Sac County Building Department | Permits, Inspections & Official Contact

Sacramento County, California permit guide

Confirm Unincorporated Jurisdiction, Submit Electronic Plans and Complete Fire, School, Sewer and Flood Clearances

Sacramento County and the City of Sacramento are separate permit agencies. A Sacramento postal address does not prove that County Building Permits and Inspection has jurisdiction.

This guide helps you verify the parcel, apply through Accela, select the right residential or commercial permit, submit complete PDF plans, coordinate outside reviews, schedule inspections before the 5:00 PM cutoff and retain the correct final approval.

Electronic-only plans and Accela application steps
Fire district, school, sewer, septic and flood routes
Inspection phone, text commands and final closeout
Sacramento County property moving through jurisdiction, electronic plan review and inspection A house beside two rivers moves through the County Accela portal toward final inspection approval. JURISDICTION • ZONING • FLOOD ACCELA PDF REVIEW APPROVED PLAN SET FINAL INSPECTION CLOSED
CITY

COUNTY
Check “Jurisdiction,” not the postal city Sacramento County Planning and Building primarily serve the unincorporated area. Enter the address or Assessor Parcel Number in the County General Map and read the Jurisdiction field. A mailing address that says Sacramento, Carmichael, Fair Oaks, Antelope or another community may still require either County or city permits depending on the parcel.
PDF
ONLY
All building projects use electronic plan submittal Sacramento County Building Permits and Inspection accepts electronic PDF plans for projects large and small. The main Building Assistance Center is now at 9800 Goethe Road.
2026
CODE
2025 California codes became effective January 1, 2026 Construction projects submitted for permit on or after that date must comply with the updated California Building Standards Code and Sacramento County amendments.
Start here

Open the Correct Sacramento County Permit Service

Official contact

Sacramento County Building Phone, Addresses and Business Hours

Public information line 916-875-5296 Permits, inspections and general Building assistance
Inspection text service 855-280-5383 Text SCHEDULE, CANCEL, RESCHEDULE or RESULTS
Primary assistance center 9800 Goethe Road Sacramento, CA 95827
Downtown counter 827 7th Street, Room 102 Sacramento, CA 95814
Business hours 8:30 AM–4:00 PM Monday through Friday
Cashier hours Through 4:00 PM Available at Goethe and Downtown locations
Planning email SacPlan@saccounty.gov Zoning and unincorporated land-use questions
Floodplain assistance 916-874-6851 Floodplain permits and elevation-certificate questions
Office-location note: The County’s main Building page identifies 9800 Goethe Road as the new Building Assistance Center. Some specialized services and cashier functions remain available at the Downtown office.
First decision

Determine Whether the Property Is in Unincorporated Sacramento County

Open County General Map
Enter address or APN
Open Parcel Details
Read Jurisdiction field
Ignore postal city name
Use County or listed city

Use Sacramento County when

  • Jurisdiction says Unincorporated Area
  • County General Map assigns County zoning
  • Parcel lies outside incorporated city limits
  • County Accela accepts the address
  • County Planning confirms responsibility
  • Project uses County development standards

Use a city when

  • Jurisdiction lists City of Sacramento
  • Parcel is inside Citrus Heights
  • Parcel is inside Elk Grove
  • Parcel is inside Folsom
  • Parcel is inside Rancho Cordova
  • Another incorporated city is listed
Do not use the mailing address as proof. Postal city and ZIP information may differ from the government agency that controls zoning and building permits.

Open the County Jurisdiction Map

Sacramento County Permit Route Finder

Select the project that most closely matches the work.

Permit decision table

Choose the Correct Sacramento County Record and Checklist

Project
Starting route
Important additional review
New dwelling or residential addition
Building permit
Site plan, Title 24, structural documents, stormwater, solar, fire district and Planning landscape review.
Kitchen or bathroom remodel
Residential alteration
Structural changes, electrical, plumbing, mechanical, smoke/CO alarms and energy requirements.
Garage conversion
Garage conversion checklist
Parking, room use, energy, egress, insulation, foundation and utility capacity.
ADU or JADU
ADU permit
Planning, easements, SacSewer, septic/well, fire district, school district and development fees.
Heating or cooling replacement
Auto-issued residential permit
Equipment information, electrical work and inspection.
Electrical panel repair or replacement
Auto-issued residential permit
Utility coordination, service size and electrical inspection.
Residential reroof without structural change
Auto-issued residential permit
Roof covering, tear-off, sheathing repairs and final inspection.
Sewer-line replacement or water heater
Auto-issued residential permit
SacSewer or utility conditions and plumbing inspection.
Residential rooftop solar and storage
SolarAPP+ for eligible contractors
SolarAPP+ approval, County record, equipment and final inspection.
Commercial tenant improvement
Commercial permit
Use, accessibility, Fire/life safety, structural, electrical, plumbing, mechanical and special inspections.
Fast residential permits

Certain Residential Permits May Issue Automatically After Payment

Heating and cooling

New residential installation or replacement may qualify for automatic online issuance.

Electrical panel

Residential panel repair or replacement may qualify when the online application is complete.

Reroof

A residential reroof without structural changes may issue after online application and payment.

Sewer-line work

Residential sewer-line repair or replacement is listed among the automatic permit types.

Water heater

Residential water-heater permits may be issued automatically through Accela.

SolarAPP+

Eligible licensed contractors may use SolarAPP+ for residential solar or solar with energy storage.

Automatic issuance does not eliminate inspections. Read all permit conditions and complete the listed final inspection.
Electronic application workflow

Apply Through Sacramento County Accela in the Correct Order

Verify unincorporated jurisdiction
Check zoning and outside agencies
Create correct Accela record
Upload complete PDF package
Pay and resolve comments
Issue, inspect and close

Verify the jurisdiction and APN

Use the County General Map and confirm that Jurisdiction says Unincorporated Area of Sacramento County.

Identify Planning and outside-agency requirements

Check zoning, easements, fire district, school district, sewer or septic, floodplain, road access, landscape and development-fee requirements.

Create an Accela Citizen Access account

Use an active email address and retain the login for payments, corrections, inspections and approved documents.

Select the exact application type

Choose the record matching the project rather than a generic category. Use the County checklist name as a guide.

Enter a complete scope of work

State what will be built, altered or replaced; size; use; construction value; affected systems and whether work already exists.

Example: “Construct a 420-square-foot rear bedroom addition with new foundation, roof framing, electrical, plumbing and heat-pump extension.”

Upload plans and documents as PDFs

Plans must be measurable, clear, legible, fully dimensioned and coordinated. The County does not accept incomplete or unreadable plan packages.

Pay plan-review fees when invoiced

Sign in, search for the building permit, locate the Record Number and choose Pay Fees Due under Actions.

Answer every correction

Upload revised sheets and a response identifying where each comment was addressed. Do not create a duplicate permit.

Complete outside clearances

Fire, school, sewer, septic, floodplain, Planning, encroachment and impact-fee requirements may control permit issuance.

Download the issued permit package

Save the permit, approved plans, inspection card, supplemental documents and conditions before beginning work.

Plan readiness

Prepare a Complete Residential New-Building or Addition Package

General and site drawings

  • Site address
  • Designer information
  • Detailed scope
  • Applicable code design
  • Scaled plot plan
  • All property-line distances
  • Existing structures
  • Drainage arrows

Architectural and structural

  • Floor plan
  • Roof plan
  • Exterior elevations
  • Building sections
  • Foundation plan
  • Floor and roof framing
  • Braced-wall locations
  • Anchorage details

Supporting documents

  • Title 24 forms
  • Structural calculations
  • Truss calculations and layout
  • Truss acceptance letter
  • CALGreen stormwater BMPs
  • Solar drawing
  • Soils report if required
  • Special-inspection forms
New single-family homes: The County checklist requires a compaction report. A soils report may also be required for questionable or expansive soil conditions and identified locations.
Existing violations and as-built work: Show unpermitted construction as proposed new work rather than labeling it as existing approved construction.
ADU workflow

Coordinate the ADU Before Uploading Building Plans

Contact Planning

Email SacPlan@saccounty.gov for height, setback, zoning and land-use requirements.

Check easements

Contact County technical resources to identify recorded or mapped easements that may restrict placement.

Confirm sewer or septic service

Contact SacSewer for public connection requirements or Environmental Management when the parcel uses an onsite wastewater system.

Identify all potential fees

Planning, Building, sewer, septic/well, local Fire and school-district fees can be separate.

Prepare the full plot plan

Show dimensions, north arrow, drainage, streets, easements, utility lines, meters and distances between every structure and property line.

Prepare the building plans

Include room uses, dimensions, doors, windows, receptacles, lights, smoke and CO alarms, shear walls, elevations, foundation, roof framing and cross sections.

Add energy, solar and Fire documents

Title 24 documents and a solar design are required. Submit residential fire-sprinkler information directly to the local fire district.

Apply through Accela

Upload the coordinated PDF package and monitor the permit for corrections and department conditions.

Free County designs

Use Sacramento County Shelf-Ready ADU Plans Only on Eligible Parcels

Smallest model 460 sq. ft. Studio or one-bedroom design
Two-bedroom model 870 sq. ft. Detached ADU design
Larger two-bedroom 1,000 sq. ft. Detached ADU design
Largest model 1,184 sq. ft. Three-bedroom design

What the plans save

  • County-provided detached ADU design
  • Previously reviewed architectural and structural package
  • Included premanufactured roof-truss calculations
  • Lower design cost for eligible residents

What remains the applicant’s responsibility

  • Unincorporated County parcel
  • Site-specific plot plan and utilities
  • Hold Harmless Agreement
  • Fire-district review
  • Solar plans for applicable models
  • Standard building and impact fees
Impact-fee threshold: The County states that shelf-ready ADUs greater than 750 square feet are subject to impact fees.
Do not redesign the shelf-ready package. Changes beyond the provided options and limited additional electrical devices can remove the project from the shelf-ready route.

Open Shelf-Ready ADU Plans

Separate approvals

Complete Reviews Outside the Main Building Permit

Agency or review
Common trigger
Applicant’s next action
Local fire district
New home, ADU, commercial work, sprinklers, alarms, fire access or water supply
Identify the district and submit plans directly when required. Pay separate district fees.
Local school district
New residential floor area or another project subject to school facilities fees
Obtain the County square-footage letter, process it with the correct district and provide clearance.
Sacramento Area Sewer District
New connection, ADU, added fixtures, sewer replacement or changed wastewater demand
Confirm connection-permit, plan-check and fee requirements with Permit Services.
Environmental Management
Septic system, well, added bedroom, new dwelling or changed wastewater load
Obtain plot-plan approval, site evaluation or onsite wastewater permit before Building issuance.
Water Resources
Construction, grading or fill within a federal or local floodplain
Obtain the floodplain management permit and required elevation documents.
Planning and Environmental Review
Use, setbacks, design review, landscape, trees, signs, parking or discretionary entitlement
Complete the required Planning application and satisfy all conditions.
Site Improvement and Permits
Driveway, sidewalk, trench, utility or other work in County right-of-way
Obtain an encroachment permit before disturbing the street or public area.
Special Districts
Development inside a roadway, park, library, drainage, water or other fee-program boundary
Confirm all parcel-specific impact fees before relying on a building-only estimate.
Public sewer and septic

Confirm the Wastewater Route Before Adding Bedrooms or Plumbing

Public sewer property

SacSewer Permit Services: 916-876-6100

  • Confirm service availability
  • Check connection permit
  • Identify lateral requirements
  • Submit sewer plans if required
  • Pay connection fees
  • Complete sewer inspection

Septic property

Environmental Management reviews onsite wastewater systems and approves plot plans used during Building permit issuance.

  • Locate existing septic record
  • Confirm approved bedroom count
  • Show tank and disposal field
  • Protect replacement area
  • Complete site evaluation
  • Obtain installation approval
Use matching plot plans. The site plan submitted to Environmental Management should match the plan submitted for the Building permit.
Floodplain construction

Obtain Flood Approval Before Designing the Finished-Floor Elevation

Current County elevation rules

  • Construction or fill in a floodplain requires a floodplain management permit.
  • The lowest finished floor for new construction must be at least 1.5 feet above the base flood elevation.
  • Slab-on-grade pads must be at least one foot above the base flood elevation.
  • Electrical, HVAC, plumbing and other service equipment must be protected or elevated 1.5 feet above the base flood elevation.

Before occupancy

  • Final elevations verified
  • California surveyor or engineer
  • Elevation Certificate completed
  • Floodplain conditions satisfied
  • Utilities properly elevated
  • Certificate accepted by County
No occupancy without required elevation documentation. The County states that an Elevation Certificate is necessary before a Certificate of Occupancy can be issued for covered floodplain projects.

Open Sacramento County Flood Guidance

Residential pool route

Install and Pass the Pool Barrier Before Plastering or Filling

Site-plan requirements

  • Property lines and easements
  • Existing structures
  • Septic and well locations
  • Pool and equipment setbacks
  • Electric panel and gas meter
  • Fence location and material

Barrier basics

  • Minimum 60-inch height
  • Limited bottom clearance
  • Restricted openings
  • Self-closing pedestrian gate
  • Self-latching hardware
  • Gate swings away from pool

Drowning prevention

The County requires the approved barrier and at least one additional qualifying safety feature for covered private single-family pool or spa projects.

Do not plaster or fill first. The pool barrier must be installed, inspected and approved before plastering or filling the pool with water.
Permit exemptions

Confirm All Three Questions Before Treating Work as Exempt

Structural permit

Does California Building or Residential Code Section 105.2 exempt the structure or repair?

Specialty trade permit

Does the project contain regulated electrical, plumbing, mechanical or gas work?

Planning approval

Do zoning, setbacks, floodplain, trees, easements or land-use rules still control the work?

A building-permit exemption does not automatically exempt zoning or trade work. Confirm the exact project with County staff before construction.
Project-cost planning

Budget Beyond the Base Sacramento County Building Permit

Cost category
What controls it
Best budgeting action
Building permit
Permit type, construction valuation, project size and required inspections
Wait for the official Accela invoice.
Plan review
Residential or commercial review scope, structural systems and specialty disciplines
Treat it as separate from the permit inspection charge.
Technology and administration
Applicable County ordinance and the permit-fee calculation
Use the current invoice rather than an old percentage.
Planning
Application type, design review, entitlement and staff processing
Obtain the Planning invoice separately.
Fire district
Local district, project type, sprinklers, alarms, fire flow and access
Contact the fire jurisdiction before final budgeting.
School district
New residential or commercial square footage and district rate
Process the County letter with the correct school district.
Sewer or septic
Connection, fixture load, onsite system, site evaluation and inspections
Request a separate SacSewer or Environmental Management estimate.
Development impact fees
Parcel location and applicable road, park, library, drainage, water or special-plan boundary
Ask Special Districts for parcel-specific fees.
Encroachment or frontage work
Driveway, trench, sidewalk, utility and public right-of-way impact
Budget separately through the Site Improvement and Permits Section.
Do not publish or rely on a generic percentage estimate. The total can change significantly by parcel because fire, school, sewer, planning and development-impact fees are not identical throughout unincorporated Sacramento County.

Open the permit record

Sign into Accela and search for the building permit.

Locate the Record Number

Confirm that the invoice belongs to the correct address and project.

Select Pay Fees Due

Use the Actions menu and save the receipt after payment.

Check for remaining conditions

Payment does not prove that all outside clearances or issuance conditions are complete.

Current code cycle

Use the 2025 California Building Standards Code for 2026 Submittals

Projects submitted January 1, 2026 or later

Sacramento County states that these projects must comply with the 2025 California Building Standards Code.

  • California Building Code
  • California Residential Code
  • California Electrical Code
  • California Mechanical Code
  • California Plumbing Code
  • California Energy Code

Local requirements also matter

  • Sacramento County Code amendments
  • Zoning Code and special planning areas
  • Floodplain Management Ordinance
  • Stormwater and CALGreen measures
  • Fire-district requirements
  • Project-specific permit conditions

Open Sacramento County Adopted Codes

Three scheduling options

Schedule by 5 PM for the Next Workday When Available

Schedule online

  1. Sign into Accela.
  2. Search for the permit.
  3. Open the underlined permit number.
  4. Find the Inspections section.
  5. Select Schedule.
  6. Choose AM or PM.

Open Accela

Schedule by phone

916-875-5296

  • Press 1 to schedule
  • Press 2 to cancel or reschedule
  • Press 3 for results
  • Press 0 for staff

Schedule by text

855-280-5383

  • Text SCHEDULE
  • Text CANCEL
  • Text RESCHEDULE
  • Text RESULTS
AM or PM is a preference, not an appointment. The County does not guarantee a specific arrival time. Check Today’s Inspections and contact the assigned inspector on the morning of the inspection for an estimated window.

Inspection-day checklist

  • Work area accessible
  • Animals secured
  • Approved stamped plans
  • Supplemental documents
  • Permit and inspection card
  • OSHA-approved ladder if needed
  • Correct work stage complete
  • Previous corrections finished

Do not schedule until

  • Permit is issued
  • Correct inspection code is known
  • All related work is ready
  • Required tests are set
  • Work remains uncovered
  • Safe access is provided
  • Contact number is accurate
  • Site address is visible
Inspection sequence

Call Before Concrete, Covering or Moving to the Next Stage

Inspection stage
Typical readiness
Do not do yet
Footing
Excavation, forms, reinforcement, dimensions and setbacks are ready.
Do not place concrete.
Foundation
Reinforcement, anchors, under-slab systems and required documents are visible.
Do not conceal or backfill.
Rough electrical, plumbing and mechanical
Each system and required test is complete.
Do not install insulation or interior finishes.
Framing
Framing, connectors, fire blocking and rough trades are ready.
Do not conceal structural connections.
Insulation
Energy insulation and air sealing are complete and visible.
Do not install drywall.
Pool barrier
Barrier, gates and required safety features are complete.
Do not plaster or fill the pool.
Final trades
Fixtures, devices, equipment, labels and safety controls are complete.
Do not assume one final closes all permits.
Final building
Construction, site work, outside approvals and required documents are complete.
Do not occupy commercial space without the required CO.
Issued-permit changes

Submit Revisions Through the Original Permit Record

Sign into Accela

Open My Records and locate the issued permit.

Select Revision/Deferral Submittal

Use the green link associated with the existing permit rather than opening a duplicate building permit.

Cloud each revised area

Clearly identify changes and include a revision checklist describing the revision on each affected sheet.

Remove prior approval stamps

Upload clean revised sheets without old County approval stamps or review notations.

Describe the revision

Explain exactly what changed and whether structural, energy, Fire, Planning or trade review is affected.

Track the revision number

The County generates a related record such as the original permit followed by REV01 or REV02.

SolarAPP exception: The County states that this revision process is not used for SolarAPP records.
Owner-builder and contractor

Identify Who Is Responsible Before the Permit Is Issued

Licensed contractor

  • California license is active
  • Classification covers the work
  • Business name matches contract
  • Workers’ compensation verified
  • Permit applicant is authorized
  • Inspection duty is written

Verify a California contractor

Owner-builder

Use the County’s Notice to Property Owner as Owner Builder and understand the responsibility accepted.

