Long Beach Permit Tool

Frequently asked questions

Long Beach Building Permit and Inspection FAQs

Where do I apply for a Long Beach building permit?

Use the LB Services portal for supported online permits. Express, over-the-counter, submitted plan-review and ready-to-issue projects may require the Development Permit Center and the correct appointment service.

Which Long Beach projects can be permitted online?

The City lists qualifying residential solar, energy storage, EV chargers, reroofs, water-heater changeouts, electrical panel changeouts and minor kitchen, bathroom or drywall work. Limits and authorization requirements apply.

Does a 120-square-foot shed need a Long Beach building permit?

A detached shed or similar accessory structure may be exempt when it does not exceed 120 square feet or 8 feet from floor to roof and has no plumbing, electrical or mechanical installation. Planning and overlay rules still apply.

Does Long Beach require a permit for replacement windows?

Yes. The City specifically identifies replacement windows as a DIY project requiring a permit. Historic review may also be required when the property is a landmark or inside a historic district.

How do I schedule a Long Beach building inspection?

Use the official online Building Inspection page. Long Beach states that telephone requests are not accepted for building inspections.

How do I cancel a Long Beach building inspection?

Email DV-CancelInspections@longbeach.gov by 8:00 AM on the inspection day. Include your name, project number and project address.

How do I check Long Beach plan-review status?

Use the Plan Review Status tool and enter the project number assigned when the application was screened and routed for review.

What extra approval is needed for a historic property?

Exterior changes to a landmark or property in a historic district require a Certificate of Appropriateness before work begins, even when a building permit is not required.

Do projects in the Long Beach coastal zone need a coastal permit?

Development in the coastal zone requires either a Local Coastal Development Permit or a Coastal Permit Categorical Exclusion in addition to other applicable permits.

What surcharges are added to Long Beach permit fees?

The City’s fee page lists a 6% Technology Surcharge, a 6% General Plan Surcharge on applicable fees and a $115 processing fee for each plan-check and permit application. Additional discipline and agency fees may apply.

Independent guide and freshness

Accuracy and Source Note

Building-Department.org is an independent informational website and is not the City of Long Beach. Permit issuance, plan review, zoning decisions, inspections, fees and enforcement actions must be handled through the City or the correct outside agency.

This guide was checked against Long Beach Community Development, Building & Safety, the Development Permit Center, LB Services, Building Inspection, Planning, Historic Preservation, coastal-planning, fee and permit-record resources.

Last reviewed: July 21, 2026.

Forms, fees, appointment hours, online permit categories, code requirements and portal functions can change. Confirm time-sensitive details before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment