Apply, Inspect and Close a Novi Building Permit Without Missing Woodland, Wetland or Site Review
Novi combines building, zoning, land-improvement and environmental review. A project that looks like one building permit may also need a woodland or wetland affidavit, grading review, soil-erosion permit, right-of-way approval, trade permits or site-plan approval.
This guide helps homeowners, contractors and businesses choose the correct BS&A service, prepare a complete package, understand the July 2026 fee schedule, schedule inspections before the cutoff and verify that every permit is closed.
What Do You Need to Do?
Novi Next-Step Finder
Select the situation that best matches the project.
City of Novi Building Department Contact Information
Confirm the Property Is Inside the City of Novi
Use Novi BS&A when
- The City of Novi BS&A search returns the parcel.
- The property record identifies the City as the municipality.
- Community Development confirms Novi jurisdiction.
Verify before applying when
- The property is close to a municipal boundary.
- The Novi mailing address differs from the governing municipality.
- BS&A cannot locate the address or parcel.
Complete Novi Reviews in This Sequence
Which Novi Permit or Approval Fits the Project?
Project |
Start with |
Extra Novi review to check |
|---|---|---|
New home |
Building and zoning permit |
Similar/dissimilar architectural review, land improvement, woodland/wetland, utilities and trades |
Home addition |
Building permit |
Energy worksheet, setbacks, grading, land improvement and woodland/wetland affidavit |
Deck |
Building permit |
Deck requirements, setbacks, woodland/wetland affidavit and grading impact |
Patio or driveway work of 1,000 square feet or more |
Minor land-improvement permit |
Drainage, grading, right-of-way and protected environmental areas |
In-ground pool |
Building and trade permits |
Land improvement, barrier, grading, woodland/wetland and electrical bonding |
Small shed or structure not requiring a building permit |
Zoning compliance permit |
Size, setbacks, easements, drainage and association restrictions |
Basement finish or residential alteration |
Building permit |
Egress, smoke and carbon-monoxide alarms, electrical, plumbing and mechanical work |
Electrical, plumbing or heating work |
Separate trade permit |
Contractor registration and related building permit |
Commercial alteration or new building |
Planning and building review |
Site plan, zoning, fire, barrier-free design, engineering and utilities |
New tenant or changed business use |
Occupancy and zoning review |
Water verification, emergency lighting, exit signs, fire alarm and fire suppression reports |
Sign |
Sign permit |
Zoning, dimensions, illumination, electrical permit and possible sign variance |
Tent, seasonal sale or temporary structure |
Temporary-use permit |
Property-owner authorization, site layout, fire access and public-hearing route |
Apply Online Without Missing a Separate Novi Review
Confirm the property and parcel
Search Novi’s BS&A assessing records and save the address, owner name, parcel number and zoning information.
Check zoning and environmental constraints
Determine whether the site contains regulated woodlands, wetlands, floodplain, drainage work or protected trees.
Choose the correct BS&A service
Use Apply for a Permit for construction and trade work. Use Apply for a Planning, Zoning or Engineering Process for site, zoning and engineering applications.
Prepare the complete document package
Upload the building application, plans, plot plan, energy information, contractor credentials and related approvals.
Submit the application and required fee
Novi’s July 2026 schedule lists a $40 building application fee for residential and nonresidential building applications.
Respond to each review discipline
Building, zoning, planning, engineering, fire, utility and environmental reviews may appear separately.
Pay the final invoice and print the permit
Once issued, print the permit and approved documents before beginning work.
Link the BS&A Account to the Novi Contractor Record
Create a BS&A account
Register and activate the account through the verification email.
Select City of Novi
Open Municipalities, search for City of Novi and select the City record.
Open View My Activity
Find this option under the Building Department section.
Enter the contractor link PIN
Choose the yellow “I have a pin” link and enter the PIN provided for the Novi contractor account.
Verify permit and inspection history
After linking, confirm that the correct permits, invoices and inspections appear before requesting work.
What to Prepare Before Starting the Application
Property information
- Exact street address
- Parcel or Sidwell number
- Owner or lessee information
- Zoning district
- Subdivision and lot number
- Proof of ownership when requested
Project information
- Clear scope of work
- Estimated construction cost
- Existing use
- Proposed use
- Building area and height
- Occupant load when applicable
Plans
- Scaled construction drawings
- Plot or site plan
- Floor plans and elevations
- Structural details
- Energy-code documents
- Truss layout when applicable
Environmental review
- Woodland/wetland affidavit
- Tree-protection fencing
- Critical root zones
- Floodplain approval
- Soil-erosion permit
- Grading and drainage plan
Utilities and access
- Water and sewer approval
- Well or septic approval
- Right-of-way permit
- Driveway information
- Utility-company approval
- Land-improvement application
Project team
- Contractor license
- Novi contractor registration
- Architect or engineer details
- Michigan seals and signatures
- Workers’ compensation information
- Owner authorization
Woodland, Wetland, Grading and Soil-Erosion Checks
Woodland/wetland affidavit
The City identifies this affidavit for residential projects including new homes, additions, decks and pools.
Minor land-improvement permit
Check this permit for residential additions, patios, accessory structures, qualifying driveway work, in-ground pools and work affecting drainage.
Soil-erosion permit
County materials identify review when earth disturbance exceeds one acre or occurs within 500 feet of a lake or stream.
Floodplain work
Do not finalize foundations or grading until the required floodplain approval is confirmed.
Tree-protection fencing
Show existing and proposed fencing, protected trees, replacement trees and grading limits on the plot plan.
Roof and sump drainage
Direct gutters, downspouts and utility or sump lines away from regulated woodland areas unless an approved plan allows otherwise.
Building a New Novi Home Requires More Than House Plans
Similar/dissimilar review
Novi reviews new single-family designs for compatibility with surrounding homes and variation from an immediately adjacent dwelling.
Construction documents
Submit the current plan sets, energy documents, Manual J information, truss layout and required professional seals.
Plot and grading plans
Show footing elevations, brick ledges, final grades, drainage, woodlands, wetlands, well, septic and floodplain information.
Truss documents
The truss layout is required during plan review. Signed and sealed truss specifications must also be available on site for rough inspection.
Permit issuance
The City checks property recording, approved splits, water and sewer permits and completion of all review disciplines.
Occupancy request
Novi’s forms page asks for two days’ notice to process a single-family or multifamily Certificate of Occupancy request.
Commercial Plan Review, Tenant Work and Change of Occupancy
New development
Begin with Planning when the project requires site-plan, special-land-use, facade, wetland, woodland or engineering approval.
Tenant alteration
Confirm whether the scope qualifies for Novi’s minor tenant-alteration process or requires full sealed architectural, structural and trade plans.
Change of occupancy
Verify the previous and proposed use before construction or signing a final lease.
Occupancy check |
What Novi may verify |
What to prepare |
|---|---|---|
Zoning compliance |
Whether the business is allowed in the zoning district |
Use description, floor area, parking and operating details |
Occupancy classification |
Use group, occupant load and fire-protection requirements |
Previous and proposed occupancy information |
Water Department |
Whether the new use affects water usage rates |
Fixture, process and expected-use information |
Emergency lighting |
Lights, batteries and emergency power |
Working fixtures and testing access |
Exit signs |
Illumination and backup power |
Operational signs and clear exit paths |
Fire suppression |
Current system condition and annual inspection |
Licensed contractor’s inspection report |
Fire alarm |
System operation and annual inspection |
Licensed fire-alarm contractor’s report |
Request Novi Inspections Before the Published Cutoff
Before requesting
- Permit is issued and active
- Correct inspection type selected
- Work complete for that stage
- Approved plans on site
- Work remains visible
- Safe access provided
Give the inspector
- Permit number
- Project address
- Trade and inspection type
- Contact name and phone
- Access instructions
- Required documents
Common Novi Inspection Stages
Stage |
Examples |
Do not proceed until |
|---|---|---|
Site and foundation |
Staking, footing, elevation, trench, backfill and sand |
The required inspection is approved before concealment or placement. |
Utility and structural |
Sewer/water, service release, brick ledge, bearing and flashing |
The inspector can see the installation and approved plans are available. |
Rough trades |
Electrical, plumbing, heating and fireplace |
Each applicable rough trade passes. |
Rough building |
Framing, trusses, beams, headers and structural connections |
Trade rough approvals and sealed truss specifications are available. |
Envelope |
Damper and insulation |
Required components are visible and energy documentation is on site. |
Finals |
Electrical, plumbing, heating, fireplace, building and final grading |
All corrections, fees and related permits are complete. |
Current Novi Building Permit and Inspection Fees
Fee item |
Current amount or formula |
Practical note |
|---|---|---|
Residential building application |
$40 |
New home, addition, alteration, repair, mobile home and zoning applications |
Nonresidential building application |
$40 |
New commercial, industrial, additions and other non-single-family work |
Trade-permit application |
$35 |
Listed separately for electrical, mechanical, plumbing and fire-system permits |
Contractor registration |
$15 |
Renewed according to the applicable license period |
Residential plan review under $30,000 |
$50 |
Additions, alterations, repairs and similar reviews |
Single-family plan review or work over $30,000 |
$155 |
Additional structural and similar/dissimilar reviews can be separate |
Residential permit valuation |
$60 plus $4.50 per additional $1,000 over $1,001 |
Valuation may use City-listed construction values |
Nonresidential permit valuation |
$60 plus $5 per additional $1,000 over $1,001 |
Plan-review and trade fees can be separate |
Minor land-improvement review |
$86.25 |
Inspection is another $86.25; additional inspections are also $86.25 |
Base or additional inspection |
$60 per trade |
Current schedule includes fire inspection in the listed category |
Reinspection |
$60 |
Fee must be paid before reinspection |
Change-of-occupancy special inspection |
$180 |
Building and trade permits may still be required |
Sign application and plan review |
$40 |
Permit and inspection are another $50 |
Zoning compliance permit |
$70 |
For sheds and structures not requiring a building permit |
Temporary Certificate of Occupancy or extension |
$125 |
A separate completion bond may be required |
Residential permit example
Construction valuation: $40,000
Base: $60
Additional increments: 39 × $4.50 = $175.50
Example permit calculation: $235.50
Application, plan review, imaging, land, trade and other project fees are separate.
