City Of Southfield Building Department | Permits, Inspections & Official Contact

Southfield permit action guide

Apply, Upload Plans, Schedule Inspections and Close a Southfield Permit Through the Correct BS&A Route

Southfield handles permit applications, plan review, inspection requests, payments and permit records online—but they are not all the same BS&A service.

This guide separates Building, Planning/Zoning, Engineering, rental registration and Certificate of Occupancy tasks so homeowners, contractors and businesses can start with the correct department and avoid preventable delays.

Correct BS&A link for every major task
Planning and Engineering sign-off explained
Fees, inspections, rentals and occupancy closeout
Southfield building permit moving through online application, plan review and inspections A Southfield skyline, BS and A portal screen, permit document and final approval animate through the municipal permit process. BUILDING • PLANNING • ENGINEERING BS&A PLAN REVIEW SIGNED OFF PERMIT FINAL INSPECTION CLOSED
24/7
Permit applications, plan review and inspection requests are online Southfield transitioned the complete Building Department workflow to BS&A. Use the City-specific municipal home page so the portal keeps Southfield selected.
$
Payment timing and card charges In-person payments are not accepted after 4:00 PM. The City currently lists a 2.75% charge for Visa, debit and Mastercard payments made in person and a 2.6% invoice-cloud fee for online credit-card payments.
Start here

Open the Correct Southfield Online Service

Official contact

Southfield Building Department Phone, Address, Hours and Payment Information

Main Building Department 248-796-4100 Permits, plan review, inspections and occupancy
Department fax 248-796-4105 Confirm before faxing time-sensitive documents
Office hours 8:00 AM–5:00 PM Monday through Friday
Payment counter cutoff 4:00 PM No in-person payments accepted after this time
Office address 26000 Evergreen Road Southfield, MI 48076
Building location Public Services Building South side of the Municipal Complex
Engineering Department 248-796-4810 Site drainage, grading, soil erosion and right-of-way
Finding the entrance: The Public Services Building is on the south side of the complex. The Building Department states that its front door faces south toward the golf course.

Southfield Permit Route Finder

Select the project that most closely matches the work.

Permit decision table

Which Southfield Permit or Approval Fits the Project?

Project
Start with
Do not miss
New building, addition or structural change
Building permit
Planning and Engineering sign-off may be required before issuance.
Roof, reroof, siding, gutters, insulation or window work
Building permit
Southfield specifically lists reroofing and similar exterior work as permit-required.
Shed under 200 square feet
Zoning permit
Show size, stories, property lines, house location and required setbacks.
Shed or detached garage over 200 square feet
Building + zoning
Site plan, construction details, property setbacks and association restrictions.
Fence
Zoning / fence permit
Administrative Planning approval, height, location, visibility and residential fence rules.
Electrical, plumbing or HVAC installation or alteration
Separate trade permit
Michigan-licensed contractor and the correct specialty inspection.
Generator
Zoning + electrical/mechanical
Equipment location, setbacks, screening, gas piping and electrical connection.
Commercial interior demolition
Building demolition route
Scope, utility safety, insurance, owner authorization and later tenant-improvement permit.
New commercial tenant or change of use
Planning approval + special inspection
Egress, life safety, required trade inspections and Certificate of Occupancy.
New home or new commercial development
Planning + Engineering + Building
Tree review, site drainage, soil erosion, utilities, grading and final site approvals.
BS&A workflow

Apply Without Sending the Project to the Wrong Department

Define exact project scope
Check Planning and Engineering
Create the BS&A application
Upload plans and documents
Pay invoice and resolve comments
Issue, inspect and close

Confirm the complete work scope

List the structure, room or system being changed, dimensions, valuation, structural work and every affected trade.

Better description: “Construct a 240-square-foot rear deck with concrete footings, guardrails, stairs and one exterior light.”

Ask whether Planning or Engineering must approve first

New construction, additions, exterior commercial changes, parking, equipment, tree removal, drainage, grading and right-of-way work can require separate approval.

Do next: Call Planning at 248-796-4150 and Engineering at 248-796-4810 when the site changes.

Create the correct BS&A application

Use Apply for a Permit for construction permits. Use Apply for a Planning or Zoning Process for PZE reviews. Use the Engineering permit page for Engineering submissions.

Search and select the correct property

Confirm the street address and parcel before attaching plans. Do not submit against a neighboring parcel or mailing-only address.

Add the correct applicant and contractor

Enter the owner, contractor, license information, email and phone accurately because notices, invoices and inspection access depend on the record contacts.

Upload one coordinated document package

Include the permit form, site plan, construction plans, calculations, contractor documents and prior department approvals that apply.

Useful file names: Permit-Application.pdf, Site-Plan.pdf, Architectural-Plans.pdf and Structural-Calculations.pdf.

Pay the City invoice

Open Pay a Building Department Fee from the Southfield BS&A municipal page. Save the receipt and watch the application for review comments.

Wait for formal issuance

An application or paid review fee is not permission to begin. Start regulated work only after the required permit has been issued.

Plan readiness

Prepare the Documents Reviewers Need

Property and zoning

  • Property address
  • Parcel or Sidwell number
  • Existing structures
  • Proposed structure location
  • Property-line distances
  • Planning approval
  • Tree-removal information
  • Association approval if required

Construction plans

  • Project scope
  • Floor plans
  • Exterior elevations
  • Building sections
  • Foundation details
  • Structural calculations
  • Energy-code information
  • Deferred submittal list

Commercial code summary

  • Construction type
  • Use group
  • Occupant load
  • Egress plan
  • Barrier-free compliance
  • Soils report when required
  • Special-inspection statement
  • Fire-protection scope
Local approval dependencies

Planning and Engineering Can Control Building-Permit Issuance

Planning Department

248-796-4150

contactplanning@cityofsouthfield.com

  • Administrative site plans
  • Full site-plan review
  • Special land use
  • Rezoning
  • Commercial and multifamily fences
  • Landscape plans
  • Tree removal
  • Zoning letters

Most Planning submissions are online through the BS&A PZE process.

Engineering Department

248-796-4810

  • New residential site review
  • New commercial site review
  • Grading and drainage
  • Soil erosion controls
  • Utilities
  • Right-of-way work
  • Culverts
  • Final grade inspection

Specified Engineering processes are submitted online rather than by mail or walk-in delivery.

New residential construction: The February 2025 Engineering checklist calls for signed and sealed site-drainage plans showing grades, setbacks, utilities and drainage. It lists a $252 review fee after submission and a $50 culvert permit when a culvert is required.
Before residential occupancy: Engineering may require a final-grade inspection, paved driveways and walkways, compliant topsoil and completed seeding, mulching or sod when weather permits.
Common residential projects

Local Rules That Frequently Surprise Homeowners

Shed under 200 sq. ft.

A building permit may not be required for a qualifying one-story detached accessory structure, but Southfield requires a zoning permit.

Show the shed size, stories, distance to the house and distances to property lines.

Reroofing

Southfield states that a building permit is required to reroof over an existing shingle layer.

The City FAQ also states that the roof is limited to two shingle layers.

Owner obtains contractor’s permit

Do not pull a homeowner permit merely because an unlicensed person asks you to do so.

Verify Michigan licensing, insurance, references and who will be legally responsible.

Current code editions

Codes Listed by the Southfield Building Department

Building and trade codes

  • 2021 Michigan Building Code
  • 2021 Michigan Rehabilitation Code
  • 2021 Michigan Residential Code
  • 2021 Michigan Plumbing Code
  • 2021 Michigan Mechanical Code
  • 2023 NEC Michigan Electrical Code

Accessibility, fire and property codes

  • ICC A117.1-2009 accessibility standard
  • 2015 International Fire Code
  • 2015 International Swimming Pool and Spa Code
  • 2015 International Property Maintenance Code
  • Applicable City ordinances and health regulations
Use the current code page—not an old checklist—for design decisions. Some older City PDFs still show prior code editions because they were created before the present Michigan code cycle.
City-linked fee schedule

Southfield Building Permit Fees and Payment Charges

Charge
Published amount or formula
Practical meaning
General application fee
$40
City-linked fee ordinance lists this as nonrefundable for permit and application types.
Minimum building permit
$60
Listed for construction valuation under $1,000.
$1,000–$10,000 valuation
$60 + 1.6% of value over $1,000
The City may use ICC Building Valuation Data rather than only the contractor’s price.
$10,000–$100,000 valuation
$204 + 1.5% of value over $10,000
Plan review and trade charges may be additional.
Residential addition, alteration or pool plan review
$75 + 0.18% of construction cost
City-linked ordinance excludes roofs, gutters and siding from this formula.
New-home plan review
$150 + 0.18% of construction cost
Separate Building permit, Engineering and other fees may apply.
Commercial plan review
$250 + 0.18% of construction cost
Listed for commercial new construction, additions and alterations.
Nonstructural interior demolition
$150 permit + $100 plan review
Other application, insurance, utility or bond requirements can apply.
Additional reinspection
$50
May be charged when work remains uncorrected, unavailable or not ready.
Permit extension
$40
The linked ordinance says permits over one year old will not be renewed.
In-person card charge
2.75%
Current Building page lists Visa, debit and Mastercard; American Express is not accepted.
Online credit-card charge
2.6%
Current City page calls this an invoice-cloud fee for BS&A payments.

Worked example: $20,000 alteration

Using the linked building-permit formula:

$204 + ($10,000 × 0.015) = $354

Illustrative residential alteration plan review:

$75 + ($20,000 × 0.0018) = $111

Application, electrical, plumbing, mechanical, zoning, Engineering, fire, online-payment and other charges may be additional.

Fee-age warning

The Building Department continues to link Ordinance No. 1663 as its fee schedule, but the PDF is older and detailed charges can be amended.

Use BS&A’s project invoice as the amount due and confirm unusual calculations with the department.

Open the City-Linked Fee Ordinance

Inspection workflow

Schedule Only When the Correct Work Is Ready

How to request

  1. Open Southfield BS&A.
  2. Select Schedule an Inspection.
  3. Locate the issued permit.
  4. Select the exact inspection discipline and type.
  5. Provide the responsible contact and access information.
  6. Save the request confirmation.

Before submitting the request

  • Permit is issued
  • Approved plans are available
  • Work is complete for that stage
  • Work remains exposed
  • Safe access is provided
  • Correct trade permit is active
  • Contact can admit inspector
  • Corrections are fully completed
Inspection discipline
Typical work checked
Do not conceal
Building
Footings, foundation, framing, insulation, structural alterations and final construction
Concrete preparation, structural connections, framing or insulation before approval.
Electrical
Service, underground, rough wiring, equipment and final installation
Conduit, cable, grounding and rough wiring.
Plumbing
Underground piping, rough plumbing, tests, fixtures and final system
Piping, connections and required tests.
Mechanical / HVAC
Ducts, gas piping, heating, ventilation, air conditioning and final equipment
Ductwork, fuel piping and required pressure tests.
Fire alarm
New or altered fire-alarm systems
Wiring and devices before the required inspection sequence.
Fire suppression
New or modified suppression and sprinkler systems
Piping, connections and test points.
The contractor is responsible for scheduling inspections. Do not request an inspection merely to reserve a date. The City’s development guide says work should be ready when the request is made.
Business and occupancy

Obtain Approval Before Occupying an Existing Commercial Suite

Confirm proposed business use
Obtain Planning zoning approval
Submit special inspection request
Complete required trade inspections
Correct and reinspect violations
Receive Certificate of Occupancy

Step-by-step

  1. Give Planning the property address and suite number.
  2. Confirm that the proposed use and parking comply with zoning.
  3. Planning records its approval in BS&A.
  4. Apply for the Building Department special/change-of-occupancy inspection.
  5. Complete Building, electrical, plumbing, mechanical, fire or other required inspections.
  6. Correct every life-safety or egress violation.
  7. Wait for the Certificate of Occupancy before opening.

City-published commercial charges

  • $40 application fee
  • $100 per inspector
  • Two inspections included per listed trade
  • $150 commercial CO fee
  • Additional correction permits may apply
  • Someone must provide access
Lease-protection tip: Confirm zoning use, parking, occupancy classification and required upgrades before signing a long-term commercial lease.

Open Official Certificate of Occupancy Instructions

Rental housing

Register and Certify a Southfield One- or Two-Family Rental

Registration cycle Every 3 years For one- and two-family rented or leased dwellings
Registration charge $300 + $40 Published registration and application charges
Morning inspection 9:30 AM–12:30 PM Adult must remain available
Afternoon inspection 12:30 PM–3:30 PM Adult must remain available

Register the rental property

Submit the rental registration information and required City charges.

Schedule the inspection window

An adult must be present for the full three-hour window so the inspector can access the dwelling.

Correct cited violations

The City gives owners 30 days to obtain required permits, make corrections and arrange follow-up inspections.

Receive the rental certificate

The certificate is issued after required inspections pass and must be renewed through the next three-year cycle.

Failure to register can lead to enforcement. The City states that noncompliance may be treated as a municipal civil infraction with a fine of up to $500, excluding other costs.

Open Official Rental Housing Instructions

Moving and demolition

Special Projects Need More Than a Standard Building Application

Moving an existing building

  • Building Department preliminary inspection
  • Traffic Engineering house-moving permit
  • Route and outside clearances
  • Site plan and building plans
  • Building permit
  • Electrical, plumbing and mechanical permits

Traffic Engineering: 248-796-4860

Demolition preparation

  • Correct demolition application
  • Utility cut-off letters
  • Owner demolition authorization
  • Insurance naming the City when required
  • Applicable demolition bond
  • Final site restoration and inspection
Permit records and closeout

Search the Record Before Assuming the Permit Is Complete

Open Building Department Record Search

Start from the Southfield BS&A municipal page and choose Building Department Record Search.

Search by address or permit information

Use the exact job address, permit number, owner or contractor details available in the portal.

Review every related permit

A building permit may have separate electrical, plumbing, mechanical, fire-alarm or fire-suppression records.

Check inspection results

Identify failed, canceled, missing or incomplete inspections. Confirm the final inspection—not only issuance.

Check Planning and Engineering closeout

New construction may still need landscaping, tree, final-grade, soil-erosion or other site approvals before occupancy.

Save proof

Keep the issued permit, approved plans, inspection history, final approval and Certificate of Occupancy when required.

Property-sale tip: “Permit found” is not the same as “permit closed.” Check every trade record and the final occupancy status.
Status decoder

What Common Online Permit Statuses Usually Mean

Application submitted The City has the request but may still need documents, payment or department review.
Invoice due Pay through the Building Department fee service so processing can continue.
Planning review Zoning, site-plan, tree, landscape, use or parking approval remains open.
Engineering review Drainage, grading, utilities, soil erosion or right-of-way approval remains open.
Corrections required Read every reviewer comment and upload a complete coordinated response.
Approved Fees, contractor information or formal permit issuance may still remain.
Issued Work may proceed only within the approved permit scope and inspection sequence.
Final / closed Save proof and verify every related trade, site and occupancy approval is also complete.
Troubleshooting

Fix Common Southfield Permit Problems

Problem
Likely cause
Best next action
Application is in the wrong BS&A service
Building work was submitted as PZE or site work was submitted only to Building.
Call the controlling department before creating another record.
Permit cannot be issued
Planning or Engineering sign-off is missing.
Ask Building which department and approval remain outstanding.
Small shed application is rejected
Missing zoning site plan, setbacks or association approval.
Upload a property survey showing size, location and all distances.
Inspection request cannot be completed
Permit is not issued, wrong discipline selected or record access is incomplete.
Verify permit status and call 248-796-4100.
Inspection fails
Work is incomplete, covered, inaccessible or differs from approved plans.
Correct every item before requesting reinspection.
Commercial tenant cannot open
Zoning approval, special inspection, corrections or CO remains incomplete.
Complete the change-of-occupancy sequence before operating.
New home cannot receive occupancy
Final grade, landscaping, Engineering or another site approval is incomplete.
Request the full department-by-department closeout list.
Permit is old
Work stopped or required inspections were not approved.
Contact Building before resuming; extension, new permit or updated-code review may apply.
Ready-to-use scripts

What to Say When Contacting Southfield Staff

Permit-route question
“I plan to [exact work] at [address/Sidwell]. Which Building permit, trade permits, Planning PZE process and Engineering review are required?”
Issuance question
“Application [number] is not issued. Which Planning, Engineering, contractor, fee or plan-review item remains incomplete?”
Inspection question
“I need the [inspection type] for permit [number] at [address]. The work is complete, exposed and accessible. Is the record eligible for scheduling?”
Commercial occupancy question
“The proposed tenant and use at [address/suite] are [use]. Which Planning approval, special inspections, corrections and CO charges apply?”
Open permit question
“Permit [number] at [address] does not appear closed. Which Building, electrical, plumbing, mechanical, Fire, Planning or Engineering item remains?”
Rental registration question
“I am registering the one- or two-family rental at [address]. Which application, payment, inspection window and furnace documentation are required?”
Final project checklist

Do Not Consider the Project Complete Until These Items Are Saved

  • Correct BS&A service selected
  • Property and parcel verified
  • Planning approval completed
  • Engineering approval completed
  • Tree review completed if required
  • Permit application accepted
  • Invoices paid
  • Plan comments resolved
  • Permit formally issued
  • Trade permits issued
  • Approved plans retained
  • Inspections passed
  • Final grade approved if required
  • Landscaping/site conditions cleared
  • Certificate of Occupancy issued
  • Final records downloaded
Office location

Southfield Building Department Map

Address: Public Services Building, Southfield Municipal Complex, 26000 Evergreen Road at Civic Center Drive, Southfield, MI 48076.
Official resources

Open the Correct Southfield Resource

Frequently asked questions

City of Southfield Building Department FAQs

Where do I apply for a Southfield building permit?

Use the City of Southfield BS&A Online municipal page. Select Apply for a Permit for building and trade permits. Use Apply for a Planning or Zoning Process for PZE applications.

What is the Southfield Building Department phone number?

Call 248-796-4100 for permit, plan-review, inspection, fee and Certificate of Occupancy questions.

What are the Southfield Building Department hours?

The department lists office hours of 8:00 AM–5:00 PM, Monday through Friday. In-person payments are not accepted after 4:00 PM.

Does Southfield accept paper permit applications?

The Building Department moved permit applications, plan review and inspection requests online through BS&A. Use the online portal and contact staff when a document cannot be uploaded.

Does a shed under 200 square feet need a permit?

A qualifying one-story detached accessory structure under 200 square feet may not require a building permit, but Southfield requires a zoning permit to verify location and setbacks.

Do I need a Southfield permit to reroof my house?

Yes. The City states that a building permit is required to reroof over an existing shingle layer and that the roof is limited to two shingle layers.

How do I schedule a Southfield building inspection?

Use the Schedule an Inspection service on Southfield’s BS&A page. Select the issued permit and exact inspection discipline only when the work is complete, exposed and accessible.

What is required before opening a business in an existing suite?

Obtain Planning zoning approval, complete the required special or change-of-occupancy inspections, correct all egress and life-safety violations and receive a Certificate of Occupancy.

How often must a Southfield rental dwelling be registered?

The City states that one- and two-family rented or leased dwellings must be registered and inspected every three years. A rental certificate is issued after required inspections pass.

How do I check whether a Southfield permit was closed?

Use Building Department Record Search in BS&A. Review the main permit, every related trade permit, inspection history, Planning and Engineering conditions and the Certificate of Occupancy when required.

Independent guide and freshness

Source and Accuracy Notes

Building-Department.org is an independent informational guide and is not the City of Southfield. Permit issuance, fee calculations, inspections, zoning approvals, Engineering approvals, rental certification and Certificate of Occupancy decisions must come from the City or its authorized systems.

This page was rebuilt using Southfield’s Building Department pages, BS&A municipal portal, December 2025 Guide to Development, February 2025 Engineering residential checklist, current code page, Planning and Engineering application pages, rental instructions, Certificate of Occupancy instructions and City-linked fee ordinance.

Last reviewed: July 21, 2026.

Forms, fees, portal behavior, payment charges, code editions and department procedures can change. Confirm time-sensitive information before paying, submitting or starting work.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment