Dearborn permit action guide

Apply, Correct, Inspect and Close a Dearborn Building Permit

Dearborn uses BS&A Online for permit applications, payments, record searches and inspection requests. Creating an account is not enough—the account must also be linked to the City before permit activity can be submitted.

This guide gives homeowners, contractors, property buyers and business owners a clear route from the first zoning check to final inspection, permit closure or Certificate of Occupancy.

Exact BS&A buttons and account-linking steps
Verified permit fees, local limits and document lists
Inspection codes, correction paths and closeout checks
Dearborn permit moving through plan review and inspection An animated application moves from project plans through review, permit issuance and final inspection. DEARBORN PROJECT SET REVIEWED BS&A PERMIT REVIEW PERMIT FINAL INSPECTION PASSED
⚠️
Complete the BS&A linking step After creating and activating your BS&A account, email the username and account email to DBNInspections@dearborn.gov. Wait for City confirmation before trying to submit permit activity.
Start here

Choose the Exact Task You Need

Dearborn Permit Next-Step Finder

Select the situation that best matches your project.

Official contact panel

Dearborn Building Permit Contact Information

General City help 313-943-2150 Dial 311 from inside Dearborn
Permit Office 313-943-2442 Application, permit and plan-review help
Inspection scheduling 313-943-2400 Have permit number and inspection code
BS&A / inspection email DBNInspections@dearborn.gov Account linking and inspection assistance
Permit questions DBNPermits@dearborn.gov Permit requirements and open-permit questions
Planning and Zoning CityPlanning@dearborn.gov Site-plan and zoning pre-application help
Administrative Center 16901 Michigan Avenue Dearborn, MI 48126
Public hours 8:00 AM–5:00 PM Monday through Friday
Before contacting staff: Have the property address, parcel number, permit number, BS&A username, account email and one clear question ready.
Avoid the wrong municipality

City of Dearborn or Dearborn Heights?

Use Dearborn BS&A when

  • The property is legally inside Dearborn
  • The address appears under City of Dearborn in BS&A
  • Dearborn Planning confirms jurisdiction
  • Existing permits are shown in Dearborn’s record search

Verify before applying when

  • The property is near Dearborn Heights
  • The postal city and legal municipality differ
  • The address cannot be found in Dearborn BS&A
  • The contractor gave you a different city portal
Fast jurisdiction check: Search the address in Dearborn BS&A. Do not assume Dearborn Heights and Dearborn use the same permitting office.
Permit decision table

Which Dearborn Permit Fits the Project?

Project
Start with
Also check
New home, addition or structural renovation
Building permit
Site plan, zoning, structural drawings, energy and trade permits
Kitchen, bath, basement or interior remodel
Renovation permit
Structural changes, egress, electrical, mechanical and plumbing
Electrical, HVAC or plumbing work
Trade permit
Michigan license, Dearborn contractor registration and related building permit
Detached garage
Garage permit
700-sq.-ft. maximum, setbacks, height, coverage, foundation and electrical work
Shed
Shed certificate
100-sq.-ft. maximum, concrete footing, height, setback and parking-pad restriction
Pool, spa or hot tub
Pool permit
Water depth, barrier, setback, electrical grounding, plumbing and deck permit
Fence, porch, deck, ramp or concrete
Project-specific permit
Property lines, site plan, neighbor or district approvals and structural details
Commercial renovation or new commercial use
Planning and building review
Site-plan review, occupancy, fire, engineering, sanitation and water/backflow
Special land use or zoning deviation
Planning application
Planning Commission, Zoning Board of Appeals or City Council approval
Demolition or wrecking
Dismantle/wrecking permit
Utilities, sewer cap, barricades, debris removal and site restoration
Online application

Apply Through Dearborn BS&A in Seven Steps

Confirm jurisdiction and project scope

Search the property in Dearborn BS&A and write a clear list of every structure and building system affected.

Example: Build a 20-by-24-foot detached garage with electrical service and a new concrete floor.

Create and activate your BS&A account

Register as a homeowner, resident or contractor and open the activation email.

Ask the City to link the account

Email the username and account email to DBNInspections@dearborn.gov.

Wait for confirmation: Permit activity may remain unavailable until staff completes the linking process.

Prepare plans, contract and authorizations

Collect the site plan or survey, scaled drawings, signed construction contract, owner authorization and contractor documents.

Local check: Some Dearborn neighborhood association and historic-district projects require an additional approval.

Submit the correct application

Open Dearborn BS&A, select Apply for a Permit and choose the permit category that matches the work.

Respond to the complete correction report

Dearborn states that ordinary building plan review commonly takes about five to ten business days, although complex or incomplete projects can take longer.

Resubmit: Revised plans plus a numbered written response explaining how each comment was addressed.

Pay, obtain issuance and save the approved set

Pay the City invoice and confirm the permit is formally issued before construction begins.

Job-site requirement: Keep the permit and stamped approved plans visible and available for inspection.
Prepare before applying

Dearborn Permit Document Checklist

Property and applicant

  • Exact property address
  • Parcel identification number
  • Owner’s legal name
  • Applicant contact information
  • Owner authorization
  • Construction value

Plans and project records

  • Mortgage survey or site plan
  • Floor plans
  • Building elevations
  • Foundation and framing details
  • Signed construction contract
  • Manufacturer information when applicable

Contractor and approvals

  • Michigan contractor license
  • Dearborn contractor registration
  • Insurance certificate
  • Workers’ compensation information
  • Historic or association approval
  • Planning or special approval
Plan-copy caution: Some older Dearborn project forms still describe multiple paper plan sets even though most permit activity is now handled through BS&A. Confirm the current digital and paper-copy requirements before printing.
Contractor protection

Do Not Pull a Homeowner Permit for an Unregistered Contractor

Licensed contractor route

  • Verify the applicable Michigan license.
  • Confirm current City of Dearborn registration.
  • Check that the contract uses the same legal business name.
  • Confirm insurance remains active during the job.
  • Use a notarized authorization when someone other than the qualifying officer submits documents.

Homeowner permit responsibility

  • The permit holder is responsible for code compliance.
  • The permit holder must schedule required inspections.
  • The permit holder receives correction notices.
  • The City cannot resolve workmanship problems with an unlicensed contractor.
  • A homeowner should not pull a permit merely because a contractor requests it.

Open Contractor Registration Form

Dearborn-specific rules

Garage, Shed and Pool Rules to Check Before Buying Materials

Project
Dearborn rule shown in City forms
Practical next step
Garage size
Maximum 700 square feet
Show outside dimensions, floor area and total lot coverage on the site plan
Garage location
Minimum three-foot side-yard setback; minimum ten feet from the house shown in the form checklist
Use a current mortgage survey and dimension every separation
Garage height
Maximum 16 feet from grade to roof peak
Show roof peak and mean roof height on elevations
Shed size
Maximum 100 square feet and maximum ten-foot height
Show width, length, height and building section
Shed foundation
Concrete slab with 24-inch-deep trench footing; sheds cannot be placed on parking pads
Leave footing and slab work open for inspection before concrete
Detached accessory buildings
Only one detached accessory building per site; total structures cannot exceed 35% of site area
Calculate existing and proposed lot coverage before applying
Pool permit threshold
Permit required for pools, spas and hot tubs containing water over 24 inches deep
Include temporary and inflatable pools when they exceed the depth threshold
Pool location
Minimum three-foot side and rear setback; ten-foot separation from overhead wires
Show property lines, structures, wires, barrier and equipment on the site plan
Planning before building

Use Dearborn’s 2026 Site-Plan Process for Commercial and Land-Use Projects

Administrative site-plan review

Dearborn’s 2026 guide states that a new use, new structure or change that affects zoning compliance generally requires site-plan review, subject to listed exceptions.

  • Application fee: $500
  • Initial completeness check: allow two to three business days
  • Department review: approximately 20 business days per review cycle
  • Departments may include: Planning, Building, Fire, Engineering, Sanitation and Water/Backflow

Prepare before submission

  • Confirm zoning district
  • Confirm proposed use is allowed
  • Write detailed project narrative
  • Prepare sealed survey
  • Prepare site and civil plans
  • Prepare floor plans and elevations
  • Prepare landscaping and lighting information
  • Obtain owner-signed affidavit
Pre-application zoning check
Submit application and $500 fee
Multi-department review
Respond to every comment
Obtain special approvals if required
Submit construction permits
Do not submit construction plans too early. The site-plan process may require changes to access, parking, drainage, fire lanes, utilities, landscaping, lighting or building placement.

Open 2026 Administrative Site-Plan Guide

Planning Commission route

Special Land Use and Planning Commission Review

Special land use fee

$1,200

Shown in Dearborn’s April 2026 Planning Commission guide.

Planning Commission site-plan fee

$1,000

Separate from administrative site-plan review.

Public hearing notice

Properties within 300 feet receive notice for applicable Planning Commission hearings.

Approval expiration: The 2026 guide states that approval becomes void if construction has not commenced within 24 months. A written request for a possible 12-month extension must be made before expiration.

Open 2026 Planning Commission Guide

Current Michigan codes

Code Editions to Confirm for a 2026 Dearborn Project

Commercial building 2021 Michigan Building Code Effective April 9, 2025
One- and two-family 2015 Michigan Residential Code Current state residential code
Existing buildings 2021 Michigan Rehabilitation Code Effective April 9, 2025
Mechanical 2021 Michigan Mechanical Code Effective March 12, 2024
Plumbing 2021 Michigan Plumbing Code Effective March 12, 2024
Electrical 2023 National Electrical Code Effective March 12, 2024
Commercial energy 2021 Michigan Commercial Energy Code Effective April 22, 2025
Local layer Dearborn ordinances Zoning and administrative requirements also apply

Check the current Michigan code list before final design

Verified fee board

Dearborn Permit and Occupancy Fees

Fee item
Posted City amount
How it works
Permit processing
$100
Listed for all permits
Residential plan review
$1 per $1,000 construction cost
$15 minimum to $150 maximum
Residential plan revision
$10 per sheet
$50 minimum
Commercial plan review up to $500,000
$200
Higher-value formula applies over $500,000
Construction permit
$100 minimum
For $2,001–$1 million: $100 plus $15 per $1,000 construction cost
Electrical, HVAC or plumbing permit
$180 minimum
Includes processing, one rough and one final inspection
Permit reinspection
$30–$60
Amount depends on the applicable permit reinspection
Garage permit
$200
Electrical or other related permits may be separate
Shed, deck, ramp or gazebo
$100
Verify complete invoice and plan-review charges
In-ground pool
$150
Trade and deck permits may be separate
Above-ground pool, spa, hot tub or sauna
$50
Depth, location and barrier rules still apply
Fence permit
$125
Includes processing and plan review
Single-family sale/rental inspection
$225
Includes one reinspection
Two-family sale/rental inspection
$275
Certificate of Occupancy has no listed charge
Use the BS&A invoice as the transaction amount. Project forms may contain older fee language, while the City’s consolidated permit and occupancy schedule controls the current published fees.

Open Official Fee Schedule

Inspection action board

Schedule and Pass Dearborn Permit Inspections

Permit issued
Correct stage completed
Work left visible
Schedule online or by phone
Read result and corrections
Pass final and confirm closure

Online scheduling

Open Dearborn BS&A and choose Schedule an Inspection.

Linked users can also manage records through My Activity.

Phone scheduling

313-943-2400

Have the complete permit number and inspection code before calling.

Job-site preparation

The permit and stamped plans must be visible and available.

Arrange safe access and leave required work uncovered.

Before requesting an inspection

  • Permit is issued
  • Correct inspection code selected
  • Work is complete for that stage
  • Stamped plans are on site
  • Concealed work is exposed
  • Inspector can access the area

After a failed inspection

  • Read every correction
  • Identify the responsible contractor
  • Correct all related items
  • Keep repaired work visible
  • Pay reinspection fee if charged
  • Request another inspection only when ready
Local inspection sequences

Garage, Shed and Pool Inspection Order

Project
Dearborn form inspection sequence
Do not cover
Garage
#110 footing/foundation → #116 concrete floor → #130 framing after rough electrical → #140 final
Footings, slab preparation, framing and rough electrical
Shed
#110 footing/slab before concrete → #140 final
Trench footing and slab preparation
Residential in-ground pool
Electrical grounding and underground plumbing → #119 re-steel → #113 pool deck before concrete
Grounding, plumbing, steel reinforcement and deck preparation
Residential above-ground pool
#157 pool barrier and pool-use approval
Barrier, gate, electrical safety and approved equipment location
Status and correction help

What the BS&A Permit Status Means

Draft The application has not been fully submitted. Finish required fields and confirm submission.
Submitted The City received the application and may be checking completeness.
In plan review One or more departments are reviewing the plans. Do not begin work.
Corrections required Submit revised plans and a written response addressing every comment.
Approved Payment, stamped plans or formal issuance may still be outstanding.
Issued Work may begin only within the approved scope and permit conditions.
Failed inspection Correct every listed item before scheduling reinspection.
Final or closed Save proof that the main and related trade permits passed final inspection.
Permit records

Find an Old, Open or Missing Dearborn Permit

Open Building Department Record Search

Use the service list on Dearborn’s BS&A municipality page.

Search by permit number first

Use the number from a permit card, invoice, correction notice or inspection report.

Try the base property address

Remove apartment, suite or unit information when the complete address returns no result.

Read the complete record

Check fees, permit status, documents, reviews and inspection history.

Request manual help

Email DBNPermits@dearborn.gov with the address, approximate year, contractor or owner name and the document needed.

For buyers and sellers: A permit number does not prove the work passed final inspection. Confirm that every associated building, electrical, mechanical and plumbing permit is closed.
Home sale requirement

Dearborn Requires a Pre-Sale Inspection Before Closing

Seller’s process

  1. Submit the inspection application and payment.
  2. Schedule the pre-sale inspection well before closing.
  3. Receive the electronic inspection report.
  4. Correct cited violations and obtain required permits.
  5. Complete required permit inspections.
  6. Pass the occupancy reinspection.

Request the Certificate of Occupancy

Email the buyer’s name and whether the buyer will occupy the property to DBNSales@dearborn.gov.

For a non-owner-occupied property, include the purchaser’s full contact information.

The Certificate of Occupancy is issued only after required violations, permits, inspections and fees are cleared.

Important timing: Dearborn states that the inspection report is valid for one year. A Certificate of Occupancy may be issued for up to six months after the inspection approval date; a new inspection may be required after that period.

Open Dearborn Home Sale Process

Common problems

Ten Dearborn Permit Delays You Can Prevent

  1. Creating a BS&A account without asking the City to link it.
  2. Applying to Dearborn for a Dearborn Heights property.
  3. Using an incomplete site plan or old mortgage survey.
  4. Leaving out the signed construction contract.
  5. Using a contractor who is not registered with Dearborn.
  1. Ignoring historic-district or neighborhood review.
  2. Submitting revised plans without a comment-response letter.
  3. Starting work when the record is approved but not issued.
  4. Covering work before the required inspection.
  5. Passing the building final while leaving a trade permit open.
Ready-to-use scripts

What to Say When Contacting Dearborn Staff

Permit requirement:
“I am planning [exact work] at [address]. Which building and trade permits are required, and do I need zoning, site-plan, historic or neighborhood approval before submitting?”
BS&A linking:
“My BS&A username is [username], and the account email is [email]. Please link the account to City of Dearborn permit activity.”
Correction response:
“Permit [number] received comments dated [date]. I uploaded revised sheets and a numbered response addressing each comment. Please confirm receipt and identify any remaining review.”
Open permit:
“I found permit [number] for [address], but it does not appear closed. Which inspection or document is missing, and what must the current owner do next?”
Final completion checklist

Do Not Treat the Project as Finished Until These Are Complete

  • Dearborn jurisdiction confirmed
  • BS&A account activated
  • Account linked to the City
  • Correct permit types selected
  • Planning and special approvals complete
  • Contractor registration verified
  • Complete plans and contract submitted
  • Review comments resolved
  • Fees paid
  • Permit formally issued
  • Stamped plans kept on site
  • Required inspections completed
  • Failed items corrected
  • Building final passed
  • Trade permits closed
  • Certificate of Occupancy obtained when required
Office map

Dearborn Administrative Center Map

Address: 16901 Michigan Avenue, Dearborn, MI 48126.
Public hours: Monday–Friday, 8:00 AM–5:00 PM.
Call 313-943-2150 before making a special trip or printing multiple plan sets.
Official resource library

Open the Correct Dearborn Portal, Guide or Form

Frequently asked questions

Dearborn Building Permit FAQs

Where do I apply for a Dearborn building permit?

Use the City of Dearborn municipality page in BS&A Online. Select “Apply for a Permit,” sign into your account and complete the City account-linking step before submitting permit activity.

How do I link my BS&A account to Dearborn?

Create and activate the account, then email your BS&A username and account email to DBNInspections@dearborn.gov. Wait for City staff to confirm that the account is linked.

How long does Dearborn building plan review take?

The City states that ordinary building plan review typically takes about five to ten business days. Complex projects, missing documents, revisions and additional department reviews can take longer.

How do I schedule a Dearborn permit inspection?

Use the Schedule an Inspection service in Dearborn BS&A or call 313-943-2400. Have the complete permit number and inspection code ready.

Do contractors need to register with Dearborn?

Yes. Contractors must hold the applicable Michigan license and complete City of Dearborn contractor registration. License, insurance and company information must remain current.

How much is the Dearborn permit processing fee?

The City’s posted permit and occupancy schedule lists a $100 processing fee for all permits. Plan review, construction, trade and project-specific fees may be added.

What are Dearborn’s garage and shed limits?

The City’s project forms list a 700-square-foot maximum and 16-foot maximum height for a detached garage. Sheds are limited to 100 square feet and ten feet in height. Additional setback, footing and lot-coverage rules apply.

Does a pool or hot tub require a Dearborn permit?

A permit is required for pools, spas, hot tubs and similar recreational bathing structures containing water more than 24 inches deep, including qualifying temporary or inflatable pools.

Does Dearborn require an inspection before a home sale?

Yes. A City pre-sale inspection and Certificate of Occupancy are required before closing. Violations and related permit work must be corrected and reinspected.

How do I find an old or open Dearborn permit?

Use Building Department Record Search in Dearborn BS&A. Search by permit number first, then by property address. Review the inspection history and final status, and email DBNPermits@dearborn.gov when records are incomplete.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not the City of Dearborn.

This page was checked against the official City of Dearborn BS&A instructions, permit application library, home-improvement process, permit fee schedule, 2026 planning guides, accessory-structure forms, home-sale requirements and the State of Michigan construction-code list.

Last verified: July 22, 2026.

Fees, forms, code editions, review times, account procedures and inspection requirements can change. Confirm time-sensitive details with the City before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment