Toh Building Department | Permits, Inspections & Official Contact

Town of Hempstead permit action guide

Apply, Track, Inspect and Close a TOH Building Permit Without Using the Wrong Office

TOH means the Town of Hempstead Department of Buildings. Start by confirming whether the Town or an incorporated village controls the property. Then use the official OpenGov portal to apply, monitor reviews, request inspections, message staff and print the permit.

This guide gives the correct department phone, inspector call windows, plan-examiner route, zoning checks, property-record steps, mother-daughter requirements and waterfront-permit path in plain language.

Town-versus-village jurisdiction check
OpenGov permit and inspection micro-steps
Zoning, records and closeout guidance
Town of Hempstead permit route from property check to final inspection An animated Long Island town map, home plan, permit document, review stamp and final inspection check explain the TOH permit process. TOH PROPERTY + ZONING REVIEWED TOH PERMIT FINAL INSPECTION CLOSED
⚠️
Town or village? A property can have a Town of Hempstead mailing address but still be inside an incorporated village with its own permit authority. Confirm jurisdiction before opening an application or paying for plans.
Start with one action

What Do You Need From the TOH Building Department?

TOH Permit Next-Step Finder

Select the situation that matches your property or project.

Critical jurisdiction check

Confirm the Town of Hempstead Is the Correct Building Authority

Use the Town portal when

  • The property is in an unincorporated Town community.
  • The Town Department of Buildings confirms jurisdiction.
  • The Town OpenGov portal accepts the property.
  • The project is not controlled by a village building department.

Verify with a village when

  • The property is inside an incorporated village.
  • The municipality on the tax or village record differs from the mailing city.
  • A village website lists its own Building Department.
  • The Town portal cannot match the property or permit type.
Simple verification script: “Can you confirm whether the Town of Hempstead or an incorporated village has building-permit jurisdiction over [full address, Section/Block/Lot]?”
Official contact panel

TOH Building Department Phone Numbers, Address and Call Windows

Main front counter 516-538-8500 General permit and application help
Front counter hours 8:00 AM–4:45 PM Call before a special trip
Building Inspectors 516-812-3088 Official directory: 7:30–10:30 AM
Plumbing Inspectors 516-812-3126 Official directory: 7:30–9:30 AM
Plans Examiners 516-812-3073 Official page: 9:00 AM–Noon
Housing & Zoning 516-812-3052 Official directory: 9:00–10:30 AM
Alternate zoning lines 516-812-3115 Also 516-812-3107
Office One Washington Street 2nd Floor, Hempstead, NY 11550
Plan Examiner appointment: The official Building Department page says to call one day before the day you want to be seen.
Project decision table

Which Town of Hempstead Permit Route Fits the Work?

Project or issue
Start with
Check before filing
Addition, dormer, new structure or structural alteration
Building permit
Survey, zoning setbacks, lot coverage, plans, contractor and trade permits
Interior renovation
Building permit
Structural change, plumbing, electrical, HVAC, egress and legal use
Deck, shed, pool, fence or exterior structure
Zoning check + permit
Survey, setbacks, lot coverage, barriers and utility locations
Plumbing, drainage, gas fixture or sewer work
Plumbing / sewer permit
Licensed plumber, fixture count and related building work
Electrical work
Electrical permit / license route
Licensed electrician and associated building permit
Solar photovoltaic system
Solar building permit
Roof structure, electrical filing and current fee rule
Existing unpermitted work
Maintain / legalization application
Current survey, plans, zoning compliance, violations and higher fees
Second kitchen for immediate-family use
Mother-daughter process
Owner occupancy, survey, tax bill, deed, photos, record search, BAR and BZA
Rental dwelling
Rental registration
Town jurisdiction outside incorporated villages and property compliance
Dock, bulkhead or structure in a waterway
Conservation OpenGov permit
Survey, drawings, deed, tax bill, NYSDEC, insurance and closeout photos
OpenGov application steps

Apply Online Without Creating the Wrong Record

Confirm jurisdiction and property identity

Use the full address and Section/Block/Lot from the tax record or survey. Confirm the Town—not a village—controls the permit.

Do not continue when: A village Building Department has jurisdiction.

Write one exact project description

Say what exists, what will change, dimensions, use and affected trades.

Better: “Construct a 14-by-18-foot rear deck with stairs and guards” instead of “deck work.”

Open the official OpenGov Permit Center

Create or sign into the account that will manage the application.

Choose the correct category

Select the permit, license, registration or inspection record that matches the project. Do not choose a similar category just to begin faster.

Unsure? Call 516-538-8500 before submitting.

Upload a complete and consistent package

Application, survey, tax bill, deed, plans, photos, owner documents and contractor information must describe the same project.

File names: Survey.pdf, Plot-Plan.pdf, Floor-Plans.pdf, Owner-Affidavit.pdf.

Monitor comments, messages and invoices

The portal lets residents monitor applications and message Town staff. Answer every comment and keep revised files coordinated.

Never assume: “Approved” means issued. Check that the permit can be printed.

Request inspections and save closure proof

Use the permit record to request inspections, then confirm the certificate of completion or occupancy record after all finals.

Final step: Save the permit, inspection results and final certificate for resale or refinancing.
Application readiness

Prepare These Items Before Opening the Portal

Property file

  • Exact street address
  • Section, Block and Lot
  • Recent tax bill
  • Current deed
  • Licensed survey
  • Existing legal use

Project file

  • Clear scope of work
  • Existing conditions
  • Proposed dimensions
  • Construction cost
  • Photos of affected areas
  • Required plans

People and approvals

  • Owner signature
  • Applicant authorization
  • Contractor details
  • Trade licenses
  • Insurance forms
  • Zoning or Board approval
Survey rule: Do not alter the survey by hand. Use the correct survey and separate plot-plan or design sheets when changes must be shown.
Zoning before construction

Check the Building Zone Ordinance Before Finalizing Plans

Confirm Town jurisdiction
Identify zoning district
Test use and dimensions
Revise the design or seek relief
Complete Board approvals
Return to the permit

Ask the Plans Examiner

Call 516-812-3073 during the listed 9:00 AM–Noon window for ordinance and plan-review questions.

Check these basics

  • Permitted property use
  • Front, side and rear setbacks
  • Lot coverage and building area
  • Height, parking and accessory structures

When relief may be needed

A variance, special exception, architectural review or another Board process may be required when the proposal does not comply.

Open the Building Zone Ordinance

Inspection action plan

Request the Correct TOH Inspection and Keep Work Visible

Building inspection

516-812-3088

Listed call hours: 7:30–10:30 AM.

Plumbing inspection

516-812-3126

Listed call hours: 7:30–9:30 AM.

Housing / zoning inspection

516-812-3052

Listed call hours: 9:00–10:30 AM.

Have ready

  • Permit number
  • Property address
  • Inspection type
  • Contact phone
  • Access instructions
  • Confirmation work is ready

Before the visit

  • Permit is issued
  • Approved plans are on site
  • Work remains exposed
  • Correct stage is complete
  • Site is safe and accessible
  • Required trade permits are active
Do not cover work early. Framing, plumbing, electrical, insulation and other concealed work may need to be reopened when the inspector cannot see it.
Portal status decoder

What the Status Means and What to Do Next

Draft Complete missing fields and confirm that the record was submitted.
Submitted The Town has the application. Watch for completeness or payment messages.
Plan review A Plans Examiner or another unit is checking the file. Do not start work.
Corrections required Read every comment, revise the correct plans and answer each item.
Board approval required Zoning or architectural relief must be completed before permit issuance.
Approved / invoice due Pay required fees and verify formal issuance.
Issued Print the permit and work only within the approved scope.
Final / certificate issued Save the certificate and verify all related permits are closed.
Property records and open permits

Find Previous Permits, a Certificate or Missing Closeout

Search the OpenGov account or public portal

The Town says residents can review previous permits through the Online Permit Center.

Use exact property identifiers

Search with the full address and Section/Block/Lot when available. Check spelling and unit information.

