Apply, Upload, Inspect and Close a North Palm Beach Building Permit Online

North Palm Beach accepts new building applications through MyGovernmentOnline—not by paper, fax or ordinary mail. Contractors must register before filing, digital plans must meet the Village’s PDF rules and separate trades may require separate sub-permits.

This guide also explains the new July 2026 small-project exemption, the changing fee method, MGO inspections, VuSpex virtual inspections, Notice of Commencement rules, flood-zone documents, construction-site standards and condominium milestone reports.

MGO application, comments, revisions, payments and inspections
HB 803 exemption, NOC, flood-zone and fee-transition help
Virtual inspections, construction-site rules and final closeout
North Palm Beach permit moving from coastal plans through MGO review and inspection An animated project plan, MGO portal, virtual-inspection camera, permit document, sailboat and final inspection check explain the North Palm Beach process. VILLAGE PROJECT PLAN MGO CUSTOMER PORTAL APPLY • PAY • INSPECT REVIEWED VUSPEX PERMIT FINAL INSPECTION CLOSED COMMUNITY DEVELOPMENT
📌
Two important July 2026 changes Florida HB 803 created a limited permit-exemption request for certain qualifying home improvements under $7,500. It also changed how municipalities may calculate building fees, so an older valuation-based fee table may not reflect the amount now calculated in MGO.
Start here

Choose the Exact North Palm Beach Action You Need

North Palm Beach Permit Next-Step Finder

Select the situation that best matches the project.

Official contact panel

North Palm Beach Building Division Contacts

Community Development 561-841-3365 Option 1 for Building
Permit email permits@village-npb.org Applications and permit questions
Building Official Valentino Perez 561-846-3366
Executive Assistant Robyn Lehoux 561-882-1156
Office address 701 U.S. Highway 1 Suite 100, North Palm Beach, FL 33408
Department hours Monday–Friday 7:00 AM–3:00 PM, except holidays
Planning option 561-841-3365 Option 2 for Planning and Zoning
Permit records email Permit Search Plans and historical permit records
Planner on-call hours: The Village lists walk-in planner availability on Monday and Wednesday from 8:00 AM to 11:00 AM.
Jurisdiction check

Confirm the Property Is Inside the Village

Use North Palm Beach MGO when

  • The legal property location is inside Village limits.
  • The North Palm Beach jurisdiction recognizes the property in MGO.
  • The existing permit was issued by the Village Building Division.
?

Verify before applying when

  • The mailing address says North Palm Beach but the parcel may be in another municipality.
  • The property is near Palm Beach Gardens, Lake Park or an unincorporated boundary.
  • MGO cannot locate the project address under North Palm Beach.
Do not create a duplicate project under another jurisdiction. Call 561-841-3365 with the parcel-control number when the address is uncertain.
New July 2026 option

Does the Project Qualify for the Under-$7,500 Exemption?

It may qualify only when all apply

  • Cost is under $7,500
  • Single-family home, duplex or townhome
  • Property is not in a flood zone
  • No structural work
  • No electrical work
  • No plumbing work
  • No mechanical work
  • No gas work

These projects remain permit-controlled

  • Exterior doors and windows.
  • Roofing.
  • Sheds and other structural work.
  • Electrical, plumbing, mechanical or gas work.
  • Properties in a flood zone.
  • Zoning and Public Works permits.
  • Pool-related fences.
Approval is required before work. A project cannot be split into smaller contracts to stay below $7,500. Unapproved work may still lead to code-enforcement action.

Read the Village exemption notice

Check the property type, scope and flood-zone restrictions.

Complete the notarized request

Describe the full scope and identify the owner and contractor, when one is used.

Attach proof of project cost

Include the contract or another document showing the complete project cost.

Email the request before starting

Send the notarized form and cost documents to permits@village-npb.org.

Permit decision table

Match the Project to the Correct Permit Path

Project
Start with
Important North Palm Beach check
New single-family home
Master building permit
Signed/sealed plans, survey, flood information, impact-fee credit, utilities and separate standalone permits
Addition or structural renovation
Building permit
Site plan, structural design, flood review, zoning and separate trades
Interior renovation
Interior renovation checklist
Structural scope, fire review, HOA approval and licensed contractor for condominium work
Roof replacement
Roofing permit
Product approvals and Palm Beach County roofing forms
Windows or exterior doors
Window/door permit
Opening schedule, floor-plan location map, product approvals and site-specific engineering for multifamily projects
Swimming pool
Standalone pool permit
Survey, barrier, drainage, electrical bonding, zoning and flood conditions
Dock or boat lift
Marine permit
Signed/sealed plans, survey, waterway approvals and zoning placement
Fence
Standalone fence permit
Survey, height, visibility, pool-barrier rules and zoning review
Driveway or right-of-way work
Building + ROW review
Drainage, culverts, sidewalks, utility clearance and Public Works notification
Generator
Standalone generator permit
Survey, setbacks, equipment data, electrical, gas and flood elevation
Solar panels
Solar permit
Signed/sealed engineering, roof layout, electrical documents and product information
A/C, water heater or electric panel
Trade permit
Equipment specifications, AHRI data, load calculations and contractor registration

Open All Project Checklists

Online application workflow

Apply Through MyGovernmentOnline in Seven Steps

Confirm jurisdiction and permit type

Verify that the property is inside North Palm Beach and identify the master permit, standalone permits and trade sub-permits.

Prepare: Project address, parcel-control number and complete scope.

Open the exact checklist

Use the Village checklist for the project instead of uploading a generic construction package.

Register the contractor first

Contractor licensing and insurance information must be current in MGO before a new permit or sub-permit is submitted.

Complete the correct permit application

Use the primary Building Permit Application for the master permit. Do not use it as the substitute for a required sub-permit application.

Upload the complete PDF package

Include plans, survey, product approvals, contractor documents, utility approvals, flood details and project-specific forms.

Do not upload: Locked files that prevent Village markup and stamping.

Pay the invoice and monitor review

Review does not move forward properly when application charges remain unpaid. Open each review task and comment in MGO.

Corrections stay in order: The Village says corrected applications return to the overall review queue rather than moving to the front.

Complete issuance requirements

Pay remaining fees, submit the recorded NOC when required, obtain sub-permit issuance and download the stamped plans before work begins.

No early work: An application number is not permission to begin construction or demolition.
Application readiness

Prepare These Items Before Opening MGO

Property and application

  • Project address
  • Parcel-control number
  • Owner information
  • Complete work description
  • Square footage
  • Reported project value

Contractor documents

  • Current license
  • General-liability certificate
  • Workers’ compensation proof
  • Qualifier signature
  • Subcontractor applications
  • Owner-builder affidavit if applicable

Plans and approvals

  • Digital plan set
  • Survey or site plan
  • Product approvals
  • Utility clearance
  • Flood information
  • HOA approval when requested
Notarization rule: The Village submittal sheet requires notarized owner and qualifier signatures when reported valuation is over $5,000 and for every owner-builder application.
Condominium work: All work in multifamily and condominium residences must be completed by a licensed contractor. Owner-builder permits are not allowed for those properties.
Project-specific documents

Do Not Miss These Local Dependencies

Project condition
Document or approval to prepare
New structure, addition, pool, dock, driveway, fence or generator
Current property survey or detailed site plan
Window or door replacement
Opening schedule, floor-plan location sketch and Florida Product Approvals or NOAs
Multifamily windows or doors
Site-specific engineering in addition to product documents
Roof permit
Product approvals and applicable Palm Beach County roofing forms
Exact A/C changeout
Exact changeout form, AHRI information and equipment tie-down/stand details
New, relocated or expanded A/C system
AHRI sheets and signed energy forms
Work affecting easements
Easement releases from affected utility companies
Water or sewer dependency
Seacoast Utility Authority approval; verify at 561-627-2900
New construction
Existing-use impact-fee credit application and Department of Health approval when applicable
Condominium alteration
HOA approval, except where the Village’s current submittal sheet excludes A/C and water-heater work
Digital plan standards

Format the PDFs So They Are Not Returned

File preparation rules

  • Upload PDF files only.
  • Combine multipage plans into a complete set.
  • Keep architectural and MEP sets separate when needed to preserve digital signatures.
  • Upload specifications and reports as separate combined PDFs.
  • Use current professional seals and certifications.
  • Maximum plan-sheet size is 24 × 36 inches.

Required PDF permissions

  • Printing allowed.
  • Commenting or markup allowed.
  • Content copying allowed.
  • Page extraction allowed.
  • Form filling allowed.
  • Digital signatures must remain valid.
Village file-name pattern: Building number + street name + suite when applicable + document description. Add “amend” or “rev” to amended files.
Field-copy rule: Open the MGO project’s documents, download the jurisdiction-stamped files and print the approved plans for the job site.

Open Digital Plan Requirements

July 2026 fee transition

Do Not Estimate the Permit From the Old Contract-Value Formula

Fee method changed: Florida HB 803 became effective July 1, 2026 and prevents municipalities from using the applicant’s project value as the direct basis for calculating a building-permit fee.

What the Village proposed

The July 9, 2026 Village Council packet introduced a revised method using flat charges, inspection-area square footage and the International Code Council square-foot valuation table.

Separate charges were identified for technology, administration, plan routing, zoning, engineering, landscape, drainage, fire and floodplain services.

Safest budgeting method

  1. Select the exact permit type.
  2. Enter accurate project square footage.
  3. Identify every trade and specialty permit.
  4. Include Planning, Fire, Public Works and impact reviews.
  5. Use the current MGO invoice as the controlling amount.
  6. Question any legacy valuation-based charge before paying.
Example from the July 2026 Council fee packet
Listed method or amount
Minimum permit fee
$78 minimum, plus applicable review charges
Technology fee
4% added to permit fee
Administrative fee
4% added to permit fee
A/C changeout
$300 per system
Fence or railing
$300 flat
Driveway
$400 flat
Garage door
$400 flat
Water heater
$250 flat
Window or door
$200 per opening
Residential solar
$25 per panel
Residential swimming pool
$3 per square foot
Building plan review
30% of permit fee when applicable
Transition warning: During this review, the Village Forms page still linked a legacy valuation-based PDF while the July 2026 Council packet contained the replacement methodology. Confirm the currently adopted amount in MGO or with Building staff before budgeting.
Notice of Commencement

File the NOC Before Scheduling Inspections

Published thresholds

  • Direct contract greater than $5,000.
  • Existing heating or A/C repair or replacement greater than $15,000.

What happens when it is missing

The Village application states that no inspections will be scheduled until the recorded Notice of Commencement is on file.

The permit may be placed on hold until the document is accepted.

Record the NOC

Use the correct property, owner, contractor and project information.

Open “Submit-NOC Document” in MGO

Search the project number and select the correct permit record.

Upload the recorded copy

Use the Notice of Commencement upload field and submit the transaction.

Plan-review status

Understand What the MGO Status Means

Draft Required fields, contacts, files or final submission may still be missing.
Submitted The application was sent, but intake and fee payment may remain.
Incomplete A checklist item, signature, contractor record or PDF requirement was not satisfied.
In review Building, Zoning, Fire, Engineering or another reviewer is evaluating the package.
Comments issued Open every comment and answer it through the MGO “Respond to Comments” workflow.
Ready for issuance Remaining fees, NOC, subcontractors or outside approvals may still be required.
Issued Download and print the Village-stamped plans before beginning work.
Final or closed Confirm that the master permit and every trade permit show completed status.
No universal review promise: The Village states that approval time depends on the project, required review disciplines, pending workload and whether corrections are necessary.

Open “Respond to Comments” Instructions

Inspection choices

Regular, Field Report or Live Virtual Inspection?

Inspection route
How it works
Best for
Traditional inspection
Request the inspection through MGO and provide field access
Any inspection requiring an onsite Village inspector
VuSpex Field Report
Upload clear photos and notes without an appointment; Village review occurs the next business day
Eligible A/C, roof, drywall, fence, water-heater and similar inspections
Live virtual inspection
Schedule in MGO, remain onsite and connect with the inspector by live video
Eligible framing, electrical, plumbing, gas, generator and window/door inspections
Snap inspection
Take live photos and communicate by chat during a scheduled inspection
Weak or unstable cellular and Wi-Fi connections

MGO permits issued after January 18, 2024

  • Schedule through the MGO customer portal.
  • Inspection times are available in MGO by about 7:30 AM on the inspection day.
  • Keep approved stamped plans at the site.

Older permits issued before January 18, 2024

  • Call 561-841-3365.
  • Request by 3:00 PM on the prior business day.
  • Daily times are posted by about 7:30 AM.
Same-day request: The Village FAQ lists a $78 advance payment for a same-day inspection, subject to staff availability. Confirm the amount because the Village’s fee method is being updated.
Virtual inspection preparation

Make the VuSpex Submission Easy to Approve

Field Report checklist

  • MGO account active
  • VuSpex account created
  • Florida selected
  • Village of North Palm Beach selected
  • Location services enabled
  • Clear, well-lit photos
  • Permit number visible
  • Useful explanatory notes

Live inspection checklist

  • Inspection scheduled in MGO
  • Responsible person onsite
  • Strong internet connection
  • Camera permissions enabled
  • Approved plans available
  • Work exposed and accessible
  • Flashlight available
  • Safe walking route
Do not upload unrelated or old photographs. Images should show the current permitted work, overall location, required close-ups and enough context for the inspector to understand what is being reviewed.
Construction-site standards

Review and Upload the Site-Standards Acknowledgement

Parking

Construction vehicles should park completely onsite and off the pavement.

Right-of-way parking needs Building Official permission when the site cannot accommodate vehicles.

Waste and dust

Contain construction waste, stabilize stockpiles, sweep affected areas daily and keep dust from leaving the property.

Drainage protection

Protect catch basins and prevent concrete, sediment, pool water and construction material from entering the street or drainage system.

Site rule
Practical requirement
Construction vehicles
No overnight right-of-way or swale parking between 8:00 PM and 7:30 AM
Road closure
Request approval at least 72 hours ahead and notify affected residents
Construction waste
Keep it secured in an enclosed containment structure
Dust-producing cutting
Use wet saws, vacuums, screening or another effective control
Pool under construction
Keep it free of debris and treat standing water to prevent insects and algae
Temporary toilets
Provide adequate facilities in a location approved by the Building Official

Review Construction Site Standards

Construction hours

Keep Noise-Producing Work Inside Village Hours

Weekdays

7:30 AM–6:00 PM

Noise-producing construction and power-driven equipment should remain within the permitted period.

Saturday

7:30 AM–6:00 PM

The same amended noise-hour range applies to Saturday construction activity.

Sunday and legal holidays

No ordinary construction

An emergency or public-safety need may require a special Village Manager authorization.

Flood and coastal review

Flood-Zone Properties Need More Than an Elevation Number

HB 803 exemption does not apply in a flood zone. Even a low-cost project may require ordinary permit and floodplain review.

Village flood assistance

  • Flood-zone determination.
  • Available elevation-certificate check.
  • Coastal-erosion information.
  • Repeated-flooding information.
  • Property-protection consultation.
  • Drainage-evaluation site visit.

New structures, additions and substantial renovations

  • Flood-zone and floodway delineation.
  • Base-flood and ground elevations.
  • Existing and proposed structures.
  • Proposed grades, fill and excavation.
  • Coastal Construction Control Line.
  • Dune, mangrove or watercourse impacts.
Zones A, AE, V and VE: The Village’s permit-submittal sheet requires additional flood-development details when any portion of the property is within one of these zones.

Open North Palm Beach Flood Information

Planning and right-of-way

Resolve Zoning and Street-Impact Work Before Construction

Planning and Zoning

The Village uses a Universal Planning and Zoning Application for variances, waivers, special exceptions, planned developments, plats and zoning amendments.

Phone: 561-841-3365, option 2

Planner hours: Monday and Wednesday, 8:00–11:00 AM

Right-of-way permit

A separate ROW permit applies when work occupies or affects a Village road, sidewalk, swale, utility area or other public right-of-way.

Examples include driveway work, utility construction, paving, striping and exterior work that blocks a street or sidewalk.

ROW step
Village requirement
Before application
Prepare site and construction plans showing property lines, easements, drainage, utilities, sidewalk and proposed work
Utility clearance
Obtain Seacoast Utility Authority clearance when applicable
Permit duration
Maximum 30 calendar days, with extensions requested before expiration
Before work
Notify Public Works at 561-691-3440 at least 48 hours before starting
After completion
Submit completion notice and request final inspection within 48 hours
Contractor and owner-builder rules

Register the Real Project Team Before Filing

Licensed contractors

  • Complete NPB registration in MGO.
  • Keep the license current.
  • Upload general-liability insurance.
  • Upload workers’ compensation proof or valid exemption.
  • Submit each trade separately when required.
  • Keep contact information current.

Owner-builders

  • Submit the Owner-Builder Affidavit in person.
  • Notarize the permit signatures.
  • Provide labor and material costs if requested.
  • Use licensed trades when required.
  • Accept responsibility for inspections and code compliance.
  • Do not use owner-builder status for condominium or multifamily work.
Private provider option

File the State Private-Provider Notice Correctly

Available services

  • Private plan review.
  • Private inspections.
  • Both plan review and inspections.
  • Licensed or certified private-provider personnel.

Important limitations

  • The Building Official retains enforcement authority.
  • The Village may require inspections when private plan review is used.
  • Changes to providers must be reported promptly.
  • Zoning, Fire, flood, utility and outside approvals still apply.

Open Private Provider Packet

Condominiums and high-rises

Milestone Inspection Reporting for Buildings Three Stories or Higher

Initial milestone

A qualifying condominium or cooperative generally requires its initial inspection by December 31 of the year it reaches 30 years of age.

Repeat cycle

After the initial milestone, another inspection is generally required every 10 years.

Professional report

Phase One is a visual inspection by a licensed architect or engineer. Phase Two follows when substantial structural deterioration is found.

Submit reports to the Village Building Official: condoconcerns@village-npb.org.

Open Milestone Inspection Information

Permit and property records

Search Online Before Paying for Document Research

Check MGO

Open the current project account for status, comments, invoices, approved files and inspections.

Search current permit and inspection history

Use the Village’s online Community Development record-search route.

Prepare a precise records request

Provide the address, parcel-control number, approximate year and exact documents needed.

Email or submit the request

Use permitsearch@village-npb.org or the official Building Department Records Request form.

Verify the charge first: The records-request form states that a minimum $50 fee applies, while the Village fee material lists $75 for an open or expired permit search per address. Ask staff which service and fee apply to the requested search.
Open permit recovery

Old Permit Not Closed? Use This Recovery Checklist

Gather before contacting staff

  • Permit number
  • Property address
  • Parcel-control number
  • Original scope
  • Approved plan set
  • Contractor information
  • Inspection history
  • NOC and HOA documents

Ask these direct questions

  • Which inspection is missing?
  • Is the permit expired?
  • Can it be reissued?
  • Are new-code plans required?
  • Are sub-permits open?
  • Is the NOC missing?
  • Is a revision unresolved?
  • What proves final closure?
Published reissuance categories: Village fee materials distinguish permits within 180 days of expiration from permits older than that period. The required review and fee can change based on permit age and the applicable Florida Building Code edition.
Problem solving

Fix Common North Palm Beach Permit Problems

Problem
Likely cause
Best next step
MGO cannot find the address
Wrong jurisdiction, spelling or property record
Confirm Village jurisdiction and use the parcel-control number
Contractor cannot submit
Registration, license or insurance is expired
Update the contractor profile before creating another application
Application returned as incomplete
Missing signatures, survey, plans, product approvals or checklist item
Compare the uploaded files with the exact permit checklist
PDF was rejected
Locked permissions, invalid signature, missing title block or incorrect file organization
Correct permissions and resubmit a combined, properly named PDF set
Review has not moved
Invoice is unpaid or another department review remains open
Open every MGO task and confirm payment and routing status
Exemption request was denied
Flood zone, prohibited trade, structural scope, property type or cost
Submit the correct permit before beginning work
Inspection cannot be scheduled
Permit not issued, NOC missing, sub-permit missing or fee hold
Review the complete project record and clear the hold
Virtual inspection was not approved
Poor photos, missing context, wrong inspection type or inaccessible work
Follow inspector comments and request the correct reinspection route
Final permit remains open
Trade final, revision, NOC, flood document, HOA item or outside approval remains incomplete
Ask for a written list of every remaining closeout item
Fee estimate differs from invoice
July 2026 fee-method transition or additional department reviews
Ask staff to identify each Building, Planning, Fire, Public Works, impact and surcharge line
Ready-to-use scripts

What to Say When You Contact the Village

Permit requirement:
“I plan to [exact work] at [full address and PCN]. Which master permit, standalone permits, sub-permits, zoning, flood, utility and right-of-way approvals apply?”
HB 803 exemption:
“The total project cost is [amount], the property type is [type] and the scope is [work]. Is the property outside a flood zone, and may I submit the notarized exemption request?”
Review delay:
“Application [number] shows [status]. Can you identify the exact payment, reviewer, missing file or outside approval preventing the next step?”
Open permit:
“Permit [number] is not final. Which inspection, trade permit, revision, NOC, flood document or department approval remains open?”
Final closeout

Do Not Finish Until Every Related Record Is Closed

  • Correct Village jurisdiction confirmed
  • Correct checklist used
  • Contractors registered
  • Master permit submitted
  • Standalone permits submitted
  • Trade sub-permits submitted
  • Zoning and ROW approvals completed
  • Flood review completed
  • Utility approval completed
  • NOC recorded and accepted
  • Permit formally issued
  • Stamped plans printed onsite
  • Site standards followed
  • Failed inspection items corrected
  • Trade finals completed
  • Master permit shows final or closed
Office location

North Palm Beach Community Development Map

Community Development: 701 U.S. Highway 1, Suite 100, North Palm Beach, FL 33408.
Department hours: Monday–Friday, 7:00 AM–3:00 PM, except holidays.
Official resource center

Open the Correct North Palm Beach Resource

Frequently asked questions

North Palm Beach Building Division FAQs

Where do I apply for a North Palm Beach building permit?

Submit new permit applications through MyGovernmentOnline. The Village no longer accepts new paper or physical permit applications.

What is the North Palm Beach Building Division phone number?

Call 561-841-3365 and select option 1 for Building. Community Development is located at 701 U.S. Highway 1, Suite 100.

What are the Building Division office hours?

The Community Development Department lists hours of Monday through Friday from 7:00 AM to 3:00 PM, excluding holidays.

Can a project under $7,500 be completed without a permit?

Only certain qualifying projects at single-family homes, duplexes and townhomes may receive an exemption. Flood-zone properties and structural, electrical, plumbing, mechanical or gas projects do not qualify. Written approval is required before work begins.

Which building code does North Palm Beach use?

New plans submitted on or after January 1, 2024 must comply with the 2023 Florida Building Code, Eighth Edition, together with applicable local and state requirements.

How do I schedule a North Palm Beach inspection?

For permits issued through MGO after January 18, 2024, request the inspection through the MGO customer portal. Older permits may use the Building Division phone process.

Which inspections can be performed virtually?

Eligible inspections may use VuSpex Field Reports, live video or Snap inspections. Available types include selected roofing, A/C, drywall, fence, electrical, plumbing, gas, window, door and water-heater inspections.

When is a Notice of Commencement required?

The Village application identifies a recorded NOC for direct contracts greater than $5,000, with a $15,000 threshold for repair or replacement of existing heating and air-conditioning equipment. Inspections are not scheduled until the required NOC is on file.

How much is a North Palm Beach building permit?

The amount depends on the current permit type, square footage or applicable flat charge, plan review, trades, technology, administration, zoning, fire, impact and other reviews. Because the fee method changed in July 2026, use the current MGO invoice rather than an older valuation calculator.

How do I find an old North Palm Beach permit?

Check MGO and the Village’s online permit-history search first. For unavailable plans or historical documents, email permitsearch@village-npb.org or submit the official Building Department Records Request.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent informational guide and is not the Village of North Palm Beach.

This page was rebuilt using the official Building Division, MGO, July 2026 exemption documents, Council fee packet, permit application, submittal rules, checklists, VuSpex inspections, construction-site standards, flood, Planning, right-of-way, condominium and records resources.

Last reviewed: July 22, 2026.

Fees, forms, portal procedures, staff, inspections and code requirements can change. Confirm time-sensitive details with the Village before applying, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.