Mountain View permit action guide

Choose the Correct ePermitsMV Route Before Uploading Plans or Scheduling Construction

Mountain View processes Building, Fire, Planning and Public Works permits electronically. The correct route may be a Same-Day Permit, SolarAPP+, ExpressPermitsMV or a standard building application with completeness review and plan check.

This guide explains which route fits the project, what documents to upload, when Planning or Public Works must review the property, how current fees are collected, how to meet the 3 p.m. inspection cutoff and how to verify that every permit was actually finaled.

Same-Day, Express, SolarAPP+ and standard routes
2025 code-cycle, Reach Code and local site checks
Fee transition, inspection cutoffs and final closeout
Mountain View digital building plans moving through permit review and final inspection An animated electronic plan moves through Mountain View permit review with hills, a technology dashboard and final inspection approval. ELECTRONIC PLAN SET ZONING • TITLE 24 • GREEN • UTILITIES ePERMITSMV REVIEW APPROVED UPLOAD PDF FINAL INSPECTION CLOSED
ONLINE
All Building and Fire Protection applications are electronic New applications, resubmittals and revisions are submitted through ePermitsMV. The public counter and virtual appointments are for assistance—not a replacement paper application route.
2025
Current code cycle Building and Fire applications submitted on or after January 1, 2026 are subject to the 2025 California Building Standards Code, Mountain View amendments and the 2025 Mountain View Green Building Code.
AUG 22
Upcoming fee change Rates shown as current on this page apply before August 22, 2026. The City has already published higher Building, trade and inspection amounts effective August 22, 2026. Check which amount appears on the live invoice.
Start here

Choose the Mountain View Task You Need

Official contact panel

Mountain View Building Division Phone, Email, Address and Hours

Building Division 650-903-6313 Building and Fire permit help
Building email building@mountainview.gov Include address and permit number
Permit Center 500 Castro Street First Floor, Mountain View, CA 94041
Public counter Monday–Friday 8:00 AM–4:00 PM
Building office hours Monday–Friday 8:00 AM–5:00 PM
Planning Division 650-903-6306 planning.division@mountainview.gov
Public Works 650-903-6311 public.works@mountainview.gov
Hazardous materials 650-903-6378 FEPDinspections@mountainview.gov
Useful subject line: “Permit route question – 123 Example Street – 450 sq ft addition.” Include the APN, project type, new area, exterior changes, trade work and whether the project affects utilities or the public right-of-way.
Permit-route decision

Same-Day, Express, SolarAPP+ or Standard Plan Review?

Route
Use it for
Do not use it when
Same-Day Permit
Qualifying like-for-like replacements or simple upgrades at single-family homes and duplexes
Work changes location, structure, use, electrical capacity or falls outside published eligibility
ExpressPermitsMV
Eligible smaller residential or small-business projects that benefit from scheduled review meetings
The project exceeds the published size, use or complexity limits
SolarAPP+
Eligible residential rooftop photovoltaic systems submitted by qualified contractors
Multifamily, commercial or otherwise ineligible systems
Standard Building Permit
New buildings, additions, structural remodels, commercial work, complex residential projects and revisions
A published faster route clearly fits the full scope
Fire Permit
Sprinklers, fire alarms and regulated fire-protection systems
Do not assume the building permit automatically includes separate Fire-system approval
Public Works Permit
Excavation, utilities, sidewalk, driveway approach or work in a public street
A building permit does not authorize right-of-way construction
Same-Day permit finder

Projects Commonly Available Without Building Plans

Electrical and energy

  • Electrical service-panel upgrade
  • EV charger
  • Battery energy storage system

Heating and cooling

  • Air-conditioning unit
  • Furnace replacement
  • Heat-pump HVAC
  • Heat-pump water heater

Exterior work

  • Reroofing
  • Siding replacement
  • Masonry fireplace or chimney repair

Plumbing

  • Water-heater replacement
  • Residential water repipe
  • Sewer line or cleanout replacement
CHECK
Same-Day does not mean every version of the project qualifies Moving equipment, adding gas piping, exceeding panel capacity, working in an HOA common area, changing roof structure or combining the work with a remodel can require a standard application and plans.
Electronic application workflow

Apply Through ePermitsMV in Eight Practical Steps

Confirm the project’s zoning and property constraints

Check the zoning district, setbacks, height, floor-area ratio, flood zone, heritage trees, creek proximity, historic status and nonconforming conditions.

Best first call for exterior work: Planning at 650-903-6306.

Choose the fastest valid permit route

Compare Same-Day, ExpressPermitsMV, SolarAPP+, standard Building, Fire and Public Works services before creating the application.

Download the project checklist and forms

Use the residential, commercial, ADU, accessibility, green-building, special-inspection or other checklist that matches the complete scope.

Create an ePermitsMV account

Use a monitored email address. The portal is the exclusive application platform, and the City recommends using a desktop for document-heavy work.

Upload clearly separated electronic files

Upload the application materials, plan set, calculations, specifications, energy documents, green-building worksheet and supporting approvals using clear file names.

Wait for prescreen and fee instructions

Staff reviews the initial package and sends the amount and payment instructions. Review does not begin until required payment is confirmed.

Respond through the existing application

Download every comment, revise the affected plan sheets and upload one coordinated resubmittal. Do not create a duplicate new application.

Download the issued permit and approved plans

Construction starts only after formal issuance. Keep the permit number and approved documents available at the job site for inspections.

Document preparation

Build a Complete Mountain View Plan Package

Property and application

  • Project address and APN
  • Current property owner
  • Title report or grant deed when required
  • Detailed scope of work
  • Construction valuation
  • Contractor or owner-builder details

Plans and engineering

  • Scaled site plan
  • Existing and proposed floor plans
  • Elevations and sections
  • Structural plans
  • Structural calculations
  • Special-inspection form when required

Energy and local approvals

  • Title 24 energy documents
  • 2025 MV Green Building worksheet
  • Smoke and CO compliance plan
  • Planning approval
  • Fire sprinkler documents
  • Public Works or tree approval
Structures close to a property line: The City’s addition and remodel guidance states that structures within six feet of a property line require a site-survey certificate and City approval before concrete footings are poured.
2025 Reach Code

Local Requirements That Can Change the Design

AC replacement

Existing single-family homes replacing an air-conditioning unit can be subject to Mountain View’s heat-pump replacement requirement.

Electric readiness

Remodels or additions installing gas or propane equipment can require electrical prewiring for future electric equipment.

Bird-safe glass

Multifamily and nonresidential new construction or major renovation can trigger bird-safe glazing requirements when substantial glazing is installed or replaced.

Required worksheet: Building applications subject to the 2025 cycle must include the applicable residential or commercial/mixed-use Mountain View Green Building Code worksheet.
Published review targets

Typical Building Permit Review Timelines After Completeness

Project
Initial review
Resubmittal review
Same-Day Permit
Same day
Same day
Single-family demolition
1 week
1 week
New single-family home or duplex
4 weeks
3 weeks
Residential addition
3 weeks
2 weeks
Whole-house remodel
3 weeks
2 weeks
Express Permit
3 weeks
3 weeks
Standard or conversion ADU/JADU
2 weeks
2 weeks
Preapproved detached ADU
2 weeks
1 week
Commercial tenant improvement
4 weeks
3 weeks
Fast-track commercial TI
2 weeks
2 weeks
New commercial or mixed-use building
6 weeks
5 weeks
Non-SolarAPP+ residential solar
3 business days
3 business days
Completeness comes first. Certain new residential and multifamily applications receive a separate 10-business-day completeness review before code-compliance review begins. Payment confirmation can also take multiple business days.
Current permit costs

Understand the Mountain View Fee Layers Before Paying

Technology fee 5% Applied to the total Building or Fire permit cost
Plan-check review 65% Of the applicable Building or trade permit fee
Current trade issuance fee $74 Electrical, mechanical and plumbing permits before Aug. 22, 2026
Current reinspection $415 No-show or project not ready for inspection
Current construction valuation
Base Building/Fire permit calculation
Effective until
$1–$500
$74
August 21, 2026
$501–$2,000
$74 plus $9 for each additional $100
August 21, 2026
$2,001–$25,000
$218 plus $44 for each additional $1,000
August 21, 2026
$25,001–$50,000
$1,234 plus $31 for each additional $1,000
August 21, 2026
$50,001–$100,000
$2,030 plus $22 for each additional $1,000
August 21, 2026
$100,001–$500,000
$3,135 plus $17 for each additional $1,000
August 21, 2026

Payment methods

  • Online Visa or Mastercard
  • Online e-check
  • Online PayPal
  • Hard-copy check payable to City of Mountain View
  • In-person Finance Department payment
  • Coordinated wire transfer for amounts over $500,000

Payment limits and timing

  • Online Building payments under $15,000 can use the listed electronic methods.
  • A convenience fee applies to online electronic payment.
  • Plan-check and part of the technology fee are collected before review.
  • Remaining issuance fees are paid before permit issuance.
Budget beyond the Building table. Trade permits, Fire, Planning, Public Works, utilities, school impact fees, development impact fees, tree work and construction-waste requirements can add separate costs.

Open Current and Upcoming Building Fees

Useful city examples

Realistic Permit-Fee Ranges for Common Projects

Bathroom remodel

Approximately $800–$1,100

The City’s project guide ties the range to bathroom size and an approximate valuation of $120 per square foot.

500 sq ft addition/remodel

Approximately $12,000

City example based on an estimated construction valuation of $250,000, excluding possible excavation and school fees.

New-construction ADU

Approximately $7,000–$13,000

City range based on an estimated construction valuation of $100,000–$300,000.

ADU conversion

Approximately $3,000–$5,000

City range based on an estimated construction valuation of $25,000–$50,000.

Junior ADU

Approximately $4,000–$6,000

City range based on an estimated valuation of $25,000–$35,000.

Excavation permit

Up to approximately $12,000

Can apply when utility upgrades or construction occur within the public right-of-way.

Building inspection scheduling

Submit Before 3 PM for the Next Business Day

Request by 3 PM Next business day Subject to permit and inspection availability
Request after 3 PM Second business day Plan sequencing around the cutoff
Inspection windows AM or PM Building inspections are not time-specific
Field hours 8 AM–3 PM Monday through Friday

Locate the permit number or address

The online scheduler accepts either identifier. Confirm the permit is issued and active.

Select the exact inspection

Choose the stage that matches the completed and exposed work—not the stage you expect to finish later.

Choose AM or PM

The City does not provide a narrow Building arrival time. Arrange continuous safe access during the selected window.

Leave the permit and plans available

Provide approved plans, equipment instructions, test reports and other documents required for the inspection stage.

Keep regulated work visible

Do not pour, backfill, insulate, cover wiring or plumbing, close walls or conceal structural connections before approval.

Check the result before continuing

Correct every item after a failed inspection. A $415 current reinspection fee may apply when the site is not ready or access is unavailable.

Schedule a Building Inspection

Other inspection departments

Use a Different Scheduling Method for Fire, Planning and Public Works

Inspection
How to request it
Advance planning
Building
Online through ePermitsMV inspection scheduler
Before 3 p.m. for next business day
Fire sprinkler or alarm
Fire online request or 650-903-6313 extension 0
Minimum five business days
Hazardous materials / Fire Marshal
650-903-6378 or FEPDinspections@mountainview.gov
Scheduled for a specific date and time
Planning
Assigned Planner or 650-903-6306
Coordinate mock-up, framing, exterior materials and occupancy stages
Public Works
Call 650-903-6311
At least 48 hours before work begins
Construction hours

Deliveries and Site Staging Count as Construction Activity

Private construction

Monday–Friday, 7 AM–6 PM

Includes physical activity, staging and material deliveries.

Saturday, Sunday and holidays

No normal construction

Saturday requires prior written approval from the Chief Building Official.

Public right-of-way

Monday–Friday, 7:30 AM–4 PM

Weekend or holiday work requires written Traffic Engineer approval.

Post the hours: The general contractor, applicant or owner must install a construction-hours sign at a prominent site entrance or exit.
Zoning and site pre-check

Resolve These Issues Before Detailed Building Plans

Exterior modifications

Planning review is strongly encouraged before preparing detailed Building plans for additions, exterior remodels and equipment enclosures.

Flood zone

A separate flood permit or elevated equipment design may apply to projects within mapped flood areas.

Heritage or street trees

Tree removal or construction affecting protected trees can require a separate permit and protection measures.

Public right-of-way

Utility connections, driveway approaches, sidewalk or street work require Public Works coordination and an excavation permit.

Project condition
Possible added review
Who to contact
Exterior addition or remodel
Setbacks, height, FAR and design compliance
Planning, 650-903-6306
Historic home
Planning or historic-preservation approval
Planning Division
Lot at least 10,000 sq ft next to a creek
Planning permit may be required
Planning Division
Existing nonconforming home
Planning permit can apply to an addition
Planning Division
New or upgraded utility connection
Excavation permit
Public Works, 650-903-6311
New residential area over 500 sq ft
School impact-fee proof before issuance
Applicable school district
Permit exemptions

Projects That May Not Need a Building Permit

Possible exemption
Published threshold
Still confirm
Detached shed or playhouse
One story, no more than 120 sq ft and no mechanical, electrical or plumbing
Zoning, location, fire-zone and tree requirements
Wood fence
Seven feet or less
Zoning height, front yard, visibility and corner-lot rules
Retaining wall
Four feet or less from footing bottom to wall top
Surcharge, slope, drainage and impounded liquids
Small detached deck
No more than 200 sq ft, no more than 30 inches above grade, unattached and not serving an exit
Setbacks and lot coverage
Small prefabricated pool
Less than 24 inches deep, no more than 5,000 gallons and fully above ground
Zoning, electrical and barrier rules
Finish work
Painting, papering, tiling, carpeting and similar work
Kitchen/bath cabinet replacements, accessibility and exterior-painting Planning rules
Mountain View is stricter about some “cosmetic” projects than people expect. Kitchen and bathroom cabinet replacement requires a permit, and exterior painting of buildings other than single-family homes or duplexes requires Planning approval.
Accessory dwelling units

Choose the Correct Mountain View ADU Route

ADU route
Building review
Typical city permit fee
New-construction ADU
Building, electrical, mechanical, plumbing and demolition; Fire or excavation when applicable
$7,000–$13,000
Existing-area conversion
Building and trade review of converted garage, basement or other area
$3,000–$5,000
Junior ADU
Building and trade review within an existing or proposed home
$4,000–$6,000
Preapproved detached ADU
Preapproved structural design plus site-specific plan, zoning, utilities and energy information
$7,000–$13,000
Legalize existing ADU
Expedited review for eligible units built or converted before Jan. 1, 2020
No penalty or violation fees under the listed program

No Planning permit

The City states that ADUs and JADUs do not require a separate Planning permit, but they must comply with zoning standards and obtain a building permit.

Preapproved is not site-approved

The structure design is prechecked, but the property owner still submits a site plan, utility connections, zoning information and applicable Title 24 report.

School fees

New residential square footage greater than 500 square feet can require school impact-fee payment before permit issuance.

Open Mountain View ADU Guidance

Solar permitting

SolarAPP+ and Standard Photovoltaic Applications

Eligible residential SolarAPP+

  1. Submit through SolarAPP+.
  2. Pay the City permit amount and SolarAPP+ charge.
  3. Download the automated approval.
  4. Keep the permit on site.
  5. Wait for the Mountain View inspection permit number.
  6. Schedule the inspection online.

SolarAPP+ adds $35, or $60 when battery storage is included, plus a convenience fee.

All other solar systems

  1. Create a standard ePermitsMV Building application.
  2. Upload the correct residential or multifamily/commercial PV package.
  3. Respond to plan-check corrections.
  4. Pay issuance fees.
  5. Schedule final inspection online.

Published review is three business days for single-family systems and five business days for other property types.

Status decoder

What the ePermitsMV Status Means

Draft The application is saved but has not been formally submitted.
Prescreen Staff is checking the permit type, documents and initial fee requirements.
Payment required Review will not begin until the required payment is confirmed.
Completeness review Staff is confirming that all checklist materials are present.
In plan review Building and applicable departments are checking code compliance.
Corrections issued Download every comment and submit one coordinated corrected package.
Approved Review is complete, but final fees or issuance conditions may remain.
Issued Work may begin within the approved scope and construction hours.
Inspection correction Fix the field items before covering work or booking reinspection.
Finaled Save proof and confirm that Fire, Planning and Public Works permits are also closed.
Permit history and plan copies

Search Online First, Then Request Missing Records

Search records from 2000 to current

Use the searchable permit-history tool with the address or APN.

Check issued and finaled records separately

A permit can appear as issued without having a final inspection. Verify the finaled list and inspection history.

Review additional records at the Permit Center

The City states that not every Building record is available online. Additional files may be viewed in person.

Use the Duplicate Plans Request Form

Professional plans can involve owner and design-professional copyright authorization before copying.

Request the exact record range

Identify the address, APN, approximate year, permit type and specific document needed to avoid an overly broad request.

Buying a property? Verify Building, electrical, plumbing, mechanical, Fire, Planning and Public Works records. One final Building permit does not automatically prove every related record was closed.
Troubleshooting

Fix Common Mountain View Permit Problems

Problem
Likely reason
Next action
Application stays in prescreen
Wrong permit type, missing form or unclear file naming
Compare the upload with the project checklist and contact Building
Review has not started
Initial fee payment has not been confirmed
Open the payment task and confirm posting
Same-Day Permit is rejected
The scope changes location, structure, service capacity or property type
Create the correct standard Building application
Corrections repeat
Only part of the comment set was answered or plan sheets conflict
Submit one complete coordinated set with a numbered response letter
Permit approved but not issued
Final fees, school proof, Public Works, Fire or another condition remains open
Check every task and assigned department in ePermitsMV
Inspection moves to another day
Request was after 3 p.m. or the requested inspection was unavailable
Plan around the published cutoff and check the request confirmation
Reinspection fee appears
No access, no-show or the work was not inspection-ready
Complete every correction and provide safe access before rescheduling
Old construction is not in the portal
The record predates searchable online history or was not digitized
Request in-person Permit Center file review
Ready-to-use scripts

Ask City Staff a Question They Can Answer Quickly

Permit-route question
“I am planning [exact work] at [address/APN]. Does it qualify for Same-Day, ExpressPermitsMV, SolarAPP+ or a standard Building application?”
Completeness question
“For [project type], which checklist, plans, Title 24 documents, Green Building worksheet and prior approvals must be uploaded at first submittal?”
Inspection question
“Permit [number] is ready for [inspection type]. Is it active, what must remain exposed and does the request qualify for next-business-day scheduling?”
Closeout question
“Permit [number] appears complete. Which Building, Fire, Planning or Public Works final is still preventing full closeout?”
Final project control

Mountain View Permit Completion Checklist

  • Property address and APN confirmed
  • Correct permit route selected
  • Zoning and exterior-review issues cleared
  • Flood, tree and creek conditions checked
  • Public Works scope identified
  • Current project checklist used
  • Electronic plans clearly labeled
  • Title 24 documents included
  • 2025 Green Building worksheet included
  • Smoke and CO compliance addressed
  • Construction valuation accurate
  • Initial review fees paid
  • Corrections submitted in one record
  • Permit formally issued
  • Construction-hours sign posted
  • Approved documents available on site
  • Inspections requested before concealment
  • All related permits finaled
Permit Center map

Mountain View Permit Center at 500 Castro Street

Public assistance: Building, Fire Protection, Planning and Public Works counters are on the first floor of City Hall. Public counter hours are Monday through Friday, 8:00 a.m.–4:00 p.m.
Official resources

Open the Exact Mountain View Permit Resource

Frequently asked questions

Mountain View Building Permit and Inspection FAQs

Where do I apply for a Mountain View building permit?

All Building and Fire Protection permits are submitted electronically through ePermitsMV. The Permit Center and virtual appointments provide assistance, but new applications are not submitted as paper packages.

What is the Mountain View Building Division phone number?

Call 650-903-6313 or email building@mountainview.gov. The Building counter is on the first floor of City Hall at 500 Castro Street.

What are the Mountain View Permit Center hours?

The public counter is open Monday through Friday from 8:00 a.m. to 4:00 p.m. Building Division office hours are listed as 8:00 a.m. to 5:00 p.m.

Which Mountain View projects qualify for Same-Day Permits?

Published examples include qualifying residential AC, furnace, heat-pump, water-heater, electrical-panel, EV-charger, reroof, siding, residential repipe and sewer-line projects. The work must meet the exact eligibility conditions.

How do I schedule a Mountain View building inspection?

Use the City’s online inspection scheduler with the permit number or address. Requests received by 3:00 p.m. on a business day are scheduled for the next business day. Later requests are scheduled for the second business day.

What time will the Mountain View building inspector arrive?

Building inspections are scheduled for an AM or PM window and are not time-specific. Inspections occur Monday through Friday between 8:00 a.m. and 3:00 p.m.

What are the construction hours in Mountain View?

Normal private construction hours are Monday through Friday from 7:00 a.m. to 6:00 p.m. Saturday work requires prior written approval, and construction is not allowed on Sunday or recognized holidays.

How much is the Mountain View technology fee?

The City applies a 5% technology fee to the total cost of each Building and Fire permit. When plan check applies, 65% of the technology fee is collected with plan-check payment and the remaining 35% before issuance.

Does a Mountain View ADU require a Planning permit?

No separate Planning permit is normally required for an ADU or JADU, but the project must meet zoning standards and obtain Building and applicable trade permits. Fire or excavation permits may also be required.

How do I find old Mountain View building permits?

Use the searchable permit-history tool for records from 2000 to current. Additional records can be viewed at the Permit Center because not every Building record is available online.

Independent guide and freshness

Source and Accuracy Note

Building-Department.org is an independent guide and is not the City of Mountain View. Applications, payments, inspections, zoning decisions and permit issuance must be completed through official City systems.

This guide was checked against the Mountain View Permit Center, ePermitsMV application pages, Building Forms, Same-Day Permits, Building Permit Fees, Permit Timelines, Inspection Scheduling, Permit History, 2025 Green Building and Reach Code, ADU guidance, construction-hours rules and project-specific residential pages.

Last reviewed: July 21, 2026.

The fee table is especially time-sensitive because updated amounts become effective August 22, 2026. Use the live City invoice as the controlling amount.

Free Building Permit & Inspection Assistant

Check Permit Type, Estimate Fees, Prepare Inspections and Find Official Building Department Links

Use this free tool before applying for a building permit, booking an inspection, checking zoning rules, or searching permit records. It helps homeowners, contractors, landlords, buyers, and business owners understand the next step before visiting the official building department portal.

Start Permit Helper
8 toolsPermit finder, fee estimate, inspection checklist, zoning pre-check, and official searches.
All citiesWorks sitewide on city, county, village, and regional building department pages.
No loginNo address, permit number, email, or private data is required to use the tool.
Mobile-firstBuilt for visitors checking permits and inspections from a phone.

What building department task do you need help with?

Choose your goal. The tool will suggest the right next step, what to prepare, and which official page to check.

Homeowner tip

Before starting work, check whether your project needs building, zoning, electrical, plumbing, mechanical, right-of-way, or HOA approval.

Contractor tip

Many portals require contractor registration, license details, insurance, plans, owner authorization, and inspection scheduling access.

Building Permit Type Finder

Select the project type to understand which permits or reviews are commonly required. Always confirm with the official local building department.

Permit Fee Estimate Calculator

Estimate a rough permit fee using project value and common percentage-based review assumptions. Local minimum fees, technology fees, impact fees, reinspection fees, and trade fees can change the final amount.

Inspection Readiness Checklist

Use this before scheduling framing, electrical, plumbing, mechanical, roofing, final, or certificate-related inspections.

Zoning and Setback Pre-check

Use this before applying for a permit when your project may affect land use, setbacks, lot coverage, height, parking, signs, fences, accessory structures, or business use.

Plan Review Timeline Estimator

Estimate how complex your review may be. Local staffing, incomplete plans, corrections, holidays, fire review, zoning review, and outside agency review can change timing.

Permit Records Search Helper

Use this if you are trying to find old permits, inspection history, certificate of occupancy details, open permits, or code-related records.

Official Building Department Resource Finder

Enter city/county and state to create safe searches for official permit portals, inspection scheduling, building codes, zoning maps, forms, fees, and contact pages.

Building Department vs Planning/Zoning

  • Building Department: permits, plan review, inspections, code compliance, certificates.
  • Planning/Zoning: land use, setbacks, height, lot coverage, signs, parking, variances.

Best sitewide placement

Place this tool after the first main guide section or before FAQs. It turns a normal article into a practical permit-preparation page.

Important note

This tool gives educational guidance only. Final permit requirements, fees, inspections, forms, and deadlines must be confirmed with the official local building department.

Leave a Comment