Payment options
- Cash, check or card in person
- Check by mail
- Electronic check or card through BS&A
- Current City page lists a 3% credit-card convenience fee
Keep the Novi Permit Active
Start within 180 days
The current fee schedule states that a permit becomes invalid when authorized work does not begin within 180 days after issuance.
Avoid a 180-day interruption
The permit can also become invalid when work is suspended or abandoned for 180 days after work starts.
Reinstatement
The July 2026 schedule lists a minimum permit-reinstatement fee of $50.
Which Construction Codes Does Novi Use?
Project category |
Published code |
Important detail |
|---|---|---|
Commercial building |
2021 Michigan Building Code |
Effective April 9, 2025 |
Commercial energy |
2021 Michigan Commercial Energy Code |
References ASHRAE 90.1-2019; effective April 22, 2025 |
Plumbing |
2021 Michigan Plumbing Code |
Effective March 12, 2024 |
Mechanical |
2021 Michigan Mechanical Code |
Effective March 12, 2024 |
Electrical |
2023 National Electrical Code |
With Michigan Part 8 amendments |
Existing commercial buildings |
2021 Michigan Rehabilitation Code |
Effective April 9, 2025 |
Detached one- and two-family residential |
2015 Michigan Residential Code |
Novi’s published code sheet still lists the 2015 MRC for covered homes |
Find an Existing, Expired or Open Novi Permit
Open Novi BS&A
Choose Building Department Record Search from the City’s service page.
Search by record number
This is usually the fastest way to find the exact permit and inspection history.
Try address, owner and parcel
Use the base address when suite, unit or directional formatting causes no result.
Review related records
Building, electrical, mechanical, plumbing, fire and land-improvement records may have separate permit numbers.
Confirm final approval
Verify passed final inspections, paid reinspection fees, final grading and Certificate of Occupancy where required.
What Common Permit Statuses Mean
Fix Common Novi Permit Problems
Problem |
Likely reason |
Best next action |
|---|---|---|
BS&A cannot find the property |
Wrong municipality or address formatting |
Use Assessing Search and confirm the parcel before applying. |
Permit application is incomplete |
Missing plans, fee, owner details or related approval |
Compare the submission with Novi’s project-specific checklist. |
Woodland review was added |
Protected woodland, tree or grading impact appears on the site |
Show tree tags, fencing, root zones, removals and drainage on the plot plan. |
Land-improvement permit was requested |
The project affects grading, drainage, a qualifying paved area, pool or protected water area |
Submit the current land-improvement application and detailed plot plan. |
Plan corrections keep returning |
Different plan sheets or responses conflict |
Use a numbered response and one coordinated revised set. |
Inspection is unavailable online |
Account is not linked, permit is inactive or inspection is not eligible |
Check View My Activity, link the contractor record or call 248-347-0415. |
Rough building inspection cannot pass |
Trade rough inspections or truss documents are missing |
Complete applicable trade approvals and place sealed truss specifications on site. |
Final building inspection is blocked |
Trade finals, grading, reinspection fees or occupancy documents remain open |
Create a closeout list for every related permit and department. |
New business cannot occupy the space |
Zoning, occupancy, water, fire or life-safety review is incomplete |
Use the commercial occupancy checklist before requesting the special inspection. |
Permit expired |
Work did not begin or stopped for 180 days |
Ask about reinstatement before performing more work. |
What to Say When You Contact Community Development
“I plan to [describe the exact work] at [address and parcel number]. Which building, zoning, trade, land-improvement, woodland, wetland and engineering permits are required?”
“Permit application [number] shows [status]. Which document, payment or department approval is preventing issuance?”
“I need the [inspection type] for permit [number] at [address]. The work is complete, approved plans are on site and access is available.”
“Permit [number] does not appear closed. Which building, trade, grading, fire or occupancy item remains outstanding?”
Do Not Consider the Project Complete Until These Are Confirmed
- City of Novi jurisdiction confirmed
- Address and parcel verified
- Zoning compliance confirmed
- Site-plan approval complete
- Woodland/wetland affidavit complete
- Land-improvement approval complete
- Soil-erosion review complete
- Floodplain approval complete
- Right-of-way approval complete
- Correct permit types selected
- Contractors registered
- Permit formally issued
- Approved plans kept on site
- Trade rough inspections passed
- Rough building inspection passed
- Energy and insulation inspections passed
- Trade finals passed
- Final building inspection passed
- Final grading approved
- Certificate of Occupancy obtained
- All fees paid
- Every related record closed
Novi Community Development Department Map
Location: Planning, Building and Code Compliance are located on the first floor.
Open the Correct Novi Building Resource
City of Novi Building Permit FAQs
Where do I apply for a Novi building permit?
Use the City of Novi BS&A portal. Select Apply for a Permit under Building Department. Separate planning, zoning or engineering applications are available through the Planning, Zoning or Engineering Process option.
What is the Novi Building Department phone number?
Call the Community Development Building Division at 248-347-0415. The office is on the first floor of the Novi Civic Center at 45175 Ten Mile Road.
How do I schedule a Novi building inspection?
Use Novi’s BS&A inspection service. The City’s published guidance says inspections should be requested 24 hours in advance and before 3:30 PM for the next business day.
Does Novi require a woodland or wetland affidavit?
The City’s forms page identifies the woodland and wetland affidavit for residential work, including new homes, additions, decks, pools and similar projects.
When is a minor land-improvement permit required?
Novi’s application identifies qualifying residential additions, patios, accessory structures, new or replacement driveways of at least 1,000 square feet, in-ground pools and certain excavation or grading near water or in a floodplain.
What are Novi’s current building application fees?
The fee schedule effective July 1, 2026 lists a $40 application fee for residential and nonresidential building permits. Separate electrical, mechanical, plumbing and fire-system schedules list a $35 application fee.
How much is a Novi reinspection fee?
The July 2026 Community Development fee schedule lists a $60 reinspection fee. It must be paid before the reinspection is performed.
Does a small Novi shed need a permit?
A small shed may not require a building permit, but Novi requires a zoning compliance permit for sheds and structures that are exempt from a building permit. Confirm size, setbacks, easements and drainage before installation.
Which building codes does Novi currently use?
Novi’s published code sheet lists the 2021 Michigan Building Code for covered commercial work, the 2023 National Electrical Code with Michigan amendments and the 2015 Michigan Residential Code for covered detached one- and two-family residential work.
How do I confirm that a Novi permit was closed?
Search the BS&A Building Department record, open every related building and trade permit, and verify passed final inspections, paid fees, final grading and Certificate of Occupancy when required.
Source and Accuracy Note
Building-Department.org is an independent informational guide and is not the City of Novi. Applications, fees, inspections, approvals and code decisions must be handled through Novi Community Development or its authorized BS&A portal.
This page was checked against official City of Novi Community Development, BS&A, forms, inspection, project-checklist, code and July 2026 fee resources.
Last reviewed: July 22, 2026.
Forms, fees, staff, code editions, portal functions and review procedures can change. Confirm time-sensitive details before filing, paying or beginning work.

Khushboo Bobade is a public records researcher and editorial writer specializing in government service documentation and construction permit systems.
Her research focuses on explaining building permits, inspection procedures, zoning regulations, and public permit records maintained by local government building departments across the United States.
Professional profile: View LinkedIn Profile
Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links
Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.
What building department task do you need help with?
Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.
Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.
Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.
Building Permit Type Finder
Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.
Permit Fee Estimate Calculator
Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.
Inspection Readiness Checklist
Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.
Zoning and Setback Pre-check
Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.
Plan Review Timeline Estimator
Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.
Permit Records Search Helper
Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.
Official Building Department Resource Finder
Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.
Building Department vs Planning/Zoning
- Building Department: permits, plan review, inspections, code compliance, certificates.
- Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.
Best sitewide placement
Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.
Important note
This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.