If you are planning any construction, renovation, addition, alteration, demolition, or new building work in New York City, you will need one or more permits from the New York City Department of Buildings (DOB).
Most applications are now filed electronically through DOB NOW: Build, the cityβs primary online permitting system. Many homeowners and contractors search for clear guidance on how to apply for a building permit in NYC, what the fees are in 2026, and how to track their job status.
This guide walks you through the process step by step using simple language so you can file correctly, avoid delays, and stay compliant with the NYC Building Code.
Whether you are an owner-builder or working with licensed professionals, understanding the DOB permit system will help your project move forward smoothly.
NYC Department of Buildings Contact Information 2026
- Main Office: 280 Broadway, 3rd Floor, New York, NY 10007
- Phone: (212) 566-5000 or dial 311 from within NYC
- DOB NOW Help: Submit questions directly in DOB NOW or visit nyc.gov/dobhelp
- Hours: MondayβFriday, 8:30 AM β 4:30 PM (borough offices may vary)
Official Page: NYC Department of Buildings (DOB)
NYC Building Permit Search 2026
Official Portal: DOB NOW: Build
- Go to the DOB NOW Public Portal (no login needed for basic searches).
- Search by property address, BIN (Building Identification Number), or job number.
- View job status, approved permits, fees paid, and inspection history.
For full historical data including older records, also check the Buildings Information System (BIS).
How to Apply for NYC Building Permits Online 2026
Most permits must now be filed electronically through DOB NOW: Build. Here is the step-by-step process.
- Create a free NYC.ID account and log into DOB NOW: Build.
- Start a new job and select the correct work type (New Building, Alteration 1, Alteration 2, etc.).
- Enter the property address, BIN, and estimated construction cost.
- Upload required documents (PDF format): architectural/structural drawings, site plans, energy code forms, and special inspection statements.
- Pay the filing fee online (most applications now have a minimum fee of $130) and submit the job.
- Monitor your account daily and respond quickly to any objections or requests for additional information.
- Once approved, display the permit card visibly at the job site before starting work.
- Schedule inspections through DOB NOW or by calling 311.
NYC DOB Building Permit Fees 2026
- Minimum Filing Fee: $130 for most applications (updated from previous years).
- Fees are calculated based on the reported construction cost, square footage, or specific project type.
- New buildings and major alterations (Alt-1) follow a tiered scale; smaller jobs have base fees plus per-square-foot or per-$1,000 charges.
- Separate fees apply for plan review, special inspections, and each subcode (electrical, plumbing, mechanical).
- Recent updates (effective January/February 2026) changed fee calculations for certain Alteration-CO jobs, full demolitions, and AHV permits.
- Work started without a permit can result in double fees plus possible fines or a Stop Work Order.
Required Documents Checklist
- Completed DOB NOW job application
- Architectural and structural drawings (sealed by licensed PE/RA when required)
- Site plan and energy code compliance documentation
- Proof of contractor license and insurance
- Owner-Builder Affidavit if applicable
- Special inspection forms (TR-1/TR-2) where required
How to Schedule Inspections in NYC
Request most inspections through DOB NOW: Build. For certain jobs, call 311. Have your approved plans and permit card ready. Failed inspections incur additional fees.
Contractor Registration & Owner-Builder
Contractors must be licensed by DCWP and registered in DOB NOW. Homeowners can file as owner-builders but must sign an affidavit accepting full responsibility for code compliance and safety.
Local Insider Tips That Really Help
- Create your NYC.ID account early and become familiar with DOB NOW: Build before filing.
- Submit complete, clearly labeled drawings the first time to minimize objections and delays.
- Use accurate construction cost estimates when filing to avoid fee adjustments later.
- Respond to objections promptly β delays here are one of the most common reasons jobs stall.
- Schedule inspections as soon as each stage is ready to keep your project on track.
Frequently Asked Questions
How do I search for existing NYC building permits?
Use the DOB NOW Public Portal (a810-dobnow.nyc.gov) or the Buildings Information System (BIS) for historical data. Search by address or BIN.
How to apply for a building permit in NYC?
Create a NYC.ID account, log into DOB NOW: Build, select the work type, upload documents, pay the filing fee, and submit the job electronically.
What are the NYC DOB building permit fees in 2026?
Most applications have a minimum filing fee of $130. Fees are calculated based on construction cost or square footage, with additional charges for plan review and subcodes.
Can I pull my own permit as an owner-builder in NYC?
Yes. You can file as an owner-builder, but you must sign an affidavit taking full responsibility for code compliance and job safety.
How long does it take to get a building permit in NYC?
Simple jobs can be approved in a few days to a couple of weeks. Major alterations or new buildings often take 4β16 weeks or longer depending on complexity.
Official Resources
- DOB NOW: Build β Apply & Search Permits
- NYC Department of Buildings Homepage
- Obtaining a Permit Guide
- Contact DOB
Updated April 2026 using only official NYC Department of Buildings sources. All new applications must be filed electronically through DOB NOW: Build.

Khushboo Bobade is a public records researcher and editorial writer specializing in government service documentation and construction permit systems.
Her research focuses on explaining building permits, inspection procedures, zoning regulations, and public permit records maintained by local government building departments across the United States.
Professional profile:Β View LinkedIn Profile