City Of Henderson Building Department | Permits, Inspections & Official Contact

Henderson permit action center

Apply, Correct, Inspect and Close a Henderson Building Permit Through DSC Online

Start with the real task—not a generic permit estimate. Apply in DSC Online, open the correct project checklist, track plan review, upload corrections, pay the invoice, schedule inspections or recover an older permit.

This Henderson-specific guide also explains the 2024 construction codes now used for current submittals, Virtual Counter eligibility, owner-builder documents, standard residential designs, zoning dependencies and the fee schedule effective October 1, 2025.

Official DSC Online application, search and inspection routes
Patio, pool, wall, addition, solar and trade-permit help
Virtual Counter, corrections, fees and closeout guidance
Henderson permit moving from digital plans through review and inspection An animated desert project plan, DSC Online screen, permit file and final inspection check explain the Henderson permit process. HENDERSON PROJECT PLAN DSC ONLINE APPLY • PAY • INSPECT REVIEWED PERMIT FINAL INSPECTION CLOSED HENDERSON CITY HALL
📌
Current Henderson permit updates The Development Services Center fee schedule took effect October 1, 2025. Henderson’s 2024 construction codes and updated standard designs apply to relevant submittals received on or after January 2, 2026.
Start here

Choose the Exact Henderson Action You Need

Henderson Permit Next-Step Finder

Select your situation to see the most useful official route.

Official contact panel

Henderson Building and Fire Safety Contact Information

Building Inspections 702-267-3900 Inspection questions and field help
Administration 702-267-3600 Building and Fire Safety administration
Permit office 240 S. Water Street Henderson, NV 89015
Inspection office 2101 Moser Drive Henderson, NV 89011
Permit office hours Mon–Thu, 7:30–5:30 Closed Fridays and holidays
Field inspections Mon–Fri, 6 AM–4 PM Inspection-service operating hours
Processing rule: Items received after 4:30 PM are not completed the same day. Online material received after Thursday work hours, Friday through Sunday or on holidays is handled as received on the next available business day.
Jurisdiction check

Make Sure the Address Is Inside the City of Henderson

Use Henderson DSC Online when

  • The property is inside Henderson city limits.
  • The address appears in Henderson’s DSC Online search.
  • Henderson—not Clark County or another city—is the permitting authority.
?

Verify before applying when

  • The mailing address says Henderson but the parcel may be unincorporated.
  • The property is near Las Vegas, Boulder City or a county boundary.
  • DSC Online does not recognize the project address.
Fast jurisdiction check: Use Henderson’s interactive maps and open “My Neighborhood,” “Zoning and Planned Land Use” or “Open Development Permits.”
Permit decision table

Match the Project to the Correct Henderson Permit Path

Project
Start with
Important Henderson check
New home or new commercial building
Full building review
Land-use approvals, civil plans, drainage, fire/life safety, utilities, building and trade permits
Residential room addition
Residential addition checklist
Site plan, floor plan, elevations, roof framing, foundation, energy and bracing information
Patio cover or carport
Patio-cover permit
Use the light-roof, heavy-roof, existing-wall or existing-roof standard that matches the project
Swimming pool or spa
Pool permit
Setbacks, safety barrier, glazing near the pool, electrical and inspection sequence
Masonry, retaining or wrought-iron wall/fence
Wall/fence permit
Wall design, foundation, retained soil, hydrant clearance and zoning placement
Residential solar system
Photovoltaic checklist
Electrical, structural, roof-loading and equipment-layout documents
Standby generator
Generator checklist
Electrical, fuel/gas, equipment clearances and location requirements
Electrical, plumbing or mechanical work only
Individual trade permit
May qualify for Virtual Counter when the application is complete
Commercial remodel or tenant improvement
Tenant-improvement checklist
Occupancy, life safety, accessibility, fire systems, plumbing-fixture count and planning approval
Change of business use or new occupancy
Planning and building pre-check
Land use, parking, fire, utilities, pretreatment, business licensing and certificate of occupancy
Online application workflow

Apply in DSC Online in Seven Clear Steps

Open the exact project checklist

Do not begin with a generic “building permit” package. Henderson publishes separate checklists for residential additions, patios, pools, solar, generators, walls, tenant improvements and other projects.

Confirm land-use and outside approvals

Check zoning, setbacks, approved entitlements, conditions of approval, drainage, civil, utility and fire requirements before completing the permit package.

Large-project rule: Required land-use and civil approvals may need to be complete before building review can proceed.

Create or sign in to DSC Online

Open the customer portal, create the account and keep the login email connected to the project.

Select the correct permit or plan type

Choose the category that matches the scope. Separate building, fire, civil or trade records may be required.

Avoid duplicates: Do not open a second application merely to correct the first one.

Upload readable, clearly named documents

Follow the city’s electronic-plan standards. Make addresses, plan dates, scope, contractor details and valuation consistent across every file.

Useful names: Site-Plan.pdf, Floor-Plans.pdf, Structural.pdf, Electrical.pdf and Response-Letter.pdf.

Monitor reviews, invoices and correction letters

DSC Online shows plan-review status, reviewer names, invoices, correction letters, permits, conditions and related documents.

Check the full record: A submitted application is not an issued permit.

Pay, obtain issuance and save the approved documents

Pay the official invoice, confirm issued status and download the permit and approved files before starting work.

Keep available: Permit information, approved plans, conditions, inspection list and project contact details.
Application readiness

Prepare These Items Before Opening the Portal

Property and scope

  • Exact project address
  • Owner information
  • Detailed scope of work
  • Construction valuation
  • Existing and proposed use
  • Project contact information

Plans and technical files

  • Site plan
  • Floor plans
  • Elevations and sections
  • Structural information
  • Energy documents
  • Trade-system plans

People and approvals

  • Contractor/license details
  • Owner authorization
  • Owner-builder affidavit if applicable
  • Subcontractor registration
  • Land-use approvals
  • Conditions of approval
Electronic revision rule: For revisions, deferred submittals or as-built files on an existing permit, open the permit’s Details page, use the Attachments tab and upload through the blue “+” boxes. The permit team receives notice of the new files.
Project-specific preparation

What Different Henderson Projects Commonly Need

Project
Prepare first
Question to resolve before filing
Room addition
Site plan, floor plan, elevations, sections, foundation, framing, energy and braced-wall information
Does the addition comply with zoning, setbacks and existing utility capacity?
Patio cover
Site plan and the matching Henderson/Southern Nevada standard design
Is the roof light or heavy, and does it connect to an existing wall or roof?
Pool or spa
Pool layout, setbacks, barrier details, glazing information and electrical scope
How will the safety barrier and access gates comply?
Wall or fence
Site location, wall type, height, footing and retaining details
Does the wall retain soil or affect a hydrant, sight zone, easement or drainage?
Residential solar
Roof layout, equipment data, one-line diagram and structural information
Does the roof or service equipment require additional work?
Commercial tenant improvement
Occupancy, floor plan, accessibility, life safety, MEP and fire-system information
Is the use permitted and does the project qualify for Virtual Counter?
Faster eligible review

Does the Project Qualify for Henderson’s Virtual Counter?

Building permits listed as eligible

  • Patios.
  • Swimming pools.
  • Individual mechanical permits.
  • Individual plumbing permits.
  • Individual electrical permits.
  • Certain smaller commercial remodels or tenant improvements.

Examples that do not qualify

  • High-hazard occupancies.
  • Institutional occupancies.
  • Dry-cleaning businesses.
  • Projects requiring a life-safety report.
  • Projects needing structural calculations.
  • Plan sets with more than 20 plumbing fixtures.
Virtual Counter rule
What the applicant must do
Apply first
Submit the eligible permit through DSC Online before booking.
Permit number required
Use the application or permit number when scheduling the appointment.
Advance booking
Book at least 24 hours in advance; the booking window is seven days.
Appointment times
The city lists 30-minute appointments at 10 AM, 11 AM, 1 PM and 2 PM Pacific Time.
No telephone appointments
Use the booking portal; one appointment per contractor per day is accepted.
Completeness check
Incomplete applications may have their appointment cancelled.
Late arrival
The city states that meetings may be cancelled when the customer is more than five minutes late.

Check Virtual Counter Eligibility

Portal status help

What You Can See and Do in DSC Online

Reviews

View plan-review status and the name of the assigned reviewer.

Documents

Download permits, correction letters, certificates, conditions and related files.

Payments

Review and pay permit fees or invoices connected to the record.

Inspections

View standard inspections, request inspections and read results.

Draft Required fields, contacts, attachments or final submission may still be missing.
Submitted The application was received, but intake and completeness review may remain.
Pending prerequisite Zoning, entitlement, civil, drainage, utilities, fire or another approval may be outstanding.
In plan review Open the record to identify the assigned reviewer and active review disciplines.
Corrections required Download the correction letter, answer every item and upload coordinated revised files.
Ready for payment Review the invoice and confirm that it belongs to the correct permit before paying.
Issued Download the permit, conditions and approved files before beginning work.
Final or closed Save closure proof and confirm that every related trade and fire record is complete.
Inspection workflow

Schedule the Correct Henderson Inspection

Permit issued
Correct work stage ready
Open DSC Online
Select inspection
Provide safe access
Read the result
Complete final closeout

Before scheduling

  • Permit is issued
  • Correct inspection is listed
  • Work is complete for that stage
  • Required work remains visible
  • Approved plans are available
  • Safe site access is arranged

After the inspection

  • Open the complete result
  • Save correction notes
  • Fix every listed item
  • Upload revisions if required
  • Request reinspection when ready
  • Confirm final status
Do not conceal work too early. Framing, wiring, plumbing, mechanical systems, insulation and other covered work may need to be reopened when the required inspection was not completed.
Possible final dependency: The city explains that a Drainage Compliance Report may need to be completed and approved before the final building inspection for applicable projects.
Fees and budgeting

Use the Current Fee Schedule and Treat the Estimator as Planning Only

Correct fee-check sequence

  1. Choose the exact permit and review types.
  2. Enter an accurate project scope and valuation.
  3. Include building, electrical, plumbing, mechanical and fire work.
  4. Check planning, civil, utility and other review fees separately.
  5. Review the official DSC Online invoice.
  6. Question an unclear charge before paying.

Why no generic calculator is included

Henderson’s estimator is only a planning tool and does not calculate every fee that may apply.

The final amount is calculated by the Development Services Center when the project is submitted under the fee schedule then in effect.

Current fee schedule: Henderson’s updated DSC schedule took effect October 1, 2025. The city states that fees will be reviewed annually and may be adjusted using a regional Consumer Price Index.
Planning and zoning fee examples

Separate Land-Use Fees May Apply Before Building Review

Community Development application
Published fee
Possible additional charge
Administrative adjustment
$164
Confirm current eligibility and filing requirements
Conditional use permit
$551
Notification fee may apply
Design review
$274
Other entitlement or technical review may apply
Variance
$413
Notification fee may apply
Waiver of standards
$287
Notification fee may apply
Zoning verification letter
$109
Use when a written zoning confirmation is needed

The published Community Development schedule states that listed amounts include records and technology charges. Confirm the current amount before filing.

Planning and land-use review

Check Zoning, Entitlements and Conditions Before Building Plans

Residential property

Confirm setbacks, height, lot coverage, accessory structures, walls, parking, easements and HOA restrictions.

Commercial property

Confirm use, occupancy, parking, signs, landscaping, loading, fire access and entitlement conditions.

Large development

Coordinate entitlement, traffic, drainage, civil plans, utility review, mapping and development agreements before building review.

Planning Services: 702-267-1500 · planner@cityofhenderson.com. Henderson Planning reviews building, sign, wall, accessory and civil permits for development-code and entitlement compliance.
Current construction codes

Use Henderson’s 2024 Code Set for Current Submittals

Code area
Current city-listed edition
Also check
Commercial building
2024 International Building Code
Southern Nevada amendments and Henderson adopting ordinance
One- and two-family residential
2024 International Residential Code
Southern Nevada amendments and local Title 15 provisions
Existing buildings
2024 International Existing Building Code
Change-of-use and alteration requirements
Mechanical
2024 Uniform Mechanical Code
Southern Nevada amendments
Electrical
2023 National Electrical Code
Southern Nevada amendments and Henderson ordinance
Pools and spas
Current pool/spa code and 2024 standards
Barrier, glazing, electrical and setback details
Effective-date note: Henderson’s standard-design pages state that the 2024-code designs apply to submittals received on or after January 2, 2026.

Open Henderson Construction Codes

Owner-builder and contractors

Register the Real Project Team Before Work Begins

Licensed contractors and subcontractors

  • Use the correct contractor of record.
  • Register subcontractors in DSC Online when required.
  • Keep license and contact information current.
  • Match building and trade records to the actual contractors.
  • Assign inspection responsibility in writing.

Owner-builder applicants

  • Use the official Owner Builder Affidavit of Exemption.
  • Complete Owner Builder Subcontractor Registration when applicable.
  • Understand responsibility for code compliance and inspections.
  • Confirm which trade work requires licensed contractors.
  • Keep contracts, invoices and inspection records.
Do not use an owner-builder filing to hide an unlicensed contractor. Confirm eligibility and trade-license requirements with Henderson and the Nevada State Contractors Board before work begins.
Permit and property records

Search DSC Online Before Filing a Records Request

Search public information in DSC Online

Search the property address, permit number, plan number or other available project information.

Open the complete record

Review status, reviews, fees, documents, conditions, inspections and available certificates.

Check the Open Development Permits map

Use the GIS map when researching active development or a location with multiple records.

Request missing or formal records

Use Henderson’s Public Records Request service when the portal does not contain the required plans, correspondence or historical documents.

Buying or selling? Do not ask only whether a permit exists. Check permit issuance, plan-review corrections, inspection history, final result and any certificate or condition tied to the record.
Open permit recovery

Old Permit Not Closed? Use This Recovery Checklist

Collect before contacting the city

  • Permit or plan number
  • Property address
  • Original project scope
  • Approved files if available
  • Contractor information
  • Inspection history
  • Current photographs
  • Sale or refinance deadline

Ask these direct questions

  • Which inspection is missing?
  • Is the permit expired?
  • Can it be reactivated?
  • Are revised plans needed?
  • Can the contractor change?
  • Are trade permits open?
  • Is a drainage report required?
  • What proves final closure?
Plan-review choices

Regular, Virtual Counter or Expedited Review?

Review path
Best for
Key limitation
Regular review
Most building, fire and trade applications
Timing depends on completeness, project type and active service targets
Virtual Counter
Eligible patios, pools, individual trades and certain smaller tenant improvements
Application must pass completeness review and meet eligibility rules
Expedited review
Eligible building or Public Works projects needing a formal accelerated process
Must be approved in advance; expedited fee is four times the normal plan-review fee
Expedited target: For approved, non-complex building projects, Henderson lists four full working days for initial and subsequent expedited reviews. Working days are Monday through Thursday, excluding holidays, and the submittal day is not counted.

Review Expedited Eligibility and Fees

Problem solving

Fix Common Henderson Permit Problems

Problem
Likely cause
Best next step
DSC Online cannot find the address
Wrong jurisdiction, address format or project location
Use Henderson GIS and call Permitting before selecting another property
Application remains incomplete
Required contact, document or workflow step is missing
Compare the portal record with the exact project checklist
Review has not started
Invoice, land-use approval, civil plan or intake item remains outstanding
Open every workflow and contact the assigned reviewer or permit technician
Correction letter keeps returning
Comments were partially answered or revised sheets conflict
Submit an itemized response and one coordinated revision package
Virtual Counter appointment cancelled
Incomplete application or ineligible project
Correct the submission and book again or use regular review
Inspection option is unavailable
Permit not issued, wrong inspection stage or hold on the permit
Check issued status and call Building Inspections at 702-267-3900
Inspection fails
Work incomplete, concealed, inaccessible or different from approved plans
Correct every note and confirm whether revised plans are required
Final inspection cannot be scheduled
Trade finals, drainage report, certificate or other prerequisite remains open
Ask for a written list of every remaining closeout item
Ready-to-use scripts

What to Say When You Contact Henderson

Permit requirement:
“I plan to [exact work] at [full Henderson address]. Which building, electrical, plumbing, mechanical, fire, civil or planning permits and checklists apply?”
Plan-review delay:
“Application [number] currently shows [status]. Can you identify the specific approval, invoice, reviewer comment or document preventing the next step?”
Virtual Counter:
“Application [number] is for [project type]. Is it eligible for Virtual Counter, and is the submitted package complete enough to book an appointment?”
Open permit:
“Permit [number] at [address] is not final. Which inspection, revision, trade record, drainage document, fee or certificate is still required?”
Final closeout

Do Not Finish Until Every Related Record Is Closed

  • Correct city jurisdiction confirmed
  • Correct project checklist used
  • Land-use approvals completed
  • Civil and drainage approvals completed
  • Building and fire reviews cleared
  • Permit formally issued
  • Approved documents downloaded
  • Required work left visible
  • Inspection corrections resolved
  • Electrical final completed
  • Plumbing final completed
  • Mechanical final completed
  • Fire final completed if required
  • Drainage compliance accepted if required
  • Certificate obtained if required
  • Main permit shows final or closed
Office location

Henderson Development Services Center Map

Permit office: Henderson City Hall, 240 S. Water Street, Henderson, NV 89015.
Inspection office: 2101 Moser Drive, Henderson, NV 89011.
Official resource center

Open the Correct Henderson Permit Resource

Frequently asked questions

Henderson Building Department FAQs

Where do I apply for a Henderson building permit?

Use the City of Henderson DSC Online portal. Create or sign in to an account, choose the correct permit or plan type, complete the application and upload the documents listed in the project-specific checklist.

What is the Henderson permitting phone number?

Call 702-267-3620 for permitting questions. Building Plan Check is 702-267-3650, and Building Inspections is 702-267-3900.

What are the Henderson permit office hours?

The permit office is open Monday through Thursday from 7:30 AM to 5:30 PM, excluding holidays. The office is closed Fridays. Field inspections are performed Monday through Friday from 6:00 AM to 4:00 PM.

How do I check a Henderson permit or plan-review status?

Open DSC Online and search the public records or sign in to the project account. The portal can show permit status, assigned reviewers, invoices, correction letters, related documents and inspection results.

Which building codes currently apply in Henderson?

Henderson lists the 2024 International Building Code, 2024 International Residential Code, 2024 International Existing Building Code, 2024 Uniform Mechanical Code and 2023 National Electrical Code, together with Southern Nevada amendments and local ordinances.

What is Henderson’s Virtual Counter?

The Virtual Counter is an online review appointment for eligible permits such as patios, swimming pools, individual trade permits and certain smaller commercial tenant improvements. Apply in DSC Online before booking.

How much is a Henderson building permit?

The amount depends on the permit type, construction valuation, plan review, trade work, fire review and other project-specific charges. Use the current fee schedule and estimator for planning, but rely on the official DSC Online invoice for the final amount.

How do I upload plan-review corrections?

Open the permit or plan in DSC Online, select the Details page and Attachments tab, then use the blue plus boxes to upload revised files. Include a clear response identifying how each correction was addressed.

How do I schedule a Henderson inspection?

Open the issued permit in DSC Online, review the list of standard inspections, select the correct inspection and submit the request. Keep approved plans available and leave required work visible.

How do I find or close an old Henderson permit?

Search DSC Online by address or permit number and review the complete inspection and document history. Then contact Building Inspections or Permitting to identify any missing final, revision, fee, trade permit, drainage document or certificate.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent informational guide and is not the City of Henderson.

This page was rebuilt from Henderson’s official Building and Fire Safety pages, DSC Online services, submittal checklists, construction codes, standard designs, Virtual Counter, fees, Planning, GIS and public-records resources.

Last reviewed: July 22, 2026.

Permit categories, fees, code editions, staffing, service targets and portal workflows can change. Confirm time-sensitive details with the City before filing, paying or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment