Martin County permit action guide

Apply, Upload Plans, Schedule Inspections and Close a Martin County Permit Correctly

Start with the exact task—not a generic permit explanation. This guide helps you confirm jurisdiction, choose the correct record, prepare Martin County forms, submit through Accela, answer Digital Plan Room comments and complete inspections.

It also explains the issues that commonly stop local projects: owner-builder appearance rules, floodplain review, Florida Product Approvals, zoning setbacks, septic or utility coordination, Notice of Commencement requirements and unfinished permit records.

The steps apply to unincorporated Martin County. A Stuart, Indiantown or other municipal mailing address does not automatically prove that the county is the permitting authority.

Official Martin County Accela application and search links
Current July 2026 fee schedule and exemption process
Online, text-message and VuSpex inspection options
Martin County permit moving from property review through digital plans to final inspection An animated parcel plan, online upload station, plan review screen, coastal waterway and final inspection check explain the Martin County permit process. PROPERTY + SITE PLAN DIGITAL PLAN ROOM FILES UPLOADED PLAN REVIEW COMMENTS CLEARED PERMIT FINAL INSPECTION PASSED MARTIN COUNTY
📌
New fee and permit-exemption rules effective July 1, 2026 Certain nonstructural work valued under $7,500 at an eligible single-family home may qualify for a written permit exemption. Approval is not automatic. The current application lists a $100 total charge—$75 for the exemption waiver and $25 for plan review—and requires project documentation before work begins.
Start here

Choose the Exact Martin County Task

Official contact panel

Martin County Building Department Contacts

Main Building Department 772-288-5916 Permits, plan review and general help
Permitting email permitting@martin.fl.us Include address and record number
Building text line 202-937-0892 Inspection scheduling, cancellation and results
Office hours 7:30 AM–4:00 PM Monday through Friday
Virtual inspection help 772-288-5489 VuSpex questions
Contractor licensing 772-288-5482 Registration and unlicensed activity
Zoning Desk 772-288-5495 Zoning district and allowed-use help
Office address 900 SE Ruhnke Street Stuart, FL 34994
Useful email format: Put the permit number and address in the subject line. In the message, identify the exact review, inspection, document or fee you need help understanding.
Avoid the wrong application

Martin County or a Municipal Building Department?

Use Martin County Accela when

  • The property is in unincorporated Martin County.
  • The Martin County property and zoning tools recognize the parcel.
  • The permit history appears under the MARTINCO Accela portal.
?

Verify first when

  • The mailing address says Stuart, Indiantown or another municipality.
  • The parcel is close to a municipal boundary.
  • You are researching an older permit issued before a boundary change.
Fast property check: Search the address or parcel through the Martin County Property Appraiser, then confirm the permitting jurisdiction before creating an Accela record.
New 2026 decision path

Does the Martin County Under-$7,500 Exemption Apply?

Project condition
Possible result
Required next action
Single-family property with nonstructural work below $7,500
May qualify
Submit the county exemption request, signed contract or quote and required property documents.
Electrical, plumbing, mechanical or gas work
Not exempt
Apply for the applicable regulated-trade permit.
Roofing, windows, exterior doors, shed, elevated deck or load-bearing work
Structural permit required
Use the normal building-permit checklist and application.
Property partly or fully inside a flood-hazard area
Not eligible
Submit the project for building and floodplain review.
Fence or exterior footprint
Extra documents
Include a survey or plot plan; fences also require the applicable compliance affidavit.
One project divided into smaller contracts
Prohibited
Submit the complete scope and full combined value.

Current charge

$100 total

$75 exemption-waiver fee plus $25 plan-review fee.

Required proof

Provide a signed contract or official quote showing the scope and final project price.

After approval

Exempt work is not inspected by Building Department staff. The owner and contractor remain responsible for code and zoning compliance.

Open the Official Exemption Application

Permit finder

Match the Project to the Correct Permit Route

Project
Start with
Local requirement to check
New home or commercial building
Full building application
Zoning, site plan, drainage, utilities, septic, fire, flood and impact fees
Room addition or structural remodel
Addition/remodel checklist
Survey, setbacks, structural plans, energy forms and all affected trades
Roof replacement or roof repair
Roof permit
Product approvals, roof forms, deck attachment and flood review
Windows, exterior doors or garage door
Building permit
Florida Product Approvals, design pressure, opening size and virtual-inspection eligibility
A/C, water heater, electrical or plumbing work
Trade permit
Licensed contractor, equipment information and related building work
Fence, gate, shed, carport or accessory structure
Project-specific checklist
Survey, setbacks, easements, anchoring, drainage and flood zone
Pool or spa
Pool permit package
Survey, barrier, electrical, zoning, septic and flood requirements
Dock, boatlift, piling or seawall
Marine-structure checklist
Environmental, waterfront, engineering and outside agency approvals
Commercial tenant improvement or use change
Commercial alteration
Zoning use, occupancy, fire, accessibility, parking and impact fees
Complete or partial demolition
Demolition permit
Utilities, asbestos responsibility, septic, environmental and site restoration
Not sure which record to choose? Open the county checklist library before starting Accela. The checklist often identifies required forms that the generic application name does not reveal.
Application workflow

Apply Through Accela in Eight Clear Steps

Confirm jurisdiction, address and parcel

Verify that Martin County is the correct permitting authority. Save the street address, parcel ID, legal owner and subdivision information.

Do next: Resolve address or ownership differences before uploading plans.

Open the exact project checklist

Martin County publishes different requirements for additions, roofing, windows, generators, pools, docks, mobile homes and many other projects.

Check zoning, flood and site restrictions

Confirm setbacks, use, flood-zone conditions, septic or sewer service, easements and environmental requirements before finalizing the design.

Why now: These reviews can change the project location, elevation or scope.

Create or sign in to the Accela account

Registration is required to create a Building, Fire or Growth Management application. Public record searches do not require an account.

Enter one complete project scope

Describe what will be built, removed, relocated or replaced. Include dimensions, use, construction value and every affected trade.

Better scope: “Replace 12 exterior windows using listed impact-rated products; no structural opening changes.”

Upload coordinated plans and support files

The ePermitHub Digital Plan Room is integrated with Accela. Follow its document standards, digital-signature checks and required attachment types.

Useful names: Survey.pdf, Site-Plan.pdf, Floor-Plans.pdf, Structural.pdf and Product-Approvals.pdf.

Read every plan-review issue

Open the Digital Plan Room comments, revise the correct sheets and clearly respond to each issue. Confirm that revised files were accepted.

Fee warning: The current schedule charges $100 per page for pages submitted after the second submittal.

Pay fees and wait for formal issuance

Pay through Accela, clear contractor or outside-agency conditions and download the issued permit and approved documents.

Do not start work: A submitted or approved application is not the same as an issued permit.
Digital Plan Room

Make Electronic Plan Review Easier

Before the first upload

  • Use searchable PDF files
  • Keep page orientation consistent
  • Use clear sheet titles
  • Apply valid digital signatures
  • Remove password protection
  • Confirm every page opens

When comments arrive

  • Read every issue
  • Identify changed sheets
  • Keep revision dates consistent
  • Upload the requested files
  • Explain each correction
  • Verify successful submission
Avoid unnecessary revision fees: Martin County’s July 2026 schedule says the second submittal used to answer the first review is not charged. Pages submitted after the second submittal may be charged at $100 per page.

Open Digital Plan Room Instructions

Application readiness

Prepare These Items Before Opening the Application

Property and applicant

  • Street address
  • Parcel ID or folio
  • Legal owner name
  • Applicant contact
  • Contractor information
  • Detailed project value

Plans and products

  • Survey or plot plan
  • Site plan
  • Floor plans and elevations
  • Structural details
  • Energy-code forms
  • Florida Product Approvals

Related approvals

  • Zoning confirmation
  • Floodplain documents
  • Septic or sewer approval
  • Environmental approval
  • Fire review if required
  • Owner-builder documents
Project document guide

What Common Martin County Projects Usually Need

Project
Helpful documents
Question to answer first
Roof replacement
Roof checklist, product approvals, assembly data and applicable affidavits
Does floodplain or structural repair work expand the scope?
Window, door or garage-door replacement
Opening schedule, product approvals, design-pressure form and installation details
Are any openings being enlarged or structurally altered?
Addition or detached structure
Survey, site plan, setbacks, grading, structural plans and energy forms
Do flood, septic, easement or environmental limits affect placement?
Pool or spa
Survey, pool plan, barrier information, electrical plans and equipment data
Does the location conflict with septic, setbacks or flood requirements?
Generator
Generator checklist, site plan, anchoring, gas/electrical details and equipment specifications
Must the generator and servicing equipment be elevated above flood level?
Dock, boatlift or seawall
Survey, structural/marine plans, environmental approvals and waterfront information
Which county, state or federal waterway approvals apply?
Commercial alteration
Code analysis, occupant load, accessibility, fire/life-safety and MEP plans
Does the proposed use change zoning, parking, fire or impact-fee requirements?
Owner-builder decision

Owner-Builder Applications Require an In-Person First Step

What Martin County requires

  • Personally appear at the Building Department.
  • Bring acceptable photo identification.
  • Sign the Building Permit Application before department staff.
  • Sign the Owner-Builder Disclosure Statement before department staff.
  • Complete later transactions electronically after this requirement is satisfied.

Who does not qualify

  • A trust, LLC or corporation does not qualify for owner-builder status.
  • An owner cannot use the exemption merely to help an unlicensed contractor control the project.
  • The owner must provide direct, on-site supervision.
  • Regulated workers must hold the licenses required for their work.
Commercial owner-builder limit: The current disclosure says qualifying commercial owner-builder work may not exceed $75,000 and must be for the owner’s own use or occupancy.
Legal responsibility: The owner-builder becomes the responsible party of record and accepts inspection, employment, workers’ compensation, safety, lien and financial obligations.

Open Owner-Builder Application

Notice of Commencement

Clear the NOC Requirement Before the First Inspection

Review permit conditions
Complete NOC
Notarize document
Record with Clerk
Obtain certified copy
Post at job site
Request inspection

Why it matters

The county NOC form warns that a required Notice of Commencement must be recorded and posted at the job site before the first inspection.

Failure to handle the document correctly can also create construction-lien and payment risk.

What to verify

  • Correct permit and property information
  • Owner and contractor names
  • General description of work
  • Recording certification
  • Expiration date
  • Copy available at the job site
Do not guess from project value alone. Review the permit conditions and Florida lien-law requirements or ask the Building Department whether an NOC is required for the specific project.

Open Martin County NOC Form

Inspection command board

Schedule Online, by Text or Through VuSpex

Accela scheduling

Log in, select Building → Schedule an Inspection, open the permit and choose the pending or available inspection type.

Open Accela

Text-message scheduling

Text 202-937-0892 with the action word, permit number, exact inspection name and optional requested date.

Use Schedule/Create, Reschedule/Update, Cancel/Unschedule or Status/View/Result.

VuSpex virtual inspection

Current virtual options include A/C, garage door, water heater, windows and doors.

Check VuSpex requirements

Text tip: When no readable date is included in the text request, the county’s instructions say the inspection is scheduled for the following working day, subject to normal scheduling rules and permit availability.

Have available

  • Issued permit
  • Approved plans
  • Recorded NOC when required
  • Florida Product Approvals
  • Manufacturer instructions
  • Prior inspection corrections

Make the site ready

  • Correct stage complete
  • Work remains visible
  • Safe access provided
  • Address clearly displayed
  • Gates and rooms accessible
  • Contact person available
Do not conceal work before approval. Framing, wiring, plumbing, mechanical work, roofing components, insulation or flood-related installations may have to be reopened when the inspector cannot verify them.
Effective July 1, 2026

Martin County Building Permit Fee Examples

Important: The county uses the greater of the applicant’s construction value or the value established through current ICC valuation data. State surcharges and fees from other Martin County departments are not included below.
Construction value
Building fee
Plan review
Inspections
Under $25,000
$75
$25
$75 each
$25,001–$50,000
$100
$100
$75 each
$50,001–$150,000
$250
$200
$75 each
$150,001–$500,000
0.20%
0.20%
$75 each
$500,001 and above
0.20%
0.18%
$75 each

Exemption request

$100 total

$75 waiver plus $25 plan review.

Master-plan lot setup

$300

Late revision pages

$100 per page

After the second submittal.

Orange Data record search

$75 each

Separate from ordinary emailed building-file requests.

Impact-fee check: New development, additional dwelling units or a commercial use change may create separate county or school impact fees. Existing-building work may qualify for an exemption when it creates no additional units, use change, floor area, parking or added trips.

Open the Current Fee Schedule

Local pre-application checks

Resolve These Martin County Issues Before Final Plans

Zoning

Confirm the zoning district, future land use, permitted use, setbacks, lot coverage, height, parking and accessory-structure rules.

Zoning Desk: 772-288-5495

Floodplain

Almost all permitted development in unincorporated Martin County receives floodplain review. Special Flood Hazard Area projects can require additional certificates.

Open flood resources

Flood elevation

New or substantially improved structures in a Special Flood Hazard Area generally must place the lowest finished floor and servicing equipment at least one foot above Base Flood Elevation.

Five-year 50% rule

For older noncompliant structures in a flood hazard area, Martin County evaluates cumulative improvement value over a five-year period.

Trees and clearing

Tree removal, landscape changes and clearing can require environmental or land-clearing review before the building permit is issued.

Check tree requirements

Septic and utilities

Confirm septic approval, sewer availability, water service, easements and utility clearances before locating a new structure or addition.

Fire review

Commercial, multifamily, hazardous-material, alarm, suppression and other regulated projects may require Martin County Fire Prevention review.

Fire Prevention: 772-288-5633

Wind and products

Current county forms reference the 8th Edition (2023) Florida Building Code and require product and wind information for covered building-envelope components.

Do not confuse maps: Flood zones, evacuation zones, zoning districts and municipal boundaries answer different questions. Review the map that matches the decision you are making.
Contractor protection

Verify the Contractor Before the Permit Is Filed

Florida license

Confirm that the state license is active and covers the exact work in the contract.

Search Florida licenses

Martin County authorization

Use the county’s licensed-contractor search to verify that the company is authorized to work locally.

Open contractor verification

Payment protection

Use a written contract, avoid cash payments to individuals and do not make final payment until the permit is properly closed.

Unlicensed activity: Report local concerns to the Martin County Licensing Division at 772-288-5482.
Permit status decoder

What Common Accela Statuses Mean

Draft Required fields or the final submission action may still be incomplete.
Submitted The county received the record and may be checking intake requirements.
In review Building, zoning, flood, fire or another discipline is reviewing the application.
Issues or corrections Open the Digital Plan Room and answer every issue before resubmitting.
Approved Fees, contractor documents or formal issuance conditions may remain.
Issued Download the permit and approved documents. Work may begin within the issued scope.
Inspection failed Read the complete result and correct every listed item before rescheduling.
Final or complete Save the closure proof and confirm that every related trade record is also closed.
Permit and building records

Find Permit Status, Old Plans, Surveys and Blueprints

Search by complete record number

Use Accela’s Building search. A complete permit number is normally more accurate than an owner-name search.

Search by house number and street

The county says public users can search without logging in. Try the base property address when a unit number returns no result.

Open the entire permit record

Review status, inspections, fees, professionals, attachments and related departmental applications.

Request unavailable plans or permit files

The Building Department accepts requests for blueprints, surveys, site plans, building plans and permit files.

Choose the delivery method

The county says emailed documents are provided without charge. A disk costs $1, while paper-copy fees depend on the document size and quantity.

Permit file vs. lien search: An ordinary request for available emailed building documents is different from a formal lien or record search handled through Orange Data.
Buying or selling? A permit number does not prove the work was completed. Confirm issuance, all inspection results, related trade finals and the Certificate of Occupancy or Completion where applicable.
Problem solver

Fix Common Martin County Permit Problems

Problem
Likely reason
Best next action
Address not found
Wrong jurisdiction, address format or parcel mismatch
Verify the parcel with the Property Appraiser before creating another record.
Owner-builder application cannot be completed online
Personal appearance and staff-witnessed signatures are required
Visit 900 SE Ruhnke Street with photo identification and both forms.
Digital Plan Room rejects files
Signature, format, security or document-standard problem
Review ePermitHub standards and upload a corrected readable PDF.
Plan review keeps returning
A comment was missed or revised sheets conflict
Use a numbered response and coordinate every affected sheet.
Inspection cannot be scheduled
Permit not issued, NOC missing, hold exists or inspection is unavailable
Open the permit record, read all conditions and contact inspection staff.
Exemption request is incomplete
Missing contract, quote, survey, fence affidavit or fee
Submit every item listed on the two-page application.
Generator or equipment location rejected
Setback, clearance, anchoring or flood-elevation problem
Revise the site plan and equipment data before resubmitting.
Permit remains open after construction
Missing final, trade permit, certificate, fee or correction
Request a discipline-by-discipline closeout list using the permit number.
Ready-to-use communication

What to Say When Contacting the Department

Permit requirement:
“I am planning to [exact work] at [full address and parcel ID]. Can you confirm whether Martin County is the correct jurisdiction, which application and checklist apply, and whether zoning, flood, septic, environmental or fire review is required?”
Plan-review issue:
“Permit [number] has comments from [discipline]. I uploaded revised sheet [number] and a response to issue [number]. Can you confirm whether another document or review still blocks approval?”
Inspection request:
“Permit [number] is issued. I need inspection [exact name] at [address] on [date]. The NOC, approved plans and product documents are available, and the work is uncovered and ready.”
Open-permit question:
“Permit [number] at [address] does not appear closed. Which inspection, fee, certificate, correction or related trade permit is still outstanding?”
Final closeout checklist

Do Not Mark the Project Finished Until These Are Complete

  • Correct jurisdiction confirmed
  • Correct application selected
  • Zoning and flood reviews cleared
  • Plans accepted in Digital Plan Room
  • Contractor or owner-builder verified
  • All permit fees paid
  • Permit formally issued
  • NOC recorded and posted when required
  • Approved documents available on site
  • Every inspection passed
  • Related trade permits closed
  • Final certificate or closure proof saved
Office location

Martin County Building Department Map

Address: 900 SE Ruhnke Street, Stuart, FL 34994. Office listing: Monday–Friday, 7:30 AM–4:00 PM. Owner-builders should bring photo identification, the application, disclosure statement and project documents.
Official resource library

Open the Correct Martin County Resource

Frequently asked questions

Martin County Building Permit Questions

Where do I apply for a Martin County building permit?

Use Martin County’s Accela Citizen Access portal. Register or sign in, select the Building application that matches the project, complete the required fields and upload documents through the integrated Digital Plan Room.

Can I search Martin County permits without an account?

Yes. Martin County says public users can search permit status without logging in. Use Advanced Search, select Search Records or Applications, choose Building and search by record number, address or contractor.

Are all Martin County permit applications online-only?

No. The county accepts permit submissions electronically and at the permit counter. Qualifying owner-builders must personally appear at the Building Department to sign the application and disclosure before staff. Later transactions can be handled electronically.

Does every project under $7,500 avoid a permit?

No. Beginning July 1, 2026, only certain nonstructural work at an eligible single-family residence may qualify. Flood-hazard properties and electrical, plumbing, mechanical, gas or structural work are excluded. Submit the written exemption request and wait for approval.

How much does the Martin County permit-exemption request cost?

The current application lists a $100 total charge: a $75 permit-exemption waiver fee and a $25 plan-review fee. The request also requires project and cost documentation.

How do I schedule a Martin County inspection?

Log in to Accela, select Building, choose Schedule an Inspection, open the permit and select the pending or available inspection. The county also accepts properly formatted inspection text requests at 202-937-0892.

Which Martin County permits qualify for VuSpex virtual inspection?

The current county page lists air-conditioning, garage-door, water-heater, window and door permits. Contractors and owner-builders need a device with a camera, a reliable signal and the VuSpex GO app.

Does an owner-builder have to visit the Building Department?

Yes. Martin County requires owner-builder applicants to personally appear with photo identification and sign both the Building Permit Application and Owner-Builder Disclosure Statement before department staff.

How do I request old plans or blueprints?

Search Accela first, then use the county building-record request page for blueprints, site plans, surveys, building plans or permit files. Martin County says emailed documents are provided without charge, while paper and disk options may have fees.

What flood requirements can affect a Martin County permit?

Almost all permitted development in unincorporated Martin County receives floodplain review. New or substantially improved structures in a Special Flood Hazard Area may need elevation, floodproofing, V-zone or engineered-opening documents and a finished Elevation Certificate before final approval.

Accuracy and source note

Independent Guide Using Current Martin County Resources

Building-Department.org is an independent informational guide and is not Martin County government.

This page was rebuilt using current Martin County Building Department, Accela, Digital Plan Room, permit-checklist, owner-builder, inspection, VuSpex, zoning, floodplain, contractor, record-request and July 1, 2026 fee and permit-exemption resources.

Last reviewed: July 23, 2026.

Forms, fees, exemptions, staff assignments, inspection options and code requirements can change. Confirm time-sensitive information with the Martin County Building Department before paying, ordering final plans or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.