Ask for the right record

Request the application, approved plans, inspection history and certificate—not only the permit number.

Town fee page note: The code has historically included a property-search or certified-certificate fee; confirm the current amount before filing.

Verify final closure

A permit record is not enough. Confirm inspections passed and a certificate of completion or occupancy was issued where required.

Buying or selling? Compare the current property layout with the survey, permit history and certificates. Ask about additions, finished basements, decks, pools, sheds, garages and second kitchens.
Local special-project guidance

TOH Processes That Need More Than a Standard Building Permit

Mother-daughter use

The official page requires an owner-signed application, three unaltered surveys, tax bill, supplementary statement, plot plans, floor plans, reversion plan, recent record search, utility bill, deed and four exterior photos.

Listed filing fee: $150, plus later Board filings and a plumbing permit for the second kitchen.

Rental registration

Use the Town registration route for properties within Town jurisdiction outside incorporated villages. Confirm village jurisdiction first.

Open rental registration

Waterway structures

As of January 24, 2025, bulkheads and other structures-in-waterways permits must be submitted through the Town OpenGov Conservation portal.

Open waterway permits

Mother-daughter checklist

Prepare the Immediate-Family Use Package Before Filing

Property and ownership

  • Owner-signed application
  • Three unaltered surveys
  • Recent tax bill
  • Copy of deed
  • Recent electric bill
  • Recent Building record search

Plans and evidence

  • Supplementary statement
  • Plot plans with parking
  • Complete floor plans
  • Primary and secondary kitchens shown
  • Reversion-to-one-family plan
  • Four daylight exterior photographs
Keep the application active The official mother-daughter page says an owner or agent application left dormant for 90 days may be abandoned and destroyed, with fees nonrefundable and nontransferable.

Open Official Mother-Daughter Instructions

Fee accuracy warning

Use the Current Town Code—Not an Old Fee Screenshot

Why fee quotes can be wrong

The Town’s public Fees page still links a Building Department PDF dated July 31, 2018. The Town’s eCode shows newer amendments, including a 2026 local law changing building-application fees.

Do not treat the older PDF as a current final quote.

Best fee-check method

  1. Choose the exact permit category.
  2. Enter the honest construction cost and scope.
  3. Review the OpenGov invoice.
  4. Check current Town Code §86-11.
  5. Ask the front counter to explain each line before paying.
Fee or cost issue
What is safely verified
Action
Standard building application
The current formula is cost-based and was amended in 2026.
Use the live eCode and portal invoice.
Work started without a permit
Town fee rules impose higher charges for prior unpermitted work.
Do not continue work; ask for the maintain/legalization route.
Mother-daughter application
The official instruction page lists a $150 filing fee.
Budget separately for Board and plumbing filings.
Property record search
The mother-daughter instructions list a recent record search and a $25 fee.
Confirm the current general record-search charge.
Waterway / bulkhead
Fee follows Town Code §168-5 after departmental approval.
Wait for the Conservation invoice.

Open the Current Town Code

Problem-solving table

Fix Common TOH Permit Problems

Problem
Likely reason
Best next action
Portal cannot find the property
Wrong jurisdiction or address format
Confirm village status and Section/Block/Lot before creating another record.
Application is stuck in draft
Missing field, document, signature or final submit action
Open every section and confirm a record number was issued.
Plan review keeps returning
Comments not fully answered or conflicting plan versions
Submit a numbered response and one coordinated revised plan set.
Zoning denial
Use, setback, lot coverage, parking or dimensional conflict
Call the Plans Examiner and ask whether redesign or Board relief is required.
Inspection option unavailable
Permit not issued, payment due or hold exists
Open the record and call the correct inspector unit.
Old permit remains open
Missing final inspection or certificate
Request the inspection history and a written closeout list.
Existing work has no permit
Previous owner or contractor built without approval
Stop alterations, gather survey/photos and ask about a maintain application.
Contractor changed
Permit record no longer matches project team
Ask how to replace the contractor and update license/insurance information before inspection.
Ready-to-use scripts

What to Say When You Call the Department

Permit question:
“I am planning [exact work] at [address and Section/Block/Lot]. Can you confirm Town jurisdiction, the correct permit category, required survey or plans, zoning review and inspections?”
Zoning question:
“The project is [dimensions and location]. Which Building Zone Ordinance rule controls the use, setback, lot coverage or parking, and can the design be revised without Board relief?”
Open permit:
“I found permit [number] for [address], but no final certificate. Which inspection or document is missing, and what must the current owner submit?”
Plan correction:
“For application [number], I have a response to each comment and a coordinated revised plan set. Please confirm the correct upload location and whether another review unit remains open.”
Project closeout

Do Not Consider the Work Finished Until These Are Complete

  • Town or village jurisdiction confirmed
  • Correct property identifiers used
  • Zoning compliance or Board approval completed
  • Correct building and trade permits issued
  • Approved plans kept at the site
  • Required work left visible for inspection
  • Every correction resolved
  • Building inspection finaled
  • Plumbing and electrical permits closed
  • Certificate of completion or occupancy issued
  • Rental or special-use approval completed
  • Final records saved for the owner
Office location

Town of Hempstead Building Department Map

Address: One Washington Street, 2nd Floor, Hempstead, NY 11550. Bring the property address, Section/Block/Lot, application number and a short written question list.
Official resource library

Open the Correct Town Page or Portal

Frequently asked questions

TOH Building Department FAQs

What does TOH Building Department mean?

TOH means the Town of Hempstead Department of Buildings. It handles building, plumbing, housing, zoning and related permit services where the Town has jurisdiction.

Where is the Town of Hempstead Building Department?

The office is at One Washington Street, 2nd Floor, Hempstead, NY 11550. The main Building Department number is 516-538-8500.

What are the TOH front counter hours?

The official staff directory lists front counter hours as 8:00 AM to 4:45 PM. Call before visiting when you need a specific inspector or Plans Examiner.

How do I apply for a Town of Hempstead building permit?

Use the official OpenGov Permit Center. Confirm jurisdiction, choose the correct category, complete the application, upload the survey and plans, monitor comments, pay the invoice and verify that the permit is issued.

How do I contact a Town of Hempstead Building Inspector?

Call 516-812-3088. The official directory lists Building Inspector phone hours from 7:30 AM to 10:30 AM.

Who handles Town of Hempstead zoning and plan questions?

Plans Examiners can be reached at 516-812-3073 from 9:00 AM to Noon. Housing and Zoning Inspectors are listed at 516-812-3052 from 9:00 AM to 10:30 AM.

Does the Town handle permits inside incorporated villages?

Not always. Incorporated villages may operate their own building departments. Confirm jurisdiction using the property address and Section/Block/Lot before applying through the Town.

What is required for a Town of Hempstead mother-daughter application?

The official page lists an owner-signed application, three unaltered surveys, tax bill, supplementary statement, plot and floor plans, a reversion plan, recent record search, electric bill, deed, four exterior photographs, a $150 filing fee and a plumbing permit for the secondary kitchen.

How do I request a bulkhead or dock permit?

As of January 24, 2025, structures-in-waterways permits, including bulkheads, are submitted through the Town OpenGov Conservation portal. Additional survey, drawings, deed, tax bill, NYSDEC, insurance and completion-photo requirements apply.

How can I verify the current Town of Hempstead permit fee?

Use the current Town Code, the OpenGov invoice and written confirmation from the Building Department. The public fee page links an older 2018 PDF, while the eCode shows newer amendments including a 2026 fee change.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent guide and is not the Town of Hempstead. Applications, inspections, payments, zoning decisions, code interpretations and approvals must be handled through the Town or the correct incorporated village.

This page was rebuilt from the official Town Building Department, staff directory, Online Permit Center, Building Zone Ordinance, current eCode, mother-daughter instructions, rental-registration page and Conservation & Waterways permit guidance.

Last reviewed: July 21, 2026.

Portal categories, laws, fees, forms, staff and inspection procedures can change. Recheck the official source before filing or paying.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.