  • Owner manages code compliance.
  • Owner coordinates inspections.
  • Employment and insurance laws may apply.
  • Unlicensed contractors create legal and financial risk.
Do not pull an owner-builder permit merely because a contractor asks you to. The permit should accurately identify who controls and performs the work.
Final approval

Save the Correct Proof That the Sacramento County Project Is Complete

Residential home project

After the inspector signs off the completed work, the permit is complete. The County states that the signed final job card serves as the Certificate of Occupancy for residential projects.

  • Signed final job card
  • Approved plans
  • Supplemental documents
  • Permit record
  • Trade finals
  • Outside clearances

Commercial project

Commercial construction may receive a separate signed Certificate of Occupancy after all Building, Fire, accessibility, system, special-inspection and agency conditions are satisfied.

  • Building final
  • Fire final
  • Trade finals
  • Special-inspection reports
  • Accessibility completion
  • Certificate of Occupancy
Keep the records for a sale or refinance. Save the plans, permit, supplemental documents and signed final card rather than relying only on the online status.
Permit history and public records

Search Current Records First, Then Request Older Documents

Search Accela

Use the permit number, address, parcel information, owner or contractor details available.

Open the main permit

Review fees, conditions, uploaded documents and inspection history.

Check related permits

Look for electrical, plumbing, mechanical, solar, pool, Fire, sewer, floodplain and Planning records.

Confirm the final result

Do not rely on Issued, Approved or Inspection Completed without reading the actual result.

Use NextRequest for unavailable records

Submit a focused public-record request with the address, APN, permit number, date range and document type.

Save the final package

Retain the signed job card or Certificate of Occupancy with the approved plans and permit history.

Homebuyer warning: An open or expired permit may not appear obvious from remodeled finishes. Search every related permit and verify the final inspection.
Status decoder

What Common Sacramento County Permit Statuses Usually Mean

Application submitted The record exists, but intake review, documents or initial fees may remain.
Additional information required Upload the requested plan, calculation, form, owner authorization or outside clearance.
Planning review Zoning, design, landscape, tree, use or another land-development issue remains open.
Plan review Residential or commercial examiners are reviewing code compliance.
Fees due Pay the current Accela invoice before processing can continue.
Approved Permit issuance, school, Fire, sewer or another condition may still remain.
Issued Work may proceed within the approved plans and required inspection sequence.
Finaled Save the signed job card or occupancy certificate and verify all related records are complete.
Troubleshooting

Fix Common Sacramento County Permit Problems

Problem
Likely cause
Best next action
Wrong agency received the application
Postal city was used instead of the General Map jurisdiction.
Check the APN and Jurisdiction field before resubmitting.
Electronic plans are rejected
Files are unreadable, not to scale, incomplete or uploaded as disconnected images.
Submit a coordinated, legible PDF plan package.
Permit review cannot finish
Fire, school, sewer, septic, floodplain, Planning or encroachment clearance is missing.
Ask for the complete issuance-condition list.
ADU costs are higher than expected
Building estimate omitted Fire, sewer, school, septic, Planning or impact fees.
Request parcel-specific estimates from every listed agency.
Revision created a duplicate record
A new permit was opened instead of using Revision/Deferral Submittal.
Contact Building before uploading additional documents.
Next-day inspection was not scheduled
Request was after 5 PM, wrong inspection code was entered or availability was limited.
Check the request in Accela or call 916-875-5296.
Inspector cannot complete the visit
No access, unsecured animals, missing plans, no ladder or incomplete work.
Correct every readiness issue before rescheduling.
Permit shows issued but no final proof exists
The final inspection or job-card sign-off was never completed.
Review inspection history and contact the assigned division.
Ready-to-use scripts

What to Say When Contacting Sacramento County Staff

Jurisdiction question
“The property is [address/APN]. The General Map shows [jurisdiction]. Does Sacramento County issue the building and Planning permits for this parcel?”
Permit-type question
“I plan to [exact work] at [address]. Which Accela record and County submittal checklist should I use?”
Outside-clearance question
“Permit [number] involves [new home/ADU/commercial work]. Which Fire, school, sewer, septic, floodplain, Planning and impact-fee clearances remain?”
Correction question
“I uploaded revised plans and a response letter to record [number]. Is there an applicant task I must complete to restart review?”
Inspection question
“Permit [number] at [address] is ready for inspection code [code]. The work is complete and exposed, plans are on site and access instructions are [details].”
Final-record question
“Permit [number] does not show a clear final. Which inspection, signed job card, Fire, trade or occupancy item is still required?”
Final checklist

Do Not Consider the Project Complete Until These Items Are Saved

  • Unincorporated jurisdiction confirmed
  • Zoning requirements confirmed
  • Correct Accela record created
  • Complete PDF plan set uploaded
  • Title 24 documents accepted
  • Fire district approval completed
  • School fee clearance completed
  • Sewer or septic approval completed
  • Floodplain approval completed
  • Planning conditions completed
  • Encroachment approval completed
  • Permit formally issued
  • Required inspections approved
  • Elevation Certificate accepted if required
  • Signed job card or CO received
  • Final records downloaded
Primary Building Assistance Center

Sacramento County Building Office Map

Primary location: Sacramento County Building Assistance Center, 9800 Goethe Road, Sacramento, CA 95827. Business hours are Monday–Friday, 8:30 AM–4:00 PM.
Official resources

Open the Correct Sacramento County Resource

Frequently asked questions

Sacramento County Building Department FAQs

Where do I apply for a Sacramento County building permit?

Apply electronically through Sacramento County Accela Citizen Access. Building plans and supporting documents must be submitted as PDFs.

How do I know whether Sacramento County or the City of Sacramento handles my property?

Enter the address or Assessor Parcel Number in the Sacramento County General Map and read the Jurisdiction field under Parcel Details. Use the County only when it shows the Unincorporated Area of Sacramento County.

What is the Sacramento County Building Department phone number?

Call Sacramento County Building Permits and Inspection at 916-875-5296 for permit, inspection and general Building assistance.

What are the Sacramento County Building office hours?

The County lists business hours of 8:30 AM–4:00 PM, Monday through Friday. The primary Building Assistance Center is at 9800 Goethe Road.

How do I schedule a Sacramento County building inspection?

Schedule through Accela, call 916-875-5296 or text 855-280-5383. For next-workday scheduling when available, submit the request before 5:00 PM on the previous day.

Can I request an exact inspection time?

No. You may select an AM or PM preference, but it is not guaranteed. Check the Today’s Inspections list and contact the assigned inspector on the morning of the inspection for an estimated window.

Which Sacramento County residential permits may issue automatically?

The County lists qualifying residential heating and cooling, electrical-panel repair or replacement, reroof without structural change, sewer-line repair or replacement and water-heater permits. Eligible licensed contractors may also use SolarAPP+.

Does Sacramento County send new-home or ADU plans to the fire district?

Applicants must identify the local fire jurisdiction and submit directly when required. Separate fire review, permits and fees may apply.

What is required when building in a Sacramento County floodplain?

Construction or fill requires a floodplain management permit. New finished floors and regulated equipment generally must be 1.5 feet above the base flood elevation, and an Elevation Certificate may be required before occupancy.

How do I prove that a Sacramento County permit was completed?

For residential work, retain the signed final job card, which the County identifies as the residential Certificate of Occupancy. Commercial projects may receive a separate signed Certificate of Occupancy. Also retain approved plans and related trade-permit finals.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent informational guide and is not Sacramento County. Permit issuance, plan review, fees, inspections, zoning decisions, floodplain approvals and occupancy determinations must come from the County or responsible outside agency.

This page was rebuilt using Sacramento County Building Permits and Inspection, Accela Citizen Access, County Planning, residential and ADU submittal checklists, inspection instructions, Water Resources, Environmental Management, SacSewer and County public-record resources.

Last reviewed: July 22, 2026.

Forms, fees, codes, staff, inspection procedures, district boundaries and outside-agency requirements can change. Verify time-sensitive information before paying fees, ordering materials or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.