City Of Laredo Building Department | Permits, Inspections & Official Contact

Longmont permit action guide

Apply, Track, Inspect and Close a Longmont Building Permit

Start with the correct route. Residential combination permits and fences can use Longmont’s Accela portal, while new commercial, multifamily and tenant-improvement packages currently follow the city’s PDF-and-email process.

This guide also covers the July 2026 code change, permit-fee calculations, use tax, contractor licensing, inspection cutoff, floodplain approval, utility coordination and permit closeout.

2024 International Codes effective July 1, 2026
Accela status, payment and inspection instructions
Current 2026 permit, plan-review and tax formulas
Longmont permit review from plans to final inspection An animated mountain project plan moves through the Accela portal, 2024 code review, floodplain screening and final inspection. LONGMONT PROJECT PLAN 2024 CODES ACCELA REVIEW REVIEWED PERMIT FINAL INSPECTION PASSED
⚠️
Accela portal warning Longmont’s Building Services page currently warns that users may experience technical difficulties after recent software updates. The city also reported a portal issue on June 26, 2026. When a submission fails, save screenshots and contact Building Services instead of creating duplicate applications.
🔐
Payment scam protection Official city email addresses end in @longmontcolorado.gov. Longmont says it does not request wire-transfer payments. Open Accela directly or call the city before paying an unexpected invoice.
Start here

Choose the Exact Longmont Task

Official contact panel

Longmont Building Services Address, Phone and Hours

Building Services 303-651-8332 Permits, inspections and licensing
Building email building.inspection@longmontcolorado.gov Include address and record number
Office hours 8:00 AM–5:00 PM Monday through Friday
Payment hours 8:00 AM–4:30 PM Cash, check or card
Code Enforcement 303-651-8695 Existing violations and complaints
Electric engineering 303-651-8386 Longmont Power & Communications
Office location Development Services Center 385 Kimbark Street, Longmont, CO 80501
🕙
Second and fourth Thursday closure The 2026 Fee Manual says Building Inspection closes from 10:00–11:00 AM on the second and fourth Thursday for staff training and coordination.
Jurisdiction check

Confirm the Property Is Inside Longmont City Limits

Use the City of Longmont when

  • The property is inside city limits
  • Accela returns the site address
  • Longmont provides the utilities or city services involved
  • The project is governed by Longmont zoning

Verify first when

  • The mailing address says Longmont but the parcel is unincorporated
  • The site is near the Boulder or Weld County boundary
  • The parcel is outside the city map
  • Accela cannot locate the property
Do not use the mailing city alone. Check Longmont’s city-limits and GIS maps before applying. A Longmont postal address can still fall under Boulder County or Weld County jurisdiction.
Permit decision table

Which Longmont Permit Route Fits the Project?

Project
Start with
Also check
New single-family home or residential addition
Residential combination permit
Zoning, utility fees, impact fees, energy, drainage and floodplain
Basement finish or residential remodel
Residential remodel permit
Egress, electrical, plumbing, HVAC and structural changes
Deck, patio, pergola, sunroom or pool
Residential building permit
Setbacks, drainage, barriers, structural plans and utilities
Accessory building over 120 square feet
Accessory-building permit
Setbacks and lot coverage; smaller structures still must meet zoning
Fence
Accela fence application
Height, corner visibility, easements and property lines
Reroof, windows, siding or retaining wall over 48 inches
Building permit
Structural repair, energy rules and product approvals
Panel, service, HVAC, gas line, water heater or plumbing
Trade permit
Licensed subcontractor and LPC utility coordination
New commercial or multifamily building
Commercial email submittal
Planning, fire, utilities, accessibility and plan-review payment
Commercial remodel or tenant improvement
TI application and emailed PDFs
Asbestos report, occupancy, fire and accessibility
Demolition
2026 demolition application
Asbestos, utility disconnects, historic review and air clearance
Development in a special flood hazard area
Floodplain Development Permit
Approval is required before the construction permit
Pod, excavation or obstruction in public right-of-way
Right-of-Way Permit
Insurance, traffic control and construction inspection
Application routes

Use the Correct Submission Method

Available through Accela

  • Register or sign in to create available applications.
  • The city’s portal guide specifically lists residential combination and fence applications.
  • Search properties, permits, licenses and enforcement records.
  • Schedule, cancel or reschedule inspections.
  • View inspection results and pay eligible fees.

Open Accela

Commercial and multifamily route

  • Download the correct city application and checklist.
  • Complete every required document.
  • Email the package to Building Services.
  • Organize new-building files by design discipline.
  • Submit commercial-remodel drawings as one complete PDF set.
  • Send supporting reports as separate PDFs.

The city’s current commercial instructions say online commercial applications are not available.

Application workflow

Build a Review-Ready Permit Package

Confirm the property and zoning

Verify city jurisdiction, zoning, setbacks, legal use, easements and floodplain status before finalizing plans.

Large development: Planning requires a pre-application meeting before a formal development application.

Write a complete project scope

Identify every building, electrical, mechanical, plumbing, gas, utility and site component.

Example: Finish 850 square feet of basement, add one bedroom with compliant egress, relocate electrical circuits and add one bathroom.

Prepare coordinated drawings

Make the application, plans, valuation, energy documents and contractor information describe the same project.

Commercial files: Separate architectural, structural, MEP, soils and truss-engineering PDFs as instructed.

Use the correct application route

Use Accela for an available online record. Follow the email/PDF instructions for new commercial, multifamily or commercial tenant-improvement work.

Pay the plan-review amount when required

Commercial submittals require a project valuation and plan-review payment at application intake.

Respond to every correction

Upload or email coordinated revisions and an item-by-item response identifying the changed sheet or document.

Wait for formal permit issuance

Do not start based on “approved” or a completed plan review. Confirm issuance and pay the required permit fees.

Complete inspections and final closeout

Do not cover work before inspection. Pass every required inspection and save the final result or Certificate of Occupancy.

Application checklist

Prepare These Items Before Submitting

Property and zoning

  • Exact project address
  • Parcel number
  • Zoning district
  • Setbacks and easements
  • Floodplain result
  • Owner information

Project package

  • Detailed scope
  • Project valuation
  • Site plan
  • Floor plans and elevations
  • Structural details
  • Energy documents

People and approvals

  • Contractor license
  • Subcontractor details
  • Insurance documents
  • Utility coordination
  • Fire review when required
  • Planning approvals
2026 permit fee calculator

Estimate the Building Permit, Plan Review and Use Tax

Enter the city-determined project valuation or a preliminary construction value. The calculator uses Longmont’s 2026 Primary Fee Schedule.

How Longmont fees work

What the Permit Invoice May Include

Charge
2026 rule
Practical note
Building permit
Based on city-determined project valuation and the Primary Fee Schedule
City may use ICC or RSMeans valuation rather than the applicant’s contract amount
Residential plan review
50% of building permit fee
Separate from the permit fee
Commercial plan review
65% of building permit fee
Payment required at commercial submittal
Separate trade plan review
50% of total permit fee
Applies when not part of a combination permit
Additional plan review
$47 per hour
Changes, additions, incomplete or changed submittal documents
Estimated use tax
50% of valuation × combined 4.865% city/county rate
Pay at permit or elect the city’s pay-as-you-go process
Reinspection
$80 per hour
Current 2026 Fee Manual amount
Temporary Certificate of Occupancy
$100 per TCO or extension
$50 may be refunded when final CO is issued before expiration
Credit-card payment
2.95% SnapPay convenience fee
Cash and check are also accepted
The calculator is not the complete project budget. Impact fees, parks, transportation, drainage, water, wastewater, electric-capacity, meter, school, fire, right-of-way and trade fees may apply.
Useful fixed fees

Selected 2026 Building and Contractor Fees

Foundation-only permits

$200 one- or two-family

$300 multifamily

$500 commercial

Contractor licenses

$175 Class A

$125 Class B

$100 Class C

$75 Class D, plumbing or mechanical

Other permit costs

$100 floodplain application

$40 temporary construction power

$40 residential service change

$10 electrical sign permit added to sign permit

Inspection command board

Schedule Before 4 PM for the Next Business Day

Online

Use Accela to schedule, cancel, reschedule and view results.

By phone

Call 303-651-8332.

Cutoff

Submit the request before 4:00 PM for next-business-day scheduling.

Have ready

  • Permit number
  • Phone number
  • Inspection item number
  • Project address
  • Access instructions
  • Requested day and time frame

Prepare the site

  • Permit is active
  • Approved plans are present
  • Work is complete for the stage
  • Required work remains exposed
  • Animals are controlled
  • Licensed subcontractors performed trade work
🕘
Homeowner scheduling windows Homeowners may request morning 7:00 AM–12:00 PM or afternoon 12:00–5:00 PM. For a more specific estimate, call the assigned inspector between 8:00 and 8:30 AM on the inspection day.
Cancellation: Cancel by 4:00 PM the business day before. Cancel Monday inspections by 4:00 PM Friday. After the deadline, call before 8:30 AM on the inspection day.
Current code framework

Longmont’s Code Changed on July 1, 2026

2024 International Codes

Longmont adopted the 2024 IBC, IRC, IMC, IFGC, IPC, IEBC, Property Maintenance Code, Pool and Spa Code, Fire Code and Metro Cohort Model Code effective July 1, 2026.

Electrical code

The city’s current code page lists the 2023 National Electrical Code, effective July 24, 2024.

2026 NEC

Building Services is reviewing the 2026 NEC and will announce when an adoption ordinance goes to City Council.

Plan-set warning: Do not reuse an older Longmont checklist or 2021-code design without confirming which code edition applies to the accepted application.
Floodplain decision

Floodplain Approval Comes Before the Construction Permit

Search property
Confirm SFHA status
Show flood boundary on plans
Submit floodplain application
Pay $100 fee
Obtain approval before building permit

A floodplain permit is required for

  • Construction or development in a Special Flood Hazard Area.
  • Placement of a manufactured home in a flood-prone area.
  • Other development regulated by Longmont floodplain rules.

Plans should show

  • The current 100-year floodplain boundary.
  • The effective FIRM or current Letter of Map Revision information.
  • Project elevations and supporting documents requested by the Floodplain Administrator.

Open Floodplain Inquiry Map

Planning and development

When a Building Permit Is Not the First Application

Situation
Start with
Current process detail
Subdivision, rezoning or larger development
Planning pre-application meeting
Required before a formal development application; meetings are held Wednesdays at 9:30 and 10:30 AM
Formal development application
Planning submission
Published weekly deadline is Thursday at 3:00 PM
Work in street, sidewalk or right-of-way
Right-of-Way Permit
Insurance, work plan, traffic control and inspections may apply
New or upgraded electric service
Longmont Power & Communications
City encourages early field-engineering contact before estimating costs or applying
Temporary use or seasonal event
Planning permit
Different use, time and attendance limits apply
Demolition

Prepare the 2026 Demolition Package Before Disconnecting the Site

Asbestos

Interior demolition requires asbestos testing. When asbestos is present, provide the approved Colorado permit and air-clearance report before issuance.

Utilities

Arrange every utility disconnect before final permit issuance. Utilities must be disconnected at least 24 hours before demolition.

Permit fee

The 2026 demolition application lists a $100 permit fee per structure.

Open 2026 Demolition Application

Contractor licensing

Who May Pull and Perform the Work?

Licensed contractors

  • Anyone performing contracting work in Longmont must hold the appropriate city license.
  • Class A, B, C and mechanical applicants must meet testing requirements.
  • Longmont does not offer reciprocal contractor licensing with other jurisdictions.
  • Electricians and plumbers submit current Colorado master and contractor licenses.
  • All contractors provide general-liability insurance.

Homeowner acting as contractor

  • The property must be the homeowner’s primary residence when applying.
  • It cannot be a rental or intended for resale or flipping.
  • HVAC, electrical, plumbing and framing subcontractors must be licensed in Longmont.
  • Electrical contractors must pull their own permits.
  • The homeowner remains responsible for inspections and permit signoffs.
Permit records and status

Search Longmont Permits Before Buying, Selling or Remodeling

Open the Building record search

Search without signing in when public search is available.

Search by permit number first

A complete record number is usually more accurate than an address.

Try site address, parcel or contractor

The Accela search supports site-address, contractor-license, parcel and record information.

Read inspections and final status

A permit appearing in search does not prove final approval. Check the inspection history and final result.

Contact Building Services when history is incomplete

Provide the property address, approximate work year and document or permit type needed.

Property-sale warning: Longmont’s Fee Manual notes that buyers may check permit history and require unpermitted work to be corrected. Search before listing or making a purchase offer.
Status decoder

What the Accela Status Means

DraftThe online record has not been submitted.
SubmittedThe city received it but may still check completeness.
In reviewOne or more city disciplines are reviewing the package.
Corrections requiredRevise the listed documents and answer every comment.
ApprovedConfirm payment and formal permit issuance before starting.
IssuedWork may proceed within the approved scope.
Inspection failedCorrect every item before rescheduling.
Final / completeSave the result and confirm all trade permits are also closed.
Troubleshooting

Fix Common Longmont Permit Problems

Problem
Best next action
Accela will not accept the submission
Save screenshots, reset the password if needed and contact Building Services before creating a duplicate record.
Property does not appear
Check city limits, parcel information and whether Boulder or Weld County has jurisdiction.
Commercial application option is missing
Use the city’s current commercial application/checklist and email the PDF package.
Permit estimate is lower than the invoice
Ask which city valuation, plan-review, tax, impact, utility, fire or trade fees were applied.
Inspection cannot be scheduled
Confirm the permit is issued, the correct inspection item is available and licensed trade permits are active.
Work differs from approved plans
Stop affected work and submit a revision before concealment or inspection.
Open permit found during sale
Obtain the inspection history and ask what current plans, corrections or final inspections are required.
Unexpected payment email
Check the sender’s domain, never wire funds and verify the invoice through Accela or the official phone number.
Ready-to-use scripts

What to Say When You Contact Building Services

Permit requirement

“I am planning [exact work] at [Longmont address]. Can you confirm city jurisdiction, the correct application route, required plans, trade permits, zoning or floodplain approvals, and the inspection sequence?”

Open permit

“Accela shows record [number] at [address] as [status]. Which correction, payment, trade permit, inspection or final document is preventing closure?”

Completion checklist

Do Not Consider the Project Finished Until These Are Complete

  • City jurisdiction confirmed
  • Zoning and setback checks complete
  • Floodplain permit approved when required
  • Utility and right-of-way approvals complete
  • Correct application route used
  • Contractors properly licensed
  • Permit formally issued
  • Approved plans available on site
  • Every inspection passed
  • Trade permits finalized
  • Certificate of Occupancy obtained when required
  • Accela record saved as final or complete
Office location

Longmont Development Services Center Map

Address: Development Services Center, 385 Kimbark Street, Longmont, CO 80501. Office hours are Monday–Friday, 8:00 AM–5:00 PM; payments stop at 4:30 PM.
Official resource library

Open the Correct Longmont Resource

FAQs

Longmont Building Permit Questions

Where do I apply for a Longmont building permit?

Use Longmont’s Accela Citizen Portal for available online applications. New commercial, multifamily and commercial tenant-improvement applications currently follow the city’s PDF-and-email submission process.

What are the Longmont Building Services hours?

The Development Services Center is open Monday through Friday from 8:00 AM to 5:00 PM. Payments are accepted until 4:30 PM. Building Inspection closes from 10:00–11:00 AM on the second and fourth Thursday for staff training.

What building codes does Longmont use in 2026?

Longmont adopted the 2024 International Codes effective July 1, 2026. The city’s current electrical-code page lists the 2023 National Electrical Code, while the 2026 NEC remains under review.

How do I schedule a Longmont inspection?

Schedule through Accela or call 303-651-8332. Requests submitted before 4:00 PM may be scheduled for the next business day. Have the permit number, phone number and inspection item number ready.

How much is a Longmont building permit?

The permit fee is calculated from the city-determined project valuation using the 2026 Primary Fee Schedule. Residential plan review is generally 50% of the permit fee and commercial plan review is 65%. Tax, impact, utility and trade fees may be additional.

What is Longmont’s construction use-tax calculation?

The 2026 Fee Manual calculates estimated use tax using 50% of the determined project valuation multiplied by the combined city and county rate of 4.865%, unless the approved pay-as-you-go option is selected.

Can a homeowner pull a permit?

A homeowner may act as the general contractor when the property is the primary residence and is not a rental or intended for resale or flipping. Licensed subcontractors are still required for covered trade and framing work.

Does a shed under 120 square feet need a permit?

The 2026 Fee Manual says accessory buildings of 120 square feet or less do not require a building permit, but they must still comply with zoning setbacks and other applicable requirements.

When is a Floodplain Development Permit required?

It is required before construction or development begins within a Special Flood Hazard Area. The floodplain approval must be completed before the associated construction permit is issued.

How do I check an old Longmont permit?

Use the Accela Building record search and search by permit number, site address, parcel or contractor. Open the inspection history and final status rather than relying only on the existence of a permit record.

Source and freshness note

Official Information Used

Building-Department.org is an independent guide and is not the City of Longmont.

This page was rebuilt using Longmont Building Services, Accela Citizen Access, the March 24, 2026 Fee Manual, the current inspection schedule, 2024 code-adoption page, contractor licensing resources, commercial-submission instructions, floodplain rules, right-of-way guidance, utility information and official scam and portal notices.

Last reviewed: July 22, 2026.

Portal availability, fees, application routes, code interpretations and inspection procedures can change. Confirm time-sensitive details with Building Services before submitting, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.