Nyc Gov Department Of Buildings | Permits, Inspections & Official Contact

NYC DOB permit and property guide

Use the Right NYC DOB System for Permits, Inspections, Violations, Records and Building Closeout

New York City does not use one database for every building task. A newer filing may be in DOB NOW, an older job may be in BIS, complaints remain in BIS, public compliance records may be in DOB NOW: Safety, and inspections use DOB NOW: Inspections or the newer Inspections Plus module.

This action guide shows owners, tenants, contractors, architects, engineers and business operators where to search, which office to contact, how to move a filing through objections and permits, and what must happen before a project is legally complete.

DOB NOW vs. BIS decision path
Permit, objection and inspection steps
CO, TCO, LOC, LNO and violation help
NYC building filing moving through DOB NOW, plan review, permit, inspection and closeout An animated New York skyline, digital filing card, review stamp and final sign-off explain the NYC Department of Buildings process. DOB NOW JOB FILED PLAN EXAM PERMIT ISSUED SIGNED OFF APPROVED NYC PROPERTY + DOB RECORD JOB FILING FINAL SIGN-OFF COMPLETE
📌
Important 2026 DOB system changes Since June 29, 2026, Electrical Development inspection requests are managed in DOB NOW: Inspections Plus. The 2025 NYC Electrical Code is in effect, and the 2025 NYC Energy Conservation Code is enforced for applicable filings beginning March 30, 2026. Starting July 27, 2026, Local Law 152 gas-piping certifications move into DOB NOW: Safety.
Start here

Choose the NYC DOB Task You Need Right Now

Most important decision

Use DOB NOW and BIS Together—They Do Not Show the Same Records

System
Use it for
Important limitation
DOB NOW Public Portal
Newer DOB NOW job filings, permits, CO details, compliance violations, devices, civil penalties and licensees
It does not display filings that exist only in BIS and does not display 311 complaints
BIS
Older permits and applications, complaints, violations, actions, inspections, occupancy information and older CO records
DOB NOW: Build filings do not appear in BIS
DOB NOW: Build
Submitting jobs, uploading documents, paying fees, viewing objections, PAAs, permit requests, renewals, AHVs, LOC and CO requests
A login and NYC.ID account are required to take filing actions
DOB NOW: Inspections
Most construction, plumbing, boiler, elevator, sign, crane, fire-suppression and other inspection requests
Inspection requests are not accepted by the old portals, phone or in person
Inspections Plus
Electrical Development inspections, re-inspections, objections, delegates and cancellations
As of July 2026, only Electrical Development inspections use this module
DOB NOW: Safety
Boiler, elevator, façade, energy, parking-structure, gas-piping and other periodic-compliance filings and violations
For a complete property violation search, also check BIS
Property due-diligence rule: Search both the DOB NOW Public Portal and BIS. A clean result in one system does not prove that the property has no filings, complaints or violations in the other.
Official contact board

NYC DOB Phone, Help Form and Customer Service Hours

DOB main phone 212-566-5000 General Department of Buildings assistance
Online help NYC DOB Help Form Use for account, filing and system questions
Complaints and city information 311 Outside NYC: 212-639-9675
In-person service 8:30 AM–4:00 PM Monday through Friday
Phone lines 8:30 AM–4:30 PM Monday through Friday
Cashier / record ticket cutoff 3:45 PM Borough-office kiosks stop issuing these tickets
Emergency construction hazard 911 Use 311 for non-emergency active-construction complaints
Office selection rule Use property borough Contact the office where the building is located
Five borough offices

Contact the DOB Office for the Property’s Borough

Borough
Customer service office
Customer service phone
CO phone
Bronx
1775 Grand Concourse, 5th Floor, Bronx, NY 10453
Brooklyn
345 Adams Street, 3rd Floor, Brooklyn, NY 11201
Manhattan
280 Broadway, 1st Floor, New York, NY 10007
Queens
120-55 Queens Boulevard, Kew Gardens, NY 11424
Staten Island
10 Richmond Terrace, 2nd Floor, Staten Island, NY 10301
Call the correct unit: Customer Service handles general inquiries, AHV and PAA status. The borough CO Unit handles Certificate of Occupancy and sign-off questions. Enforcement units handle DOB violations, Stop Work Orders and Vacate Orders.
Permit decision table

Which NYC DOB Filing or Permit Path Fits the Project?

Project or task
Likely filing path
Important dependency
New building
New Building filing
Registered design professional, zoning, energy, structural, utilities, site safety and agency requirements
Change in use, egress or occupancy
Alteration-CO
Schedule of Occupancy and new/amended Certificate of Occupancy path
Interior renovation without CO change
Alteration filing
Tenant protection, asbestos, accessibility, structural and trade work
Plumbing, sprinkler or standpipe work
DOB NOW: Build work type
Licensed contractor, related building filing and required inspection sign-offs
Electrical work
Electrical filing in DOB NOW
Licensed electrician and Inspections Plus for Electrical Development inspection
Elevator installation or modernization
Elevator filing
Elevator permits, tests, inspections and DOB NOW: Safety compliance
Sidewalk shed, supported scaffold, fence or sign
Temporary construction equipment / sign
Permit duration, insurance, removal notification and AHV if work occurs outside normal hours
Full or partial demolition
Demolition filing
Pre-demolition inspection, utility disconnects, safety plans and adjoining-property protection
Place of Assembly
PA / TPA filing
DOB and FDNY requirements; PACO may be required for applicable assembly spaces
Work before 7 AM, after 6 PM or weekend
After Hour Variance
Approved AHV must match the location, dates, hours and work
Professional filing check: Many NYC projects require a Registered Architect or Professional Engineer, licensed contractor and Special Inspection Agency. Confirm the allowed filer and required stakeholders before creating the job.
DOB NOW application workflow

Move a NYC Filing From Project Idea to Issued Permit

Property and zoning research
Design professional and work types
Job filing and documents
Plan exam and objections
Job approval
Permit request and signatures
Permit issued and printed

Research the property in both systems

Check the DOB NOW Property Profile and BIS for active jobs, violations, complaints, occupancy information, landmark or Loft Law flags and prior applications.

Save: borough, block, lot, BIN, address, current legal use and existing CO or LNO information.

Define the work and the correct filing type

Write the scope by floor, use, affected systems and construction operation. Identify whether the work changes use, egress, occupancy, structure, fire protection or energy systems.

Avoid: filing a minor alteration when the completed project actually requires a CO change.

Add every required stakeholder

The owner, applicant, contractor and other required parties must be correctly associated. Required stakeholders provide electronic signatures before the permit request is submitted.

Check: NYC.ID email, company, license, insurance and owner information.

Upload coordinated documents and required items

Plans, energy documents, zoning analysis, tenant protection, asbestos, special inspections and agency approvals must describe the same project.

Version control: keep one current drawing set and clearly identify every revision.

Resolve plan-exam objections

Open every objection, revise the correct drawing or form and resubmit. DOB NOW can be used to schedule a virtual meeting with the plan examiner when needed.

Best response: repeat the objection, answer it directly and identify the revised sheet/detail.

Submit the permit request after job approval

Enter all permit information, obtain electronic signatures, resolve Work Without a Permit civil penalties when applicable and submit the permit request online.

Important: approved job filing does not automatically mean the work permit is issued.

Print the issued permit and protect the approved scope

Associated stakeholders can print the permit in DOB NOW, and anyone can print an available permit from the public portal. Keep required documents posted or available at the site.

Field changes: substantive changes require a Post Approval Amendment; other changes may require as-built drawings before sign-off.
Submission readiness

Documents and Information to Prepare Before Filing

Property and legal use

  • Address, BBL and BIN
  • Existing CO or legal-use evidence
  • Current occupancy and use
  • BIS and DOB NOW property flags
  • Zoning district and overlays
  • Open jobs and violations

Plans and technical scope

  • Architectural drawings
  • Structural drawings
  • Energy analysis
  • Plumbing / mechanical scope
  • Fire-protection scope
  • Schedule of Occupancy if needed

Project administration

  • Owner authorization
  • Applicant and contractor details
  • License and insurance status
  • Construction cost
  • Special inspection list
  • Agency approvals and required items
Occupied-building warning: Check tenant-protection, means-of-egress, fire-safety and occupied-building requirements before demolition or alteration begins. A permit does not authorize unsafe access restrictions or work outside the approved scope.
Job and permit status help

What Common NYC DOB Statuses Mean

Pre-filing / draftThe filing may not appear publicly. Log into DOB NOW and complete the required filing steps.
Plan Exam / In ReviewDOB is reviewing plans and required information. Do not treat this as approval.
Objections issuedThe applicant must revise documents or provide a code-based response before approval.
ApprovedThe job filing is approved, but a work permit may still need to be requested, signed and issued.
Permit EntireThe filing has permits for the applicable work types; this is an important LOC-request condition but not final project closure by itself.
Permit issuedThe specific permit is active subject to scope, permit duration, insurance and inspection requirements.
PAA pendingA Post Approval Amendment is being reviewed. Field work affected by the change should not outrun approval.
Signed OffThe permit or work type has completed required closeout actions. Confirm the job-level LOC or CO status.
LOC IssuedA Letter of Completion was issued for applicable work that does not require a new or amended CO.
CO IssuedThe final Certificate of Occupancy documents the legal use and occupancy; it has no expiration date.
Objection response

How to Fix Plan-Review Objections Without Creating More Delays

Use this correction method

  1. Export or list every open objection.
  2. Assign each item to the responsible discipline.
  3. Revise the exact plan, form or calculation.
  4. Write a direct response with the sheet/detail reference.
  5. Upload one coordinated revision package.
  6. Confirm the submission returned to the correct examiner.

Common reasons objections return

  • Only part of the objection was answered.
  • The response cites a drawing that was not uploaded.
  • Architectural and engineering plans conflict.
  • The scope, cost and work types do not match.
  • Required stakeholder signatures are missing.
  • An agency approval or required item remains open.
Response format:
“Objection 4: Revised. Sheet A-202 now shows the required one-hour corridor separation and door rating. Detail 7/A-501 was added. The life-safety narrative and door schedule were revised to match.”
Inspection workflow

Request the Correct NYC DOB Inspection and Prepare the Site

Most development inspections

Use DOB NOW: Inspections for construction, plumbing, boilers, elevators, signs, fire suppression, cranes and other supported inspection areas.

Electrical Development inspections

Since June 29, 2026, use the DOB NOW: Inspections Plus module for electrical requests, re-inspections, objections and delegates.

Public inspection results

Search the DOB NOW Public Portal or BIS, depending on the filing. Associated users can also view details inside the filing dashboard.

Before requesting

  • Permit is issued and current
  • Required documents uploaded
  • Plans and permit posted on site
  • Correct inspection stage complete
  • Work remains visible
  • Safe access is available

After an objection or failure

  • Read the exact objection
  • Identify whether it is certifiable
  • Upload permitted proof when allowed
  • Request re-inspection only when ready
  • Check the final inspection status
  • Confirm job and permit sign-off
Cancellation rule: Standard DOB NOW inspection cancellations are accepted online up to 48 hours before the scheduled inspection. For Inspections Plus, the system allows cancellation up to two business days before the inspection; follow the confirmation instructions for a later cancellation.
Inspection and sign-off matrix

Do Not Request Final Closeout Until Every Required Discipline Is Ready

Closeout item
What must be complete
Common blocker
Construction final
Work matches approved plans and all construction objections are resolved
Unapproved field changes or incomplete life-safety work
Plumbing final
Required tests, fixtures, connections and related filing sign-off
Open plumbing permit or failed inspection
Electrical final
Electrical inspection is Pass-Final and filing fees are paid
Open objection, expired license/insurance or unpaid balance
Elevator final
Applicable tests, inspection and elevator sign-off
Open elevator filing or Safety compliance item
Special inspections
All required reports submitted by the Special Inspection Agency
Missing final technical report certification
Required items
Final survey, BPP, PW3, agency approvals and other listed items
One open required item prevents LOC or CO request
Occupancy and completion

Know the Difference Between CO, TCO, LOC and LNO

Document
What it proves
Important rule
Certificate of Occupancy
Legal use and permitted occupancy after required work, approvals, fees, violations and sign-offs are resolved
A final CO has no expiration date
Temporary Certificate of Occupancy
DOB determined the space is safe to occupy while final items remain
TCOs typically expire 90 days after issuance and must be renewed or replaced
Letter of Completion
Minor alteration work that does not require a new/amended CO has completed closeout
Permits, final reports, AHVs and required inspections must be complete
Letter of No Objection
DOB does not object to the stated legal use of certain pre-1938 buildings that did not require a CO
Request it from the borough office where the property is located
Occupancy warning: A lease, tax record, utility account or old floor plan does not replace a CO, TCO or accepted legal-use documentation. A building cannot be legally occupied when a required CO or TCO has not been issued.
CO search workflow

Find the Certificate of Occupancy for a Property

Older CO requests

For a CO request before March 1, 2021, search the property in BIS and select View Certificates of Occupancy. Open the available PDF.

Search BIS

Newer CO requests

For a CO request on or after March 1, 2021, search the DOB NOW Property Profile by address and open the Certificate of Occupancy section.

Search DOB NOW

No CO found? The building may predate 1938, the record may be in the other system, a CO may never have been issued, or an open job may still be blocking completion. Contact the property’s borough CO Unit.
Violations and complaints

Search and Resolve DOB Violations in the Correct Order

Search BIS and DOB NOW

BIS contains complaints, OATH/ECB information and many DOB violations. DOB NOW Public Portal contains specified compliance violations and newer Safety information.

Do not use only one search.

Identify the violation type and issuing unit

Determine whether the record is a DOB violation, OATH/ECB summons, boiler/elevator/façade compliance issue, Stop Work Order, Vacate Order or complaint.

Correct the physical condition

Permits, licensed contractors, inspections or professional reports may be required before DOB will accept proof of correction.

Submit the correct proof

DOB violations are handled by the issuing unit. OATH/ECB Certificates of Correction are submitted through DOB NOW: BIS Options.

Pay applicable penalties and confirm dismissal

Payment alone does not prove that the violation has been dismissed. Recheck the public record after the issuing unit processes the correction.

BIS violation display: Open DOB violations appear without an asterisk next to the violation number. A dismissed DOB violation is shown with an asterisk, such as V*7052-18P.
Stop Work and Vacate Orders

Use the Issuing Enforcement Unit—Not a Normal Permit Inquiry

Stop Work Order

Stop the prohibited work, identify the issuing unit, correct the cited condition and request the required enforcement re-inspection.

Vacate Order

Do not reoccupy or remove posted notices without authorization. Use the official Vacate Order rescission process and issuing-unit instructions.

Unsafe condition

Call 911 for immediate danger. Use 311 for non-emergency unsafe construction, illegal work and active site complaints.

Building history and records

Search the Property, Then Request Missing Plans and Folders

Search DOB NOW by address, BBL, BIN or job number

Review newer filings, permits, CO information, compliance violations and civil penalties.

Search BIS for older and complaint records

Review jobs, permits, complaints, violations, inspections, actions and occupancy information.

Use DOB NOW: BIS Options for physical records

Submit a request in advance for folders, plans, microfilm, docket books, reels, index/I-cards or curb-cut cards.

Wait for the pickup notice

DOB emails the requester when records are ready for pickup at the borough office where the property is located.

Use NYC OpenRecords when appropriate

File a FOIL request when the needed document is not available through normal BIS Options or issuing-unit procedures.

Public Portal limitation: Plans cannot be viewed directly in the DOB NOW Public Portal. Request them through DOB NOW: BIS Options.
Older-building research

Special Checks for Pre-1938 Buildings

No CO may exist

Buildings constructed before 1938 were not always required to have a Certificate of Occupancy unless later alterations changed the use, egress or occupancy.

Legal use still needs evidence

Search old I-cards, BIS jobs, plans and records. When eligible, request a Letter of No Objection from the property’s borough office.

Do not assume: A pre-1938 building can still have illegal conversions, open alterations or an occupancy history that conflicts with current use.
After-hours construction

Check the After Hour Variance Before Night or Weekend Work

When an AHV is generally required

Construction work before 7:00 AM, after 6:00 PM or on weekends requires an approved After Hour Variance unless a lawful exception applies.

How the public checks it

Use DOB building data and the After Hours Variance Map to verify whether a project has authorization for the location and time.

Noise is a separate issue: An AHV does not authorize unsafe work or eliminate all NYC noise and construction requirements.
Permit renewal

Renew Before the Permit Expires

DOB NOW filing

  1. Open the initial permit filing.
  2. Select Renew Work Permit.
  3. Complete the required information.
  4. Upload supporting documents when required.
  5. Apply electronic signature and submit.

Current renewal fee

DOB’s permit-renewal instructions list a $130 renewal fee for each work type, except when an exemption or fee deferral applies.

Insurance and license information must remain current.

2026 sidewalk-shed change: Sidewalk-shed permits issued or renewed on or after February 2, 2026 expire every 90 days and no longer auto-renew in DOB NOW.
Business and occupancy

Check Legal Use Before Leasing or Renovating a NYC Business Space

Question
Why it matters
Where to verify
Does the CO allow the proposed use?
A lease does not authorize a use that conflicts with the legal occupancy
DOB NOW or BIS CO record and borough CO Unit
Will occupant load or egress change?
The project may require Alteration-CO, fire-safety work and occupancy review
Registered design professional and DOB filing path
Is a Place of Assembly required?
A PACO is required for applicable spaces where 75 or more people gather indoors or 200 or more gather outdoors
DOB Place of Assembly and FDNY requirements
Are there open violations or jobs?
They can delay permits, occupancy, financing or final CO
BIS and DOB NOW Public Portal
Does the work affect accessibility?
Entrances, routes, toilet rooms, counters and other features may require upgrades
Project design professional and plan examiner
Codes and 2026 changes

Which Current NYC Codes Should the Project Team Check?

2022 Construction Codes

The NYC Construction Codes include the Building, Plumbing, Mechanical, Fuel Gas and administrative provisions used for applicable projects.

Open the 2022 Construction Codes

2025 Electrical Code

The 2025 NYC Electrical Code took full effect on December 21, 2025. DOB NOW electrical filing requirements were updated June 29, 2026.

Open the Electrical Code

2025 Energy Code

Enforcement of the 2025 NYC Energy Conservation Code began March 30, 2026 for applicable filings and incomplete energy analyses.

Open the Energy Code

Licensed professional check

Verify the Applicant, Contractor and License Before Work Starts

Use the DOB NOW license search

Search by last name, business name, license number or construction-superintendent license number. Review active status and associated information.

Search NYC DOB Licensees

Match the project documents

  • Contract name matches business
  • License type fits the work
  • Insurance is current
  • Permit names the real contractor
  • Applicant remains responsible
  • Special Inspection Agency is listed
Fees and budgeting

Do Not Use a Generic Percentage-Based NYC Permit Calculator

Why the amount varies

  • Job type and work types
  • Floor area and construction cost
  • Plan examination and permit stages
  • Electrical, plumbing, elevator or other filings
  • Civil penalties and Work Without a Permit issues
  • Renewals, AHVs, CO/TCO and compliance filings

Reliable fee sequence

  1. Create the correct filing.
  2. Report accurate cost and work types.
  3. Review the DOB NOW fee summary.
  4. Resolve penalties separately.
  5. Pay the filing, permit or inspection-stage balance.
  6. Save every receipt.
Verified exact examples: DOB lists a $130 permit-renewal fee per work type when not exempt or deferred. Copies of certain DOB violations cost $8 for the first copy and $5 for each additional duplicate copy. Confirm the live amount before payment.
Troubleshooting

Fix Common NYC DOB Search, Filing and Closeout Problems

Problem
Likely reason
Practical next step
No filing appears in DOB NOW
It may be a BIS filing, pre-filing draft or address/BIN mismatch
Search BIS, BBL and BIN; associated users should search inside DOB NOW
BIS shows nothing recent
The filing was created in DOB NOW: Build
Search the DOB NOW Public Portal or Open Data
Public Portal shows no plans
Plans are not viewable through the public portal
Request records through DOB NOW: BIS Options
Job is approved but no permit
Permit request, signatures, insurance, penalties or permit review remain open
Open the permit request and check every stakeholder and objection
Inspection cannot be requested
Wrong module, unpaid balance, missing document, expired license or permit issue
Use Inspections Plus for electrical and verify fees, documents and credentials
LOC request is unavailable
Job not in Permit Entire status or required items/permits/AHVs remain open
Complete PW3, reports, inspections, sign-offs and documents
CO cannot be issued
Open applications, violations, inspection sign-offs or Schedule of Occupancy issue
Use the CO checklist and contact the borough CO Unit
Violation payment made but record remains open
The physical correction or proof was not accepted
Contact the issuing unit and confirm correction/dismissal processing
Pre-1938 building has no CO
A CO may not have been required at original construction
Research I-cards and request an LNO when eligible
Ready-to-use scripts

What to Say When You Contact NYC DOB

Record-search question
“I am researching [address], BBL [number], BIN [number]. I checked both DOB NOW and BIS. I need [plans/CO/violation/job folder]. Which system or borough unit holds the record?”
Blocked-permit question
“Job [number] is approved, but permit [number/work type] is not issued. Which signature, insurance item, penalty, objection or permit requirement remains open?”
CO closeout question
“For job [number] at [address], which construction, plumbing, electrical, elevator, survey, BPP, PW3, violation or Schedule of Occupancy item is blocking the CO?”
Violation question
“Violation [number] was issued by [unit]. The physical condition was corrected on [date]. Which form, inspection, proof and penalty payment are required for dismissal?”
Final closeout checklist

Do Not Treat the NYC Project as Complete Until These Are Confirmed

  • Property and legal use confirmed
  • Correct filing and work types used
  • All DOB objections resolved
  • Required agency approvals completed
  • Permit issued before work
  • Required permit and plans posted
  • Field changes approved or documented
  • Special inspections completed
  • Construction final passed
  • Plumbing final passed
  • Electrical final passed
  • Elevator final passed when applicable
  • Open required items cleared
  • Applicable violations resolved
  • LOC, CO or TCO issued as required
  • Public record rechecked and saved
Office map

NYC DOB Manhattan Borough Office and Customer Service Map

Manhattan Borough Office: 280 Broadway, New York, NY 10007. Use the borough office where the property is located for property-specific customer service, CO and enforcement questions.
Official resource library

Open the Correct NYC DOB Tool or Guide

Frequently asked questions

NYC Department of Buildings FAQs

Should I search DOB NOW or BIS for an NYC property?

Search both. DOB NOW Public Portal contains newer DOB NOW filings and specified compliance records. BIS contains older filings, complaints, many DOB and OATH/ECB violations, actions, inspections and occupancy information. The two systems do not display identical records.

Where do I apply for an NYC building permit?

Most current job filings and permit requests are submitted through DOB NOW: Build. Create an NYC.ID account, add required stakeholders, upload documents, resolve objections and submit the online permit request after the job filing is approved.

What are NYC DOB customer service hours?

Borough-office in-person and drop-off customer service hours are 8:30 AM to 4:00 PM, Monday through Friday. Phone lines are open 8:30 AM to 4:30 PM. Ticket kiosks stop issuing cashier and record-room tickets at 3:45 PM.

How do I schedule an NYC DOB inspection?

Use DOB NOW: Inspections for most development inspections. Since June 29, 2026, Electrical Development inspections use DOB NOW: Inspections Plus. Inspection requests are not accepted through the old portals, by phone or in person.

Why is my NYC job approved but the permit is not issued?

Job approval and permit issuance are separate. The permit request may still need required information, electronic signatures, current license or insurance details, resolution of permit objections, payment or Work Without a Permit civil-penalty clearance.

How do I find a Certificate of Occupancy?

For CO requests before March 1, 2021, search BIS and select View Certificates of Occupancy. For requests on or after March 1, 2021, search the DOB NOW Property Profile and open the Certificate of Occupancy section.

What is the difference between a CO and a Letter of Completion?

A Certificate of Occupancy states the legal use and permitted occupancy and is required for new buildings and certain major changes. A Letter of Completion may close minor alteration work that does not require a new or amended CO.

How do I remove a DOB violation?

Correct the condition, provide acceptable proof to the issuing unit and pay applicable civil penalties. Payment alone does not dismiss the violation. Recheck the public record after DOB processes the correction.

How do I request old NYC building plans?

Submit a record request through DOB NOW: BIS Options for folders, plans, microfilm, docket books, reels, I-cards or curb-cut cards. DOB will email you when the material is ready for pickup at the property’s borough office.

What if a pre-1938 building has no Certificate of Occupancy?

Some pre-1938 buildings were not required to have a CO unless later work changed the use, egress or occupancy. Research BIS, I-cards and other records. When eligible, request a Letter of No Objection from the property’s borough office.

Independent guide and freshness

Official Information Used for This Page

Building-Department.org is an independent informational guide and is not the New York City Department of Buildings.

This page was rebuilt using official NYC DOB resources for DOB NOW, BIS, inspections, Inspections Plus, office locations, building data, violations, permit applications, CO/TCO, LOC/LNO, permit renewals, current codes and 2026 service updates.

Last verified: July 22, 2026.

Portal modules, staff, office locations, fees, code requirements and filing procedures can change. Confirm time-sensitive requirements through NYC DOB before filing, paying, visiting an office or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.