Redford Building Department | Permits, Inspections & Official Contact

If you are planning any kind of construction, renovation, addition, fence, roof, or other building work in Redford Township, Michigan, you will need a building permit from the Redford Township Department of Building and Safety.

Many homeowners and contractors search for clear answers about how to apply for a building permit in Redford Township, what the fees are in 2026, and how to check the status of their application quickly.

This guide explains the entire process in simple language so you can understand what to do, what to expect, and how to avoid common problems that slow things down.

Whether you are a homeowner doing your own work or a contractor handling a larger job, the steps are the same and the goal is to get your permit approved smoothly and on time.

Redford Township Building Department Contact Information 2026

  • Address: 12200 Beech Daly Road, Redford Township, MI 48239 (Leo Snage Public Services Building)
  • Phone: (313) 387-2680
  • Email: building@redfordtwp.gov
  • Hours: Monday–Friday, 8:30 AM – 4:30 PM

Official Page: Redford Township Building & Safety

12200 Beech Daly Road, Redford Township, MI 48239

Official Portal: BS&A Online Portal

  1. Go to the BS&A Online portal (public search available).
  2. Search by property address or permit number.
  3. View the current status, approved plans, fees paid, and inspection history.

How to Apply for Redford Township Building Permits 2026

Here is the clear step-by-step process that most people follow to get their permit approved as smoothly as possible.

  1. Go to the BS&A Online portal and create or log into your account.
  2. Start a new application and choose the right permit type for your project (building, electrical, mechanical, plumbing, fence, etc.).
  3. Enter the full project address and the estimated value of construction.
  4. Upload or bring the completed Building and Zoning Permit Application, required drawings, site plans, and supporting documents.
  5. Pay the required fees (all permits include a $15.00 application fee).
  6. Submit the complete application online or in person at the Building Department.
  7. Check your account regularly and reply quickly if the department asks for more information or corrections.
  8. Once approved, display the permit card at the job site before any work begins.
  9. Schedule required inspections by calling (313) 387-2680 (inspectors available in office 8:30–9:30 AM and 3:30–4:30 PM).

Redford Township Building Permit Fees 2026

  • Official Fee Schedule: Download Building Permit Fees Schedule (PDF)
  • All building permits include a $15.00 application fee.
  • Fees are calculated based on the value of construction plus a plan review fee (roofs only are exempt from plan review).
  • Example: For projects valued $1,000 or less – $22 permit fee + $15 plan review (where applicable).
  • For larger projects, add $16 per additional $1,000 (or portion) to the permit fee and $11 per additional $5,000 (or portion) to the plan review fee.
  • Other common fees: Builder registration $27, re-inspection $56, work started without permit $56 (double fee penalty applies).
  • Work started without a permit can result in double fees plus possible fines or a Stop Work Order.

Required Documents Checklist

  • Completed Building and Zoning Permit Application
  • Site plan or survey showing existing structures and proposed work
  • Detailed construction drawings and specifications
  • Proof of contractor license and insurance (if applicable)
  • Owner-Builder Affidavit if you are doing the work yourself
  • Any required trade permit applications (electrical, plumbing, mechanical)

How to Schedule Inspections in Redford Township

Appointments with the inspectors may be scheduled by calling (313) 387-2680. Inspectors are typically available in the office between 8:30–9:30 AM and 3:30–4:30 PM. Have your approved plans and the permit card ready when the inspector arrives. Re-inspection fees of $56 may apply for failed or missed inspections.

Contractor Registration & Owner-Builder

Contractors must register with the township and provide proof of valid Michigan licenses and insurance. Homeowners can apply as owner-builders but take full responsibility for code compliance and job safety.

Local Insider Tips That Really Help

  • Submit complete and clearly labeled drawings the first time so you avoid having to resubmit everything later.
  • Include the $15 application fee and plan review fee (if required) with every submission.
  • Check the property for any old violations or open permits before you start a new application.
  • Call the office early in the morning (8:30–9:30 AM) for faster answers and to schedule inspections.
  • Use the BS&A Online portal to submit applications, make payments, and track your permit status in real time.

Frequently Asked Questions

How do I search for existing building permits in Redford Township?

Use the public search function in the BS&A Online portal by property address or permit number. You can see the status and history without logging in for basic records.

How to apply for a Redford Township building permit?

Create an account on the BS&A Online portal, complete the Building and Zoning Permit Application, upload required documents, pay the fees (including the $15 application fee), and submit online or in person.

What are the Redford Township building permit fees in 2026?

All permits include a $15 application fee. Fees are based on the value of construction plus a plan review fee (roofs only are exempt from plan review). Re-inspection and work-without-permit fees are $56 each.

Can I pull my own permit as an owner-builder in Redford Township?

Yes. You can apply as an owner-builder, but you must sign paperwork that says you take full responsibility for the work and safety.

How long does it take to get a building permit in Redford Township?

Simple projects can be approved in just a few days. More complicated jobs usually take between one and three weeks depending on how complete your submission is and the need for plan review.

Official Resources

Updated April 2026 using only official Redford Township sources. Use the BS&A Online portal for the fastest permitting experience.

Leave a Comment