City of Sacramento Building Department

Sacramento permit action guide

Apply, Track, Inspect and Close a City of Sacramento Building Permit

Begin with the right route. A water heater may qualify for a minor permit, while an addition, ADU, pool, structural remodel or commercial project needs electronic plan review and Planning clearance.

This guide shows the official permit portal, public-counter hours, plan-submittal sequence, inspection cutoffs, 2026 virtual-inspection rules, permit-status meanings, fees, owner-builder responsibilities and final closeout steps.

Online permit application and public record search
Minor permit versus electronic plan-check decision
Inspection scheduling, corrections and final closure
Sacramento permit moving through electronic plan review and inspection An animated city permit portal, plan file, review approval and final inspection check explain Sacramento’s permit process. PUBLIC PERMIT PORTAL Search address or record… CITY REVIEW PLANNING PLAN CHECK FEES / CONDITIONS ISSUANCE APPROVED PERMIT FINAL INSPECTIONPASSED SACRAMENTO
🏗️
2026 code changeAll new permit and plan-review applications submitted on or after January 1, 2026 must comply with the 2025 California Building Standards Codes and applicable Sacramento amendments.
📱
Virtual inspections required for some web permitsSince January 12, 2026, VuSpex is required for residential minor HVAC, water-heater, solar/PV and EV-charger web permits. Residential reroof virtual inspection remains optional.
Start here

Choose the Sacramento Task You Need

Sacramento Permit Route Checker

Select your situation to get the best first action.

Official contact panel

City of Sacramento Building Division Contact Information

Public counter916-808-5318Permit help and appointments
Inspection questions916-808-5795Monday–Friday, 7:00 AM–4:30 PM
Inspection scheduling916-808-7622Automated IVR scheduling and changes
General help line916-264-5011Listed on current Building forms
Residential/ADU plan review916-215-7650Residential, ADU, JADU and electrical review
Commercial plan review916-808-4526Life safety, accessibility, mechanical and plumbing
Project management916-808-1927Projects over $1 million and small-business help
Public counter address300 Richards Boulevard, 3rd FloorSacramento, CA 95811

Monday and Friday

9:00 AM–12:00 PM
Appointment only.

Tuesday through Thursday

9:00 AM–3:30 PM
Appointments are prioritized; walk-ins are served only as availability allows.

No paper plan submissions: Bring electronic files on a thumb drive if using the public kiosk. All plan-review submissions and resubmissions must be electronic.
Avoid the wrong portal

Confirm the Property Is Inside Sacramento City Limits

Use the City portal when

  • The parcel is inside Sacramento city limits
  • The City zoning and parcel tool returns the site
  • The City Public Permit Portal recognizes the address
  • The project is not in unincorporated Sacramento County

Verify first when

  • The mailing address says Sacramento but the parcel may be unincorporated
  • The property is near a city boundary
  • The City portal cannot find the address
  • A contractor refers to Sacramento County instead of the City
Fast check: Use the City zoning and parcel tools. A Sacramento mailing address alone does not prove City jurisdiction.
Permit decision table

Which Sacramento Permit Route Fits the Project?

Project
Start with
Important extra check
Water heater replacement
Minor permit
VuSpex virtual inspection is required for residential web permits
Residential HVAC replacement
Minor permit
Eligible 1–2 family scope; VuSpex required for web permit
Residential or commercial reroof
Minor permit
Residential reroof may use optional virtual inspection
Nonstructural kitchen or bath remodel
Email minor-permit package
Like-for-like only; structural changes need plan review
Panel change or whole-house rewire
Minor electrical permit
EV-charger circuits require plan review and virtual inspection rules may apply
Room addition or structural remodel
Electronic plan check
Planning clearance, structural plans and related trade permits
New house or commercial building
Planning + electronic plan check
2025 codes, utilities, fire, impact fees and occupancy requirements
Pool or spa
Electronic plan check
Site plan, barriers, electrical and plumbing requirements
Shed/building over 120 square feet
Plan review
Zoning, setbacks and structural documents
ADU or JADU
ADU plan + site-specific review
Planning clearance, addressing, utilities, fire separation and 2026 code
Faster permit route

When a Sacramento Minor Permit Can Avoid Full Plan Review

Common no-plan permit scopes

  • Residential and commercial water heaters
  • Residential HVAC for 1–2 family homes
  • Residential and commercial reroofs
  • Residential panel changes and rewires
  • Residential sewer, water and repiping work
  • Eligible nonstructural kitchen and bath remodels

Full plan review is still required when

  • Walls or structural framing change
  • Use or occupancy changes
  • An addition is constructed
  • A pool, garage or large accessory structure is proposed
  • Commercial construction is involved
  • Planning entitlement or zoning relief is needed
Kitchen or bath remodel package: The City commonly requests the Universal Building Permit Application, Owner-Builder Verification when applicable, Planning Exemption Form Express and Residential Interior Remodel Questionnaire. Submit the current package to ezpermit@cityofsacramento.org.
Electronic application

Apply for a Sacramento Permit in Seven Clear Steps

Confirm jurisdiction and permit route

Decide whether the work is a minor permit or requires electronic plan check. Confirm that the property is inside the City.

Do first: Write one clear scope sentence and identify every affected trade.

Check zoning and Planning clearance

Most building permits require Planning clearance. Some projects need a Planning entitlement before a building record can move forward.

Check: Allowed use, setbacks, height, lot coverage, parking and any special permit.

Create the permit record online

Open the Public Permit Portal, sign in, select the correct record type and enter the address, owner, applicant, contractor, scope and valuation.

Wait for the Building Submittal Record when plan review applies

After Planning clearance, the City creates a Building Submittal Record, often shown as SUB, and emails the applicant.

Expert tip: Do not upload plans to the wrong record or create a duplicate permit to bypass the sequence.

Upload coordinated electronic plans

Follow the electronic plan-check naming, format and checklist rules. Plans must be readable, correctly oriented and professionally signed where required.

Consistency test: Scope, valuation, drawings, energy documents and permit types must match.

Respond to all plan-check comments

Download every correction, revise the coordinated set and provide a response identifying where each issue was addressed.

Version control: Keep one dated revision set so reviewers do not receive conflicting files.

Pay fees and confirm formal issuance

Approved plans do not automatically authorize construction. Resolve conditions, pay the invoice and confirm the record says Issued before work begins.

Save: Issued permit, City-approved plans, payment receipt and inspection list.
Application readiness

Prepare These Items Before Opening the Portal

Property and applicant

  • Exact street address
  • Assessor parcel number
  • Owner legal name
  • Applicant contact information
  • Contractor license details
  • Owner authorization when applicable

Project details

  • Clear scope of work
  • Construction valuation
  • Existing and proposed use
  • Area, dimensions and quantities
  • Building and trade permit list
  • Desired construction phases

Electronic documents

  • Site plan
  • Existing and proposed plans
  • Structural calculations
  • Energy and CALGreen documents
  • Accessibility details when applicable
  • Planning or agency approvals
Planning before building

Clear the Sacramento Planning Step Before Plan Check

Confirm City jurisdiction
Check zoning and allowed use
Obtain entitlement if required
Create permit record
Receive SUB record
Complete plan check
Pay and issue permit
Planning question
Why it matters
Best action
Is the proposed use allowed?
A legal office, restaurant, dwelling or retail use may have different zoning and parking rules
Confirm before signing a lease or designing the project
Are setbacks and lot coverage compliant?
Additions, decks, sheds and ADUs can conflict with property-line requirements
Use a scaled site plan and verify zoning standards
Is a conditional use permit or variance required?
A public entitlement process can precede the building permit
Complete Planning review before final construction plans
Is the property historic?
Exterior changes or demolition may need preservation review
Check preservation requirements before ordering materials
Business lease warning: A landlord’s statement that a use is allowed is not City approval. Confirm zoning, occupancy, parking, accessibility and required construction before signing a long-term lease.
Accessory dwelling units

Use Sacramento’s ADU Resources Without Skipping Site Review

Pre-designed plans

The City offers studio, one-bedroom and two-bedroom ADU plan resources that may reduce design work.

Site-specific work remains

Preapproved plans still require property-specific placement, foundation, utilities, fire separation, energy and zoning review.

Choose the code path

The plan cover should identify whether the project uses the local ADU ordinance or State ADU standards, as applicable.

2026 code note: Sacramento highlights new fire-separation considerations because an ADU counts as a dwelling unit under the 2025 code framework.

Open Sacramento ADU Resources

Inspection workflow

Schedule the Inspection Before the Daily Cutoff

Before 6:00 PM

Requests are normally scheduled for the next workday.

After 6:00 PM

Requests made after the cutoff, on weekends or holidays are normally scheduled two working days later.

Inspection-day contact

The inspector contacts the customer by phone on the inspection day to arrange the time.

Schedule or change an inspection

  • Use the Public Permit Portal
  • Or call IVRS at 916-808-7622
  • Cancel online when possible
  • Call by 7:00 AM on inspection day to cancel or reschedule
  • After 7:00 AM, contact the assigned inspector
  • Keep the permit and approved plans onsite

Prepare the job site

  • Correct inspection type selected
  • Work complete for that stage
  • Concealed work remains exposed
  • Safe access is available
  • Approved plans are City-stamped
  • Prior corrections are resolved
Construction hours: Monday–Saturday, 7:00 AM–6:00 PM; Sunday, 9:00 AM–6:00 PM, unless an approved urgent exception applies.
VuSpex virtual inspection

Prepare for a Sacramento Virtual Inspection

Required for residential web permits

  • Minor HVAC
  • Minor water heater
  • Solar/PV
  • EV chargers
  • Effective January 12, 2026
  • Residential reroof remains optional

Make the video inspection work

  • Create the VuSpex account
  • Enable camera and location
  • Use a stable internet connection
  • Provide good lighting
  • Have permit information ready
  • Be ready to show all requested areas live

Open Virtual Inspection Instructions

City status decoder

What Sacramento Permit Statuses Mean

AppliedThe record exists, but documents, fees or intake steps may be incomplete.
Plan Check TargetThe application is in an active formal-review cycle and not every reviewer has responded.
Plan Check WaitCorrections were issued and the City is waiting for the applicant’s resubmittal.
VerifyAll disciplines approved; final stamps and issuance fees are being prepared.
Verify WaitPlan approvals are complete, but proof of outside impact-fee payment is missing.
Process WaitApprovals are complete, but conditions or unpaid fees remain unresolved.
Ready to IssueApprovals and conditions are complete; final payment is generally the remaining action.
IssuedThe permit is approved and paid. Construction and required inspections may proceed.
FinaledAll required inspections for the permit were approved.
Certificate of OccupancyA qualifying new commercial building or tenant space is approved for occupancy.
Fees and budgeting

Build a Complete Sacramento Permit Budget

Building fees

Permit and plan-review fees depend on scope, calculated valuation, project type and current schedules.

Other agency fees

Projects may include fire, sewer, sanitation, transportation, utilities, parks, school or housing-related charges.

Paid preliminary estimate

The City offers a preliminary estimate process. Allow about 10 business days and provide a valid address or parcel number.

Estimate request: Email the current fee-estimate worksheet to ezpermit@cityofsacramento.org. For projects valued at $1 million or more, use CDDPM@cityofsacramento.org. Preliminary estimates do not include off-site work.
Owner-builder decision

Understand the Risk Before Signing as Owner-Builder

You become the responsible party

The current City form states that the owner-builder becomes the permit holder of record and accepts responsibility for the work, inspections and compliance.

  • Read and initial every disclosure
  • Sign and return the form before issuance
  • Provide required identity or notarized verification
  • Obtain prior approval before an agent signs

Hiring unlicensed workers creates risk

When an owner-builder hires unlicensed people and the total labor and material value reaches the legal threshold, employer, payroll, tax and workers’ compensation duties may arise.

  • Verify contractor licenses
  • Verify workers’ compensation coverage
  • Do not lend the owner-builder exemption to a contractor
  • Consider placing the permit in a licensed contractor’s name

Read the Current Owner-Builder Form

Permit records and open permits

Research a Property Before Buying, Selling or Remodeling

Search the Public Permit Portal

Search by record number when known, then by property address. Open each building and trade record.

Check more than the permit title

Review status, plan-check history, conditions, fees and inspections. “Issued” does not mean “Finaled.”

Match visible work to the records

Compare additions, converted garages, ADUs, electrical panels, reroofs and remodels with City permit history.

Ask what remains open

For an expired or unfinished permit, ask which inspection, fee, plan revision or related trade permit remains.

Save final proof

Keep the Finaled record, Certificate of Occupancy and final inspection documentation with the property file.

Property-sale warning: A permit number is not proof that work was completed legally. Verify final inspection approval and associated electrical, plumbing and mechanical permits.
Commercial closeout

Know When a Temporary or Final Certificate of Occupancy Is Needed

Temporary Certificate of Occupancy

A TCO may allow limited phased use such as stocking, stocking and training, or public/employee occupancy. It has a fee and can take up to seven business days.

Relevant inspections may include Building, Fire, Planning, County Health and Public Works.

Final Certificate of Occupancy

A C of O is generally required for new commercial buildings and for qualifying additions, remodels or tenant improvements involving a use change.

The main and associated permits must pass final inspections and fees must be paid.

Submission route: Use the current City TCO or C of O request form and send it to ezpermit@cityofsacramento.org. Allow up to seven business days after all prerequisites are complete.
Troubleshooting

Fix Common Sacramento Permit Problems

Problem
Likely reason
Practical fix
Portal cannot find the address
Jurisdiction, new address or parcel-format issue
Confirm City limits and complete addressing steps before creating a false record
Permit remains Applied
Intake, document or fee requirement is incomplete
Open the full record and check attachments, invoice and workflow notices
Plan Check Wait does not change
The City is waiting for a corrected resubmittal
Submit a coordinated revision set and itemized response
Record shows Verify Wait
Proof of outside impact-fee payment is missing
Upload or provide the required school, sewer or regional sanitation payment proof
Record shows Process Wait
Unresolved conditions or unpaid fees remain
Review every condition and invoice instead of creating another permit
Inspection cannot be scheduled
Permit not issued, incorrect inspection sequence or a hold exists
Confirm status, prerequisites and inspection code before retrying
Virtual inspection fails
Location, camera, signal or lighting problem
Enable permissions, improve connection and have every requested area accessible
Old permit is expired
Application or construction inactivity
Ask whether reactivation, new plans, new fees or a replacement permit is required
Ready-to-use scripts

What to Ask Sacramento Building Staff

Permit route:
“I am planning [exact work] at [address/APN]. Can you confirm whether it qualifies for a minor permit or needs Planning clearance and electronic plan review?”
Status question:
“Record [number] currently shows [status]. Which document, fee, outside-agency proof or condition is preventing the next step?”
Correction response:
“The revised set and response letter address every comment for record [number]. Please confirm the files are attached to the correct SUB record and identify any remaining discipline review.”
Open permit:
“Permit [number] at [address] is not Finaled. Which inspections or related trade records remain, and what does the current owner need to complete?”
Final closeout

Do Not Consider the Project Complete Until These Are Confirmed

  • City jurisdiction confirmed
  • Correct minor or plan-review route selected
  • Planning clearance completed
  • 2025 code requirements addressed
  • Building and trade permits issued
  • Approved plans available onsite
  • Virtual inspection account ready when required
  • All corrections resolved
  • All building and trade finals passed
  • Outside-agency fees documented
  • Certificate of Occupancy obtained when required
  • Finaled records saved with property documents
Public counter location

City of Sacramento Building Division Map

Address: 300 Richards Boulevard, 3rd Floor, Sacramento, CA 95811. Paper plans are not accepted. Bring electronic files on a thumb drive if using the public kiosk.
Official resources

Open the Correct Sacramento Permit Page

Frequently asked questions

City of Sacramento Building Permit FAQs

Where do I apply for a City of Sacramento building permit?

Apply through the City’s Public Permit Portal. Most permit applications and every plan-review submission or resubmission must be electronic. Minor no-plan permits may use the online or email route described by the City.

How can I tell whether the property is in the City or Sacramento County?

Use the City zoning and parcel tools and confirm that the parcel is inside Sacramento city limits. A Sacramento mailing address may still be in unincorporated Sacramento County, which uses a different permitting authority.

Which projects qualify for a Sacramento minor permit?

Common eligible scopes include water heaters, qualifying residential HVAC, reroofs, residential panel changes, rewires, repiping, sewer or water replacement and qualifying nonstructural kitchen or bathroom remodels. Structural and commercial construction generally requires plan review.

What building code applies to new Sacramento applications in 2026?

Applications submitted on or after January 1, 2026 must comply with the 2025 California Building Standards Codes and applicable City of Sacramento amendments.

How do I schedule a Sacramento building inspection?

Schedule online through the Public Permit Portal or call the inspection IVR system at 916-808-7622. Requests made before 6:00 PM are normally placed on the next workday; later, weekend and holiday requests are normally two working days later.

Which Sacramento permits require a VuSpex virtual inspection?

Since January 12, 2026, residential web permits for minor HVAC, minor water heaters, solar/PV and EV chargers require VuSpex virtual inspection. Residential reroof virtual inspection is optional.

What does Plan Check Wait mean?

Plan Check Wait means correction comments were issued and the City is waiting for the applicant to submit revised documents. Upload a coordinated correction set and a clear response to each comment.

Can I submit paper plans at the Sacramento public counter?

No. The City states that plan-review submissions and resubmissions must be electronic. A public kiosk is available during counter hours; bring electronic files on a thumb drive when using it.

Can Sacramento preapproved ADU plans be built without further review?

No. Preapproved or pre-designed ADU plans still require site-specific Planning, zoning, foundation, utility, addressing, fire-separation, energy and building-permit review.

How do I confirm that a Sacramento permit is fully closed?

Confirm the main permit status is Finaled, check that all associated electrical, plumbing and mechanical permits passed final inspection, and obtain the Certificate of Occupancy when the project requires one.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent informational guide and is not the City of Sacramento. Permit applications, inspections, plan-check decisions, zoning determinations, fees and approvals must be handled through the City or the correct jurisdiction.

This page was checked against official City of Sacramento Permit Services, Public Counter, Building contacts, Electronic Plan Check, Minor Permits, Inspections, Virtual Inspections, Permit Status, Building Codes, Fees, zoning and ADU resources on July 23, 2026.

Forms, fees, contacts, code rules, counter schedules and portal functions can change. Confirm time-sensitive information before submitting, paying or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment