Boone County Building Department | Permits, Inspections & Official Contact

Boone County, Kentucky permit action guide

Get Zoning Approval, Apply for the Right Permit and Close Your Boone County Project

Most projects follow two separate steps: obtain the correct zoning permit from the Boone County Planning Commission, then submit the building or trade permit through the Boone County Building Department.

This guide explains the new GovWell permit route, Florence–Union–Walton zoning differences, inspection scheduling, required documents, current fee pages, trade inspections and the final closeout checks that protect a future sale or refinance.

Zoning permit first for projects that change the site or use
Current GovWell application route launched June 1, 2026
24-hour inspection notice and final-closeout checklist
Boone County zoning and building permit journey An animated Kentucky parcel map moves through zoning approval, GovWell permit review, inspection and final closure. PARCEL + ZONING PERMIT GOVWELL APPROVED BUILDING PERMIT FINAL INSPECTION CLOSED
📌
New permit platform Boone County Building Department moved to GovWell on June 1, 2026. Use the County’s current Building Permits page to enter the live portal. Old Oracle portal bookmarks may no longer show the correct application route.
Choose one action

What Do You Need From Boone County?

Official contact panel

Boone County Building Department Address, Phone and Hours

Building Department 859-334-2218 Permits, inspections and project questions
Office hours Monday–Friday 8:00 AM–5:00 PM
Office location 2950 Washington Street 3rd Floor, Burlington, KY 41005
Planning Commission 859-334-2196 Zoning permits and land-use review
Planning email plancom@boonecountyky.org Include the property and zoning jurisdiction
Electrical inspections 859-746-9111 County page lists Steve Helmer
Public Services 859-334-3600 County road and infrastructure questions
Inspection notice At least 24 hours Have the permit number and inspection type ready
Fastest useful call: “My project is at [address]. I have zoning permit [number] and building permit [number]. Which inspection or document is required next?”
Two approvals, one correct order

Get the Zoning Permit Before the Building Permit

Confirm zoning jurisdiction
Submit zoning application
Receive zoning permit
Open GovWell building record
Complete reviews and fees
Issue, inspect and close

Step 1: Boone County Planning Commission

The Planning Commission handles zoning applications for unincorporated Boone County and the cities of Florence, Union and Walton. The correct zoning form and Board route depend on the property’s jurisdiction.

Open zoning applications and forms

Step 2: Boone County Building Department

After zoning approval, use the Building Department’s current permit page to enter GovWell, upload plans, follow review comments, pay fees and request inspections.

Open the current building-permit route

Florence, Union or Walton property? Zoning permits and Board of Adjustment hearings follow that city’s jurisdiction and meeting route. Confirm the jurisdiction with Planning Commission staff before filing. Do not assume the mailing city identifies the correct zoning authority.
Zoning check

Review These Items Before Paying for Final Plans

Use and zoning district

Confirm that the proposed house, business, accessory structure, short-term rental or other use is allowed at the parcel.

Setbacks and placement

Check front, side and rear yards, easements, road frontage and spacing before locating an addition, deck, garage, pool or shed.

Board relief

When the project cannot meet current zoning standards, ask whether redesign or a Boone, Florence, Union or Walton Board of Adjustment process is required.

Open the Current Zoning Ordinance Viewer

Project decision table

Which Boone County Permit Route Fits the Work?

Project
Start with
Also check
New house, duplex, townhouse or addition
Zoning permit, then building permit
Site plan, structural plans, utilities, septic/sewer, HVAC, electrical and plumbing
Interior remodel or basement finish
Residential alteration permit
Egress, smoke/CO alarms, structural changes and trade permits
Deck or porch
Zoning + deck permit
Setbacks, footing/hole inspection, framing where required and final
Garage, barn, shed or accessory structure
Accessory-structure zoning permit
Size, placement, foundation, electrical and driveway access
In-ground swimming pool
Zoning + building permit
Barrier, electrical bonding, equipment location, grading and final safety inspection
HVAC installation or replacement
Mechanical permit
Electrical inspection, gas work and emergency replacement instructions
Electrical, plumbing or gas-line work
Trade permit
Licensed contractor, rough inspection, concealment and final inspection
Commercial tenant finish or occupancy change
Zoning + commercial building review
Accessibility, fire, occupant load, utilities and state-agency requirements
Sign, tent or temporary structure
Correct zoning/building application
Location, duration, wind/loading, fire and road visibility
Demolition
Demolition permit
Utilities, asbestos/environmental requirements, site safety and final grading
Simple permit test: Boone County says permits are commonly required when work changes a building’s structure, size, footprint or safety systems, or involves electrical, plumbing, HVAC or gas work.
Current online application

Apply Through the New GovWell Route in Seven Steps

Confirm zoning jurisdiction

Determine whether the parcel follows unincorporated Boone County, Florence, Union or Walton zoning.

Save: Address, parcel details, zoning district and jurisdiction name.

Obtain the zoning permit

Submit the correct Planning Commission application and plot/site information before the building permit where zoning approval is required.

Open the County’s current Building Permits page

Use this page to enter the live GovWell platform. Avoid old Oracle bookmarks.

Select the exact permit type

Choose residential, commercial, structural, mechanical or another category that matches the actual scope.

Do not: Start a duplicate record when the address or category fails. Call 859-334-2218 first.

Upload a coordinated document package

The project description, zoning permit, site plan, construction drawings, valuation and contractor information must agree.

Useful names: Zoning-Permit.pdf, Site-Plan.pdf, Floor-Plans.pdf, Structural-Details.pdf.

Answer comments and pay through the record

GovWell is intended for plan uploads, project tracking, review comments, fee payment and approved-plan access.

Response method: Number each comment and state the sheet or document where it was corrected.

Confirm issuance before construction

An application, zoning permit or plan approval alone does not authorize work. Confirm the building permit is issued and printable.

Keep on site: Issued permit and approved plans.
Before opening the portal

Boone County Application Checklist

Property and zoning

  • Exact project address
  • Parcel or lot information
  • Zoning jurisdiction
  • Approved zoning permit
  • Plot or site plan
  • Utility/septic information

Project information

  • Clear scope of work
  • Existing and proposed use
  • Dimensions and square footage
  • Construction valuation
  • Floor and elevation plans
  • Structural details

People and trades

  • Owner information
  • Applicant authorization
  • Builder/contractor details
  • HVAC contractor
  • Electrician and plumber
  • Professional seals if required
Consistency check: The zoning permit, site plan, building plans and written application should show the same structure location, dimensions and use.
Project-specific preparation

What to Prepare for Common Boone County Projects

Project
Useful documents
Question to answer first
Deck or porch
Plot plan, dimensions, footing locations, framing, stairs, guards and attachment details
Does the proposed location meet zoning setbacks?
Basement finish
Existing/proposed floor plan, room labels, egress, smoke/CO, electrical, plumbing and HVAC layout
Will any room be used as a bedroom or separate unit?
Garage, barn or shed
Zoning plot plan, size, height, foundation, framing and electrical scope
Is the structure allowed at the proposed size and location?
Pool
Plot plan, pool details, barrier, equipment, electrical/bonding and grading information
Can the pool, equipment and barrier fit required setbacks?
New residence or addition
Zoning permit, site plan, full construction drawings, structural, energy, utilities and trade information
Are sewer/septic, access and zoning approvals complete?
Commercial tenant finish
Use description, occupant load, accessibility, life safety, floor plan, MEP and fire information
Is the business use permitted at the address?
Inspection action plan

Schedule Inspections at Least 24 Hours in Advance

Call 859-334-2218

The County’s residential and commercial inspection pages instruct applicants to call the Building Department and submit requests at least 24 hours in advance.

  • Permit number
  • Project address
  • Inspection type
  • Requested date
  • Contact name and phone
  • Access or gate instructions

Prepare the job site

  • Permit is issued
  • Approved plans are available
  • Correct stage is complete
  • Work remains exposed
  • Site is safe to access
  • Address is visible
Project stage
What should be ready
Common delay
Footing / deck holes
Excavation, size, depth, location and reinforcement visible
Concrete placed before inspection or location differs from plans
Foundation
Forms, reinforcement, drainage/waterproofing stage and approved layout
Missing plans, unsafe access or work covered
Rough framing
Framing and required rough trades coordinated and visible
Field changes or incomplete electrical/plumbing/HVAC rough work
Insulation / concealment
Required rough inspections passed before closure
Walls or ceilings closed too early
Final
Project complete, safe, accessible and consistent with approved scope
Open trade permits, missing guards/alarms or unfinished site work
Do not cover work before inspection. Concrete, framing, wiring, plumbing, HVAC, insulation or other concealed work may need to be opened when the inspector cannot verify it.
Status decoder

What the Permit Status Means

Draft Finish required fields and attachments; confirm the record was submitted.
Submitted / intake The County has the record but may still be checking completeness.
In review Plans or department approvals are being checked. Do not start work.
Corrections required Read every comment and submit one coordinated revision set.
Fees due Open the record, review the itemized charges and pay through the current portal.
Approved Confirm formal permit issuance; approval alone may not authorize construction.
Issued / active Work may proceed within the approved scope and inspection sequence.
Final / closed Save proof and verify every structural and trade permit is also complete.
Fee verification

Get the Correct Permit Fee From the Official Schedule

Residential projects

Use the current residential fee page for houses, additions, remodels, decks, garages, pools and other residential work.

Open residential permit fees

Commercial projects

Use the current commercial fee page for new buildings, alterations, tenant finishes, occupancy changes and commercial systems.

Open commercial permit fees

Total project cost may include more than the building fee: zoning, electrical, plumbing, HVAC, fire, Public Works, septic/sewer, state review or reinspection charges may be separate. Use the GovWell invoice and ask the department to explain unclear items before paying.
Trade permit coordination

Do Not Close the Main Permit While a Trade Permit Is Still Open

Electrical

The County currently lists licensed/certified electrical inspector Steve Helmer for residential and commercial electrical inspections.

859-746-9111

HVAC / mechanical

HVAC installation and replacement requires the correct permit and inspection. Electrical work serving the equipment is inspected separately.

Open residential HVAC guidance

Plumbing and gas

Confirm the permit, licensed contractor, rough inspection and final inspection required for the exact fixture, piping or gas scope.

Open contractor guidance

Local special-project checks

Projects That May Need Another Boone County Office

Project condition
Possible additional route
Ask before design
Driveway, utility or work in a county right-of-way
Boone County Public Works / Public Services
Is a right-of-way, encroachment or road permit required?
Floodplain, stream or major grading
Planning Commission and applicable engineering/environmental review
Which floodplain, drainage, erosion or grading application applies?
Short-term rental
Boone County short-term-rental permit process
Is the use allowed, and which inspection or operating requirements apply?
Commercial fire system or occupant change
Building, fire and possible state review
Which plans, occupant-load and fire permits must be approved before opening?
Zoning variance or special exception
Correct Board of Adjustment for Boone, Florence, Union or Walton
Which jurisdiction, deadline and hearing location controls the parcel?

Open Public Works Permits Open Short-Term Rental Process

Permit and property research

Find an Old Permit, Plan or Open Inspection

Start with the current permit route

Use the Building Department’s current page to access GovWell and search or manage available records.

Check County permit reports

Monthly reports and permit-statistics pages can help identify an approximate permit date, type or jurisdiction.

Confirm the legal property record

Use the PVA for property data and the Boone County Clerk for deeds and recorded land documents when ownership, lot or legal-description history matters.

Ask for the complete permit file

Request the application, approved plans, review comments, inspection history and final/closure record—not only the permit number.

Verify every related trade permit

A structural permit may appear complete while electrical, HVAC or plumbing records remain open. Confirm each final.

Buying or selling? Compare the current building to the zoning permit, approved plans and final inspection records. Ask about finished basements, decks, garages, pools, additions and HVAC replacements.
Troubleshooting

Fix Common Boone County Permit Problems

Problem
Likely reason
Best next action
Old portal link no longer works
County changed to GovWell on June 1, 2026
Start from the official Building Permits page.
Building application cannot proceed
Missing zoning permit or wrong zoning jurisdiction
Contact the Planning Commission and confirm Boone, Florence, Union or Walton.
Address or project not found
Portal format, parcel mismatch or duplicate account
Call 859-334-2218 before creating a second record.
Review comments keep returning
Only some comments were answered or files conflict
Submit one numbered response and coordinated plan set.
Inspection was not scheduled
Request was late or required information was missing
Call at least 24 hours ahead with permit number and inspection type.
Inspector cannot approve the work
Work is covered, inaccessible or differs from approved plans
Expose the work safely and ask whether revised plans are required.
Final inspection blocked
Open electrical, HVAC, plumbing or site item
Get a written list of every remaining final and permit.
Property sale reveals an open permit
Previous owner never completed closeout
Collect the file and ask what current inspection or documentation is needed.
Useful call scripts

What to Say When You Contact the County

Permit requirement:
“I am planning [exact work] at [address]. The zoning jurisdiction is [Boone/Florence/Union/Walton]. Which zoning permit, building permit, plans and trade permits are required?”
Portal problem:
“I am trying to use the current GovWell route for [project]. My address or record is not appearing. Can you confirm the correct account, permit category and property format before I create another application?”
Inspection request:
“I need a [inspection type] for permit [number] at [address]. The work is complete for that stage, visible and accessible. The site contact is [name and phone].”
Open permit:
“Permit [number] does not show final closure. Which structural or trade inspections remain, and what must the current owner submit to close the record?”
Final project control

Do Not Consider the Project Finished Until These Are Complete

  • Zoning jurisdiction confirmed
  • Zoning permit approved
  • Correct GovWell building record submitted
  • Plans and site information coordinated
  • Building permit formally issued
  • Approved plans available on site
  • Required work left visible
  • Building inspections passed
  • Electrical inspection closed
  • HVAC permit and final closed
  • Plumbing/gas permit closed
  • Final building record saved
Office location

Boone County Building Department Map

Address: 2950 Washington Street, 3rd Floor, Burlington, KY 41005. Office hours are Monday–Friday, 8:00 AM–5:00 PM. Bring the zoning permit, building record number, property address and a short question list.
Official resource library

Open the Correct Boone County Page

Frequently asked questions

Boone County Building Department FAQs

Which Boone County does this Building Department guide cover?

This page covers Boone County, Kentucky. The Building Department office is at 2950 Washington Street, 3rd Floor, Burlington, KY 41005.

What is the Boone County Building Department phone number?

Call 859-334-2218 for building permits, application help and residential or commercial inspection scheduling. The official office hours are Monday through Friday from 8:00 AM to 5:00 PM.

Where do I apply for a Boone County building permit in 2026?

Start from the official Boone County Building Permits page. The County changed its online permitting platform to GovWell on June 1, 2026, so older Oracle portal bookmarks may be outdated.

Do I need a zoning permit before the building permit?

Many projects require zoning approval first. The Boone County Planning Commission provides zoning-permit forms for unincorporated Boone County and the cities of Florence, Union and Walton. Confirm the correct jurisdiction before applying.

What projects commonly require a Boone County building permit?

Permits are commonly required for new buildings, additions, structural alterations, basement finishes, decks, garages, barns, sheds, in-ground pools, commercial alterations and work involving electrical, plumbing, HVAC or gas systems.

How do I schedule a Boone County building inspection?

Call 859-334-2218 at least 24 hours before the requested inspection. Have the permit number, property address, inspection type, requested date, contact number and access information ready.

Which inspections may be required for a deck?

The exact sequence depends on the design. Common stages include footing or deck-hole inspection, framing inspection where applicable and final inspection. Follow the approved plans and the County’s residential inspection table.

Who handles electrical inspections in Boone County?

The County’s current electrical-inspection information lists licensed and certified inspector Steve Helmer for residential and commercial electrical inspections at 859-746-9111. Confirm the current process before requesting service.

How do I pay a Boone County permit fee?

Open the permit record in the current GovWell route, review the itemized fees and pay through the official system. The County also publishes separate residential and commercial fee pages for planning your budget.

How can I find an old Boone County permit or confirm it is closed?

Start with the current permit portal route and the County’s monthly permit reports. Ask the Building Department for the application, approved plans, inspection history and final record, then confirm that related electrical, HVAC and plumbing permits are also closed.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent informational guide and is not Boone County, the Boone County Planning Commission or a city government. Applications, zoning approvals, payments, inspections and code decisions must be handled through the appropriate official agency.

This page was rebuilt using official Boone County Building Department, Boone County Planning Commission, GovWell platform announcement, inspection, fee, code, permit-report and Public Works resources.

Last reviewed: July 21, 2026.

Portal links, fees, code editions, inspectors, forms and procedures can change. Recheck the official page before filing, paying or beginning work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.