City of Richmond Building Department: Permits, Inspections, Portal, Fees and Official Contact
Building inside the City of Richmond can involve more than a simple permit form. Depending on the project, you may need the Online Permit Portal, building application, construction drawings, zoning or site plan review, owner statement, asbestos certification, fee payment, inspection scheduling and final approval before work is complete. This guide explains the official Richmond Permits and Inspections process in simple language, so homeowners, contractors, developers and property buyers can avoid wrong submissions, missing documents, review delays and inspection problems.
Office
Permits and Inspections Office, 900 E. Broad St., Room 108, Richmond, VA 23219.
Phone
Call 804-646-4169 for permit questions, status help and customer service.
Email PDRPermitsAndInspections@rva.gov for permit and inspection office help.
Walk-in hours
Permit Center walk-in hours are listed as Monday to Friday, 8 a.m. to 1 p.m.
Official City of Richmond Building Permit Links and Resources
Email: PDRPermitsAndInspections@rva.gov. Office: 900 E. Broad St., Room 108, Richmond, VA 23219. For Online Permit Portal help, the city lists CSSHelp@rva.gov on the main permit page and CSSHelp@richmondgov.com on the portal information page.
What the City of Richmond Permits and Inspections Bureau Does
The City of Richmond Permits and Inspections Bureau reviews applications and construction documents for construction, alterations and improvements to new and existing structures inside the city. After permits are issued, the bureau inspects work at specific stages through completion.
For users, this means the office is not only a place to “get a permit.” It is the city review path for building code safety, plan review, inspection sequencing, permit fee processing, job-site permit posting and final completion. If your project is inside city limits, start here before work begins.
Permit intake
Applications, plans and required documents are reviewed through the city’s permit process and Online Permit Portal.
Plan review
Construction documents are reviewed for compliance before the city issues the permit.
Field inspections
After issuance, inspectors verify work at required stages before completion.
Richmond Online Permit Portal: Apply, Pay, Search, Print and Schedule Inspections
The City of Richmond Online Permit Portal lets users apply for supported permits from home or office, submit plans for review, pay invoices, request inspections and check request status from a computer or phone.
Portal task | What it helps with | Practical tip |
|---|---|---|
Register or log in | Applicants must register online before applying through the portal. | Use the same email associated with your permit account when the system requires re-registration. |
Apply for a plan | Use the Apply button from the Dashboard for supported plan types. | Use a clear project description that matches the work and permit category. |
Pay an invoice | After invoicing, customers can pay from the My Invoices section. | Save the payment receipt and invoice notice in your project file. |
Print a permit | After issuance, the permit can be viewed and printed from My Permits. | Post the permit on the job site before starting work. |
Schedule inspections | Use the My Inspections section to view and schedule inspections. | Schedule only when the work is ready and approved plans are available. |
Search public records | Users can search for permits, plans and inspections through portal search functions. | Try address, permit number or property search tools if the first result is not found. |
Permit and Plan Types Available in Richmond’s Online Permit Portal
Richmond lists several plan types that can currently be applied for through the Online Permit Portal. The city also notes that more permit types may be added later.
Portal plan type | Common use | Before you apply |
|---|---|---|
Building – residential and commercial | New construction, alterations, additions, repairs, tenant fit-up and other building work. | Prepare drawings, scope, valuation, contractor details and required owner forms. |
Electrical – residential and commercial | Electrical system work, circuits, service changes and fixtures. | Confirm license and scope details before submission. |
Mechanical – residential and commercial | HVAC, mechanical equipment and related system work. | Include equipment and scope details where needed. |
Gas piping – residential only | Residential gas piping work. | Confirm code, contractor and inspection requirements. |
Plumbing – residential only | Residential plumbing work. | Have plumbing scope, fixture and contractor details ready. |
Certificate of Zoning Compliance | Zoning confirmation before certain uses or projects proceed. | Confirm property address, proposed use and zoning details. |
Site Plan | Development and site-related review. | Prepare site drawings, project narrative and related review documents. |
How to Apply for a Richmond Building Permit Without Missing Key Details
A clean application helps the City of Richmond review your project faster. The most common preventable delays come from unclear scope, missing documents, wrong portal category, valuation issues or not responding to city comments.
Step 1: Confirm city jurisdiction
Make sure the property is inside the City of Richmond and not a nearby county or separate locality.
Step 2: Choose the right permit type
Select the portal plan type or application category that matches building, electrical, mechanical, plumbing, gas, zoning or site work.
Step 3: Prepare the application
Use the official Building Permit Application when needed and include scope, value of work, contractor information and project details.
Step 4: Upload plans and documents
Submit drawings, owner statement, asbestos certification, site plan, lien agent details, trade information or other required documents.
Step 5: Watch for invoices and comments
Pay invoices from the portal and respond to plan review comments quickly with complete revisions.
Step 6: Print and post permit
After issuance, print the permit from My Permits and post it on the job site before work begins.
City of Richmond Permit Review Time Goals
Richmond publishes goal times for Permits and Inspections Bureau review. The city notes these are bureau goals only and that other city departments may take longer depending on staffing or additional information required from the applicant.
Review stage | Published goal time | Practical planning tip |
|---|---|---|
Online submittal review | 3 to 5 business days | Submit a complete package and check email/portal messages daily. |
Initial plan review for $1 to $1.5 million projects | 5 to 10 business days | Do not schedule work before the permit is actually issued. |
Initial plan review for $1.5 million to $10 million projects | 10 to 20 business days | Plan extra time for other department comments. |
Larger or complex projects | 20 to 30 business days or more | Use clear revision responses and professional plan coordination. |
Inspections | Same day as the scheduled date | Schedule only when the work is ready and accessible. |
Richmond Building Permit Fees and Value of Work
The official City of Richmond Fee Schedule explains that permit fees are based on the value of work and that, for all permits, a 2.0% state surcharge is added to the final calculated fee.
Fee issue | Official detail | Practical meaning |
|---|---|---|
Value of work | Value equals the higher of contractor estimate or RS Means price. | Do not understate valuation; the city may calculate based on a higher standard estimate. |
State surcharge | A 2.0% state surcharge is added to final calculated fee. | Expect the final amount to include more than just the base permit fee. |
Rejected or withdrawn permits | Minimum administrative and plan review fees may apply. | Incomplete applications can still cost money if rejected or withdrawn. |
Revised plan fee | Minimum revised plan fee may apply once a permit has been issued. | Avoid design changes after issuance where possible. |
Invoice payment | Portal users can pay invoiced plans from My Invoices. | Watch for invoice emails so the application does not stall. |
City of Richmond Building Inspections: Scheduling and Job-Site Tips
After a permit is issued, Richmond inspects work at required stages through completion. Inspection scheduling assistance is listed at 804-646-1628, and the portal also includes inspection scheduling from the My Inspections section.
Use portal inspections
Online portal users can view and schedule inspections through My Inspections.
Call for scheduling help
Use 804-646-1628 for inspection scheduling assistance when needed.
Contact inspector after 7 a.m.
Richmond encourages customers to contact their inspector after 7 a.m. on inspection morning to arrange a meeting time.
Request call-ahead
When scheduling, users may request a 30-minute call ahead from the inspector.
Do not cover work
Do not cover framing, wiring, plumbing, mechanical or other required inspection work before approval.
Keep permit and plans ready
Post the issued permit and keep approved documents available for the inspector at the job site.
Emergency Permits for Power, Water, Heat or Occupied Building Issues
Richmond provides emergency information for situations where a permit is needed to restore power, water, heat to an occupied building or for other emergencies.
Apply first
The city instructs users to apply for the permit in the Online Permit Portal.
Email application details
After applying, the city instructs users to email the address and application plan number to the listed staff contacts.
Use only for true urgency
Emergency permit routing should be used for urgent restoration or occupied-building safety issues, not normal project acceleration.
Keep records
Save your portal application number, email, invoice, permit and inspection notes.
Richmond Building Permit Application, Owner Statement and Required Documents
The official Building Permit Application asks for property owner, contractor, job address, license, construction cost, scope of work, lien agent, architect/engineer and other project information. It also references owner statement and asbestos certification requirements where applicable.
Document or detail | Why it matters | Practical tip |
|---|---|---|
Building Permit Application | Main form for building permit/certificate application details. | Complete scope, valuation and contact information carefully. |
Owner Statement | Required for owners applying for work in the City of Richmond where applicable. | Submit the owner statement with the application through the accepted route. |
Asbestos Certification | May be required depending on project type and building conditions. | Do not ignore asbestos-related prompts on the application. |
Contractor license and business license | The application states a copy must be on file before a permit is issued. | Upload or submit license information early to avoid issuance delay. |
Site plan or survey | Needed for certain work involving location, lot, grading or site disturbance. | Attach clear property layout, driveway, grading or disturbed-area information where relevant. |
Value of work | Permit fees are based on value of work including labor, materials, overhead and profit. | Use realistic full project valuation, not only material cost. |
Richmond Online Permit Portal Tips That Save Time
The portal page and user tips explain several small details that can reduce frustration when searching addresses, saving drafts or submitting plan requests.
Use portal navigation buttons
The city says users should use portal navigation buttons such as Back, Save Draft and Next rather than relying only on browser behavior.
Save drafts correctly
If you pause a plan request, use Save Draft. It will be found under Drafts in the My Plans section of the Dashboard.
Search addresses carefully
The city warns that address searches should avoid punctuation and avoid spelling out the street type fully.
Use sample descriptions
Clear project descriptions help reviewers understand whether the work is repair, alteration, new construction, tenant fit-up, demolition or trade work.
Richmond Third-Party Inspection Policy and Expedited Permit Notes
Richmond references a limited 48-hour third-party inspection policy for individual inspections when the building official is unable to perform a scheduled inspection within two working days of a request or agreed date, or when otherwise authorized in writing by the building official.
Do not assume automatic approval
Third-party inspections must follow the city’s official policy and reporting requirements.
Check expedited permit eligibility
Richmond lists certain permit types that may be expedited, including affordable housing, city interdepartmental projects, city-approved third-party agency plan review projects and solar projects.
Email required staff
For listed expedited categories, the city provides staff notification instructions after submission.
Keep written proof
Save all approvals, reports, third-party documents and city emails in your project folder.
How to Search Richmond Permits, Plans and Inspections
Permit search is useful before buying a property, hiring a contractor, checking whether work was permitted, confirming inspection status or finding a permit number.
Use portal search
The Online Permit Portal supports search functions for permits, plans and inspections.
Try property tools
Users can perform some functions even when not logged in, including property search using map or search options.
Check status carefully
Look for whether the application is draft, submitted, invoiced, under review, issued, inspected or completed.
Why City of Richmond Building Permits Get Delayed
Most delays happen because the application is incomplete, the wrong plan type is selected, the valuation is unclear, contractor license documents are missing, review comments are not answered or another department needs more information.
Common delay | What it usually means | How to avoid it |
|---|---|---|
Wrong portal category | The selected plan type does not match the project. | Review supported portal plan types before applying. |
Unclear scope of work | The reviewer cannot understand what is being built, altered, repaired or demolished. | Use a detailed but simple description of the exact work. |
Missing owner statement or asbestos certification | Required application documents were not included. | Review the Building Permit Application checklist before submitting. |
Contractor license not on file | The permit cannot be issued until required license and business license documents are on file. | Upload or submit contractor license documents early. |
Invoice unpaid | The portal invoice has not been paid from My Invoices. | Watch email notifications and pay promptly. |
Waiting on applicant response | Review time stops while the city waits for returned comments or additional information. | Reply to every comment with a clear revision response. |
City of Richmond Permits and Inspections Phone Number, Email, Address and Map
Use the official contact information below for building permit applications, plan review questions, fee questions, inspection scheduling help, portal access issues and permit status assistance.
Permits and Inspections Office
Phone: 804-646-4169
Email: PDRPermitsAndInspections@rva.gov
Inspection scheduling help: 804-646-1628
Portal help: CSSHelp@rva.gov
Office address and hours
Permits and Inspections Office
900 E. Broad St., Room 108
Richmond, VA 23219
Walk-in: Monday-Friday, 8:00 a.m. to 1:00 p.m.
Phone line: Monday-Friday, 8:00 a.m. to 5:00 p.m.
Map shows Richmond City Hall, 900 E. Broad St., Richmond, VA 23219. The Permits and Inspections Office is listed at Room 108. For most permit activity, start with the Online Permit Portal or official permit page before visiting in person.
Open the official City of Richmond Permits and Inspections page
City of Richmond Building Department FAQs
These FAQs focus on the most common user searches around Richmond building permits, inspections, online permit portal, review times, fees, forms, permit status and official contact details.
QHow do I contact the City of Richmond Building Department?
Contact the City of Richmond Permits and Inspections Office at 804-646-4169 or PDRPermitsAndInspections@rva.gov. The office is located at 900 E. Broad St., Room 108, Richmond, VA 23219.
QWhere do I apply for a Richmond building permit online?
Use the official City of Richmond Online Permit Portal. The portal lets supported users apply for plans and permits, submit plans for review, pay invoices, print issued permits, request inspections and check status.
QWhat permit types are available through Richmond’s Online Permit Portal?
Richmond lists portal plan types including residential and commercial building, electrical and mechanical, residential gas piping, residential plumbing, Certificate of Zoning Compliance and site plan.
QWhat is the Richmond inspection scheduling phone number?
The City lists inspection scheduling assistance at 804-646-1628. The portal also supports scheduling inspections from the My Inspections section for portal users.
QWhat are Richmond permit office walk-in hours?
The Permit Center walk-in hours are listed as Monday through Friday, 8:00 a.m. to 1:00 p.m. The phone line is listed as open Monday through Friday, 8:00 a.m. to 5:00 p.m.
QHow long does City of Richmond plan review take?
Richmond lists goal review times including 3 to 5 business days for online submittal review, 5 to 10 business days for initial plan review for projects from $1 to $1.5 million, 10 to 20 business days for $1.5 million to $10 million, and 20 to 30 business days or more for larger or complex projects.
QCan I start work after submitting a Richmond building permit application?
No. The official Building Permit Application states that the application is not authorization to start work and that no work shall start until a permit is posted on the job site.
QWhere can I find the Richmond Building Permit Application?
Use the official Building Permit Application PDF linked from the City of Richmond Permits and Inspections page. It asks for contractor/owner details, job address, proposed use, value of work, scope and related application information.
QWhere can I find Richmond permit fees?
Use the official City of Richmond Permits Fee Schedule PDF. The schedule explains value-of-work fee calculations, administrative fees, plan review fees, revised plan fees and the 2.0% state surcharge.
QHow can I get help with the Richmond Online Permit Portal?
The City lists CSSHelp@rva.gov for help with the Online Permit Portal on the main permit page and CSSHelp@richmondgov.com on the portal information page. For general permit questions, call 804-646-4169.
QCan I search Richmond permits without logging in?
The City’s portal page says certain functions are available without logging in, including searching for properties using the map or search options to view projects throughout the city.
QIs Building-Department.org the official City of Richmond website?
No. Building-Department.org is an independent guide. Official permit applications, inspections, payments, plan review decisions and code actions must be handled through the City of Richmond or its official Online Permit Portal.

Khushboo Bobade is a public records researcher and editorial writer specializing in government service documentation and construction permit systems.
Her research focuses on explaining building permits, inspection procedures, zoning regulations, and public permit records maintained by local government building departments across the United States.
Professional profile: View LinkedIn Profile
Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links
Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.
What building department task do you need help with?
Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.
Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.
Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.
Building Permit Type Finder
Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.
Permit Fee Estimate Calculator
Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.
Inspection Readiness Checklist
Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.
Zoning and Setback Pre-check
Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.
Plan Review Timeline Estimator
Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.
Permit Records Search Helper
Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.
Official Building Department Resource Finder
Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.
Building Department vs Planning/Zoning
- Building Department: permits, plan review, inspections, code compliance, certificates.
- Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.
Best sitewide placement
Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.
Important note
This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.