Broomfield does not accept building-permit applications through its online portal. Applications, plans, revisions, affidavits and general questions must be emailed to the Building Division. The portal becomes useful later for public searches, payment, permit cards, approved documents and contractor inspection scheduling.

This guide turns that unusual workflow into a clear project path. Homeowners can use the simple instructions, while contractors and design professionals can use the detailed document, licensing, code, valuation, use-tax, review and inspection checkpoints.

You will also learn which projects go to Planning or Engineering instead of Building, how to use the public permit search without registering, what Broomfield accepts as a base plan, how long current reviews may take and how to avoid the city’s $150 reinspection or late-cancellation charge.

Email-submission workflow explained step by step
Current 2026 code, review and inspection rules
Fees, use tax, records and closeout actions
Broomfield permit package moving from email to plan review, payment and final inspection An animated email envelope carries building plans to a plan analyst, then to payment and a final inspection check. EMAIL PERMIT PACKAGE TO: buildingpermits@broomfield.org PLAN ANALYST PAY & ISSUE INSPECTIONS REVIEWED PAID FINAL INSPECTION CLOSED ONE DESCOMBES DRIVE
📌
2026 code and plan-submittal updates Broomfield’s 2024 International Code package and Colorado Low Energy and Carbon Code became effective April 15, 2026. The city says enforcement of the 2026 National Electrical Code begins August 1, 2026. Also, since November 1, 2025, Improvement Location Certificates are not accepted as base plans for permit review.
Start here

Choose the Broomfield Permit Action You Need

Simple and expert routes

Use the Homeowner Lane or the Professional Lane

Homeowner or first-time applicant

  1. Confirm the project needs a Building permit.
  2. Download the General Permit Application and project checklist.
  3. Complete the Homeowner Statement when doing any work yourself.
  4. Prepare a valid site/base plan and floor plan.
  5. Email one organized package to Building.
  6. Wait for comments or approval, then pay.
  7. Keep the permit card and plans on site for inspections.

Contractor, architect, engineer or developer

  1. Verify Broomfield contractor licensing and trade credentials.
  2. Coordinate Planning, Engineering, Fire, Health and Stormwater dependencies.
  3. Confirm the code edition based on permit-issuance date.
  4. Use complete valuation by trade, including labor and permanent systems.
  5. Control digital and hard-copy plan requirements.
  6. Submit engineer reports before rough and final inspections when required.
  7. Reconcile all sub-permits and Certificate of Occupancy conditions.

Broomfield Permit Route Finder

Select your situation to see the correct agency, official route and first documents to prepare.

Official contact panel

Broomfield Building Division Address, Phone Numbers and Service Times

Building Division 303-438-6370 Use option 5 for permit and inspection help
Permit email buildingpermits@broomfield.org Applications, plans, revisions and questions
Automated inspections 303-438-6376 Press option 1
Contractor licensing contractorlicense@broomfield.org New licenses and renewal documents
Office address George Di Ciero City & County Building One DesCombes Drive, Broomfield, CO 80020
Payment counter 9:00 AM–4:00 PM Cash, check or card
Homeowner plan help Tuesday 9 AM–Noon Thursday 1–4 PM
Fastest way to get useful help: Include the property address, project description, applicant name and existing permit number in the subject line. Attach the city form and documents instead of sending only “Do I need a permit?”
Jurisdiction and agency check

Broomfield Is Both a City and a County—but Not Every Permit Goes to Building

Your task
Primary Broomfield division
Important distinction
Building, remodeling, decks, pools, HVAC, roofing, solar or structural work
Building Division
Email applications and plans; do not submit the application through Citizen Access.
Fence installation or replacement
Planning Division
Fence permits are not Building Division permits; Planning reviews zoning, height and location.
Dumpster, roll-off, container, street closure, driveway or public improvements
Engineering Division
Engineering handles public-way, utility and container-related permits.
New commercial construction fire review
North Metro Fire District
Submit separately to Fire as well as Broomfield Building.
Food service or public pool in a commercial project
Public Health
Separate Health review may be required.
New commercial grading, utilities or site work
Engineering / Stormwater
Separate Engineering review applies; Stormwater review may apply when disturbance exceeds one acre.
Email-submission workflow

How to Submit a Broomfield Permit Application Correctly

Choose permit type
Download forms
Prepare plans
Email Building
Respond to review
Pay and issue
Inspect and close

Choose the project form and required checklist

Start with the General Permit Application unless Broomfield provides a project-specific form such as re-roofing, tenant finish, new single-family or new commercial construction.

Do next: Open the official homeowner or contractor permit page and download every document listed for the project.
Expert check: Commercial projects may require separate applications to Fire, Engineering, Health or Stormwater.

Complete the application fields fully

Provide the property, owner, contractor, job contact, construction description, total project valuation and separate valuation for general, electrical, HVAC, plumbing and fire-sprinkler work.

Do next: Include labor, materials, overhead, profit, equipment and permanent systems in valuation—not only material receipts.
Expert check: Make the valuation breakdown match contracts, trade scope and plan documents.

Prepare an accepted base plan and construction plans

For work involving location on a property, use an improvement survey plat, plot plan, plat, site plan, aerial image or another plan/survey accepted by Broomfield. An ILC is no longer accepted as the base plan.

Do next: Show property dimensions, existing structures, proposed construction and actual distances to property lines.
Expert check: Use a Colorado licensed surveyor when the city’s base-plan or land-survey requirements call for signed and stamped work.

Name files so a reviewer can understand them

Use filenames such as 01-Permit-Application.pdf, 02-Site-Plan.pdf, 03-Floor-Plans.pdf, 04-Structural.pdf and 05-Homeowner-Statement.pdf.

Do next: Open every attachment before sending to confirm pages are readable and correctly oriented.
Expert check: Keep revision dates and design-professional seals consistent across the full document set.

Email the complete package

Send the application and attachments to buildingpermits@broomfield.org. The city states that applications cannot be submitted through the online portal.

Suggested subject: New Permit Application – 123 Example Street – Basement Finish.
Expert check: For large files, contact Building before splitting the submittal across multiple messages.

Wait for permit entry and plan review

Permit technicians enter the application, and plan analysts approve it or email the applicant with comments. Save the assigned permit number and every message.

Do next: Respond in the existing email thread so staff can connect revisions to the correct record.
Expert check: Use an itemized correction response identifying sheet, detail and revision date.

Pay only after the permit is ready

Once approved, pay through Citizen Access or at the payment counter. The city then provides the permit card and access to approved documents.

Do next: Download and print the permit card and approved plans before construction starts.
Expert check: Reconcile permit fees, use tax, trade fees and any separate review-agency charges.

Request all inspections and final approval

The property owner or contractor must schedule required inspections. The permit is not complete merely because it was issued or construction appears finished.

Do next: Confirm the final inspection, related trades and Certificate of Occupancy when applicable.
Expert check: Submit required engineer letters before rough and final inspections are scheduled.
Email template

Copy This Broomfield Permit Submission Email

To: buildingpermits@broomfield.org

Subject: New Permit Application – [Property Address] – [Project Type]

Hello, attached is the permit package for [brief project description] at [full property address]. The owner is [name], the applicant is [name/company], and the project valuation is [$ amount]. Attached are the completed application, [list plans/checklists/statement]. Please confirm receipt and advise if another form, Planning approval, engineer document or contractor item is required.
Permit decision matrix

What Broomfield Requires for Common Projects

Project
Primary documents
Special Broomfield detail
Current review target
Like-for-like A/C, furnace or water-heater replacement
General application and project information
A/C valuation must include an electrical value and licensed electrical contractor
1–3 business days for listed like-for-like work
Re-roof
Re-roofing application and roof-slope report
Roof affidavits may apply to mid-roof or final inspection
About 1 week
Basement finish or remodel
General application, questionnaire and plans
Engineer report required for an interior structural remodel
1–2 weeks
Deck
Application, deck handout, plans and site plan
Steel or metal decks require an engineer-stamped report
2–3 weeks as exterior residential work
Residential addition
Application, remodel questionnaire, plans, site plan and engineer report
Base-plan and property-line information must be complete
4–5 weeks for first comments
Garage
Application, plans and site plan
Engineer report if attached or larger than 600 square feet
Confirm with Building
Retaining wall over 3 feet
Plans, site plan and engineer-stamped report
Separate Planning/site constraints may also apply
Confirm with Building
Solar PV system
Plans, site plan and engineer-stamped report
Solar inspection affidavit may apply
1–2 weeks
Swimming pool or spa
Plans, site plan and engineer-stamped report
Barrier, electrical and equipment requirements must coordinate
Confirm with Building
Fence
Planning application and site plan
Planning—not Building—issues the fence permit
Planning guidance says generally 1–2 working days
Tenant finish
Tenant-finish application and submittal requirements
Coordinate occupancy, fire, accessibility and MEP work
5–6 weeks for first comments
New commercial building
Commercial application, full plans, soils, calculations, energy and utility documents
Separate Fire, Engineering, Health and Stormwater submissions may apply
6–7 weeks for first comments
New house
Single-family application, submittal requirements, plot/drainage and acknowledgements
Certificate of Occupancy checklist must be planned from the start
7–8 weeks for first comments

Review periods are city goals, not guarantees. Incomplete plans, outside reviews, structural complexity and correction cycles can extend the schedule.

Plans and base-plan rules

What to Show on Broomfield Plans Before You Email Them

Site or base plan

  • Lot dimensions
  • Existing buildings
  • Proposed construction
  • Distances to property lines
  • Easements where relevant
  • North arrow and address

Floor and construction plans

  • Existing and proposed rooms
  • Room uses
  • Dimensions
  • Framing and structural work
  • Doors, windows and egress
  • Trade systems affected

Professional information

  • Engineer stamp where required
  • Structural calculations
  • Product evaluation reports
  • Energy-code forms
  • Soils report when applicable
  • Special-inspection documents
Do not use an Improvement Location Certificate as the permit base plan. Effective November 1, 2025, Broomfield says it will accept improvement survey plats, plot plans, plats, site plans, aerial photos and other accepted plans or surveys—including signed and stamped survey work when required.
Application field decoder

How to Complete the Broomfield General Permit Application

Application field
What to enter
Mistake to avoid
Address of proposed construction
The physical job-site address, including unit or suite when applicable
Using only the owner’s mailing address
Property owner
Legal owner name, email, phone and mailing address
Using a tenant or property manager as the legal owner
Contractor and license
Legal contractor name, contact details and Broomfield license number
Listing an unlicensed or differently named business
Job contact
Person who can answer review and inspection questions
Providing an inactive email or office-only number
Project valuation
Total value of labor, materials, overhead, profit, equipment and permanent systems
Entering only material cost
Trade valuations
Separate values for general, electrical, HVAC, plumbing and fire sprinkler
Leaving affected trade values blank
Property-line distances
Actual front, left, right and rear distances
Guessing instead of using a valid plan or survey
Construction description
Specific work, size, rooms and systems affected
Using vague terms such as “remodel”
Signature
Owner or authorized agent certification
Sending an unsigned application
Current review planning

Broomfield Plan-Review Targets and Homeowner Help Hours

Faster residential reviews

  • Like-for-like residential A/C, water heater and furnace: 1–3 business days
  • Re-roofing: 1 week
  • Standard HVAC/water-heater work: 1–2 weeks
  • Window and door: 1–2 weeks
  • Solar PV: 1–2 weeks
  • Basement finish/remodel: 1–2 weeks
  • Residential EV charger: 1–2 weeks

Longer plan reviews

  • Exterior residential work: 2–3 weeks
  • Sign: 3–4 weeks
  • Residential addition: 4–5 weeks
  • Commercial EV charger: 2–4 weeks
  • Tenant finish: 5–6 weeks
  • New commercial building: 6–7 weeks
  • New house: 7–8 weeks
Homeowner help: A Building Plans Analyst is listed as available Tuesdays from 9:00 AM to noon and Thursdays from 1:00 PM to 4:00 PM. Some homeowner permits may qualify for same-day review and issuance. Call before visiting.
2026 code transition

Which Building and Electrical Codes Apply?

2024 International Codes

Broomfield adopted the 2024 Building, Mechanical, Plumbing, Fuel Gas, Existing Building and Fire codes effective April 15, 2026.

Energy and carbon code

The code update includes the Colorado Low Energy and Carbon Code. Residential and commercial energy documents may be required.

Electrical transition

The city currently observes the 2023 NEC and says enforcement of the 2026 NEC begins August 1, 2026. Confirm the code based on permit-issuance date.

Homeowner permits

What the Broomfield Homeowner Statement Means

When an owner may act as contractor

Broomfield’s form allows a homeowner-occupant to act as general contractor on qualifying new construction, remodeling or repair of the owner’s privately owned residence when the owner is doing the work.

The Homeowner Statement is required whenever the homeowner performs any portion of the project.

Electrical and plumbing limitations

The form says qualifying homeowners may personally perform electrical or plumbing work when the property is not intended for sale or resale, is not rental property occupied by tenants and is not generally open to the public.

Work must remain exposed for required inspections before concealment and again at completion.

Hiring someone changes the permit responsibility: If another person performs the general contracting work, that contractor must be licensed by Broomfield and become the contractor of record.

Open the Homeowner Statement

Contractor licensing

How a Contractor Becomes Licensed in Broomfield

License application

Complete and sign Broomfield’s contractor license application.

Insurance certificate

Provide current general liability insurance showing the City and County of Broomfield, One DesCombes Drive, as certificate holder.

State trade credentials

Plumbing and electrical contractors must include current State and Master licenses when applicable.

Send new-license documents to: contractorlicense@broomfield.org. Building staff process the license and establish the contractor’s online account.
Fees and Broomfield use tax

How Permit Fees, Use Tax and Payment Work

Permit-fee basics

Permit fees are calculated separately for general, electrical, mechanical and plumbing work based on each trade valuation.

  • Mobile-home setup: $100 flat fee
  • Construction/office trailer: $100
  • Demolition: $100
  • Temporary stand or kiosk: $100
  • Cleanup permit: $100
  • Solar removal and replacement: $70
  • Graywater permit: $200 plus use tax

Card and counter payments

The payment counter is listed as open from 9:00 AM to 4:00 PM. The city accepts cash, check or card and does not accept electronic checks for Building Division payments.

Card payments carry a 2.65% convenience fee with a $1.25 minimum.

Broomfield use-tax example

For contracted work, the city assumes materials equal 50% of total project valuation. The General Permit Application currently shows a Broomfield assessed rate of 4.15%.

$20,000 project × 50% materials = $10,000 materials. $10,000 × 4.15% = $415 Broomfield use tax.

A homeowner performing all work lists the actual total materials cost instead of using the 50% assumption.

$150 inspection charges: A $150 reinspection fee may be required after a disapproved inspection with a penalty. A $150 late-cancellation charge applies when a same-day inspection is canceled after 8:30 AM.
Inspection command center

How to Schedule, Track and Pass Broomfield Inspections

Automated scheduling

Call 303-438-6376 and press option 1.

Enter the permit number using numerals only and the 3-digit inspection code shown next to the required inspection on the permit card.

Scheduling cutoff

Requests must be received before 11:00 PM the day before the requested business day. Next-day availability is not guaranteed.

The automated line offers up to four business-day choices.

Day-of timing

Inspection arrival can occur between about 8:30 AM and 4:00 PM.

Check the live Daily Inspection List or call option 5 between 8:00 and 8:30 AM for a more precise window.

Inspection action
Exact practical rule
What happens if missed
Find the correct inspection code
Use the 3-digit code beside the inspection on the permit card
An unlisted inspection cannot be scheduled; call option 5 if it appears missing
Prepare the site
Permit card and approved plan set must be on site; work must be ready
A $150 reinspection fee may be assessed
Cancel before the inspector route is set
Call option 5 before 8:30 AM for a same-day cancellation
Cancellations after 8:30 AM may be charged $150
Check the inspector route
Use the Daily Inspection List; completed inspections disappear as it refreshes
Do not assume a fixed appointment time
Engineer inspection
Email the original signed and sealed report before rough and final inspections are scheduled
The requested inspection may be blocked
Weather cancellation
Reschedule if the city cancels because of closure or delayed opening
Inspections are not automatically rolled to the next day

View Today’s Inspection List

Safety inspection detail

Smoke and Carbon-Monoxide Alarms May Be Checked

Broomfield says inspections for new houses, townhomes, apartments, interior alterations and additions include verification of smoke and carbon-monoxide alarms. Smoke alarms are also required in connection with water-heater, furnace or air-conditioning work.

The city’s guidance identifies smoke alarms in bedrooms, outside bedrooms within 15 feet and on each level of the home. Use the current city handout for exact placement and interconnection requirements.

Status decoder

What Common Broomfield Permit Statuses Mean

Email sent, no permit number Building may not have entered the application yet, or the package may be incomplete. Confirm receipt before resending.
Entered / pending review A permit record exists and is waiting for a plan analyst or another reviewing division.
Corrections required Respond to each comment and email revised documents using the existing permit reference.
Approved / payment due Review is complete, but the permit is not issued until required fees and tax are paid.
Issued The permit card and approved documents should be available. Work must follow the issued scope.
Inspection disapproved Correct the cited work and pay any assessed reinspection penalty before rescheduling.
Final inspection approved Check related trade permits and Certificate of Occupancy requirements.
Finaled / closed Save the final record, permit card, inspection result and occupancy documentation.
Public permit search

How to Search Broomfield Permits Without Creating an Account

Open Citizen Access

Use the city’s public permit search link. Do not register just to search.

Select Public Access in the side menu

The city specifically instructs general users to choose Public Access. Registration is reserved for contractors who need online inspection scheduling.

Search by permit number first

Use the BP permit number when available. Otherwise, enter the property address or other available search field.

Search tip: Try the base address before adding unit or suite information.

Open the record and review documents

Check permit type, status, valuation, inspections, contractor information and final result. A search result alone does not prove closure.

Request older records when necessary

Broomfield says Building Division reports are available online, while reports older than three years may require a public-records request.

Planning and fence permits

Do Not Send a Fence Permit to the Building Division

Fence permit basics

Planning processes fence permits. Broomfield guidance says permits are required for new fences, replacements and relocations. The residential FAQ also identifies permits for fences over 30 inches and certain structural repairs or replacements.

Submit the fence application and site plan to PlanningApps@broomfield.org.

What the site plan should show

  • Property address
  • Proposed fence location
  • Material and color
  • Fence height
  • Length
  • Property lines and site features
Extra access permit: If fence, patio or landscaping work requires access through a park, open space or greenbelt behind the property, obtain the free Parks access permit at least 48 business hours before work.
Commercial expert checklist

New Commercial Construction Requires Separate Agency Coordination

Agency or document
When it applies
Action
North Metro Fire Rescue District
New commercial construction and applicable fire systems
Submit separately to Fire
Broomfield Engineering
Grading, utilities, civil work and related permits
Submit separate engineering plans and permits
Broomfield Public Health
Food service or public pool
Submit Health plans separately
Stormwater
Site disturbance over one acre
Complete separate Stormwater requirements
Water/sewer license
New or changed nonresidential service
Provide usage estimates, meter, sewer tap and fire-line information
Hard-copy plans
Current new-commercial submittal requirements
Provide the required stamped hard copy plus electronic documents
Energy forms
2024 code / Low Energy and Carbon Code projects
Submit forms not already contained in the main plan set
Permit closeout

How to Resolve an Open or Unfinished Broomfield Permit

Collect the permit history

  • BP permit number
  • Application and approved scope
  • Approved plans
  • Contractor records
  • Inspection history
  • Engineer reports

Identify what remains

  • Missing inspection
  • Disapproved inspection
  • Unpaid reinspection fee
  • Open trade permit
  • Missing engineer letter
  • Certificate of Occupancy item

Ask Building for the remedy

  • Can the current permit be completed?
  • Are updated plans required?
  • Must the contractor change?
  • Which inspections are still valid?
  • Is a new permit needed?
  • Which final document closes the record?
Do not make final payment based only on completed-looking work. Confirm final Building and trade inspections and obtain the applicable Certificate of Occupancy or final permit record.
Troubleshooting center

Fix Common Broomfield Permit and Inspection Problems

Problem
Likely reason
Practical action
I submitted through the portal but no permit exists
The portal does not accept building-permit applications
Download the correct form and email the complete package to buildingpermits@broomfield.org
No response to my email
Large, incomplete or unclear package
Follow up with the address and project in the subject line; call option 5 without sending duplicate applications
My site plan was rejected
An ILC or incomplete base plan was submitted
Replace it with an accepted plot/site/survey document showing project location and property lines
Public search asks me to register
Wrong portal option selected
Choose Public Access; general search users should not create an account
Inspection is not listed
The inspection is not on the permit card
Call 303-438-6370 option 5 instead of selecting a different code
No inspection dates are available
The four-day automated schedule is full
Call option 5 for assistance
Inspection failed because plans were missing
Permit card or approved plans were not on site
Prepare the required job-site documents and pay any assessed $150 fee before rescheduling
I must cancel today
The site is not ready
Call option 5 before 8:30 AM to avoid the late-cancellation charge
Contractor does not appear in Broomfield
License or online account is incomplete
Email the license application, insurance and state/master credentials to contractorlicense@broomfield.org
Old permit delays a sale
Final inspection, sub-permit or C/O remains open
Search the record and request a written list of closeout requirements from Building
Ready-to-use scripts

What to Say When You Contact Broomfield Building

Permit requirement question
“I am planning [exact work] at [address]. The project will affect [structure/electrical/plumbing/HVAC]. Can you confirm the application, project checklist, site-plan type, engineer documents and separate Planning or Engineering approvals required?”
Application follow-up
“I emailed a permit package on [date] for [address and project]. Can you confirm receipt and whether a permit number or missing-document notice has been issued?”
Correction response
“Attached are revisions for permit [BP number]. The response list addresses each review comment and identifies the revised sheet, detail and date. Please confirm the revision was attached to the existing permit.”
Inspection scheduling problem
“Permit [numeric number] does not list inspection code [type], or the automated system has no available dates. Can you confirm the required inspection and help schedule it?”
Open permit question
“Permit [BP number] at [address] is not final. Can you identify the missing inspection, fee, engineer report, trade permit or occupancy item required to close it?”
Contractor licensing email
“Attached are the signed license application, general liability certificate naming the City and County of Broomfield as certificate holder, and applicable State and Master licenses. Please advise when the license and online account are active.”
Final completion checklist

Do Not Consider the Broomfield Permit Complete Until These Items Are Confirmed

  • Correct Broomfield division identified
  • Correct application downloaded
  • Homeowner Statement completed if needed
  • Accepted base plan prepared
  • All trade valuations included
  • Contractor license verified
  • Complete package emailed
  • Permit number saved
  • Every review comment answered
  • Fees and use tax paid
  • Permit card printed
  • Approved plans on site
  • Correct inspection codes used
  • Engineer reports submitted
  • All trade finals passed
  • Certificate of Occupancy obtained if required
  • Permit shows final or closed
  • Owner saves final records
Keep a project copy: Print this checklist or save the page as a PDF.
Address and map

Broomfield Building Division Location

George Di Ciero City & County Building: One DesCombes Drive, Broomfield, CO 80020.
Building Division: 303-438-6370, option 5.
Payment processing: 9:00 AM–4:00 PM. Call before visiting for a plan-review consultation.
Official resource library

Open the Correct Broomfield Building Resource

Frequently asked questions

Broomfield Building Permit, Search and Inspection FAQs

Where do I submit a Broomfield building permit application?

Email permit applications, plans, revisions and affidavits to buildingpermits@broomfield.org. Broomfield states that building-permit applications cannot be submitted through the Citizen Access portal.

What is the Broomfield Building Division phone number?

Call 303-438-6370 and use option 5 for permit, plan-review and inspection assistance. The automated inspection line is 303-438-6376, option 1.

How do I search Broomfield building permits?

Open Citizen Access, select Public Access in the side menu and search by address or permit number. General public-search users should not register for an account; registration is intended for contractors scheduling inspections online.

How do I schedule a Broomfield inspection?

Call 303-438-6376, press option 1 and enter the permit number using numerals only and the 3-digit inspection code shown on the permit card. Requests must be received before 11:00 PM for the following business day, but next-day service is not guaranteed.

What must be at the job site for an inspection?

The permit card and an approved plan set must be on site, the requested work must be complete and accessible, and work that requires inspection must remain visible. A $150 reinspection fee may be assessed when the site is not ready.

How long does a Broomfield permit review take?

Current city goals range from 1–3 business days for listed like-for-like residential replacements to 7–8 weeks for a new house. Re-roofing is listed at about one week, basement finish at 1–2 weeks, exterior residential work at 2–3 weeks and tenant finish at 5–6 weeks. These are goals, not guarantees.

Can I use an Improvement Location Certificate for my permit site plan?

No. Broomfield states that ILCs have not been accepted as base plans since November 1, 2025. Accepted alternatives include improvement survey plats, plot plans, plats, site plans, aerial photos and other accepted plans or surveys.

Who issues fence permits in Broomfield?

The Planning Division processes fence permits. Submit the fence application and site plan to Planning rather than the Building Division and verify zoning, height, easements, PUD standards and corner-lot sight restrictions.

How is Broomfield building use tax calculated?

For contracted work, Broomfield assumes materials equal 50% of total project valuation and applies the current city use-tax rate. The General Permit Application currently illustrates a 4.15% rate: a $20,000 project results in $10,000 assumed materials and $415 of Broomfield use tax.

How do I close an old Broomfield permit?

Search the permit record, identify missing inspections, unpaid reinspection charges, engineer reports, open trade permits or Certificate of Occupancy items, and call Building at 303-438-6370 option 5 for the current closeout requirements.

Source and freshness notes

Independent Guide and Official-Action Notice

Building-Department.org is an independent informational website and is not the City and County of Broomfield. Applications, payments, inspections, approvals, code interpretations, licenses and enforcement decisions must be handled by Broomfield or the responsible official agency.

This guide was refreshed using current City and County of Broomfield Building, Planning, Engineering, payment, inspection, fee, code and public-record resources on July 21, 2026.

Code editions, review targets, forms, fees, tax rates, contacts and inspection procedures can change. Confirm time-sensitive details before filing, paying, ordering plans or starting construction.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment