Fort Myers Building Department | Permits, Inspections & Official Contact

Fort Myers permit command center

Move Your Fort Myers Project From Property Check to Permit, Inspection and Final Approval

A Fort Myers permit is more than an online application. The project may also need city-jurisdiction confirmation, zoning review, floodplain documentation, Fire review, Engineering approval, validated subcontractors, staged inspections and a Certificate of Occupancy or Completion.

This practical guide brings those separate tasks into one clear path. Homeowners can use the simple lane, while contractors, architects, engineers, developers, landlords and business owners can use the deeper review, flood, fee, site-permit and closeout checkpoints.

You will learn which portal to open, what documents to prepare, how long common reviews average, how to schedule or cancel inspections, what the current permit-exemption request actually allows and how to verify that every related record is final.

City limits → zoning/flood → permit review
EnerGov application, payment and inspection help
Hurricane, flood and site-work checkpoints
Fort Myers permit workflow beside the Caloosahatchee River An animated palm tree, river, flood elevation line, digital portal and application cards show the Fort Myers process from permit application through final inspection. FLOOD ELEVATION CHECK CITY OF PALMS + RIVER RESILIENCE ENERGOV SELF SERVICE STEP 1 APPLY + UPLOAD STEP 2 REVIEW + ISSUE STEP 3 INSPECT + CLOSE CO / CC READY
📌
Current local updates used in this guide Fort Myers revised permit fees effective August 5, 2025. The city also now offers a narrowly limited permit-exemption request for qualifying nonstructural single-family work below $7,500; approval carries a $50 fee. Florida’s current statewide code remains the 8th Edition (2023), with the 9th Edition planned for a later 2026 effective date—confirm the controlling code when filing.
Start here

Choose the Fort Myers Building Department Task You Need

Beginner and expert lanes

Use the Simple Property-Owner Path or the Full Development Path

Homeowner or small project

Simple practical path

  1. Confirm the address is inside Fort Myers.
  2. Describe the complete project in one sentence.
  3. Check the permit table and exemption rules.
  4. Gather ownership, contractor and plan documents.
  5. Apply and pay through EnerGov.
  6. Wait for formal issuance before work.
  7. Complete every inspection and save final proof.
Contractor, designer, developer or business

Professional control points

  1. Map zoning, flood, Engineering, Fire and utility dependencies.
  2. Coordinate site, building and trade records.
  3. Validate all subcontractors before inspection requests.
  4. Use digitally signed documents where required.
  5. Track intake, discipline review and processing separately.
  6. Schedule the 702 pre-construction meeting for applicable site permits.
  7. Close building, trade, site, Fire and occupancy records together.

Fort Myers Next-Step Finder

Select your situation for the most practical official route.

Official contact directory

Fort Myers Building, Permitting & Inspections Contacts

Inspections division239-321-7923Scheduling and inspection-process help
Inspection cancellation help239-321-7920Use after the 5:30 AM online cancellation cutoff
Plan review239-321-7915Review and correction questions
Flood review239-321-7931Flood-zone and substantial-improvement questions
Planning and zoning239-321-7975Use, setbacks, zoning map and site-plan review
Engineering239-321-7451Private-development and infrastructure review
702 pre-construction meeting239-321-7445pweng@fortmyers.gov
BPI office1825 Hendry StreetSuite 101, Fort Myers, FL 33901
Community Development239-321-7900Department-level help
Public records239-321-7042Citywide public-record requests
Florida DBPR850-487-1395State contractor-license verification
Call-first rule: Bring or state the full address, strap/parcel number, permit number, exact project scope, contractor name, portal status and the wording of any review comment. The city’s general government hours are Monday–Friday, 8:00 AM–5:00 PM; confirm BPI counter availability before traveling.
City versus county

Confirm Fort Myers or Lee County Jurisdiction Before Applying

Use the City of Fort Myers when

  • The city boundary map shows the parcel inside municipal limits.
  • The address appears in Fort Myers EnerGov.
  • Community Development confirms city zoning.
  • The city is responsible for the property’s building and site reviews.

Verify Lee County when

  • The mailing address says Fort Myers but the parcel is unincorporated.
  • The property is near a municipal boundary.
  • Fort Myers EnerGov cannot locate the address.
  • The Lee County property record identifies county jurisdiction.
Do not rely on the mailing city. Many unincorporated Lee County properties use “Fort Myers” in their postal address. Check the city’s “Am I in the City?” map before paying or uploading a complete plan set.
Permit decision matrix

Which Fort Myers Projects Require Permits?

Project
Likely route
Prepare first
Extra review to check
New home, commercial building or addition
Building + site/trades
Site plan, construction plans, structural, energy, value and contractors
Zoning, Engineering, Fire, flood, utilities and impact fees
Interior or exterior remodel
Building permit
Existing/proposed plans and full scope
Electrical, plumbing, mechanical, accessibility and occupancy
Roof repair or replacement
Roof permit
Roof type, area, valuation, product approval and contractor
Dry-in, in-progress and final inspections
Exterior doors, windows, shutters or storm panels
Building permit
Product approvals, opening sizes, attachment and valuation
Florida product approval and hurricane provisions
Fence, wall, shed, pool, spa or screen enclosure
Zoning + building
Survey/site plan, setbacks, dimensions and product/structural details
Flood, electrical, barrier and utility easements
A/C, generator, electrical, gas or plumbing work
Trade permit
Equipment/scope, value and licensed subcontractor
Building, flood and Fire review depending on installation
Driveway, grading, fill, parking lot or roadway work
Site/Engineering permit
Civil plan, drainage, traffic, utilities and site information
702 pre-construction meeting and site inspections
Seawall, bulkhead, marine dock or lake embankment
Building + environmental/site
Survey, structural/marine plans, waterward limits and ownership
State/federal, flood and environmental approvals
Commercial change of occupancy or tenant build-out
Building + occupancy
Existing/proposed use, code analysis, life safety, accessibility and MEP
Zoning, Fire, business tax, utilities and health licensing
Demolition or moving a building
Special permit
Ownership, utilities, demolition/move plan and environmental documents
Fire, Engineering, historic, asbestos and site restoration

The city’s official “Do I Need Permits?” list also identifies permits for awnings, canopies, dumpsters, exterior painting exceptions, PODS, tree removal, signs, special events, utilities, sidewalks, solar panels, irrigation and other work. Ask about the complete scope rather than assuming one listed item covers the whole project.

New permit-exemption request

When a Small Fort Myers Repair May Qualify for an Exemption

All listed eligibility conditions must fit

  • Work is at a single-family dwelling
  • Total value is less than $7,500
  • Property is not in a flood-hazard area
  • Work is nonstructural
  • No structural components, doors or windows
  • No electrical, plumbing, mechanical or gas work
  • Project was not divided to evade permitting
  • Zoning and other regulations still apply

What to submit

  • Completed Permit Exemption Request.
  • Detailed scope of work.
  • Floor plan or site plan.
  • Contract or other proof of work type and value.
  • Owner or contractor certification.

City fee: $50 upon approval.

Open the official exemption request

This is not automatic. The city may inspect the work. If it does not qualify, the owner or contractor can be required to obtain permits, pay fees and correct or remove noncompliant work.
Electronic application

How to Submit and Manage a Fort Myers Permit in EnerGov

Confirm city jurisdiction
Check zoning and flood
Prepare applications and plans
Submit in EnerGov
Answer reviews
Pay and obtain permit
Inspect and close

Define the complete project

Identify the property, current and proposed use, exact work, size, value and all building/trade/site systems affected.

Do next: Use the “Do I Need Permits?” table and call Planning when use, setbacks or site changes are involved.
Expert checkpoint: Build an approval matrix covering BPI, Zoning, Engineering, Fire, Flood, utilities and outside agencies.

Gather the correct application and checklist

Use the city’s Permits & Applications page for project forms, supporting-document checklists, affidavits and revision requests.

Do next: Confirm ownership, property address, strap number, job value and contractor information are consistent.
Expert checkpoint: Identify digitally signed/sealed documents, deferred submittals and design-professional affidavits.

Create or use the correct EnerGov account

Open Customer Self Service, register, verify the email and start the correct record type.

Do next: Save the application/permit number and account email.
Expert checkpoint: Keep one controlled applicant account and accurate contractor/subcontractor relationships.

Upload application, plans and supporting documents

Use readable file names and make the narrative, plans, valuation and record type tell the same story.

Do next: Reopen every uploaded PDF and confirm orientation, legibility and completeness.
Expert checkpoint: Coordinate architectural, structural, MEP, civil, energy, flood and Fire information.

Pay the required application or permit charges

After payment verification, the record may enter technical review or issue when all required documents are complete.

Do next: Save the itemized receipt and confirm payment posted to the correct record.
Expert checkpoint: Budget permit, plan review, technology, trust, radon, site, impact and outside-agency charges separately.

Respond to every plan-review comment

The city sends a comment letter when corrections are required. Revise the correct application or plans and upload them through EnerGov.

Do next: Use a numbered response letter and identify each revised page.
Expert checkpoint: Keep revisions coordinated across disciplines and avoid conflicting duplicate plan sets.

Confirm formal issuance before work

Paid, reviewed and approved are not always the same as issued. Download the issued permit and approved documents.

Do next: Post or keep the permit and approved plans at the job site.
Expert checkpoint: Review permit conditions, subcontractor validation, special inspections and flood/site requirements.

Complete inspections and obtain closeout

Request inspections in the correct sequence, resolve failures and obtain a Certificate of Occupancy or Completion when applicable.

Do next: Save final inspection results and certificate documents.
Expert checkpoint: Reconcile building, trade, site, Fire and occupancy records before owner turnover.
Application readiness

What to Prepare Before Opening EnerGov

Property and ownership

  • Exact address and unit
  • Strap or parcel number
  • Legal owner name
  • Proof of ownership after recent sale
  • Applicant/agent authorization
  • Existing legal use

Project facts

  • Detailed scope
  • Job valuation
  • Area and dimensions
  • Existing/proposed conditions
  • Equipment and products
  • Occupancy/use change

Plans and professionals

  • Site or survey plan
  • Construction drawings
  • Structural calculations
  • Energy documents
  • Contractor and subcontractors
  • Flood/Fire/Engineering approvals
Official average timelines

Fort Myers Plan Review Time Frames and What They Include

Project category
Average intake
Average plan review
Average processing after review
Published total
Single-family new / remodel
3 calendar days
7 calendar days
2 calendar days
12 calendar days
Commercial new / remodel
3 calendar days
17 calendar days
2 calendar days
22 calendar days
Multifamily new / remodel
3 calendar days
13 calendar days
2 calendar days
18 calendar days
These are averages, not promises. The city says they include Building, Engineering, Fire, Zoning and associated trades. Incomplete plans, flood review, outside approvals, revisions or payment delays can extend the process.
Agency dependency map

Which Fort Myers Reviews May Control Permit Issuance?

Review
Why it may apply
Practical preparation
Building / trade review
Structural, accessibility, energy, life safety, hurricane and technical code compliance
Coordinated architecture, structure, MEP and product approvals
Zoning / Planning
Use, setbacks, lot standards, site-plan compliance and business-tax zoning
Survey, site plan, current/proposed use and dimensional data
Flood review
Flood zone, elevation, substantial improvement/damage and compliant construction
Elevation information, structure value, detailed cost and flood documents
Fire Prevention
Commercial/multifamily life safety, alarms, sprinklers, fire access and hazardous uses
Fire plans, occupancy information and associated system permits
Engineering
Traffic, drainage, sanitation, water/sewer, driveways, right-of-way, site preparation and bonds
Civil/site plans, utility and drainage calculations, logistics and bond information
Utilities / Public Works
Water, sewer, lift station, road, stormwater or infrastructure connections
Service demand, connection plans and capacity/impact requirements
Outside environmental agencies
Wetlands, waterways, seawalls, docks or regulated environmental work
State/federal permits and resource-specific documentation
Site permits and Engineering

Projects With Site Work May Need a 702 Pre-Construction Meeting

Engineering reviews may cover

  • Traffic and access
  • Sanitation and dumpsters
  • Drainage and stormwater
  • Water and sewer installation
  • Driveways and right-of-way
  • Site preparation
  • Lift station construction
  • Utility/subdivision/right-of-way bonds

Official 702 process

  1. Obtain the issued site-related permit.
  2. Call 239-321-7445 or email pweng@fortmyers.gov to coordinate the pre-construction meeting.
  3. After coordination, request inspection 702 through EnerGov.
  4. Discuss inspection comments at 239-321-7453.
Inspection command center

How to Request, Cancel and Prepare for Fort Myers Inspections

Information required

  • Permit number
  • Three-digit inspection code
  • Correct job address
  • Validated subcontractor
  • Ready construction stage
  • Safe site access

Important timing rules

  • Requests received after 5:30 AM automatically move to the next business day.
  • Online cancellation is available before 5:30 AM on inspection morning.
  • After 5:30 AM, call 239-321-7920.
  • Service Change, Re-roof Dry-In and Re-roof In-Progress can offer an estimated 8:00 AM–3:00 PM hour.
Inspection problem
Why EnerGov may block it
Best action
Subcontractor cannot request inspection
Electrical, plumbing, mechanical, roofing or gas subcontractor is not validated
Update and validate the Subcontractor Worksheet before requesting.
Duplicate request rejected
System prevents duplicate same-day inspections
Check existing scheduled inspections before submitting again.
Approved inspection cannot be requested
System blocks inspection types already approved
Choose the next required inspection or contact BPI.
Inspection scheduled too late
Request entered after the 5:30 AM cutoff
Expect the next business day and verify portal date.
Work not ready
Construction stage, access or documentation is incomplete
Cancel before cutoff or contact the office; reschedule only when ready.
Do not conceal work early. Keep foundations, framing, roofing layers, electrical, plumbing, mechanical, gas and flood-elevation components visible until the required inspection passes.
Status decoder

What Common EnerGov Statuses Mean

DraftThe record has not been submitted. Finish required fields and confirm submission.
Intake / prescreenStaff is checking record type and document completeness.
In reviewBuilding, trades, Engineering, Fire, Zoning or Flood review is active.
Corrections requiredRead the comment letter, revise the correct files and respond item by item.
Fees duePay the correct invoice and confirm that the payment posts.
ApprovedIssuance, subcontractor validation or outside conditions may remain.
IssuedWork may proceed within the approved scope and inspection sequence.
Inspection failedCorrect every listed item before requesting reinspection.
Final holdTrade, Fire, Engineering, Flood, fee or occupancy items may remain.
Final / closedSave proof and confirm all related permits are also complete.
Current fee system

Fort Myers Permit Fees and Verified Flat-Fee Examples

City Council adopted revised permit fees through Resolution 2025-96 effective August 5, 2025. Use the city calculators for valuation-based building, demolition, moving-building and site permits.

Over-the-counter permit
Single-family total
Commercial / multifamily total
Important note
Existing A/C replace or repair
$102
$127
Commercial/multifamily permit fee increases by $50 for each three units after the first three.
New or existing electrical
$157
$157 for listed repair/replacement category
Confirm whether the project qualifies for flat-fee processing.
Garage door replacement
$102
Use applicable calculator/category
Product approval and attachment details may be required.
Irrigation / sprinklers
$102
$102
Site and backflow requirements may be separate.
Mechanical existing repair
$102
$127
Upgrade or alteration categories may differ.
Siding
$157
$157
Scope and exterior-review requirements still apply.
Plumbing new/repair/upgrade
$157
$157 for listed categories
Fixtures, sewer/water or site work may create other charges.
Minor selective demolition / engineer report
$102
$102
Full-structure and interior demolition use the city calculator.
Re-roof, roof-over or roof repair
$157
$217
Follow dry-in, in-progress and final inspection requirements.
Single-family shutters / storm panels
$157 base
$102 for listed commercial storm-panel category
The schedule adds $75 to the single-family permit fee when electrical work is included.
Do not use one flat fee for every job. The city provides separate calculators for all other permit types, full/interior demolition, moving buildings and site permits. Impact fees, plan review, Fire, Engineering, utilities and outside agencies may be additional.
Floodplain and substantial improvement

Check the Fort Myers Flood Path Before Pricing a Remodel or Repair

Substantial improvement

Fort Myers defines this as cumulative qualifying improvement work during a 12-month period costing 50% or more of the building’s market value before work begins.

Substantial damage

If restoration cost equals or exceeds 50% of the building value before damage, flood-compliance upgrades can be triggered even when the owner plans a smaller repair scope.

Market value

The calculation concerns the structure—not land and unrelated site improvements—and may use adjusted tax-assessment value or a qualified appraisal under city rules.

Prepare for flood review

  • Flood-zone and base-flood information
  • Elevation certificate when required
  • Structure value excluding land
  • Detailed contractor cost estimate
  • Complete scope of all work
  • Substantial-improvement affidavits
  • Pre-construction elevation details
  • Mechanical/electrical equipment elevations
Never divide one project to avoid the 50% calculation. Fort Myers uses a cumulative 12-month definition, and flood review can materially change elevation, design, cost and feasibility. Call Flood Review at 239-321-7931 before finalizing the contract.
Contractor protection

Verify the Contractor and Keep the Permit in the Correct Name

City warning signs

  • Large deposit or full payment before work begins.
  • Contractor asks the owner to pull a “homeowner permit.”
  • Pressure to sign immediately for a special price.
  • License classification does not match the work.
  • Contractor avoids being listed on the permit.

Verification checklist

  • Florida license is active
  • Classification matches scope
  • City contractor registration is complete
  • Insurance and workers’ compensation checked
  • Permit is in contractor’s name
  • Subcontractors are validated
  • Inspection responsibility is written
  • Final payment follows closeout proof

Search Florida DBPR licenses

Current building code

Which Florida Building Code Applies in Fort Myers?

Current code during this update

The Florida Building Commission identifies the 8th Edition (2023) Florida Building Code as effective December 31, 2023. It remains the current statewide edition as of this page’s July 2026 verification.

Upcoming transition

The state is developing the 9th Edition (2026), with a planned effective date later in 2026. Ask which edition controls based on the application and permit timeline.

Open Florida Building Code Online

Certificate closeout

Certificate of Occupancy and Certificate of Completion

Certificate of Occupancy

Use EnerGov or visit the BPI office to obtain a copy of an issued CO. A new building, occupancy change or applicable commercial/residential project may require the CO before lawful occupancy.

Certificate of Completion

A CC can be requested for permits that do not require a CO. All final inspections—including Fire when applicable—must show “pass,” and all job fees must be paid. Call 239-321-7920.

Plans, permits and inspection records

How to Find Fort Myers Building Records

Search EnerGov first

Search by permit number, address or available property information. Open the full record and related permits.

Identify the exact record needed

Choose site plans, structural/architectural plans, permit application/supporting documents, all inspections, a specific permit or duplicate job-site plans.

Submit the city’s Plans/Permits records request

Provide the address or parcel number, contact information and a focused description. The form asks requesters to allow at least 10 business days for response.

Budget for reproduction and research

The current form lists $0.15 per single-sided standard page and $0.20 per double-sided page. Staff time exceeding one hour, large plans and extensive requests can create additional charges or deposits.

Open the Plans & Permits Records Form

Troubleshooting center

Fix Common Fort Myers Permit Problems

Problem
Likely reason
Practical response
Address is not found
Wrong jurisdiction or address format
Use the city-boundary map and verify the parcel before creating another record.
Application remains incomplete
Required form, attachment, signature or payment is missing
Reopen every section and compare documents with the project checklist.
Review exceeds the average
Multiple agencies, flood review, incomplete plans or corrections
Identify the exact discipline and comment holding the record.
Correction letter repeats items
Response did not address every comment or plans conflict
Use a numbered response and coordinated revision set.
Inspection request is blocked
Subcontractor is not validated or inspection already exists
Update the Subcontractor Worksheet and check scheduled/approved inspections.
Inspection moved to next day
Request arrived after 5:30 AM
Verify the scheduled date and plan around the published cutoff.
Final inspection cannot occur
Trade, Fire, Engineering, Flood, fee or site items remain
Request a list of every open condition and related permit.
Permit fee seems wrong
Wrong calculator, value, record type or added surcharges
Compare the itemized invoice with Resolution 2025-96 calculators before paying.
Old permit has no final
Inspection or certificate closeout was never completed
Ask BPI which current inspection, plans or contractor update is required.
Flood review changes the project
50% rule, elevation or equipment-location issue
Pause design/contract changes and coordinate with Flood Review.
Ready-to-use communication

Call and Email Scripts That Get a Clear Answer

Permit requirement
“I am planning to [exact work] at [address]. The property is [type/use]. Can you confirm city jurisdiction, the correct permit types, required plans, flood/zoning review and inspections before I begin?”
Permit status
“My record is [number] and EnerGov shows [status]. Which division, document, fee or outside approval is preventing the next step?”
Correction response
“Attached are revised documents and an itemized response to every review comment. Please confirm that the files entered the next review cycle and identify any remaining discipline.”
Inspection request
“I need inspection code [three-digit code] for permit [number] at [address]. The work is complete, exposed and accessible, and the listed subcontractor is validated.”
Flood question
“The proposed repair/improvement value is [amount] and the structure value is [amount]. Which flood documents, elevation information and substantial-improvement forms are required before application?”
Old permit closeout
“Permit [number] at [address] does not show final. Please identify every missing inspection, fee, trade permit or certificate required for closure.”
Final project control

Fort Myers Permit Completion Checklist

  • City versus Lee County confirmed
  • Zoning and planning path checked
  • Flood-zone review completed
  • Engineering/site review checked
  • Correct EnerGov records created
  • Plans and forms coordinated
  • Contractor and subcontractors validated
  • All fees paid
  • Permit formally issued
  • Approved documents on site
  • 702 meeting completed when required
  • Inspections requested before cutoff
  • Work remained exposed
  • All failed items corrected
  • Building/trade/site finals passed
  • CO or CC obtained when required
Save this checklist: Keep it with plans, receipts, inspection results and contractor documents.
Office location

Fort Myers Building, Permitting & Inspections Map

Location: Community Development Department, Building, Permitting & Inspections, 1825 Hendry Street, Suite 101, Fort Myers, FL 33901. Call 239-321-7925 before a records, plan-review or specialized visit.
Official resource library

Open the Correct Fort Myers Permit Resource

Frequently asked questions

Fort Myers Building Permit, Inspection and Records FAQs

Where do I apply for a City of Fort Myers building permit?

Use the City of Fort Myers EnerGov Customer Self Service portal. Register or sign in, choose the correct record type, upload the application and supporting documents, pay required fees and monitor reviews and inspections.

What is the Fort Myers permit office phone number and address?

Building, Permitting & Inspections is at 1825 Hendry Street, Suite 101, Fort Myers, Florida 33901. Call 239-321-7925 or email permits@fortmyers.gov.

How do I schedule a Fort Myers inspection?

Schedule through EnerGov using the permit number and three-digit inspection code. Requests received after 5:30 AM move to the next business day. Online cancellations must be completed before 5:30 AM on inspection morning; call 239-321-7920 after that cutoff.

How long does Fort Myers permit review take?

The city publishes average total calendar-day times of 12 days for single-family new/remodel, 22 days for commercial new/remodel and 18 days for multifamily new/remodel. These averages include Building, Engineering, Fire, Zoning and associated trade reviews.

Does a Fort Myers mailing address mean the property is inside the city?

No. Many unincorporated Lee County properties use Fort Myers as the mailing city. Use the city’s “Am I in the City?” map and confirm jurisdiction before filing.

Can a small Fort Myers home repair qualify for a permit exemption?

A city exemption request may be available for qualifying single-family work valued below $7,500 that is outside flood-hazard areas, nonstructural, excludes doors/windows and contains no electrical, plumbing, mechanical or gas work. Approval is required and carries a $50 fee.

What is the Fort Myers flood 50% rule?

Qualifying improvements during a cumulative 12-month period reaching 50% or more of the building’s market value can be treated as substantial improvement. Substantially damaged or improved buildings may need flood-compliance upgrades. Contact Flood Review before contracting.

What are common Fort Myers flat permit fees?

The current over-the-counter schedule lists totals such as $102 for a single-family A/C replacement, $157 for listed single-family electrical or plumbing work, $157 for a single-family re-roof and $217 for a commercial or multifamily re-roof. Use the live city calculator for the exact project.

How can I obtain old Fort Myers plans or inspection history?

Search EnerGov first. If the file is not online, submit the Public Records Request for Plans/Permits and identify the property, record type and approximate permit year. The form asks requesters to allow at least 10 business days.

What is required for a Fort Myers Certificate of Completion?

All final inspections must show a pass disposition, including Fire when applicable, and all fees associated with the job must be paid. Contact BPI at 239-321-7920 to request the Certificate of Completion.

Independent guide and freshness

Source, Accuracy and Update Notes

Building-Department.org is an independent informational guide and is not the City of Fort Myers. Applications, payments, inspections, official records, flood determinations and code interpretations must be handled through the city or responsible agency.

This page was researched against official City of Fort Myers, Florida Building Commission and Florida DBPR resources and refreshed on July 21, 2026.

Forms, fees, code editions, staff, review averages and portal behavior can change. Confirm time-sensitive details before paying, ordering materials, scheduling work or relying on a permit status.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.