St. Johns County permit action guide

Apply, Track and Close a St. Johns County Building Permit With the Right Local Steps

Start with the exact job you need to complete. Apply for a permit, check review comments, schedule an inspection, obtain a clearance sheet, verify a contractor, calculate fees or request old plans.

This guide explains the county process in plain language while preserving the details that matter to owners, contractors and design professionals: clearance-sheet validity, plan sufficiency, wind and flood information, Notice of Commencement rules, inspection cutoffs, owner-builder limits and final closeout.

Permit search, plan log and 24/7 e-services
Clearance sheet, product approval and inspection steps
FY26 fees, 2026 impact fees and owner-builder rules
St. Johns County building plan moving through review, wind protection and inspection A coastal parcel plan enters the county permit system, receives approval and reaches final inspection. COASTAL PROJECT PLAN REVIEW APPROVED PERMIT FINAL INSPECTION PASSED PERMIT CENTER
!
Current local notes St. Johns County says a 30% reduction in general building-permit fees remains in effect until further notice. Its FY26 fee schedule is current, and the Phase 1 impact-fee table took effect March 4, 2026. Confirm the live total before paying.
Start with one action

What Do You Need From the St. Johns County Building Department?

St. Johns County Next-Step Finder

Select your situation to see the most useful official route and what to prepare first.

Official contact panel

St. Johns County Building Department Phone Numbers, Address and Hours

Building permits 904-827-6800 bldcodes@sjcfl.us
Automated inspections 904-827-6842 Schedule, cancel or check results
Contractor licensing 904-827-6820 conlicen@sjcfl.us
Permit Center 4040 Lewis Speedway St. Augustine, FL 32084
Published hours 7:30 AM–4:30 PM Monday through Friday
Fax 904-827-6849 Reference the permit, address and contractor
Call efficiently: Have the permit or clearance-sheet number, job address, parcel number, contractor name and exact portal message ready.
Avoid the wrong office

Confirm the County Has Jurisdiction Before Filing

Use the county process when

  • The project is in unincorporated St. Johns County.
  • The county permit search recognizes the parcel or address.
  • County staff confirms Building Department jurisdiction.
?

Verify first when

  • The property is inside St. Augustine or St. Augustine Beach.
  • The mailing city does not match the government jurisdiction.
  • The parcel is close to a municipal boundary.
  • The county tools return no parcel or permit result.
Do this before paying: Confirm the parcel, jurisdiction and utility provider. A postal address alone does not prove which permitting office handles the work.
Local pre-permit document

Understand the St. Johns County Clearance Sheet

What it tells you

  • 911 address
  • Flood information
  • Zoning setbacks
  • Minimum floor elevation
  • Traffic and comprehensive-plan information

Where to start

Single-family, duplex, commercial interior work, pools, barns and approved-PUD model homes are directed to the Permit Center front counter at 4040 Lewis Speedway.

Commercial DRC projects

Projects requiring Development Review Committee approval receive the clearance sheet through Development Review after DRC approval.

Expiration: A clearance sheet is valid for six months. Do not allow it to expire while final plans, financing or utility approvals are pending.
Permit decision table

Which St. Johns County Permit Fits the Project?

Project
Likely starting route
Extra item to check
New house, addition or structural alteration
Building permit
Clearance sheet, plans, energy forms, trusses, utilities, flood and trade permits
Interior remodel
Building permit
Electrical, plumbing, HVAC, gas, occupancy and fire separation
Electrical service, panel, wiring or fixtures
Electrical permit
Building permit when structure, walls or use change
Plumbing, drains, fixtures or water heater
Plumbing permit
Well, septic, utility, gas or building work
HVAC replacement or ductwork
Mechanical permit
Electrical, energy and equipment information
Gas piping or gas appliance
Gas permit
Mechanical, fire and venting requirements
Irrigation system
Irrigation permit
Backflow protection and water-provider requirements
Pool or spa
Pool permit
Clearance sheet, barrier, electrical, plumbing and Health rules
Demolition
Demolition application
Utilities, environmental, coastal and site-restoration requirements
Change of use, commercial construction or major site work
Development pre-review
DRC, fire, accessibility, transportation, utilities and impact fees
Application workflow

Apply in Seven Clear Steps

Confirm jurisdiction and parcel information

Verify the county handles the property and save the tax parcel number, legal description and job address.

Do not rely only on: The mailing city shown on a deed, utility bill or listing.

Obtain the correct clearance sheet

Use the clearance-sheet process to establish address, flood data, setbacks, minimum floor elevation and other parcel conditions.

Deadline: The clearance sheet is valid for six months.

Choose the correct permit and separate trade permits

The building application warns that separate permits may be required for electrical, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks and air conditioners.

Keep scopes aligned: The main permit and trade permits should describe the same project.

Prepare the application and supporting plans

Complete owner, contractor, job, valuation, use, square footage, flood, utility, septic, well, termite and private-provider fields that apply.

Use the checklist: Compare the package with the Residential or Commercial Sufficiency Checklist before submitting.

Use the correct online or counter route

St. Johns County e-services support permit status, plan logs, accounts, inspections and online trade permits. Larger building packages may require clearance-sheet and plan-center steps.

Answer review comments without creating conflicting plans

Open the Plan Review Log, answer every comment and clearly identify each changed sheet or document.

Resubmission warning: The FY26 schedule lists added fees for repeated resubmissions and major alterations.

Pay, post documents and complete inspections

Pay the final county invoice, keep the permit card and approved construction documents on site, record and post the Notice of Commencement when required, and schedule each inspection before work is covered.

Closeout: Verify all building and trade finals plus the C/O or completion status.
Residential sufficiency

What a Complete Residential Plan Package May Need

Core permit package

  • Approved clearance sheet and site plan
  • Building permit application
  • Two building-plan sets
  • Ownership verification
  • Contractor license, workers’ comp and liability
  • Impact-fee acknowledgement

Technical documents

  • Energy forms and signature page
  • Manual J and Manual D
  • Truss engineering
  • Signed product-approval form
  • Termite company and treatment method
  • Private-provider documents if used

Site and utility approvals

  • Water/sewer availability or paid receipt
  • Septic permit and approved plans
  • Well permit
  • DEP permit when applicable
  • Flood or V-Zone documents
  • Recorded NOC before first inspection
Product approval: The building application requests manufacturer, product description, limitation of use and approval number. Multiple products may require the county Product Approval Specification Form.
Wind, flood and coastal checks

Do Not Finalize Plans Until These Site Conditions Are Confirmed

Wind design

County guidance says permits after December 31, 2023 use wind design loads from ASCE 7-2022. Confirm the project location, exposure and product approvals.

Flood elevation

The clearance sheet includes flood information and minimum floor elevation. V-Zone projects may require the county design and performance certificate.

Coastal work

Emergency temporary coastal armoring and other shoreline projects have separate forms and may require state or federal authorization.

Expert check: Make sure the site plan, first-floor elevation, structural design, wind calculations and product approvals use the same project assumptions.
Notice of Commencement

Resolve the County’s NOC Threshold Before the First Inspection

What the county consistently requires

  • Record the NOC in the county records.
  • Post it at the job site.
  • Provide it to Building Services before the first inspection when required.
  • Make owner, contractor, property and lender information accurate.

Why you should confirm the threshold

Current county pages show different project-value thresholds: the Building Permits page says projects exceeding $5,000, while the Inspection Guidelines page says greater than $2,500.

Safest action: Call 904-827-6800 before the first inspection and follow the permit-specific requirement.

Owner warning: The county application warns that failing to record an NOC may result in paying twice for improvements.

Open the Official NOC Form

Inspection command center

Schedule, Cancel and Prepare for St. Johns County Inspections

Same-day cutoff Before 7:00 AM Inspections scheduled before 7 AM are listed for the same day.
Automated phone 904-827-6842 Use the permit number to schedule, cancel or check results.
Online route Private Account A private online account is required to schedule or cancel online.
Late cancellation Contact inspector After 7 AM on inspection day, contact the assigned inspector to avoid a fee.

Before scheduling

  • NOC resolved
  • Permit card posted
  • Approved plans on site
  • Permit holds cleared
  • Correct request number selected
  • Work ready and uncovered

Before reinspection

  • Read every correction
  • Complete all repairs
  • Keep correction list on site
  • Contact inspector with questions
  • Do not repeat an uncorrected request
  • Confirm safe access
Stop before covering work: County guidance says work must not continue beyond an inspection point until approval is obtained. Concealed work may need to be reopened.
Early power

Early Power Is Not Permission to Occupy the Building

Project
County prerequisite
Important limit
Commercial
Approved Energize Building Inspection, including meter-base connections
Early power does not replace final inspections or the Certificate of Occupancy
Residential
Approved Insulation Inspection and approved Meter Can Inspection
Permanent use or occupancy before a formal C/O is prohibited
All early-power requests
Safe devices, completed panel, grounding and electrical check
Unpaid permit, impact or solid-waste fees can block release

Open the 2026 Early Power Form

FY26 fees

Useful Fee Numbers and a Worked Building-Permit Example

Permit issuance $14 FY26 Building Services schedule
Permit extension $37 Building and listed trade permits
Reinspection $53 Building/trade schedule amount
Plan review 50% One-half of the calculated building permit fee

FY26 valuation formula

  • $1,001–$50,000: minimum $19 or $11 for first $1,000 plus $2.63 per additional $1,000.
  • $50,001–$100,000: $140 for first $50,000 plus $2.10 per additional $1,000.
  • $100,001–$500,000: $246 for first $100,000 plus $1.58 per additional $1,000.
  • $500,001 and up: $879 for first $500,000 plus $1.05 per additional $1,000.

Example: $75,000 valuation

$140 for the first $50,000, plus 25 × $2.10 for the next $25,000.

Base building permit calculation: $192.50

Plan review at one-half would be $96.25 before issuance, surcharges, impact fees, trade permits, fee reductions or other charges.

30% reduction: The county says the reduction in general building-permit fees remains in effect until further notice. Use the current estimator and invoice to see how the reduction is applied to the specific record.

2026 Phase 1 Residential Impact Fees

Dwelling size
Published total
Effective date
Under 800 sq. ft.
$6,907
March 4, 2026
801–1,250 sq. ft.
$13,115
March 4, 2026
1,251–1,800 sq. ft.
$17,811
March 4, 2026
1,801–2,500 sq. ft.
$22,490
March 4, 2026
2,501–3,750 sq. ft.
$27,514
March 4, 2026
3,750–5,000 sq. ft.
$30,883
March 4, 2026
5,001 sq. ft. and over
$32,441
March 4, 2026
Impact fees are separate: Do not treat the building-permit calculation as the total development cost. School, road, fire, parks, public-building, law/jail and conservation impact fees may apply.
Owner-builder permit

Know the St. Johns County Owner-Builder Restrictions Before Signing

County affidavit rule
What it means
Personal appearance
The owner must personally appear and sign the affidavit in the Building Services Division.
Allowed project
The form covers qualifying one- or two-family residences, farm outbuildings and commercial work not exceeding $75,000.
Own use or occupancy
The building may not be built or improved for sale or lease under the exemption.
One-year presumption
Sale or lease within one year can create a presumption that the exemption was violated.
Direct supervision
The owner-builder must provide direct, onsite supervision.
Workers and liability
The owner may face tax, workers’ compensation, insurance and injury liability.
Do not pull a permit for an unlicensed contractor. The county warns that the owner may become legally and financially responsible for the project and worker injuries.

Read the 2026 Owner-Builder Affidavit

Permit life

Prevent the Permit From Becoming Null and Void

Start within six months

The current building-permit application says a permit becomes null and void when authorized work does not begin within six months.

Do not abandon work for six months

The application also says a permit becomes null and void when work is suspended or abandoned for six months after construction begins.

If time is running out: Contact Building Services before expiration. The FY26 fee schedule lists a $37 permit-extension fee and separate reactivation-related charges for certain permit types.
Permit and plan records

Find a Permit First, Then Request Missing Documents

Search the permit database

Search by permit number, project address, project name, parcel number or other available fields.

Open inspection and certificate details

Check inspection history, holds, releases, issued permits and Certificate of Occupancy status.

Check the plan-review log

Use the Plan Log to find review comments and the status of application submittals.

Request job copies when online records are incomplete

Ask for Building Permit Plans and Permit Package job copies. Provide project name, address and parcel number.

Public-record request tip: St. Johns County says a requester is not required to identify themselves or explain why the record is needed. Confidential or exempt requesters should follow the county’s special email or mail instructions.
Status decoder

What the Permit Status Means

Application received County staff has the application, but sufficiency review may not be complete.
Pending comments Open the Plan Log and answer each reviewer’s comment.
Hold A clearance, utility, flood, contractor, impact-fee or other condition is unresolved.
Ready to issue Payment, signatures, NOC or final release items may remain.
Issued Work may proceed only within the approved scope and inspection sequence.
Disapproved inspection Correct every cited item and keep the correction list on site before reinspection.
Temporary C/O Occupancy is limited by temporary approval and listed conditions.
Final / C/O issued Save the final result and confirm all trade permits are also closed.
Troubleshooting

Fix Common St. Johns County Permit Problems

Problem
Likely reason
Best next action
Address not found
Parcel, jurisdiction or address-format mismatch
Confirm parcel and municipality before filing another application.
Plan review is not moving
Pending sufficiency item or reviewer comment
Open the Plan Log and compare the package with the sufficiency checklist.
Inspection cannot be scheduled
NOC, permit hold, wrong request number or permit not issued
Check permit status and resolve every hold before calling 904-827-6842.
Late inspection cancellation
Cancellation submitted after 7 AM
Contact the assigned inspector directly to avoid a service fee.
Repeated reinspection fee
Corrections remain incomplete or the correction list is missing
Complete every item and keep the list on site before rescheduling.
Cannot find old plans
Public search shows status but not full job copies
Submit a Permit Center public-record request with address and parcel number.
Permit expired
Work did not begin or was inactive for six months
Ask about extension, reactivation, updated plans and remaining inspections.
Fee is higher than estimate
Plan review, trades, impact fees, reinspection, resubmission or other charges
Compare each invoice line with the FY26 schedule and current impact-fee table.
Ready-to-use scripts

What to Say When You Call or Email

Permit requirement
“I plan to [describe exact work] at [full address and parcel number]. Does the county have jurisdiction, which permit and clearance sheet do I need, and which plans or inspections apply?”
Plan-review delay
“My application is [number] at [address]. Which sufficiency item or review comment is preventing the next step, and where should I submit the correction?”
Inspection question
“I need inspection request [number] for permit [number]. The work is uncovered and ready. Are there any holds, NOC requirements or documents missing?”
Open permit record
“I found permit [number] at [address], but I cannot confirm final approval. Please identify the outstanding inspection, hold or certificate requirement.”
Final checklist

Do Not Consider the Project Complete Until These Are Confirmed

  • Correct jurisdiction confirmed
  • Clearance sheet active
  • Correct permit types selected
  • Plans and product approvals accepted
  • Utilities, septic or well approvals complete
  • Wind and flood requirements addressed
  • Fees and impact fees paid
  • NOC recorded and posted when required
  • Permit card and approved plans on site
  • Every required inspection approved
  • Failed items corrected
  • Trade permits finaled
  • C/O or completion status confirmed
  • Final records saved
Permit Center map

St. Johns County Building Department Location

Address: 4040 Lewis Speedway, St. Augustine, FL 32084.
Bring: Application or permit number, parcel number, clearance sheet, plans, correction notice, contractor information and photo ID.
Official resources

Open the Correct St. Johns County Tool or Form

Frequently asked questions

St. Johns County Building Department Questions

Where can I search a St. Johns County building permit?

Use the official county permit search. You can search by permit number, project address, project name, parcel number and other available fields. Open the complete record to check inspections, holds, releases and certificate status.

What is the St. Johns County Building Department phone number?

Call 904-827-6800 for building permits and plan-review help. Contractor Licensing is 904-827-6820, Permit Center Records is 904-827-6822 and the automated inspection line is 904-827-6842.

What time must I schedule an inspection for same-day service?

The county inspection page says inspections scheduled before 7:00 AM will be performed the same day. Check permit holds, use the correct request number and make sure the work is ready before scheduling.

How long is a St. Johns County clearance sheet valid?

A clearance sheet is valid for six months. It may include the 911 address, flood information, zoning setbacks, minimum floor elevation and other parcel details used during permitting.

When is a Notice of Commencement required?

County pages currently show different project-value thresholds, while the building application warns that the NOC must be recorded and posted before the first inspection when required. Confirm the permit-specific requirement with Building Services before scheduling the first inspection.

Can a property owner apply as an owner-builder?

Yes, when the project qualifies under Florida law and the county affidavit. The owner must personally appear and sign, provide direct onsite supervision and accept legal, financial, employment and insurance responsibilities.

How long does a St. Johns County building permit remain active?

The current building-permit application says the permit becomes null and void if work does not begin within six months or if work is suspended or abandoned for six months after it starts.

Are impact fees included in the building-permit fee?

No. Building-permit and plan-review fees are separate from impact fees. The 2026 impact schedule includes roads, schools, public buildings, fire rescue, law and jail, parks and conservation components.

How do I request old building plans or a complete permit package?

Search the permit first, then submit a Permit Center public-record request. Provide the project name, address and parcel number and ask for Job Copies of Building Permit Plans and the Permit Package.

Does early power allow me to occupy a new building?

No. The county’s early-power form says early electricity is for construction convenience and does not replace final inspections or a Certificate of Occupancy. Occupancy before a formal C/O is prohibited.

Source and accuracy note

Official Information Used for This Guide

Building-Department.org is an independent informational guide and is not St. Johns County Government.

This page was checked against the St. Johns County Building Department, permit and plan-status tools, clearance-sheet guidance, Building Inspection procedures, current 2026 forms, FY26 fee schedule, 2026 Phase 1 impact-fee table, owner-builder affidavit, Early Power agreement and Permit Center records instructions.

Last reviewed: July 21, 2026.

Fees, forms, inspection procedures, code editions, contacts and online systems can change. Confirm time-sensitive information before filing, paying, scheduling or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.